PROJECT CONTROL REPORT TEMPLATE

The Project Control Report outlines the current status of the project, highlighting overall progress and any significant achievements or delays. It includes sections on project components, risks, roadblocks, and budget/cost considerations. The report aims to provide a comprehensive overview of the project's health and any areas needing attention.

Uploaded by

SHRADDHA YADAV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views3 pages

PROJECT CONTROL REPORT TEMPLATE

The Project Control Report outlines the current status of the project, highlighting overall progress and any significant achievements or delays. It includes sections on project components, risks, roadblocks, and budget/cost considerations. The report aims to provide a comprehensive overview of the project's health and any areas needing attention.

Uploaded by

SHRADDHA YADAV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT CONTROL REPORT

PROJECT
RISKS / NAME
ROADBLOCKS

POTENTIAL RISKS
PROJECT
ON TRACK
MANAGER
DATE OF
STATUS
ENTRY
PERIOD
COVERED

PROJECT STATUS THIS PERIOD

Enter information here about overall status and highlights. Examples: “Regained lost time from last period;" "Sub-
OVERALL structure concreting began two days earlier than anticipated;" "Delay in some non-critical path activities, but minimal.”
PROJECT
STATUS

PROJECT COMPONENTS
STAT
COMPONENT KPI REMARKS
US

DESIGN

PROCUREMENT

CONSTRUCTION

COMMISSIONING
Productivity
RESOURCES

Projected
TIMELINE Completion
Last Scope
SCOPE change

RISKS

Call out highlights. Examples: "Exceptional work," "Solved problems, as


ROADBLOCKS
well as issues, including establishing ownership for fixing trouble spots."

BUDGET/COST

OTHER