SUPMITTAL OF RC CONC DIM
SUPMITTAL OF RC CONC DIM
ACTION ** CODE
TO: ABCG APPROVED A
APPROVED AS NOTED B
WE ARE SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/ REVISE AND RESUBMIT C
DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY) REJECTED D
POOL
SER. Drawing No. REV DESCRIPTION Code Attachments
TYPE
RC CONCRET DIMINSION SHOP
1 DRAWING
RC CONCRET DIMINSION
SHOP DRAWINGS
Consultant to enter Action Codes and Remarks, and return to Contractor Discipline
CONSULTANT'S COMMENTS CIVIL TRUE
MEC ####
ARCH ####
PLUMP ####
HVAC ####
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general
conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and
dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner.
ROUTING