The document lists various maintenance and operational activities along with their start and end times, durations, and responsible personnel from January to June 2023. It includes multiple instances of Hammer Mill Maintenance, Quality Control, and Staff Training, with durations ranging from 8 to 483 minutes. The signoff indicates the individuals responsible for each activity, primarily Adam and Donald.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
12 views3 pages
Production Downtime Log Jan-Jun
The document lists various maintenance and operational activities along with their start and end times, durations, and responsible personnel from January to June 2023. It includes multiple instances of Hammer Mill Maintenance, Quality Control, and Staff Training, with durations ranging from 8 to 483 minutes. The signoff indicates the individuals responsible for each activity, primarily Adam and Donald.
Quality Control Donald Power Outage Donald Weather-related Downtime Adam Quality Control Adam Hammer Mill Maintenance Adam Doubler Leak Donald Staff Training Adam Hammer Mill Maintenance Adam Material Shortage Adam Quality Control Donald Safety Inspection Donald Safety Inspection Adam Computer System Failure Donald Weather-related Downtime Donald Supplier Delay Delay Donald Quality Control Adam Hammer Mill Maintenance Adam Staff Training Donald Supplier Delay Delay Donald Hammer Mill Maintenance Adam Quality Control Adam Power Outage Donald Staff Training Adam Staff Training Donald Hammer Mill Maintenance Adam Power Outage Donald Staff Training Adam Staff Training Donald Staff Training Adam