TEMPLATE FOR SUBMISSION OF PROJECT PROPOSAL - ANNEXES 1 and 2
TEMPLATE FOR SUBMISSION OF PROJECT PROPOSAL - ANNEXES 1 and 2
ANNEX 1 - OVERVIEW
PART 1
1.1. Project Title: (full title and subtitle of project)
Name of Applicant
1.2. Name of
Applicant: Full Contact Details:
1.
2.
3.
Indicative Budget
Total Eligible Direct Costs (all activities)
Schedule
A. Personnel Costs
B. Transportation
F. Other Costs
Total Costs
GEF/UNIDO co-funding in
%
Up to 33% per kW of
UNIDO/ Applicant installed capacity for Waste-
Budget Items
GEF funding to-energy projects; up to
28% per kW of installed
capacity for solar PV
projects
A. Personnel Costs
B. Transportation
F. Other Costs
Partner 1
Partner 2
Signature:
Name:
Position in organization:
The project contractor/developer/investor will procure, transport to the project site and install
and commission solar PV water pumps or waste-to-energy systems to deliver up to 20 kW of
installed capacity (for solar systems) and up to 50m3 of biogas production (for waste-to-energy
systems), linked to productive uses that are based in the following technologies: (i) Conservation
and Agro-Processing (Solar Dryers/Cold storage/Ventilation/Solar Systems for
Processing/Grinding/Milling/Pealing/Packaging/etc.); (ii) Solar water pumping and Irrigation
(solar water pumps, elevated water storage); (iii) Waste-to-Energy (Biomass/Biogas anaerobic
digester Systems).
The scope of works and supply includes the following: complete technical design of the system,
procurement and shipment of the selected RE equipment, installation, commissioning, operation
and documentation. The contractor/developer/investor is obliged to provide UNIDO with the
performance characteristics of all major equipment to be supplied as part of this demonstration
project. UNIDO reserves the right to request more information on the performance of the
equipment being proposed. In addition, UNIDO reserves the right to request the
contractor/developer/investor for the names of the suppliers of the different equipment.
b) Guarantee Requirements
c) Delivery Period
A time schedule for the implementation should be developed by the Contractor including
delivery, start up and training of personnel. Delivery of the equipment to the project site should
be within 6 months after the signature of the contract. The overall duration of the contract is 12
months.
d) Reporting
Progress reports shall be submitted to UNIDO in accordance with the provisional time schedule.
The reports should be provided in English; the format and number of copies are given in the
contract.
1. Inception report, elaboration of the plan of action for the contract execution in
collaboration with UNIDO including feasibility studies, equipment selection with justification
and the work plans with related timetable. The inception report should be submitted within a
month after the signature of the contract.
2. Progress reports, confirming progress of project to date (each quarter) and including a
copy of the bidding documents, purchase orders and related invoices associated with the
purchase of parts, equipment and services.
3. Final report, upon completion of the work describing all the works performed under the
contract including commissioning and project documentation.
e) Guarantee Requirements
The contractor/developer/investor must guarantee the quality of all the work as specified in this
RFP. The contractor/developer/investor guarantees that engineering design, specifications,
technical documentation and other documents, which are the basis of the proposed biomass
energy system, are in accordance with the project objective. The contractor/developer/investor
must also guarantee that the machinery, equipment and all other technological components will
be new, of recent conception, without any defect or malfunction, and that the time for the
technical guarantee will be at least 12 months, starting from the date of the commissioning. If
second-hand refurbished equipment is included in the proposal (like wind turbines), written
guarantee should be provided by the contractor/developer.
f) Conditions
The contractor/developer/investor has the responsibility to read and understand the provisions
and conditionality of accessing the GEF grant under this pilot project as captured in this RFP.
UNIDO reserves the right to determine the form and nature of support that each project proposal
can access from this project. This will be determined from the full proposal that will be presented
in the final proposal that UNIDO will receive and review. UNIDO reserves the right to conduct
on-site visits to the project being proposed for verification.
Grant payment terms will be determined by UNIDO and will depend on the work plan submitted
and capital expenditure projections derived from the work plan. In this connection, the
contractor/developer/investor should present a detailed work plan with full costing.
g) Compliance with laws and regulations of Mozambique and international norms
This demonstration project should comply with the applicable laws and regulation in
Mozambique. As such, as a pre-condition for accessing the grant contract, the
contractor/developer/investor should secure all applicable approvals of the project that include a)
Environmental Impact Assessment; b) Energy Purchase Agreement with local off-taker(s) and
national grid operator (if necessary) c) Erection Permit; d) License for production and grid
connection (if necessary). In the case that the rules and regulations in Mozambique are silent on
specific aspects applicable to the pilot project, UNIDO reserves the right to request that the
project complies with known and acceptable international standards and norms. Failure on the
part of the contractor/developer/investor to secure requisite regulatory approvals for the project
approvals within 6 months of receiving this request for full proposal will result in UNIDO
terminating the grant contract.
1 Item 1 Nos.
2 Item 2 Nos.
3 Item 3 Nos.
1
The bill of quantities indicates the major items expected for the desired system. Other miscellaneous and minor
items are foreseen and will depend on the manufacturer of the equipment. Performance characteristics of all major
equipment must be provided as an annex.