This document is a Submittal Transmittal Form for the transmission of drawings, documents, and samples related to a pool project, submitted by OUT LiNE company to ABCG for approval. It includes a list of drawings with descriptions and action codes for the consultant to indicate the status of the submission. The contractor is reminded that compliance with the project requirements remains their responsibility despite the review process.

Uploaded by

omassar9955
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

SUPMITTAL OF RC CONC DIM

This document is a Submittal Transmittal Form for the transmission of drawings, documents, and samples related to a pool project, submitted by OUT LiNE company to ABCG for approval. It includes a list of drawings with descriptions and action codes for the consultant to indicate the status of the submission. The contractor is reminded that compliance with the project requirements remains their responsibility despite the review process.

Uploaded by

omassar9955
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SD:Shop

TYPE :Shop Drawing CA:Calculation SM:Sample MIR:Material Inspection Request


Drawings MOS:Method Of Statement GT:Guarantee TF:Temporary Facilities
OT:Other CT:Certificates TT:Test Results MK:Mock-up MD:Manufacturer's Data

POOL TYPE : E26 OUT LINE-ACBG-002 Rev. 0


SUBMITTAL TRANSMITTAL FORM Date: 19-2-2025
TRANSMISSION OF DRAWINGS, DOCUMENTS, MATERIALS, ETC. SUBMITTED FOR CODE
APPROVAL
FROM : OUT LiNE company . YOUR INFORMATION

ACTION ** CODE
TO: ABCG APPROVED A
APPROVED AS NOTED B
WE ARE SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/ REVISE AND RESUBMIT C
DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY) REJECTED D
POOL
SER. Drawing No. REV DESCRIPTION Code Attachments
TYPE
RC CONCRET DIMINSION SHOP
1 DRAWING

RC CONCRET DIMINSION
SHOP DRAWINGS

FROM MAIN CONTRACTOR : CONCRETE PLUS FOR ENGINEERING AND CONSTRUCTION

QC MANAGER : Technical Office MANAGER :

RECEIVED BY CONSULTANT DOCUMENT CONTROLLER : M.R DATE : SIGNATURE:

Consultant to enter Action Codes and Remarks, and return to Contractor Discipline
CONSULTANT'S COMMENTS CIVIL TRUE
MEC ####
ARCH ####
PLUMP ####
HVAC ####

FOR CONSULTANT ENGINEER:

FOR PROJECT MANAGER DATE: FOR Technical Office MANAGER DATE:

Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general
conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and
dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner.