0% found this document useful (0 votes)
6 views

Brudge

The document is a response to a request for clarification and detail drawings for bridge protection works related to the Mazoria–Durame–Durgi-Omo Nada Road Project. It includes a cross-section drawing and sample photos for the contractor's reference, emphasizing that the contractor is responsible for creating the final detailed working drawing. Additionally, it mentions the inclusion of a drawing from the ERA 2013 Standard for further guidance in modifying the drawings for the project's five bridges.

Uploaded by

Mesafint lisanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Brudge

The document is a response to a request for clarification and detail drawings for bridge protection works related to the Mazoria–Durame–Durgi-Omo Nada Road Project. It includes a cross-section drawing and sample photos for the contractor's reference, emphasizing that the contractor is responsible for creating the final detailed working drawing. Additionally, it mentions the inclusion of a drawing from the ERA 2013 Standard for further guidance in modifying the drawings for the project's five bridges.

Uploaded by

Mesafint lisanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ቫልዩ VALUE

ኢንጂነሪንግ Engineering
ኃላፊነቱ የተወሰነ የግል ማህበር Private Limited Company

Ref No: VE/DG/RE/ /2024


Date: _________________
To: Project Manager
Bridge Construction PLC
Hosaena, Ethiopia

Cc: -Project File; Hosaena


Encl: ____ pages

Re: Consultancy Services for the Construction Supervision of Mazoria–Durame–Durgi-


Omo Nada Road Project, Lot II: Durgi-Gibe River
Contract II: Km 97+700 – Km 125+400

Subject: Regarding Typical Drawing for Bridge Abutment Scour Protection Work.

Dear Sir's,

This is in response to your letter dated February 12, 2025, with reference number
BRC/DG/0854/25, in which you requested a clarification and detail drawing for bridge protection
works.

Although the contractor is ultimately responsible for creating the detail drawing, we have included
a cross section drawing and sample photos from a bridge abutment scour protection work that has
already been built for your convenience.

As a result, we have included a sample drawing and pictures with this letter for your reference,
which will assist you in creating a detail working drawing for approval later.

For your further reference, we have also included a drawing from the ERA 2013 Standard
drawing.

For later approval, you must create a comprehensive working drawing by modifying those
standard drawings to fit the project's five bridges.

Sincerely Yours,

E-mail:- [email protected]
Kirkos Sub City, Wereda 02, H.No. 464 Tel:- +251118883276
P.o.box:- 6294 +251930099978
Addis Ababa, Ethiopia