0% found this document useful (0 votes)
17 views

21CV56

The document outlines the principles of transportation engineering, emphasizing its importance for economic and social development, and discusses various modes of transportation including road, rail, air, and water. It details the historical context of highway development in India, including key recommendations from the Jayakar Committee and the establishment of organizations like the Central Road Fund and Indian Road Congress. Additionally, it covers road classification based on various criteria such as traffic volume and location, highlighting the infrastructure's role in facilitating mobility and economic activities.

Uploaded by

yash.aim786
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

21CV56

The document outlines the principles of transportation engineering, emphasizing its importance for economic and social development, and discusses various modes of transportation including road, rail, air, and water. It details the historical context of highway development in India, including key recommendations from the Jayakar Committee and the establishment of organizations like the Central Road Fund and Indian Road Congress. Additionally, it covers road classification based on various criteria such as traffic volume and location, highlighting the infrastructure's role in facilitating mobility and economic activities.

Uploaded by

yash.aim786
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 148

VISVESVARAYA TECHNOLOGICAL UNIVERSITY

BELGAUM

TRANSPORTATION ENGINEERING
(Subject Code: 21CV56)
LECTURE NOTES

V-SEMESTER
Saketh Shetty
Assistant Professor

AJIET
A J INSTITUTE OF ENGINEERING & TECHNOLOGY
DEPARTMENT OF CIVIL ENGINEERING
(A unit of Laxmi Memorial Education Trust. (R))
NH - 66, Kottara Chowki, Kodical Cross - 575 006
Highway Engineering – 18CV52

MODULE 1
PRINCIPLES OF TRANSPORTATION ENGINEERING

Topics to be covered
Principles of Transportation Engineering: Importance of transportation, Different modes of
transportation and comparison, Characteristics of road transport Jayakar committee recommendations,
and implementation – Central Road Fund, Indian Roads Congress, Central Road Research Institute
Highway Development and Planning: Road types and classification, roadpatterns, planning surveys,
master plan – saturation system of road planning, phasing road Development in India, problems on best
alignment among alternate proposals Salient Features of 3rd and 4th twenty year road development
plans and Policies, Present scenario of road development in India (NHDP & PMGSY) and in Karnataka
(KSHIP & KRDCL) Road development plan - vision 2021.

Importance of Transportation
Transportation is a toll to measure the Economic, Industrial, Social and Cultural development of
any country. It is vital for the economic development of any region people and the communities
are essentially to be transported material from one place to other. In the production stage
transportation is required for carrying raw materials like seeds, manure, coal, steel etc. In the
distribution stage transportation is required from the production centers via; farms and factories
to the marketing centers and later to the retailers and the consumers for distribution. The
importance of transportation may include:
• Availability of raw materials: Transportation helps in carrying the raw materials from one
place to another place. Initially raw materials are made at one place and are being transported
to another place for processing and for manufacturing goods.
• Availability of goods to the customer: The goods are being transported from one place to
another place. These goods which are produced at one place are transported to other distant
places for their usage. It flexibly moves the goods from one place to another place.
• Enhances the standard of living: It improves the standard of living. As the transportation of
each and every good is being done then the productivity increases which results in the reduced
or the effective costs. Because of reduction in the cost they can use differentcommodities for
different purposes and can lead a secure life.
• Helps a lot during the emergencies and even during natural disasters: Transportation helps
during the natural disturbances. It helps in quick moving from one place to another place and
supplies the required operations.
• Helps for the employment: Transportation provides employment for many people as drivers,
captains, conductors, cabin crew and even the people are used for the construction of different
types of transportation vehicles. And even by the use of transportation the remote people are
being employed with the access to the urban facilities and the opportunities.
• Helps in mobility of the laborers: Many people are traveling to other countries on their
employment basis. Transportation plays an important role in such cases.

1|Page
Highway Engineering – 18CV52

• Helps for bringing nations together: Transportation on the whole is used for globalization
i.e. it brings nations together and it creates awareness about the cultural activities and even
about the industries and helps a lot for importing and exporting of different goods. These above
are some of the necessities which make us to use transportation.

The importance and adequacy of transportation system of a country indicates its economic and
social development.
Economic Activity: Two important factors well known in economic activity are:
• Production or supply
• Consumption for human wants or demand.
Economic activity is the process by means of which the products are utilized to satisfy human
demand. The role of transportation in the economic activity starts its function from production
stage to the final distribution. Increased productivity of various items such as agricultural and
industrial products and their distribution through efficient transportation system can lower the cost
of the products. The cost of transportation substantially influences the consumer price of the
commodities.
Social Effects: The various social effects of transportation may be further classified into:
• Sectionalism and transportation: improved transportation has important implication in
reducing sectionalism with in the country and also outside the country. More frequently travels
in other part of the country and outside the country tends to increases knowledge of the people
from other section of society.
Concentration of population into urban area: improves transportation facilities bring prosperity
to the urban population. The employment opportunities, prosperity and superior facilities for
education, medical care etc available in urban area attracts the population from other areas,
resulting in enhanced economic activities. Inadequate transportation facilities lead toconcentration
of population in cities which often results in growth of slums in urban area, leading to various
associated problems. If efficient transportation facilities area available, the people would prefer to
reside at localities away from urban centers and commute to the city for their work. In general the
transportation facilities are essential for the well being of the community.
Aspect of safety, law and order: transport facilities are essential for rusting aids to areas affecting
by an emergency to maintain law and order at home it is required to have an efficient system of
transport network. To define the territory of the country against external aggressionand to guard
the borders with the foreign territories transport facilities are needed.

2|Page
Highway Engineering – 18CV52

Different Modes of Transportation

Road way

Land

Railway

Transportation has
developed along
three basic media Water Waterway

Air Airway

Three basic modes of transport are by land, water and air. Land has given development of road
and rail transport. Water and air have developed waterways and airways respectively. Apart from
these major modes of transportation, other modes include pipelines, elevators, belt conveyors,
cable cars, aerial ropeways and monorails. Pipe lines are used for the transportation of water, other
fluids and even solid particles.
The four major modes of transportation are:
• Roadways or highways
• Railways
• Airways
• Waterways
Roadway
Advantages Disadvantages
Lesser Risk of Damage in Transit Seasonal Nature
Less Capital Outlay Accidents and Breakdowns
Unsuitable for Long Distance and Bulky
Door to Door Service
Traffic
Service in Rural Areas Slow Speed
Flexible Service Lack of Organization
Suitable for Short Distance Large consumer of petroleum energy
Max service to one and all
Private Owned Vehicles
Feeder to other Modes of Transport

Railway
Advantages Disadvantages
Employment Opportunities Huge Capital Outlay
Better Organized Lack of Flexibility

3|Page
Highway Engineering – 18CV52

High Speed over Long Distances Lack of Door to Door Service


Suitable for Bulky and Heavy Goods Unsuitable for Short Distance and Small Loads
Cheaper Transport Booking Formalities
Larger Capacity No Rural Service
Administrative Facilities of Government Centralized Administration
Energy required is one fourth to one sixth of
that required by the road
Airway
Advantages Disadvantages
Fastest mode of transport The haul unit per unit length is costly.
Comfortable and Quick Services Small Carrying Capacity
Emergency Services Breakdowns and Accidents
Most Suitable for Carrying Light Goods of
Large Investment
High Value
National Defense Specialized Skill employees
Space Exploration Unsuitable for Cheap and Bulky Goods
Legal Restrictions
Waterway
Advantages Disadvantages
Minimum energy to haul unit load through unit Slowest mode of transport
distance
Operated only on sea routes between harbours
Most energy efficient transport system
and ports
Suitable for bilk cargo Depends on weather condition
Ocean tides affects the loading and unloading
Leads to the development of the industries.
operation
Cheapest: Cost per tonne is lowest The route is circuitous.

Characteristics of Road Transport


• Roads are used by various types of road vehicles like cars, buses, truck, two and three
wheeled automobiles, pedal cycles and animal drawn vehicles. But railway tracks are used
only by rail locomotives and wagons, waterways are used only by ships and boats.
• Road transport requires a relatively small investment for the government. Motor vehicles are
much cheaper than other carriers like rail locomotives and wagons, water and air carriers.
• Construction and maintenance of road is also cheaper than that of railway tracks, docks,
harbors and airports.
• Road transport offers a complete freedom to road users to transfer the vehicle from one lane
to another and from one road to another according to need and convenience. This flexibility
of changes in location, direction, speed, and timing of travel is not available in other modes
of transport.
• In particular for short distances travel, road transport saves time.
4|Page
Highway Engineering – 18CV52

• Speed of movement is directly related with the severity of accident. The road safety
decreases with increasing dispersion in speed. Road transport is subjected to a high degree of
accidents due to flexibility of movements offered to the road users.
• Road transport is the only means of transport that offers itself to the whole community alike.

Highway Development in India


In the beginning of fifth century A.D., emperor Ashoka had improved the roads and provided
facilities for travelers. During the Pathan and Mughal periods, the roads of India were greatly
improved during the time of Mughal period. Roads linking North-West and the Eastern areas
through gangatic plains were built during this time. In 1865 Lord Dalhousie, governor general
formed the public work department.

Jayakar Committee Recommendations and Implementation of Recommendations


Over a period after the First World War, motor vehicles using the roads increased and this
demanded a better road network which can carry mixed traffic conditions. The existing roads
where not capable of withstand the mixed traffic conditions. For the improvement of roads in India
government of India appointed Mr. Jayakar Committee to study the situations and to recommend
suitable measures for road improvement in 1927 and a report was submitted in 1928 with following
recommendations:
• Road development in the country should be considered as a national interest. As the provincial
and local government do not have the financial and technical capacity for road development.
• Extra tax to be levied from the road users as fund to develop road.
• A Semi-official technical body has to be formed to collect and pool technical knowhow from
various parts of the country and to act as an advisory body on various aspects of the roads.
• A research organization should be instituted at National level to carry out research and
development work and should be available for consultation.
Implementations
Majority of the recommendations were accepted by the government implemented by Jayakar
Committee. Some of the technical bodies were formed such as,
• Central Road Fund (CRF) in 1929
• Indian Road Congress (IRC) in 1934
• Central Road Research Institute (CRRI) in 1950.

Central Research Fund (CRF)


• Central Research Fund (CRF) was formed on 1stMarch 1929.
• The consumers of petrol were charged an extra levy of 2.64 paisa/litre of petrol to buildup
this road development fund.
• From the fund collected 20 percent of the annual revenue is to be retained as meeting expenses
on the administration of the road fund, road experiments and research on road and bridge
projects of special importance.

5|Page
Highway Engineering – 18CV52

• The balance 80 percent of the fund to be allotted by the Central Government to the various
states based on actual petrol consumption or revenue collected.
• The accounts of the CRF are maintained by the Accountant General of Central Revenues.
• The control of the expenditure is exercised by the Roads Wings of Ministry of Transport.
• At present the revised cess collected on petrol and high speed diesel towards CRF is @ Rs 2/
litre.

Indian Road Congress (IRC)


• It is a semi -official technical body formed in 1934.
• It was formed to recommend standard specifications.
• It was constituted to provide a forum of regular technical pooling of experience and ideas on
all matters affecting the planning, construction and maintenance of roads in India.
• IRC has played an important role in the formulation of the 20-year road development plans in
India.
• Now, it has become an active body of national importance controlling specifications,
guidelines and other special publications on various aspects of Highway Engineering.
• The IRC publishes journals, research publications, standards, specifications, guidelines and
other special publications on various aspects of highway engineering.

Central Road Research Institute (CRRI)


• CRRI was formed in the year 1950 at New Delhi
• It was formed for research in various aspect of highway engineering
• It is one of the National laboratories of the Council of Scientific and Industrial Research.
• This institute is mainly engaged in applied research and offers technical advice to state
governments and the industry on various problems concerning roads.

Highway Research Board (HRB)


The HRB of the IRC was set up in 1973 with a view to give proper direction and guidance to
road research activities in India. The objectives are to
• Ascertain the nature and extent of research required
• Correlate research information from various organizations in India and abroad with a view to
exchange publications and information on roads.
• Co-ordinate and conduct correlation services
• Collect and disseminate results of research
• Channelize consultative services

Road Classification
• Based on weather
❖ All-weather roads: These roads are negotiable during all weather, except at major
river crossings where interruption of traffic is permissible up to a certain limit extent,
the road pavement should be negotiable during all weathers.

6|Page
Highway Engineering – 18CV52

❖ Fair-weather roads: On these roads the traffic may be interrupted during monsoon
season at causeways where streams may overflow across the roads.
• Based on the carriage way
❖ Paved Roads: These roads are provided with a hard pavement course which should
be at least a water bound macadam (WBM) layer.
❖ Unpaved Roads: These roads are not provided with a hard pavement course of at least
a WBM layer. Thus earth roads and gravel roads may be called as unpavedroads.
• Based on Surface pavement provided
❖ Surface Roads: These roads are provided with a bituminous or cement concrete
surfacing. Roads which are provided with bituminous surfacing are called as black
toped roads and that of concrete are referred to as concrete roads respectively.
❖ Unsurfaced Roads: These are not provided with bituminous or cement concrete
surfacing.
• Based on Traffic Volume
❖ Heavy traffic roads
❖ Medium traffic roads
❖ Light traffic roads
• Based on Load transported or tonnage
❖ Class-I or Class-A
❖ Class-II orClassBetc
• Based on location and Function
The Nagpur road plan classified the roads in India based on location and function into
following five categories
❖ National Highways (NH): The NH connects the capital cities of the states and the
capital cities to the port. The roads connecting the neighbouring countries are also
called as NH. The NH are at least 2 lanes of traffic about 7.5m d wide. The NH usually
has concrete or bituminous surfacing. NH-1 is one of the national highways connecting
Delhi to Amritsar.
❖ State Highways (SH): SH are the main roads within the state and connect important
towns and cities of state. The width of state highways is generally 7.5m. The NH and
SH have the same design speed and geometric design specifications. SH -88 is one of
the state highway connecting Mysore – Hunsur- Periyapatna –Bylakuppe –
Kushalanagar – Madkeri – Sulya - Puttur – Bhantwal.
❖ Major District Roads (MDR): These are the important roads within a district serving
areas of production and markets and connecting with other major roads or main
highways of a district. The MDR has lower speed and geometric design specification
than NH/SH. The MDR should have at least metalled single lane carriage way (i.e.,
3.8m) wide. The roads carry mixed traffic.
❖ Other District Roads (ODR): These roads serving rural areas of production and
providing them outlet to market centres, taluk headquarters, block development

7|Page
Highway Engineering – 18CV52

headquarters or other main roads. These are of lower design specification than MDR.
These roads have a single lane and carry mixed traffic.
❖ Village Roads (VR): These are roads connecting villages or groups of villages with
each other to the nearest road of a higher category.
• Modified Classification of Road system by Third Road Development Plan
❖ Primary System (Expressways and National Highways)
❖ Secondary System (State Highways and Major District Roads)
❖ Tertiary System (Other District Roads and Village Roads).
Expressways are a separate class of highways with superior facilities and design standards
and are meant as through routes having very high volume of traffic. The expressways are
to be provided with divided carriageways, controlled access, grade separations at cross
roads and fencing. These highways should permit only fast moving vehicles. Expressway
may be owned by the central government or state government, depending on whether the
route is a NH or SH.
• Based on Urban Roads
❖ Arterial roads
❖ Sub-arterial roads
❖ Collector Streets
❖ Local Streets
Arterial and Sub-arterial roads are primarily for through traffic on a continuous route, but
sub-arterials have a lower level of traffic mobility than the arterials. Collector streetsprovide
access to arterial streets and they collect and distribute traffic from and to localstreets
which provide access to abutting property.

Road Patterns
• Rectangular or block pattern
In this pattern, the whole area is divided into rectangular blocks of plots, with streets
intersecting at right angles. The main road which passes through the center of the area should be
sufficiently wide and other branch roads may be comparatively narrow. The main road isprovided
a direct approach to outside the city.

Advantages:
❖ The rectangular plots may be further divided into small rectangular blocks for construction of
buildings placed back to back, having roads on their front.
❖ In this pattern has been adopted for the city roads.
❖ The construction and maintenance of roads of this pattern is comparatively easier.
Limitations:
This pattern is not very much convenient because at the intersections, the vehicles face each
other.
Example: Chandigarh has rectangular pattern

8|Page
Highway Engineering – 18CV52

• Radial or star and block pattern


In this pattern, the entire area is divided into a network of roads radiating from the business
outwardly. In between radiating main roads, the built-up area may be planned with rectangular
block.
Advantage:
❖ Reduces level of congestion at the primary bottleneck location.
❖ Prevents traffic from accessing local flow routes in the direction of the event venue that
operate in favor of degress traffic flow.
❖ If one is block then other side traffic can move.
❖ Vehicles face each other less than block pattern.
Limitations:
❖ Proves particularly effective if two-lane ramp traffic does not have to merge at downstream
end of ramp.
❖ Safety appurtenances such as guide rail transitions, crash attenuators, and post support bases
have not been designed to provide adequate protection at hazardous locations from the opposite
direction of travel.

• Radial or star and circular pattern


In this system, the main radial roads radiating from central business area are connected together
with concentric roads. In these areas, boundary by adjacent radial roads and corresponding circular
roads, the built-up area is planned with a curved block system.

9|Page
Highway Engineering – 18CV52

Advantages:
❖ At traditional intersections with stop signs or traffic signals, some of the most common types
of crashes are right-angle, left-turn, and head-on collisions. These types of collisions can be
severe because vehicles may be traveling through the intersection at high speeds. With circular
pattern, these types of potentially serious crashes essentially are eliminated because vehicles
travel in the same direction.
❖ Installing circular pattern in place of traffic signals can also reduce the likelihood of rear-end
crashes.
❖ Removing the reason for drivers to speed up as they approach green lights and by reducing
abrupt stops at red lights.
❖ Because round abouts improve the efficiency of traffic flow, they also reduce vehicle emissions
and fuel consumption.
Limitations:
❖ Center lines of roads leading to circular pattern should be properly aligned with the central
island.
❖ Approach roads should be sufficiently curved, far enough in advance of circular pattern, to
reduce vehicle speeds of entering drivers.
❖ Islands separating the approach and exit lanes, known as splitter islands, should extend far
enough to provide pedestrian refuge and to delineate the roundabout.
❖ Traffic signs, pavement markings, and lighting should be adequate so that drivers are aware
that they are approaching a roundabout and that they should reduce their travel speed.
❖ For older drivers declines in vision, hearing, and cognitive functions, as well as physical
impairments, may affect some older adults' driving ability. Intersections can be especially
challenging for older drivers.
Example: Intersection with traffic signals converted to a circular pattern in Asheville, North
Carolina

• Radial or star and grid pattern

10 | P a g e
Highway Engineering – 18CV52

Change in direction, and because street patterns are the most enduring physical element of any
layout, it could potentially contribute to systematic site planning and, consequently, deserves a
closer look. Though the network is entirely interconnected, north-south movement becomes
circuitous, indirect, and inconvenient, making driving an unlikely choice and vividly illustrating
that interconnectedness by itself is insufficient to facilitate movement.
Advantages:
❖ Keep vehicular traffic safe with a high proportion of 3-way intersections.
❖ Reduce cut-through traffic by similar or other means.
❖ Improve traffic flow in both directions using Savannah’s cellular structure.
❖ Improve land use efficiency and unit density.
Limitations:
❖ Islands separating the approach and exit lanes, known as splitter islands, should extend far
enough.
❖ Traffic signs, pavement markings, and lighting should be adequate so that drivers are aware
that they should reduce their travel speed.
Examples:
The Nagpur road plan formulae were prepared on the assumption of Grid pattern.

• Hexagonal pattern
In this pattern, the entire area is provided with a network of roads formatting hexagonal figures.
At each corner of the hexagon, three roads meet the built-up area boundary by the sides of the
hexagons is further divided in suitable sizes.
Advantages:
Three roads meet the built-up area boundary by the sides of the hexagons.
Limitations:
Traffic signs, pavement markings, and lighting should be adequate so that drivers are aware that
they should reduce their travel speed.

11 | P a g e
Highway Engineering – 18CV52

Planning Surveys
The studies for collecting the factual data for highway planning are known as fact finding studies
or planning surveys. The planning surveys consist of the following studies
• Economic studies
• Financial studies
• Traffic or road use studies
• Engineering studies
Economic studies
The details to be collected include the following
❖ Total population and classified distribution of different population based on occupation,
income etc
❖ Trend of population growth
❖ Agricultural and industrial products
❖ Industrial and agricultural development and future trends
❖ Existing facilities of communication, education, banks, hospitals, post office etc
❖ Per capita income
Financial studies
The details to be collected are
❖ Sources of income and estimated revenue
❖ Living Standards
❖ Resources from local levels, toll taxes, vehicle regestration and fines
❖ Future trends in financial aspects
Traffic or road use studies
Traffic surveys should be carried out in the whole area and on selected routes and locations in
order to collect the following details
❖ Traffic Volume/day, annual or daily traffic peak flow and design hourly volume
❖ Origin and destination studies
❖ Traffic flow patterns
❖ Mass transportation facilities
❖ Accidents, their cause and cost analysis
❖ Future trend and growth in traffic volume
❖ Growth of passenger trips and trend in the choice of modes
12 | P a g e
Highway Engineering – 18CV52

Engineering studies
The required engineering studies are
❖ Topographic study
❖ Soil details
❖ Location and classification of existing roads
❖ Road life studies
❖ Specific problems in drainage constructions & maintenance.
• Assessment of various other developments in the area that is likely due to the proposed
highway development.

Objective of Planning Surveys


• Workout, the financial system and recommended changes in tax arrangements and budget
procedures, provide efficient, safe economics, comfortable and speedy movement for goods
and people.
• Plan a road network for efficient traffic operation at minimum cost.
• Plan for future requirements and improvements of roads in view of developments and social
needs.
• Fix up data wise priorities for development of each road link based on their utilities.

Preparation Of Plans
Before finalizing the alignment and other details of the road development programme, the
information collected during the fact finding studies are presented in the form of plans.
Plan-1: This plan should give the topographical details related to existing road network, drainage,
structures, towns and villages with population, agricultural, industrial and commercial activities.
Plan-2: Should give the details pertaining to the distribution of population.
Plan-3: Should indicate the location of places with productivity.
Plan-4: Should indicate the existing network of roads and proposals received.

Master Plan
Master plan is the final road development plan for the study area which may be a block, taluk,
district, state or the whole country. Based on the above plans, different possible network of new
roads and improvement of some of the existing roads are proposed. In each proposal, thepopulation
and productivity of each locality, the traffic flow, topography and all other details, both existing
and possible changes in future are kept in view. In developing countries like India, the total target
road length to be achieved for the country as whole, during a selected plan period may be fixed
depending upon the financed that could be made available during the plan period.

Determination of Optimum Road Length


To decide the best road system out of various alternative proposals, it is desirable to make use of
concept of saturation system based on U.S system of highway planning.
Saturation System

13 | P a g e
Highway Engineering – 18CV52

In this system optimum road length is calculated for an area based on the concept of attaining
maximum utility per unit length of the road. This is also called as maximum utility system. Factors
to attain maximum utility per unit length are
• Population served by the road network
• Productivity (industrial and agricultural) served by the road network.
Population factors or units
Since, the area under consideration consists of villages and towns with different population these
are grouped into some convenient population range and some reasoning values of utility units to
each range of population serve are assigned.
Population less than 500, utility unit = 0.25
501 to 1001, utility unit = 0.50
1001 to 2000, utility unit = 1.00
2001 to 5000, utility unit = 2.00 etc.
Productivity factors or units: The total agricultural and industrial products served by each road
system are worked out and the productivity served may be assigned appropriate values of utility
units per unit weight.
Utility per unit length of road
The total utility units served by each road system are found by adding the population units and
productivity units. The total units scored are divided by the total road length of each system to
obtain the utility rate per unit length of road.

Highway Planning In India


The first attempt for proper planning of the highway development programme in India on a long
term basis was made at the Nagpur Conference in 1943. After, the completion of the Nagpur Road
Plan targets, the Second Twenty year Plan was drawn for the period 1961-1981. The Third Twenty
Year Road Development Plan for the period 1981-2001 was approved only by the year 1984.

First Twenty Road Plan (Nagpur Road Plan)


The conference of chief engineer held at Nagpur in 1943 for first twenty road development plan
(1943-1953). The roads were classified into five major categories: NH, SH, MDR, ODR and VR.
Recommendations were made for the geometric standards of roads, bridges and highway
organization. Two formulae were finalized based on star and grid pattern to calculate the road
length for the country as a whole.
Salient feature
• The responsibility of construction and maintenance of national highways were assigned to the
central government.
• Planned for 20 year (1943-63) aiming to provide 2 lakh km of surfaced roads and remaining
unsurfaced roads. Total targeted road length 5,32,700 km . Achieved 7, 09,122km by the end
of 1961.
• Road density was 16km/100sqkm.

14 | P a g e
Highway Engineering – 18CV52

• The road length formulated is based on star and grid pattern. But due consideration was given
for existing irregular pattern and obligatory points not fitting in the geometric pattern.
• The size of grid is 16km so that max distance from the centre is 8km and average distance
from village road to metalled road is 3.2 km.
• The ODR and VR are meant to provide internal road system linking to higher category of
road network.
• An allowance of 15 % was given for agricultural and industrial development during next 20
years.
• The length of railway tracks in the area was also considered in deciding the length of the first
category of road.

Formulae
❖ NH+ SH+ MDR (km) = [A/8 + B/32 + 1.6N + 8T] +D – R
❖ ODR+ VR (km) = [0.32V + 0.8 Q + 1.6 P + 3.2 S] + D
Where, A= agricultural area, km2
B= Non-Agricultural area, km2
N = number of towns and villages with population range 2001-5000.
T= number of towns and villages with population over 5000
D = Development allowance of 15 percent of road length calculated to be provided for
agricultural and Industrial during the next 20 years
R= Existing length of railway track in km.
V= Number of villages with population 500 or less
Q= Number of villages with population range 501-1000
P = Number of villages with population range 1001-2000
S= Number of villages with population range 2001-5000

Second Twenty Year Road Plan (1961-1981) Bombay Road Plan


This plan envisaged overall road length of 10,57,330 km by the year 1981 achieved. The cost of
the plan has been worked out to Rs. 5,200 crores based on 1958 price level. Five different formulae
were framed to calculate the length of NH, SH, MDR, ODR and VR.
Classification of the Roads by Bombay Road Plan:
• Express way:are those connecting major capitals and other important centre with in the
country where the traffic density is high and the vehicles are allowed to travel with no cross
interruption. The express way are constructed with high design standards and design speed.
• National highway
• State highway
• Major district road
• Other district road
• Village road

15 | P a g e
Highway Engineering – 18CV52

Salient feature
• Drawn on more scientifically in view of development needed in under developed areas.
• Targeted road density 32km per 100 sqm, road length of 10,57,330 km, achieved road length
= 15,02,697km.
• Maximum distance of any place in a developed or agricultural area would be 6.4 km from a
metalled road and 2.4 km from any category of roads.
• Every town with population above 2000 in plains and above 1000 in semi-hill areas and
above 500 in hilly areas should be connected by a metalled road.
• While calculating the road length in hilly regions, an allowance up to 100 percent to be made
in arriving at the road length.
• Expressways have also been considered in this plan and 1600 km of length has been included
in the proposed target of National Highways.
• Length of railway track is considered independent of the road system.
• The development factor of only 5 % is provided for future development and unforeseen
factors.
Formulae
❖ NH = [A/64+ B/80 +C/96 + 32K + 8M] +D
❖ NH+ SH, (km) = [ A/20 + B/24 + C/32] + [ 48K + 24 M + 11.2 N + 1.6 P] + D
❖ NH + SH+ MDR ( km) = [ A/8 + B/16 + C/24] + [ 48 K + 24 M + 11.2 N + 9.6 P + 6.4 Q+
2.4 R] + D
❖ NH+SH+MDR+ODR, (km) = [3A/16+3B/32+C/16] + [48K +24 M + 11.2 N +9.6P + 12.8 Q
+ 4R + 0.8 S + 0.32 T] + D
❖ NH+SH+ MDR+ ODR+ VR (km) =[ A/4 + B/8 + C/12] + 48K + 24 M + 11.2 N + 9.6 P +
12.8 Q + 5.9 R + 1.6 S + 0.64 T + 0.2 V] +D
Where,
A = Developed and agricultural areas; km2
B= Semi-developed area,
C = Underdeveloped area,
K = number of towns with population over 1,00,000
M = number of towns with population range 1,00,000 – 50,000
N = number of towns with population range 50,000- 20,000
P = number of towns with population range 20,000- 10,000
Q = number of towns with population range 10,000- 5,000
R = number of towns with population range 5,000- 2,000
S = number of towns with population range 2,000- 1,000
T = number of towns with population range 1,000- 500
V = number of towns with population range below 500
D = Development allowance of 5 percent of road length calculated for further development and
other unforeseen factors.

Third Twenty Year Road Development Plan (1981-2001) (Lucknow Plan)

16 | P a g e
Highway Engineering – 18CV52

It was finalized and the plan document was published by the year 1984. The major objectives or
salientfeatures are
• The future road development should be based on the revised classification of road system
consisting of Primary, Secondary and Tertiary road system.
• The road network should be developed so as to preserve the rural oriented economy and to
develop small towns with all the essential facilities.
• All the villages with population of 500 should be connected by all weather roads.
• The overall density of road is increased to 82km per 100 sq.km
• The NH network should be expanded to form square grids of 100 km sides so that no part of
the country is more than 50 km away from NH.
• Expressway should be constructed along major traffic corridors to provide fast travel.
• Roads should also be built in less industrialized areas that attract the growth of industries.
• Long term master plans for road development should be prepared at various levels.
• All towns and villages with population over 1500 should be connected by Major district
Roads and villages with population 1000 to 1500 by ODR.
• There should be improvements in environmental quality and road safety.
Formulae
❖ Length of NH (km) = area of the region/ 50
❖ Length of SH (km)
➢ By area, SH (km) = area of the region/ 25
➢ Based on no. Of towns, SH (km) = 62.5 x no. Of towns – NH
Adopt length of SH (higher of the two criteria)
• Length of MDR, in the District
➢ Based on area, MDR (km) = area of the region/12.5
➢ Based on number of towns, MDR(km) = 90 x number of towns
Provide length of MDR (higher of the two criteria)
• Total length of all categories of roads may be assumed to provide an overall density of road
length equal to 82km per 100 sq.km area by the year 2001.
NH + SH + MDR + ODR + VR (km) = area of the region x (82/100)
Therefore length of ODR + VR (km) = Total Length – (NH + SH + MDR)

Salient Features Of Vision 2021


• The fourth 20-year road development plan of the country has not yet been got approved as an
official plan document for development of roads. Instead ‘road development plans Vision
2021’ has been formulated (2001 – 2021).
• This document covers
❖ Primary road system consisting of expressways and NH
❖ Secondary road system consisting of SH and MDR
• It was observed that target length of third road development plan was not achieved. The total
length of NH achieved was 57,700km as against the target of 66,000km and that of SH
achieved was 1,24,300km as against the target of 1,45,000km. The total length of
17 | P a g e
Highway Engineering – 18CV52

MDR+ODR+VR was 24,89,000kmwhere as the actual achievement was 29,94,000km. Thus


against the overall total target length of 27,00,000km the total achieved was 31,76,000km.
• The total target length to be achieved as per Vision 2021 are
❖ Primary highway system consisting of 15,766km of expressways and 80,000km of
NH.
❖ Secondary road system consisting of 1,60,000km of SH and 3,20,000km of MDR.

Pradhan Mantri Gram Sadak Yojana (PMGSY)


• It was launched by the central government in December 2000.
• To provide village connectivity with all-weather road.
• The Ministry of Rural Development was vested with the responsibility to prepare the master
plans in consultation with the state governments.
• The objective of this rural development programme is to provide all-weather road connectivity
to all villages having population over 1000 by the year 2003 and to villages with population
500 and above by the year 2007.
• This is probably one of the largest rural road development programmes ever taken up in the
country.
• The PMGSY became a part of the Bharat Nirmanprogramme.
• According to latest figures made available by the state government, there are about 1.73 lakh
km unconnected habitations and about 3.65lakh km new road connectivity are required to be
taken up under the PMGSY programme as per the norms.
• The revised cost of this project is estimated to be Rs 1,32,150crores (2003-04 prices).

National Highways Development Projects (NHDP)


• It was observed that target length of third road development plan was not achieved. The total
length of NH achieved was 57,700km as against the target of 66,000km and that of SH
achieved was 1,24,300km as against the target of 1,45,000km. The total length of
MDR+ODR+VR was 24,89,000kmwhere as the actual achievement was 29,94,000km. Thus
against the overall total target length of 27,00,000km the total achieved was 31,76,000km.
• Realizing the deficiencies in the NH system of country, the National Highways Authority of
India (NHAI) took up the NHDP by the year 2000, in different phases.
• Phase I:
‘Golden Quadrilateral’ of total length 5846km connecting the four major metropolitan cities.
The four sides of quadrilateral are
❖ Delhi – Mumbai
❖ Mumbai – Chennai (via Bangalore)
❖ Chennai – Kolkata
❖ Kolkata – Delhi
This project was started in December 2000 and was planned to be completed in six years.

18 | P a g e
Highway Engineering – 18CV52

• Phase II:consisting of
❖ North – South corridor connecting Srinagar too Kanyakumari
❖ East – West corridor connecting Silchar to Porbandar, of total length 7,300km.
• Further development of selected stretches of NH was planned in Phases III, IV and V.
• Development of expressways was planned as Phase VI and improvement of urban road
networks as phase VII.

Karnataka State Highways Improvement Project (Kship)


• Karnataka State Highways Improvement Project (KSHIP) is a road upgrading and
rehabilitation initiative by Government of Karnataka under the World Bank loan to undertake
improvement of 3411 km of roads consisting of State Highways and Major District Roads.
• The broad objective of the Project is improving of existing road network involving rising of
formation levels; strengthening of pavements; widening and realignment of roads where
necessary.
• The work involved pavement design, highway design, and design of structures and
environmental and social impact evaluation of the project.
• The expected contract period for construction work is 36 months.
• The design life (or operation period) of the project is 20 years from the start of operation.

Karnataka Road Development Corporation Limited (Krdcl)


The Government has constituted “Karnataka Road Development Corporation Ltd” vide
Government order No.PWD 172 CRM 97 dated 01-06-1999 and this was established on 21st
July 1999 as a wholly owned Government of Karnataka enterprises.
• The Corporation is established under Companies Act, 1956 (Sl.No.of 196 (56) as a Public
Limited Company wholly owned by Government of Karnataka and is under theadministrative
control of the Public Works Department.
• The Corporation will take up development programme for Roads, Bridges and other related
infrastructure development works connected with surface transport.
• The Corporation has its Registered Office at Bangalore.
• The Corporation has an initial Authorized Share Capital of Rs.200.00 crores. The initial paid
up capital of Rs.10.00 crores will be subscribed in cash.
• The Corporation functions under the supervision and control of the Board of Directors.

19 | P a g e
Highway Engineering – 18CV52

Questions

1. Explain Importance of Transportation.


2. What are the social effects of transportation? Explain.
3. Explain Different Modes of Transportation.
4. Differentiate between roadways, airways & waterways.
5. What are Jayakar Committee Recommendations and Implementation Recommendations?
6. What are the objectives of CCRI?
7. What are the objectives of IRC?
8. What are the objectives of HRB?
9. Explain classification of roads with their advantaged & disadvantages.
10. What are the objectives of Pradhan Mantri Gram Sadak Yojana?
11. What are the objectives of planning survey?
12. Explain the process involved in planning survey.

20 | P a g e
Highway Engineering – 18CV52
MODULE - 2
HIGHWAYS ALIGNMENT AND SURVEYS
Highway Alignment and Surveys: Ideal Alignment, Factors affecting the alignment, Engineering
surveys-Map study, Reconnaissance, Preliminary and Final location & detailed survey, Reports
and drawings for new and re-aligned projects
Highway Geometric Design: Cross sectional elements–width, surface, camber, Sight distances–
SSD, OSD, ISD, HSD, Design of horizontal and vertical alignment–curves, super-elevation,
widening, gradients, summit and valley curves

Introduction
The position or the layout of the centre line of the highway on the ground is called the alignment.
It includes horizontal alignment i.e., straight path, horizontal deviation and curves and vertical
alignment i.e., changes in gradient and vertical curves.
If any improper alignment present, leads to increase in
• Construction cost
• Maintenance cost
• Vehicle operation cost
• Accident rate

Requirements of an Ideal Alignment


An ideal alignment between two stations should offer maximum utility by serving maximum
population and products and also should possess following requirements
• Short: it is desirable to have a short alignment between two stations. A straight path between
the two terminals would provide this.
• Easy: it is should be easy to construct and maintain the road with minimum problems and also
the alignment should be easy for vehicle to operate with easy gradient and curves.
• Safe: it should be safe enough for construction and maintenance from the view point of
stability of natural hill slopes, embankment and cut slopes. It should be safe for the traffic
operation with safe geometric features.
• Economical: The road alignment could be considered economical only if the total cost
including initial cost, maintenance cost and vehicle operation cost is lowest.

Factors Controlling Alignment


The various factors which control the highway alignment are
• Obligatory points
• Traffic
• Geometric design
• Economics
• Other considerations

1|Page
Highway Engineering – 18CV52
Obligatory Points: there are control points governing the alignment of the highways. These
control points may be divided broadly into two categories.
• Points through which the alignment is to pass
This may cause the alignment to often deviate from the shortest or easiest path. The various
examples of this category may be bridge site, intermediate town, a mountain pass or quarry.
Case 1: When it is necessary to cross hill range, mountains the various alternatives are to cut
a tunnel or to go around the hill. This suitability depends on many factors like site condition,
topography, cost consideration etc. Figure (a) shows how the straight alignment AB is
deviated along the hill side pass, thus avoiding a tunnel or heavy cutting.

Case 2: the road bridge across a river can be located at a place where the river has straight
and permanent path and where there is a bend in the river, also the selected location of the
bridge should be such that the abutment and pier can be properly constructed. Figure (b) shows
that the straight alignment between stations A and B which crosses the river at thebend is
not a suitable location and hence the alignment is to deviated along the path shown (by dash
lines).
Case 3: when connecting a road network between two stations, it always beneficial toprovide
a link road or to connect the proposed alignment through nearby station. The straight alignment
AB may be shifted along line ACB, as shown in figure (c) in order to connect the intermediate
station C. It is also possible to connect the station C with a link road as sown in figure, thus
avoiding the deviation of the straight alignment.
• Points through which the alignment should not pass

2|Page
Highway Engineering – 18CV52
This may also make it necessary to deviate from the proposed shortest alignment due to the
obligatory points through which alignment should not pass such as religious places( temples
church, mosque and grave), very costly structure, unsuitable land ( lakes, ponds, marshy soil)

Traffic
The alignment should suit traffic requirements. Origin and destination study should be carried
out in the area and the desire lines be drawn showing the traffic flow. The new alignment should
keep in view of desired lines, flow patterns and future trends.
Geometric design
Geometric design factors such as gradient, radius of curve and sight distance, overtaking sight
distance, ruling gradient on hilly region also would govern the final alignment of the highway.
As far as possible while aligning a new road, the gradient should be flat and less than the ruling or
design gradient.
Economics
The alignment finalized based on the above factors should be economical compared to other
alignment. While working out the economics, the factors to be considered are initial construction
cost, regular and periodic maintenance cost of the road and vehicle operation cost in future years.
It is essential to work out overall economics based on ‘life cycle cost’ of the road project and not
consider the initial cost of the road project only.
Other consideration
Factors like drainage consideration, hydrological factors, water table, seepage flow, high flood
level, political considerations and monotony also affect in deciding the alignment. Straight road of
very long stretch may be monotonous for driving. Hence, after a few kilometers of straight road,
it may desirable to have a slight bend or to provide some road side amenities, to break the
monotony and keep the driver alert.

Special Considerations for Hilly Area Alignment


In hill roads additional care has to be given for
• Stability
• Drainage
• Special geometric standards of hill roads
• Resisting length.
Stability
While aligning hill roads, special care should be taken to align the road along the side of the hill
which is stable. A common problem in hill roads is that of landslides. The cutting and filling of
earth to construct roads on hill side causes steepening of existing slopes and this affect its stability
of the hill slopes.
Drainage
Numerous hill side drains should be provided for adequate drainage facility across the road. But
the cross drainage structure being costly, attempts should be made to align the road in such a way
that the number of very expensive cross drainage structures is kept minimum.
3|Page
Highway Engineering – 18CV52
Geometric standard of hill roads
Different sets of geometric design standards are followed on hill roads with reference to gradient,
curves and speed and they consequently influence the sight distance, radius of curve and other
related features. The route should enable the ruling gradient to be attained in most of the length,
minimizing steep gradients, hair pin bands and needless rise and fall.
Resisting length
The resisting length of a road may be calculated from the total work to be done to move the loads
taking the horizontal length, the actual difference in levels between the two stations and the sum
of ineffective rise and fall in excess of floating gradient. In brief, the resisting length of the
alignment should be kept as low as possible.

Engineering Surveys for Highway Alignment


The stages of engineering surveys for highway locations are
• Map study
• Reconnaissance survey
• Preliminary surveys
• Final location and detailed surveys
Map study
❖ By careful study of topographical map, it is possible to have an idea of several possible
alternate routes so that further details of these may be studied later at the site.
❖ The features like river, hills valleys, and counter intervals can be observed.
❖ By knowing these feature it can fairly assign the alignment avoiding valleys, lakes and
possible location of bridge (avoiding sharp turns etc.).
❖ It is also possible to suggest permissible gradient considering counter intervals.

Reconnaissance
It is to examine the general character of the area for deciding the most feasible routes for detailed
studies. A field survey party may inspect a fairly broad stretch of land along the proposed
alternative routes of the map in the field. Only few simple instruments like abney level tangent
clinometers, barometer or GPS are used by the reconnaissance party to collect additional details
rapidly. Some of the following details are collected
❖ Valleys, ponds, lakes, marshy land, hills, permanent structures and other obstruction along
the route which are not available in the map.
❖ Approximate values of gradient, length of gradient and radius of curves of alternate
alignments.
❖ Number and type of cross drainage structures, maximum flood level and natural ground
water level along the probable routes.
❖ Sources of construction materials, water and location of stone quarries.
❖ When the alignment passes through hill, additional details like type of rocks, dip of strata,
seepage flow.

4|Page
Highway Engineering – 18CV52
Preliminary Survey
This survey can be done either by Conventional approach or aerial survey if the area is more.
The main objectives of preliminary survey are
❖ To survey the various alternate alignments proposed after the reconnaissance and to collect
all the necessary physical information and details of topography, drainage and soil.
❖ To compare the different proposals in view of the requirements of a good alignment.
❖ To estimate quantity of earth work materials and other construction aspects and to work out
the cost of alternate proposals.
❖ To finalize the best alignment from all consideration.

Final Location and Detailed survey


❖ The alignment finalized at the design office after the preliminary survey is to be located on
the field by establishing the centre line.
❖ The centre line of the road finalized is to be translated on the ground during the location
survey
❖ The centre line stakes are driven at suitable intervals say 50 m in plain and rolling terrains
and at 20 m in hilly terrain.
❖ Temporary bench marks are fixed at intervals of about 250 m and at all drainage and under
pass structures.
❖ The cross sectional levels are taken at very 50 – 100 m in plain terrain, 50 – 75m in rolling
terrain, 50m in built-up area and 20m in hilly areas intervals.
❖ The cross section should be taken at curves and where there is a gradient change.
❖ The data collected during the detailed survey should be elaborate and complete for
preparation of detailed plans, design and estimate of the project.

Drawings and Reports


The following drawings are usually prepared in a highway projects
• Key map : Proposed and existing roads, important places
• Index Map : topography, size being 32 x 20 cm
• Preliminary survey plans : alternate alignment, other information
• Detailed plan : alignment, boundaries, counter intervals, A2 size sheet
• Longitudinal section: Datum line, existing ground, vertical profile, scale 1 H: 10 V
• Detailed cross section: level at every 100 m interval
• Land acquisition plans; details of buildings, well, other details
• Drawing of cross drainage and other retaining structures: scale 1:1, structural details
• Drawings of road intersections: Intersection details and traffic flows
• Land plans showing quarries etc.

Project Report
The project report forms an important part of the project document. It should contains
information such as
• General details of the project and its importance
5|Page
Highway Engineering – 18CV52
• Feature of the road including selection of the route, alignment, traffic etc.
• Road design and specifications
• Drainage facilities and cross drainage structures
• Materials, labour and equipments
• Rates
• Construction programming
• Other miscellaneous items like diversion of traffic, road side amenities, rest houses etc.
New Highway Project
The new highway project work may be divided into the following stages
• Route selection
The selection of route is made keeping in view the requirements of alignment and the
geological, topographical and other features of the locality and also possible upgrading of
speed standards in future, without being necessary to realign the road. After the alignment is
finalized, the plans and working drawings are prepared.
• Materials and design
The soil samples collected from the selected route during the soil survey are tested in the
laboratory in order to design the required pavement thickness and the design of embankment
and cut slopes. The possibility of using low cost construction materials should be fully exposed.
When high quality pavement materials like bituminous mixed or cement concrete are used in
the surface course, the mix design specification and construction control tests should be strictly
followed. In India, CBR method has been recommended by IRC fordesigning the thickness of
flexible pavement.
• Construction
The construction of the road may be divided into two stages i.e., earthwork and pavement
construction. The earth work consists of excavation and construction of embankments. The
pavement construction is subsequently taken up starting with the preparation of subgrade and
the construction of sub-base, base and surface courses of the pavement.

Steps In New Project Work


• Map study
This is carried out with the help of available topographic maps of the area.
• Reconnaissance survey
During this survey, a general idea of a topography and other features, field identification of
soils and survey of construction materials, by an on the spot inspection of the site.
• Preliminary survey
Topographic details and soil survey along alternate alignments, consideration of geometric
design and other requirements of alignment, preparation of plans and comparison of alternate
routes, economic analysis and selection of final alignment.
• Location of final alignment
Transfer of the alignment from the drawings to the ground by driving pegs along the centre
line of finally chosen alignment, setting out geometric design elements by location of tangent
6|Page
Highway Engineering – 18CV52
points, apex, circular and transition curves, elevation of centre line and superelevation details.
• Detailed survey
Survey of the highway construction work for the preparation of longitudinal and crosssections,
computations of earth work quantities and other construction material and checking details of
geometric design elements
• Material survey
Survey of construction materials, their collection and testing
• Design
Design details of embankment and cut slopes, foundation of embankments and bridges, and
pavement layers and cross drainage structures.
• Earth work
Excavations for highway cutting and drainage system construction and embankments
• Pavement construction
Preparation of subgrade, construction of sub base, base and surface courses
• Construction controls
Quality control tests during different stages of construction and check for finished road surface
such as unevenness, camber, superelevation and extra widening of pavement atcurves.
• Construction planning and programming
The construction planning and programming to be carried out taking into accounts all the
restraints and existing problems. In order to minimize the construction cost and time, it is
essential to resort to appropriate approaches such as use of critical path method (CPM) and
project evaluation and review technique (PERT).

Necessity of Re- Alignment


• Improvement of horizontal alignment design elements, such as radius, super elevation,
transition curve, clearance on inner side of the curve of shifting the curve to provide adequate
sight distance, elimination of reverse curve and undesirable zigzag.
• Improvement of vertical alignment design elements like steep gradients, changes in summit
curves to increase sight distance, correction of undesirable undulations like humps.
• Raising the level of a portion of a road which is subjected to flooding, sub mergence or water-
logging during monsoons.
• Re-construction of weak and narrow bridges and culverts and changes in water way at locations
slightly away from the existing site.
• Construction of over bridges or under bridges at suitable locations across a railway line in place
of level crossing or across another road to provide grade separated intersection.
• Re-alignment required due to a portion of road being submerged under water at the reservoir
area on account of construction of a new dam.
• Construction of a bypass to avoid the road running through a town or city
• Defense requirement.

7|Page
Highway Engineering – 18CV52
Steps In Re Alignment
• Reconnaissance of the stretch of road to be re-aligned, study of the deficiency and possible
changes in alignment.
• Survey of existing road recording the topographic features and all other existing features
including drainage conditions along a strip of land on either side of the road.
• Observation of spot level along the centre line of the road and cross section levels at suitable
intervals.
• Soil survey along the stretches of land through which the re-aligned road may possibly pass.
• Comparison of economics and feasibility of alternate proposal of realignment.
• Finalization of the design features and realigned road stretch
• Preparation of drawings.
• Marking out centre line
• Earthwork and preparation of sub grade
• Checking of geometric design elements
• Design and construction of new pavement

Geometric Design of Highway


Geometric design of highways deals with the following elements
• Cross section elements
• Sight distance considerations
• Horizontal alignment details
• Vertical alignment details
• Intersection elements

Design Control and Criteria


The geometric design of highways depends on several design factors. The important factors
which control the geometric elements are
• Design speed
• Topography or terrain
• Traffic factors
• Design hourly volume and capacity
• Environmental and other factors

8|Page
Highway Engineering – 18CV52
Design speed

The design speed is the most important factor controlling the geometric design elements of
highways. The design speed is decided taking into account the overall requirements of the
highway. In India, different standards have been assigned depending upon the importance of the
class of road. Further the design speed standards are modified depending upon the terrain or
topography. Design of almost every geometric design elements of a road is dependent on the design
speed.

Topography
The topography or the terrain conditions influence the geometric design of highwaysignificantly.
The terrains are classified based on the general slope of the country across the alignment as plain,
rolling, mountainous and steep terrain. The design standards specified for different classes of roads
are different depending on the terrain classification. For example the design speed oh NH and
SH on plain terrain with general cross slope of 10% is 100kmphwhereas on rolling terrain
with general slope of 10 to 25% is 80kmph and that on mountainous terrain with cross slope 25
to60% is 50kmph.

Terrain Classification Cross slope of the country, percent


Plain 0-10
Rolling 10-25
Mountainous 25-60
Steep Greater than 60
Traffic factors
The factors associated with traffic that affects geometric design of roads are the vehicular
characteristics and human characteristics of road users. It is difficult to decide the design vehicle
or the standard traffic lane under the mixed traffic flow condition prevalent especially on urban
roads of developing countries like India. This is a complex problem. However, it is often
necessary to consider some standard vehicle as the design vehicle. The important human factors

9|Page
Highway Engineering – 18CV52
which affect traffic behavior include the physical, mental and psychological characteristics of
drivers and pedestrians.
Design hourly volume and capacity
The traffic flow or volume keeps fluctuating with time, from a low value during certain off peak
hours to the higher flow during the peak hours. It will be uneconomical to design the roadway
facilities for the peak traffic flow or the highest hourly traffic volume. Therefore a reasonable value
of traffic volume is decided for the design and this is called design hourly volume.
Environmental and other factors
The environmental factors such as aesthetics, landscaping, air pollution, noise pollution and
other local conditions should be given due consideration in the design of road geometrics. Some
of the arterial high speed highways and expressways are designed for higher speed standards and
uninterrupted flow of vehicles by providing controlled access and grade separated intersections.

Highway Cross Section Elements

Pavement surface
characteristics
camber
Width of pavement
Highway cross medians
section elements
Kerbs
Road margins
Width of roadway
Right of way

Pavement Surface Charcteristics


The pavement surface depends on the pavement type. The important characteristics of the
pavement are
• Friction
• Unevenness
• Light reflecting characteristics
• Drainage of surface water

Friction
The friction or Skid resistance between vehicle tyre and pavement surface is one of the factors
determining the operating speed and minimum distance required for stopping the vehicles. When
vehicle negotiates a horizontal curve, the lateral friction developed counteracts the centrifugal

10 | P a g e
Highway Engineering – 18CV52

forces and thus governs the safe operating speed. Frictional force is an important factor in the

11 | P a g e
Highway Engineering – 18CV52
acceleration and retarding abilities of vehicles. The frictional force that develops between the
wheel and the pavement is the load acting multiplied by a factor called the coefficient of friction
and denoted as f. The choice of the value of f is a very complicated issue since it depends on many
variables. IRC suggests the coefficient of longitudinal friction as 0.35-0.4 depending onthe
speed for calculating stopping sight distance and coefficient of lateral friction as 0.15 for horizontal
curve design. Lack of adequate friction can cause skidding or slipping of vehicles.
• Skidding happens when the path traveled along the road surface is more than the
circumferential movement of the wheels due to friction
• Slip occurs when the wheel revolves more than the corresponding longitudinal movement
along the road.
Factors affecting friction
❖ Type of the pavement (like bituminous, concrete, or gravel),
❖ Condition of the pavement (dry or wet, hot or cold, etc),
❖ Condition of the tyre (new or old)
❖ Speed of the vehicle
❖ Relative roughness
❖ Brake efficiency
❖ Load and tyre pressure
❖ Temperature of tyre and pavement
❖ Type of skid, if any
Below table shows the recommended value of ‘f’ by IRC
Speed, kmph 20 to 30 40 50 60 65 80 100 and above
Longitudinal friction coefficient
0.40 0.38 0.37 0.36 0.36 0.35 0.35
value, f for SSD

Pavement Unevenness
Presence of undulations on the pavement surface is called pavement unevenness which results in
• Increase in discomfort and fatigue to road users
• Increase in fuel consumption and tyre wear
• Increase in vehicle maintenance cost
• Reduction in vehicle operating speed increase in accident rate
Unevenness index is a measure of unevenness which is the cumulative measure of vertical
undulations of the pavement surface recorded per unit horizontal length of the road. It is measured
by an instrument called Bump integrator (BI) in terms of unevenness index. An unevenness index
value less than1500 mm/km is considered as good, a value less than 2500 mm.km is satisfactory
up to speed of 100 kmph and values greater than 3200 mm/km isconsidered as uncomfortable even
for 55 kmph.
The unevenness may be caused due to the following reasons
• Inadequate or improper compaction of either the fill, subgrade or pavement layers or
combination of these
• Use of improper construction machinery

12 | P a g e
Highway Engineering – 18CV52
• Use of inferior pavement materials
• Improper surface and subsurface drainage
• Unscientific construction practices
• Poor maintenance practices
• Localized failures

Light Reflecting Characteristics


• Night visibility depends upon the color and light reflecting characteristics of the pavement
surface
• The glare caused by the reflection of head light is high on wet pavement surface than dry
• White roads have good visibility at night, but caused glare during day time.
• Black roads has no glare during day, but has poor visibility at night

Drainage
The pavement surface should be absolutely impermeable to prevent seepage of water into the
pavement layers. Further, both the geometry and texture of pavement surface should help in
draining out the water from the surface in less time.

Camber
Camber or cant is the cross slope provided to raise middle of the road surface in the transverse
direction to drain off rain water from road surface. The objectives of providing camber are
• to prevent the entry of surface water into the pavement layers and subgrade soil
• To prevent the entry of water into the bituminous pavement layers
• To remove the rain water from the pavement surface as quickly as possible
The required camber of a pavement depends on
❖ Type of pavement surface
❖ The amount of rainfall
Types of camber
There are generally three types of the cambers
➢ Straight Camber
➢ Parabolic Camber
➢ Combination of straight and parabolic camber
Straight Camber: This type of camber is provided by meeting two straight surfaces at the crown.
Crown is the central and top most point on the surface of the road. The edge shape produces in-
convenience to the traffic so it is not used in general.
Parabolic Camber: Parabolic camber is provided by providing a parabolic shape to the surface of
the road. It is also not used in general because it has steep slopes towards the edges, which can
create the outward thrust to the vehicles.
Combination Camber:This camber is formed by use of the straight surfaces at the edges but
parabolic surface at the centre. It is mostly used for the road construction because both the problem
of the earlier two is solved if we use this camber.

13 | P a g e
Highway Engineering – 18CV52

Too steep slope is undesirable for it will erode the surface. Camber is measured in 1 in n or n%
(eg. 1 in 50 or2%) and the value depends on the type of pavement surface. The values suggested
by IRC for
various
categories of
pavement is
given in
Table

Width Of Pavement Or Carriage Way


Width of the carriage way or the width of the pavement depends on the width of the traffic lane
and number of lanes. Width of a traffic lane depends on the width of the vehicle and the clearance.
Side clearance improves operating speed and safety. The maximum permissible width of a vehicle
is 2.5m and the desirable side clearance for single lane traffic is 0.625 m. Thisrequire
minimum of lane width of 3.75 m for a single lane road (figure a) and 7m for two lane road (figure
b). The desirable carriage way width recommended by IRC is given in Table

14 | P a g e
Highway Engineering – 18CV52

Medians or traffic separators

In highways with divided carriageway, a median is provided between two sets of traffic lanes
intended to divide the traffic moving in opposite direction. The main function of the median is to
prevent head on collision between vehicle s moving in opposite directions on adjacent lanes. The
traffic separators used may be in the form of pavement markings, physical dividers or area
separators. The functions of medians are
• To channelize traffic into streams at intersections
• To shadow the crossing and turning traffic
• To segregate slow traffic
• To protect pedestrians
The IRC recommends a minimum desirable width of 5m for medians of rural highways, which
may be restricted to 3m. The absolute minimum width of median in urban area is 1.2m and
desirable minimum is 5m.

Kerbs
Kerbs indicate the boundary between the carriage way and the shoulder or islands or footpaths.
Different types of kerbs are
❖ Low or mountable kerbs
These types of kerbs are provided such that they encourage the traffic to remain in the through
traffic lanes and also allow the driver to enter the shoulder area with little difficulty. The height
of this kerb is about 10 cm above the pavement edge with a slope which allows
15 | P a g e
Highway Engineering – 18CV52
the vehicle to climb easily. This is usually provided at medians and channelization schemes
and also helps in longitudinal drainage.
❖ Semi-barrier type kerbs
When the pedestrian traffic is high, these kerbs are provided. Their height is 15cm above the
pavement edge. This type of kerb prevents encroachment of parking vehicles, but at acute
emergency it is possible to drive over this kerb with some difficulty.
❖ Barrier type kerbs
They are designed to discourage vehicles from leaving the pavement. They are provided when
there is considerable amount of pedestrian traffic. They are placed at a height of 20 cm above
the pavement edge with a steep batter.

❖ Submerged kerbs
They are used in rural roads. The kerbs are provided at pavement edges between the pavement
edge and shoulders. They provide lateral confinement and stability to the pavement.

Road Margins

16 | P a g e
Highway Engineering – 18CV52
❖ Shoulder
Shoulders are provided along the road edge and are intended for accommodation of stopped
vehicles, serve as an emergency lane for vehicles and provide lateral support for base and surface
courses. The shoulder should be strong enough to bear the weight of a fully loaded truck even in
wet conditions. The shoulder width should be adequate for giving working space around a stopped
vehicle. A minimum width of 2.5 m is recommended by IRC for 2-lane rural highwaysin India.
The functions of shoulders are
❖ Structural ability and support to the edges of the flexible pavements
❖ Capacity of carriageway and the operating speeds of vehicles increases
❖ Serves as an emergency lane
❖ Acts as service lanes for vehicles that are disabled
❖ Parking lanes
Parking lanes are provided in urban lanes for side parking. Parallel parking is preferred because
it is safe for the vehicles moving on the road. The parking lane should have a minimum of 3.0 m
width in the case of parallel parking. As far as possible parallel parking should be allowed as it is
safer for moving vehicles.
❖ Bus-bays
Bus bays are provided by recessing the kerbs for bus stops. They are provided so that they do not
obstruct the movement of vehicles in the carriage way. They should be at least 75 meters away
from the intersection so that the traffic near the intersections is not affected by the bus-bay.
❖ Cycle track
Cycle tracks are provided in urban areas when the volume of cycle traffic is high Minimum width
of 2 meter is required, which may be increased by 1 meter for every additional track.
❖ Footpath
Footpaths are exclusive right of way to pedestrians, especially in urban areas. They are provided
for the safety of the pedestrians when both the pedestrian traffic and vehicular traffic is high.
Minimum width is 1.5 meter and may be increased based on the traffic. The footpath should be
either as smooth as the pavement or smoother than that to induce the pedestrian to use the footpath.
❖ Guard rails
They are provided at the edge of the shoulder usually when the road is on an embankment. They
serve to prevent the vehicles from running o the embankment, especially when the height of the
fill exceeds 3m. Various designs of guard rails are in use. Guard stones painted in alternate black
and white are usually used. They also give better visibility of curves at night under headlights of
vehicles.
❖ Drive ways
Drive ways connect the highway with commercial establishment like fuel stations, servicestations
etc. Drive ways should be properly designed and located, fairly away from an intersection. The
radius of the drive way curve should be kept as large as possible, but the width of the drive way
should be minimized to reduce the crossing distance of pedestrians.
❖ Lay byes

17 | P a g e
Highway Engineering – 18CV52
They are provided near public conveniences with guide maps to enable drivers to stop clear off the
carriageway. It should normally be 3m width and at least 30m length with 15m end tapers on both
sides.
❖ Frontage road
Frontage roads are provided to give access to properties along an important highway with
controlled access to express way or free way. The frontage roads may run parallel to the highway
and are isolated by a separator, with approaches to the through facility only at selected points,
preferably with grade separators.

❖ Embankment slope
Embankment slope should be as flat as possible for the purpose of safe traffic movement and also
for aesthetic reasons. For safety considerations, the desirable slope for the embankment is 1 in 3.

Width of Formation Or Roadway


Width of formation or roadway is the sum of widths of pavement or carriageway including
separators, if any and the shoulders. The width of roadway standardized by the IRC is given in
table below

Right of Way and Land Width


Right of way is the area of land acquired for the road, along its alignment. The width of the acquired
land for right of way is known as land width and depends on the importance of the road and
possible future development. To prevent development along highways, control lines and building
lines may be provided. Control line is a line which represents the nearest limits of future
uncontrolled building activity in relation to a road. Building line represents a line on either side
of the road; between which and the road no building activity is permitted at all. The right of way
width is governed by
❖ Width of formation: It depends on the category of the highway and width of roadway and road
margins.

18 | P a g e
Highway Engineering – 18CV52
❖ Height of embankment or depth of cutting: It is governed by the topography and the vertical
alignment.
❖ Side slopes of embankment or cutting: It depends on the height of the slope, soil type etc.
❖ Drainage system and their size which depends on rainfall, topography etc.
❖ Sight distance considerations on curves etc., there is restriction to the visibility on the inner
side of the curve due to the presence of some obstructions like building structures etc.
❖ Reserve land for future widening.

Typical Cross Section of Roads

19 | P a g e
Highway Engineering – 18CV52

Sight Distance
It is the length of road visible ahead to the driver at any instance. Sight distance available at any
location of the carriageway is the actual distance a driver with his eye level at a specified height
above the pavement surface has visibility of any stationary or moving object of specified height
which is on the carriageway ahead.

Restrictions To Sight Distance


• At horizontal curves, when the line of sight is obstructed by objects at the inner side of the
curve (fig a)
• At a vertical curve the line of sight is obstructed by the road surface of the summit curve (fig
b)
• At an uncontrolled intersection when a driver from one of the approach roads is able to sight
a vehicle from another approach road proceeding towards the intersection (fig c)

Types of Sight Distance


Three types of sight distances situations are considered in the design
• Stopping sight distance (SSD) or Absolute minimum sight distance

20 | P a g e
Highway Engineering – 18CV52
• Safe overtaking sight distance (OSD) or Passing sight distance
• Safe sight distance for entering into uncontrolled intersections
Apart from the three situations mentioned above, the following sight distances are considered by
the IRC in highway design
❖ Intermediate sight distance
This is defined as twice the SSD. When OSD cannot be provided, intermediate sight distance
(ISD) is provided to give limited overtaking opportunities to fast vehicles.

❖ Head – light sight distance


This is the distance visible to a driver during night driving under the illumination of the vehicle
head lights. This sight distance is critical at up gradient and at ascending stretch of the valley
curves.

Stopping Sight Distance (SSD)


The minimum distance visible to a driver ahead on a highway at any spot should be of sufficient
length to safely stop a vehicle travelling at design speed, without collision with any other
obstruction. This is also called as non passing sight distance or absolute minimum sight distance.
The sight distance available to a driver traveling on a road at any instant depends on the following
factors
• Features of the road ahead
• Height of the driver’s eye above road surface
• Height of the object above the road surface
The features of the road ahead which affects the sight distance are the horizontal alignment and
vertical profile of the road, the traffic condition and the position of obstructions. For the purpose
of measuring the stopping sight distance or visibility ahead, IRC has suggested the height of eye
level of driver as 1.2m and the height of the object as 0.15m above the road surface.

Factors on Which Stopping Sight Distance Depends


• Total reaction time of the driver
• Speed of vehicle
• Efficiency of brakes
• Frictional resistance between the road and the tyre
• Gradient of the road, if any
Total reaction time
Reaction time of a driver is the time taken from the instant the object is visible to the driver to the
instant when the brakes are applied. The total reaction time may be split up into two parts:
perception and brake reaction time. The perception time is the time required for a driver to realize
that brakes must be applied. It is the time from the instant the object comes on the line of sight of
the driver to the instant he realizes that the vehicle needs to be stopped. The brake reaction time
depends on several factors including the skill of the driver, the type of the problems and various
other environmental factors. The total reaction time may be explained with the help of PIEV
theory.
21 | P a g e
Highway Engineering – 18CV52
PIEVtheory
According to PIEV theory, the total reaction time of the driver is split into four parts
• Perception time
It is the time required for the sensations received by the eyes or ears of the driver to be
transmitted to the brain through the nervous system and spinal cord. In other words, it is the
time required to perceive an object or situation.

• Intellection time
It is the time required for the driver to understand the situation. It is also the time required for
comparing the different thoughts, regrouping and registering new sensations.
• Emotion time
It is the time elapsed during emotional sensations and other mental disturbance such as fear,
angry or any other emotional feelings like superstition etc with reference to situation. It varies
for different drivers.
• Volition time
It is the time taken by the driver for the final action, such as brake application.

Speed of vehicle
The stopping distance depends very much on the speed of the vehicle. First, during the total
reaction time of the driver the distance moved by the vehicle will depend on the speed. Second,
the braking distance or the distance moved by the vehicle after applying the brakes, before coming
to a stop depends also on the initial speed of the vehicle. Hence it is evident that higher the speed,
higher will be the stopping distance. Hence it is evident that higher the speed, higher will be the
stopping distance.

Efficiency of brakes
The efficiency of the brakes depends upon the age of the vehicle, vehicle characteristics etc. If the
brake efficiency is 100%, the vehicle will stop the moment the brakes are applied. But practically,
it is not possible to achieve 100% brake efficiency. Therefore the sight distance required will be
more when the efficiency of brakes is less.

Frictional resistance between road and tyres


The frictional resistance between the tyre and road plays an important role to bring the vehicle to
stop. When the frictional resistance is more, the vehicles stop immediately. Thus sight required
will be less. No separate provision for brake efficiency is provided while computing the sight
distance. This is taken into account along with the factor of longitudinal friction. IRC has specified
the value of longitudinal friction in between 0.35 to 0.4.

Gradient of the road


Gradient of the road also affects the sight distance. While climbing up a gradient, the vehicle can
stop immediately. Therefore sight distance required is less. While descending a gradient, gravity
22 | P a g e
Highway Engineering – 18CV52
also comes into action and more time will be required to stop the vehicle. Sight distance required
will be more in this case.

Analysis of Stopping Sight Distance


The stopping sight distance of a vehicle is the sum of
• The distance travelled by the vehicle at uniform speed during the total reaction time, t which
is known as lag distance
• The distance travelled by the vehicle after the application of the brakes, until the vehicle
comes to a dead stop which is known as braking distance
Lag distance
If ‘v’ is the design speed in m/sec and ‘t’ is the total reaction time of the driver in seconds, then
Lag distance = vt (m)
If the design speed is V kmph, then the lag distance = 0.278Vt ≈0.28Vt (m)

Braking distance
Assuming a level road, the braking distance may be obtained by equating the work done in
stopping the vehicle and the kinetic energy of the vehicle moving at design speed. If the
maximum frictional force developed is F (kg) and the braking distance is I (m), then work done
F*I=W*f*I
Kinetic energy of the vehicle of weight W moving at the design speed of v m/sec = Wv2/2g
Hence WfI = Wv2/2g
Therefore braking distance, I= v2/2gf
Where l = braking distance, m
V = speed of vehicle, m/s
f = frictional coefficient
g = acceleration due to gravity = 9.8m/s2

Stopping distance on level road


𝑣2
SD = 𝑣𝑡 + 2𝑔𝑓
𝑉2
If speed is V kmph, SD = 0.278Vt + 254𝑓

Stopping distance on slope ground


𝑣2

SD = 𝑣𝑡 + 2𝑔(𝑓±𝑛%)

𝑉2
If speed is V kmph, SD = 0.278Vt + 254(𝑓±𝑛%)

Overtaking Sight Distance (OSD)


The minimum distance open to the vision of the driver of a vehicle intending to overtake slow
vehicle ahead with safety against the traffic of opposite direction is known as the minimum
overtaking sight distance or the safe passing sight distance. The OSD is the distance measured
23 | P a g e
Highway Engineering – 18CV52
along the centre of the road which a driver with his eye level at 1.2m above the road surface can
see the top of an object 1.2m above the road surface.

Factors on which OSD depends


• Speeds of overtaking vehicle, overtaken vehicle and the vehicle coming from opposite
direction, if any
• The minimum spacing between vehicles depends on the speeds
• Skill and reaction time of the driver
• Rate of acceleration of overtaking vehicle
• Gradient of the road, if any
Analysis of overtaking sight distance on a two way road

Vehicle A travelling at the design speed v m/s or V kmph desires to overtake another slower vehicle
B moving at a speed of vb m/s or Vb kmph. The vehicle A has accelerate, shift to the adjacent right
side lane, complete the overtaking and return to the left lane, before the on-coming vehicle C
approaches the overtaking stretch as shown in fig.
The OSD is divided into three components
• d1 the distance traveled by overtaking vehicle A during the reaction time t
• d2 the distance traveled by the vehicle during the actual overtaking operation T
• d3 is the distance traveled by on-coming vehicle C during the overtaking operation (T).
Therefore
OSD = d1 + d2 + d3
It is assumed that the vehicle A is forced to reduce its speed to vb, the speed of the slow moving
vehicle B and travels behind it during the reaction time t of the driver. So d1 is given by:
d1 = vbt
Then the vehicle A starts to accelerate, shifts the lane, overtake and shift back to the original lane.
The vehicle A maintains the spacing s before and after overtaking. The spacing s in m is given by:
s = 0.7vb + 6
Let T be the duration of actual overtaking. The distance traveled by B during the overtaking
operation is 2s+vbT. Also, during this time, vehicle A accelerated from initial velocity vb and
overtaking is completed while reaching final velocity v. Hence the distance traveled is given by:

24 | P a g e
Highway Engineering – 18CV52

The distance traveled by the vehicle C moving at design speed v m=sec during overtaking
operation is given by:
d3 = vT
The overtaking sight distance is

where
vb is the velocity of the slow moving vehicle in m/sec2,
t the reaction time of the driver in sec,
s is the spacing between the two vehicles in m
a is the overtaking vehicles acceleration in m/sec2.
In case the speed of the overtaken vehicle is not given, it can be assumed that it moves 16 kmph
or 4.5m/s slower than the design speed. Therefore vb = (v – 4.5)m/s or Vb = (V – 16)kmph
The acceleration values of the fast vehicle depends on its speed and given in Table

Speed Maximum overtaking acceleration


V, kmph V, m/s A, kmph a, m/sec2
25 6.93 5.0 1.41
30 8.34 4.80 1.30
40 11.10 4.45 1.24
50 13.86 4.0 1.11
65 18.0 3.28 0.92
80 22.20 2.56 0.72
100 27.80 1.92 0.53
If v is in kmph, than OSD is given by
OSD = 0.28Vbt + 0.28VbT+2s + VT
25 | P a g e
Highway Engineering – 18CV52
14.4 𝑠
T=√
𝐴

A is in kmph/s
S = 0.2Vb +6
Absolute Minimum Sight Distance
Safe stopping distance, SSD for the design speed is the absolute minimum sight distance and this
should be made available all along the road stretches irrespective of the category of road. If on any
road stretch SSD is not available due to any reason such as obstruction to vision, immediate steps
should be taken to either remove the obstruction to the sight line or install suitableregulatory signs
to specifying the speed limit along the appropriate warning signs. On horizontal curves the
obstruction on the inner side of the curve should be cleared to provide the required set back distance
such that the absolute minimum sight distance is invariably available.

Overtaking Zones
It is desirable to construct highways in such a way that the length of road visible ahead at every
point is sufficient for safe overtaking. This is seldom practicable and there may be stretches where
the safe overtaking distance cannot be provided. In such zones where overtaking or passing is not
safe or is not possible, sign posts should be installed indicating “no passing” or “overtaking
prohibited” before such restricted zones start. However overtaking opportunity for vehicles
moving at design speed should be given at as frequent intervals as possible. These zones which are
meant for overtaking are called ‘overtaking zones’. Figure shows an overtaking zone with
specifications for the position of the sign posts. Sign posts should be installed at sufficient distance
in advance to indicate the start and end of overtaking zone. The minimum length of overtaking
zone should be three times the safe overtaking sight distance and desirable length should be five
times the OSD.

Sight Distance at Uncontrolled Intersections


It is important that on all approaches of intersecting roads, there is a clear view across the corners
from a sufficient distance so as to avoid collision of vehicles. The design of sight distance at
intersection may be based on three conditions
• Enabling the approaching vehicle to change speed

26 | P a g e
Highway Engineering – 18CV52
• Enabling approaching vehicle to stop
• Enabling stopped vehicle to cross main road

Enabling the approaching vehicle to change speed


The sight distance should be sufficient to enable either one or both the approaching vehicles to
change speed to avoid collision. The vehicle approaching from the minor road should slow
down. The total reaction time required approaching from the minor road should be slow down.
The total reaction time is assumed as two seconds. Hence the two sides AC and BC of the sight
triangle along the intersection approaches up to the conflict point C should be at least equal to
the distance covered by a vehicle travelling at design speed in two seconds preferably in three
seconds.
Enabling approaching vehicle to stop
In this case, the distance for the approaching vehicle should be sufficient to bring either one or
both of the vehicles to a stop before reaching a point of collision. Hence, the two sides AC and BC
of the sight available should each be equal to the safe stopping distance. The traffic of the minor
road is generally controlled by an appropriate traffic sign. In such a case the sight distance for a
minor road should be at least equal to the SSD for the design speed of that road.
Enabling stopped vehicle to cross main road
The sight distance available from the stopped position of the minor road should be sufficient to
enable the stopped vehicle to start, accelerate and cross the main road, before another vehicle
travelling at its design speed on the main road reaches the intersection. The time, T required for
the stopped vehicle to cross the main road would depend upon the reaction time of the driver, width
of the main road, acceleration and length of vehicle.

Design of Horizontal Alignment


Horizontal alignment is one of the most important features influencing the efficiency and safety of
a highway. A poor design will result in lower speeds and resultant reduction in highway
performance in terms of safety and comfort. In addition, it may increase the cost of vehicle
operations and lower the highway capacity. Horizontal alignment design involves the
understanding on the design aspects such as design speed and the effect of horizontal curve on
the vehicles. The horizontal curve design elements include design of super elevation, extra
widening at horizontal curves, design of transition curve, and set back distance.

Horizontal Curve

27 | P a g e
Highway Engineering – 18CV52
A horizontal curve is a curve in plan to provide change in direction to the centre line of road. A
simple circular curve may be designated by either the radius, R of the curve in m or the degree, D
of the curve. The relation between the radius and degree of the circular curve is given by
1720
𝑅=
𝐷
When a vehicle traverses a horizontal curve, the centrifugal force acts horizontally outwards
through the centre of gravity of the vehicle. The centrifugal force developed depends on the radius
of the horizontal curve and the speed of the vehicle negotiating the curve. This centrifugal force is
counteracted by the transverse frictional resistance developed between the tyres iscounteracted by
the transverse frictional resistance developed between the tyres and the pavement which enables
the vehicle to change the direction along the curve and to maintain the stability of the vehicle.
Centrifugal force P is given by
𝑊𝑣2
𝑃=
𝑔𝑅
Where, W = weight of the vehicle, kg
R = radius of the circular curve, m
v = speed of the vehicle, m/s

g = acceleration due to gravity = 9.8m/s2


The ratio of the centrifugal force to the weight of the vehicle, P/W is known as the centrifugal
𝑣2
ratio or impact ratio. Therefore centrifugal ratio, P/W = 𝑔𝑅

The centrifugal force acting on a vehicle negotiating a horizontal curve has the following two
effects
• Tendency to overturn the vehicle outwards about the outer wheels and
• Tendency to skid the vehicle laterally, outwards
Overturning effect
The centrifugal force that tends the vehicle to overturn about the outer wheels B on horizontal
curve without superelevation is illustrated in Fig 4.18. Let h be the height of the centre of gravity
of the vehicle above the road surface and b be the width of the wheel base or the wheel track of
the vehicle.

The overturning moment due to centrifugal force, P = Ph


This is restricted by the restoring moment due to weight of the vehicle W and is equal to (W.b/2).
The equilibrium condition for overturning will occur when Ph= b/2h. This means that there is
28 | P a g e
Highway Engineering – 18CV52

danger of overturning when the centrifugal ratio P/W or 𝑣2/gR attains a values of b/2h.

29 | P a g e
Highway Engineering – 18CV52
Transverse skidding effect
The centrifugal force developed has also the tendency to push the vehicle outwards in the
transverse direction. The forces developed under this condition are sown in Fig 4.19. If the
centrifugal force developed exceeds the maximum transverse friction force or transverse skid
resistance counteracting the centrifugal force, the vehicle will start skidding in the transverse
direction.

The equilibrium condition for the transverse skid resistance developed is given below
P =FA + FB = f(RA+RB) = fW
Where, f = coefficient of friction
RA and RB= normal reactions at wheels A and B
RA+RB= W = weight of vehicle
Since P = fW, the centrifugal ratio P/W= f
In other words when the centrifugal ratio attains a value equal to the coefficient of lateral
friction, f there is a danger of lateral skidding. Thus to avoid both overturning and lateral skidding
on a horizontal curve, centrifugal ratio should always be less than b/2h and alsotransverse
friction coefficient, f.
If friction coefficient, f is less than b/2h, the vehicle would skid and not overturn. On the other
hand if the value of b/2h is lower than f, the vehicle would overturn on the outer side before
skidding. Thus the relative danger of lateral skidding and overturning depends on whether f is
lower or higher than b/2h.

Super elevation
In order to counteract the effect of centrifugal force and to reduce the tendency of the vehicle to
overturn or skid, the outer edge of the pavement is raised with respect to the inner edge, thus
providing a transverse slope throughout the length of the horizontal curve. This transverse
inclination to the pavement surface is known as super elevation or cant or banking. The rate of
superelevation. ‘e’ is expressed as the ratio of the height of outer edge with respect to the horizontal
width. From figure

30 | P a g e
Highway Engineering – 18CV52

𝑁𝐿
e= = 𝑡𝑎𝑛𝜃
𝑀𝐿

In practice the inclination θ with the horizontal is very small and the value of tan θ seldom
exceeds 0.07. Therefore the value of tan θ is practically equal to sin θ.
𝐸 𝑡𝑜𝑡𝑎𝑙 𝑠𝑢𝑝𝑒𝑟𝑒𝑙𝑣𝑎𝑡𝑒𝑑 ℎ𝑒𝑖𝑔ℎ𝑡
𝑒 = 𝑡𝑎𝑛 𝜃 = 𝑠𝑖𝑛 𝜃 = =
𝐵 𝑤𝑖𝑑𝑡ℎ 𝑜𝑓 𝑝𝑎𝑣𝑒𝑚𝑒𝑛𝑡

Analysis of Super elevation


The forces acting on the vehicle while moving on a circular curve of radius R (m) at speed of v
m/s are shown in figure. These forces are
• The centrifugal force P = Wv2/gR acting horizontally outwards through the centre of gravity,
CG.
• The weight W of the vehicle acting vertically downwards through the CG.
• The frictional force developed between the wheels and the pavement counteracting
transversely along the pavement surface towards the centre of the curve.
The centrifugal force developed is thus opposed by corresponding value of
❖ The friction developed between the tyres and the pavement surface
❖ A component of the force of gravity due to the superelevation provided.

Figure shows the cross section of pavement with all forces. Considering the equilibrium of the
components of forces acting parallel to the plane
Pcosθ = Wsinθ + FA +FB
Pcosθ = Wsinθ + fRA + fRB .............................. (1)
f is the coefficient of lateral friction and RA and RB are the normal reactions at wheels A and B.
Equilibrium of the components of forces acting perpendicular to the plane
Wcosθ + Psinθ = RA + RB
31 | P a g e
Highway Engineering – 18CV52
Therefore equation (1) becomes
Pcosθ = Wsinθ + f(RA + RB)
Pcosθ = Wsinθ + f(Wcosθ + Psinθ)
Pcosθ - fPsinθ = Wsinθ + Wfcosθ
Dividing by Wcosθ,
𝑃
(1 – f tanθ) = tanθ + f
𝑊
𝑃 tanθ + f

i.e., centrifugal ratio, =


𝑊 1 – f tanθ

The value of coefficient of lateral friction, ‘f’ is taken as 0.15 for the design of horizontal curves.
The value of tanθ or transverse slope due to superelevation seldom exceeds 0.07 or about 1/15.
Hence the value of (f tanθ) is about 0.01. Thus the value of (1 – f tanθ) = 0.99 and may be
approximated to 1.0.
𝑃
Therefore, = tanθ + f = e + f
𝑊

𝑃 𝑣2
But =
𝑊 𝑔𝑅

Therefore the general equation for design of superelevation is given by


𝑣2
e+f= 𝑔𝑅
where,

e = rate of superelevation = tanθ


f = design value of lateral coefficient = 0.15
v = speed of the vehicle, m/s
R = radius of the horizontal curve, m
g = acceleration due to gravity = 9.8m/s2
If V is in kmph, than superelevation is given by
𝑉2
e+f= 127𝑅

Maximim Super elevation


From the practical view point it will be necessary to limit the maximum allowable superelevation
to avoid very high values of ‘e’. In the case of heavily loaded trucks and bullock carts carrying
less dense materials like straw or cotton, the centre of gravity of the loaded vehicle will be
relatively high and it will not be safe for such vehicles to move on a road with high rate of
superelevation. Hence to avoid the danger of toppling of such loaded slow moving vehicles, it is
essential to limit the value of maximum allowable superelevation. The IRC has fixed the maximum
limit of superelevation in plain and rolling terrains and in snow bound areas as 7.0%or 0.07. On
hill roads not bound by snow a maximum superelevation of 10% and on urban roads 4% is
recommended.

Minimum Superevelation
32 | P a g e
Highway Engineering – 18CV52

From drainage considerations it is necessary to have a minimum cross slope to drain off the surface
water. If the calculated superelevation is equal to or less than the camber of the road surface, then
the minimum superelevation to be provided on horizontal curve may be limited to

33 | P a g e
Highway Engineering – 18CV52
the camber of the surface. Thus after the elimination of the crown a uniform cross slope equal to
the camber is maintained from outer to inner edge of pavement at the circular curve.

Attainment of Super elevation In The Field


The road cross section at the straight portion is cambered with the crown at the centre of the
pavement and sloping down towards both the edges. But the cross section on the portion of circular
curve of road is super elevated with a uniform tilt sloping down from the outer edge of the
pavement up to inner edge. Thus the crowned camber sections at the straight before the start of the
transition curve should be changed to a single cross slope equal to the desired super elevation at
the beginning of the circular curve. This change may be conveniently attained at a gradual and
uniform rate through the length of horizontal transition curve. The full superelevation is attained
by the end of transition curve or at the beginning of the circular curve. The attainment of
superelevation may be split up into two parts
• Elimination of crown of the cambered section
• Rotation of pavement to attain full superelevation

Elimination of crown of the cambered section


This may be done by two methods. In the first method, the outer half of the cross slopes is rotated
about the crown at a desired rate such that the surface falls on the same plane as the inner half and
the elevation of the centre line is not altered as shown in figure below.

Thus no point on the curve will have a negative super elevation the outer half of the pavement
even at the start of the transition curve. This method has a drawback that the surface drainage
will not be proper at the outer half, during a short stretch of the road with a cross slope less than
the camber between point A and C in fig 4.24.
In the second method of eliminating the crown, known as diagonal crown method, the crown is
progressively shifted outwards, thus increasing the width of the inner half of cross section
progressively. This method is not usually adopted as a portion of the outer half of the pavement
has increasing values of negative super elevation on a portion of the outer half, before the crown
is eliminated as shown in figure.

34 | P a g e
Highway Engineering – 18CV52

Rotation of pavement to attain full superelevation


When the crown of the camber is eliminated, the superelevation available at this section is equal
that of camber. But the superelevation to be provided at the beginning of circular curve may be
greater than the camber in many cases when the design superelevation is more than the minimum
value. Hence the pavement section will have to be rotated further till the desired banking is
obtained. There are two methods of rotating the pavement cross section to attain the full
superelevation after the elimination of the camber (shown in figure below).

❖ By rotating the pavement cross section about the centre line, depressing the inner edge and
raising the outer edge each by half the total amount of superelevation, i.e., by E/2 with
respect to the centre.
❖ By rotating the pavement cross section about the inner edge of the pavement section raising
both the centre as well as the outer edge of the pavement such that the outer edge is raised
by the full amount of super elevation, E with respect to the inner edge.
In this method as the pavement section is rotated about the centre line, the vertical profile of the
centre line remains unchanged, the outer edge is banked and inner edge is depressed resulting in
an advantage in balancing the earth work. The disadvantage of this method is the drainage problem
due to depressing the inner edge below the general level.
The second method of rotating about the inner edge is preferable in very flat terrain in high rain
fall areas when the road is not taken on embankment, in order to avoid the drainage problem. In
this case the centre of the pavement is also raised, which may be considered as a disadvantage of
the method as the vertical alignment of the road is altered. The plan of the horizontal curve
including the straight, transition and circular curves are shown in figure (a). Elimination of the
crown of cambered section, attainment of uniform slope and the two methods of rotating the
pavement section to attain full super elevation has been illustrated in figure (b). The vertical

35 | P a g e
Highway Engineering – 18CV52
profiles of the inner edge, centre line and outer edge by the two methods of rotation are shown in
figure (c).

The super elevation is introduced by raising the outer edge the pavement at a rate not exceeding
1 to 150 in plain and rolling terrain and 1 in 60 on mountainous and steep terrain as per
recommendations of the IRC.

Radius of Horizontal Curve


The radius of the horizontal curve is an important design aspect of the geometric design. The
maximum comfortable speed on a horizontal curve depends on the radius of the curve. Although
it is possible to design the curve with maximum super elevation and coefficient of friction, it is not
desirable because re-alignment would be required if the design speed is increased in future.
Therefore, a ruling minimum radius Rruling can be derived by assuming maximum super elevation
and coefficient of friction.
𝑣2 𝑉2
Rruling= 𝑔(𝑒+𝑓) or Rruling= 127(𝑒+𝑓)

36 | P a g e
Highway Engineering – 18CV52
Ideally, the radius of the curve should be higher than Rruling. However, very large curves are also
not desirable. Setting out large curves in the field becomes difficult. In addition, it also enhances
driving strain.

Widening of Pavement on Horizontal Curves


The objects of providing extra widening of pavement on horizontal curve are due to the following
reasons
• An automobile such as car, bus or truck has a rigid wheel base and only the front wheels can
be turned. When the vehicle takes a turn to negotiate a horizontal curve, the rear wheels do not
follow the same path as that of the front wheels. This phenomenon is called ‘off tracking’.
The off tracking depends on the length of the wheel base of the vehicle and the turning angle
or the radius of the horizontal curve negotiated.
• At speeds higher than the design speeds when the superelevation and lateral friction developed
are not fully able to counteract the outwards thrust due to the centrifugal force, some transverse
skidding may occur and the rear wheels any take paths on the outside of those traced by the
front wheels on the horizontal curves. However this occurs only at excessively high speeds.
• The path traced by the wheels of a trailer in the case of trailer units, it also likely to be either
side of the central path of towing vehicle, depending on the speed, rigidity of the universal
joints and pavement roughness.
• In order to take curved path with larger radius and to have greater visibility at curve, the drivers
have tendency not to follow the central path of the lane, but to use the outer side atthe
beginning of a curve.
• While two vehicles cross or overtake at horizontal curve there is a psychological tendency to
maintain a greater clearance between the vehicles, than on straights for increase safety.

Analysis of Extra Widening On Horizontal Curves


Extra widening of pavement on horizontal curves is divided into two parts
• Mechanical widening
• Psychological widening
Mechanical widening
The expression for extra width can be derived from the simple geometry of a vehicle atahorizontal
curve as shown in figure. Let R1 is the radius of the outer track line of the rear wheel, R2is the
radius of the outer track line of the front wheel ‘l’ is the distance between the front and rear wheel
(taken as 6.1 or 6m for commercial vehicles), n is the number of lanes, then the mechanical
widening Wmis derived below

37 | P a g e
Highway Engineering – 18CV52

In figure, OC – OA = OB – OA = R2 – R1 = Wm
R1 = R2 - Wm
From ΔOAB, OB2 = OA2 + BA2

Therefore the widening needed for a single lane road is

If the road has n lanes, the extra widening should be provided on each lane. Therefore, the extra
widening ofa road with n lanes is given by,

Please note that for large radius, R2≈ R, which is the mean radius of the curve, then Wm is given
by

Psychological widening

38 | P a g e
Highway Engineering – 18CV52
At horizontal curves drivers have a tendency to maintain a greater clearance between the vehicles
than on straight stretches of road. Therefore an extra width of pavement is provided for
psychological reasons for greater maneuverability of steering at higher speeds and to allow for the
extra space requirements for the overhangs of vehicles. Psychological widening is therefore
important in pavements with more than one lane. An empirical formula has been recommended by
the IRC for deciding the additional psychological widening ‘Wps’ which is dependent on the design
speed, V (kmph) of the vehicle and the radius, R (m) of the curve. The psychological widening is
given by
𝑉
Wps= 9.5√𝑅
Hence the total widening We required on a horizontal curve is given by
We = Wm + Wps
𝑛𝑙2 𝑉
We = +
2𝑅 9.5√𝑅

The extra width recommended by the IRC for single and two lane pavements are given in table
below
Radius of curve, m Up to 20 to 41 to 61 to 101 to Above
20 40 60 100 300 300
Extra width on two - lane 1.5 1.5 1.2 0.9 0.6 Nil
pavement, m
Extra width on single lane 0.9 0.6 0.6 Nil Nil Nil
pavement, m
Method of Introducing Extra Widening In the Field
The widening is introduced gradually, starting from the beginning of the transition curve or the
tangent point (TP) and progressively increased at uniform rate equally on both sides, till the full
value of designed widening ‘We’ is reached at the end of transition curve where full values of super
elevation is also provided, as shown in figure below. The full value of extra width We is continued
throughout the length of the circular curve and then decreased gradually along the length of
transition curve. Usually the widening is equally distributed i.e., We/2 each on innerand outer
sides of the curve.

On sharp curves of fill roads the extra widening We may be provided in full, only on the inside of
the curve, as shown in figure below. On horizontal circular curves without transition curves, two-
thirds the widening is provided at the end of the straight section, i.e., before the start of the circular
curve beyond the tangent point as in the case of super elevation.

39 | P a g e
Highway Engineering – 18CV52

Horizontal Transition Curves


Transition curve is provided to change the horizontal alignment from straight to circular curve
gradually and has a radius which decreases from infinity at the straight end (tangent point) to the
desired radius of the circular curve at the other end (curve point) There are five objectives for
providing transition curve and are given below
• To introduce gradually the centrifugal force between the tangent point and the beginning of
the circular curve, avoiding sudden jerk on the vehicle. This increases the comfort of
passengers.
• To enable the driver turn the steering gradually for his own comfort and security,
• To provide gradual introduction of super elevation, and
• To provide gradual introduction of extra widening
• To enhance the aesthetic appearance of the road.

Different Types of Transition Curves


The types of transition curves commonly adopted in horizontal alignment of highways are
• Spiral
• Lemniscates
• Cubic parabola

40 | P a g e
Highway Engineering – 18CV52

The general shapes of these three curves are shown in figure. All the three curves follow almost
the same path up to deflection angle of 4º, and practically there is no significant difference even
up to 9º. In all these curves, the radius decreases as the length increases. But the rate of change of
radius and hence the rate of change of centrifugal acceleration is not constant in the case of
lemniscates and cubic parabola, especially at deflection angles higher than 4º. In spiral curve the
radius is inversely proportional to the length. The IRC recommends the use of the spiral as
transition curve for the following reasons
❖ The spiral curve satisfies the requirements of an ideal transition, as the rate of change of
centrifugal acceleration is uniform throughout the length.
❖ The geometric property of spiral is such that the calculations and setting out the curve in the
field is simple and easy.
The equation of the spiral may be written as
LR = LsRc = constant
Therefore, L = m√𝜃
m = constant = √2𝑅𝐿𝑠
θ = tangent deflection angle in radius

Factors Affecting Transition Curves Length


• Radius of circular curve, R
• Design speed, V
• Allowable rate of change of centrifugal acceleration, C (0.5 to 0.8, depending on the design
speed)
• Maximum amount of super elevation, E which depends on the maximum rate of super
elevation, e and the total width of the pavement, B at the horizontal curve.
• Whether the pavement cross section is rotated about the inner edge or the centre line to
introduce full amount of super elevation, after the elimination of the camber.
• Allowable rate of introduction of super elevation, which depends on the terrain, location and
environmental conditions of site.

41 | P a g e
Highway Engineering – 18CV52
Length of Transition Curve
The length of the transition curve should be determined as the maximum of the following three
criteria: rate of change of centrifugal acceleration, rate of change of super elevation, and an
empirical formula given by IRC.
Rate of change of centrifugal acceleration
At the tangent point, radius is infinity and hence centrifugal acceleration is zero. At the end of
the transition, the radius R has minimum value R. The rate of change of centrifugal acceleration
should be adopted such that the design should not cause discomfort to the drivers. If C is the rate
of change of centrifugal acceleration, it can be written as
𝑣2
𝑣2 𝑣3
𝐶= = 𝑅𝐿𝑆
= (m3/s)
𝑅𝑡 𝑣 𝐿𝑆𝑅
𝑣3

Therefore, Ls = 𝐶𝑅

If the design speed is V kmph


0.0215𝑉3
Ls = 𝐶𝑅
80
By IRC, C = (m3/s), (0.5<C<0.8)
(75+𝑉)
Where V is in kmph

i.e., the minimum and maximum values of C are limited to 0.5 and 0.8 respectively.

Rate of introduction of super-elevation


Raise (E) of the outer edge with respect to inner edge is given by E = eB = e(W +We). The rate
of change of this raise from 0 to E is achieved gradually with a gradient of 1 in N over the length
of the transition curve. Therefore, the length of the transition curve Ls is
Ls = Ne (W +We) = EN (pavement rotated about inner edge)
𝑒𝑁 𝐸𝑁
Ls = 2
(W +We) = 2

By empirical formula
For plain and rolling terrains
2.7𝑉2
Ls =
𝑅
For mountainous and steep terrains
𝑉2
Ls =
𝑅
Where V is in kmph
Setting out Transition Curve
Transition curves are introduced between the tangent points of the straight stretches and the ends
42 | P a g e
Highway Engineering – 18CV52

of the circular curve on both sides as shown in figure. If the length of transition curve is Ls and
the radius of the circular curve is R, the shift, S of the transistion curve is given by the formula

43 | P a g e
Highway Engineering – 18CV52
Ls2
S=
24𝑅

Set-Back Distance on Horizontal Curves


The ‘set back distance’ or ‘clearance’ required from the centre line of a horizontal curve to an
obstruction on the inner side of the curve to provide adequate sight distance depends upon the
following factors
• Required sight distance, S
• Radius of horizontal curve, R
• Length of the curve, Lc which may be greater or lesser than S
Let C be the obstruction to vision on the inner side of a horizontal highway curve of radius R, ACB
the line of sight and arc AFB be the sight distance S (refer figure below). The length of the curve
is denoted by Lc. The two conditions considered are when the length of the curve is greater than
and less than the sight distance S.
When Lc>S
The sight distance is measured long the centre line of the road and the angle subtended at the
centre, α is equal to S/R radians. Therefore half central angle is given by

𝛼 𝑆 180𝑆
= 𝑟𝑎𝑑𝑖𝑎𝑛𝑠 = 𝑑𝑒𝑔𝑟𝑒𝑒𝑠
2 2𝑅 2𝜋𝑅

Set back distance or clearance, m = CF = OF – OC


𝛼
m = R - Rcos
2
In the case of wide roads with two or more lanes, if d is the distance between the centre line of
the road and the centre line of the inside lane in m, than
𝛼′
m' = R – (R – d)cos
2
𝛼′ 180𝑆
= 𝑑𝑒𝑔𝑟𝑒𝑒𝑠
2 2𝜋(𝑅 − 𝑑)

When Lc<S
44 | P a g e
Highway Engineering – 18CV52

𝛼′ 180𝑆
= 𝑑𝑒𝑔𝑟𝑒𝑒𝑠
2 2𝜋(𝑅 − 𝑑)
m' = FG + GC

𝛼′ (𝑆−𝐿𝑐) ∝′
m' = R – (R – d) cos + + 𝑠𝑖𝑛
2 2 2

Design of Vertical Alignment


The natural ground or the topography may be level at some places, but may have slopes of varying
magnitudes at other locations. In order to have smooth vehicle movements on the roads, the
changes in the gradient should be smoothened out by the vertical curves. The verticalalignment is
the elevation or profile of the centre line of the road. The vertical alignment consistsof grades and
vertical curves. The vertical alignment of a highway influences
• Vehicle speed
• Acceleration and deceleration
• Stopping distance
• Sight distance
• Comfort while travelling at high speeds
• Vehicle operation cost

Gradient
Gradient is the rate of rise or fall along the length of the road with respect to the horizontal. It is
expressed as a ratio of 1 in x or n%.

45 | P a g e
Highway Engineering – 18CV52

Types of Gradient
Many studies have shown that gradient up to 7% can have considerable effect on the speeds of the
passenger cars. On the contrary, the speeds of the heavy vehicles are considerably reduced when
long gradients as at as two percent is adopted. Although, flatter gradients are desirable, it isevident
that the cost of construction will also be very high.
Therefore, IRC has specified the desirable gradients for each terrain. However, it may not be
economically viable to adopt such gradients in certain locations, steeper gradients are permitted
for short duration. Gradients are divided into four categories
• Ruling gradient
• Limiting gradient
• Exceptional gradient
• Minimum gradient

Ruling gradient
Ruling gradient is the maximum gradient within which the designer attempts to design the vertical
profile of a road. Gradients up to the ruling gradient are adopted as a normal course in design of
vertical alignment and accordingly the quantities of cut and fill are decided. Hence ruling gradients
is also known as ‘design gradient’. However flatter gradients may be preferred where ever
practicable.
The selection of ruling gradient for the purpose of design is a complex job as several factors such
as type of terrain, the length of the grade, the speed, pulling power of different types of vehicles
and presence of horizontal curves are to be considered. In plain terrain or flat country it may be
possible to adopt a flat gradient. But on hill roads it may not be economical or sometimes not even
possible to adopt the same gradient because of large difference in levels to be covered in short
length of road. Therefore different values of ruling gradient are specified on different terrains. The
IRC has recommended ruling gradient values of
❖ 1 in 30 on plain and rolling terrain
❖ 1 in 20 on mountainous terrain
❖ 1 in 16.7 on steep terrain
46 | P a g e
Highway Engineering – 18CV52
Limiting gradient
Where topography of a place compels adopting steeper gradient than the ruling gradient, ‘limiting
gradient’ is used in view of enormous increase in cost in constructing roads with gentlergradients.
However the length of continuous grade line steeper than the ruling gradient should belimited. On
rolling terrain and on hill roads, it may be frequently necessary to exceed ruling gradient and adopt
limiting gradient but care should be taken to separate such stretches of steep gradients by providing
either a level road or a road with easier grade.
Exceptional gradient
In some extra ordinary situations it may be unavoidable to provide still steeper gradients than
limiting gradient at least for short stretches and in such cases the steeper gradient up to ‘exceptional
gradient’ may be provided. However the exceptional gradient should be strictly limited only for
short stretches but exceeding about 100m at a stretch.
Minimum gradient
The road can be level, with little or no gradient. In such cases there will be problems of drainage.
Though the surface water can be drained off to the side drains by providing proper camber on the
pavement surface and cross slope on the shoulders, a certain longitudinal slope is essential, to drain
the water along the side drains depending on the surface of the drains.
A minimum gradient of about 1 in 500 may be sufficient to drain water in concrete drain or gutter,
but on inferior surfaces of drains a slope of 1 in 200 or 0.5 percent may be neededwhereas
on kutcha open drains or soil drains, steeper slopes up to 1 in 100 or 1.0 percent may be needed
depending on the soil type.

Grade Compensation on Horizontal Curves


When sharp horizontal curve is to be introduced on a road which has already the maximum
permissible gradient, then the gradient should be decreased to compensate for the loss of tractive
effort due to the curve. This reduction in gradient at the horizontal curve is called grade
compensation or compensation in gradient at horizontal curve, which is intended to off-set the
extra tractive effort involved at the curve. This is calculated from the empherical relation
30+𝑅
Grade compensation, % =
𝑅
The maximum value of grade compensation is limited to 75/R, where R is the radius of the circular
curve in m.
According to the IRC the grade compensation is not necessary for gradients flatter than 4% and
therefore when applying grade compensation correction, the gradients need not be eased beyond
4%.

Vertical Curves

47 | P a g e
Highway Engineering – 18CV52
Due to change in grade on the vertical alignment of highway, it is necessary to introduce vertical
curve at intersections of different grades to smoothen out the vertical profile and thus ease off the
changes in gradients for the fast moving vehicles. The vertical curves used in highway may be
classified into two categories
• Summit curves or crest curves with convexity upwards
• Valley curves or sag curves with concavity upwards

Summit curves
Summit curves with convexity upwards are formed in any one of the cases illustrated in figure
below. The deviation angle, N between the two intersecting gradients is equal to the algebraic
difference between them.

Length of the summit curve


The important design aspect of the summit curve is the determination of the length of the curve
which is parabolic. As noted earlier, the length of the curve is guided by the sight distance
consideration.
Distance, Let L is the length
Case a: Length of summit curve greater than sight distance
The situation when the sight distance is less than the length of the curve

48 | P a g e
Highway Engineering – 18CV52

Case b: Length of summit curve less than sight distance

When stopping sight distance is considered the height of driver's eye above the road surface (h1)
is taken as 1.2 meters, and height of object above the pavement surface (h2) is taken as
0.15 meters. If overtaking sight distance is considered, then the value of driver's eye height (h1)
and the height of the obstruction (h2) are taken equal as 1.2 meters.
Valley curve
Valley curves or sag curves with convexity downwards are formed in any one of the cases
illustrated in figure below. The deviation angle, N between the two intersecting gradients is equal
to the algebraic difference between them.

Length of the valley curve


The valley curve is made fully transitional by providing two similar transition curves of equal
3 3/
length The transitional curve is set out by a cubic parabola y = bx where b = 2N L2 The length
of the valley transition curve is designed based on two criteria:
1. Comfort criteria; that is allowable rate of change of centrifugal acceleration is limited to a
Comfortable level of about 0:6m/sec3.
2. A safety criterion; that is the driver should have adequate headlight sight distance at any
Part of the country.

49 | P a g e
Highway Engineering – 18CV52
Comfort criteria
The length of the valley curve based on the rate of change of centrifugal acceleration that will
ensure comfort: Let c is the rate of change of acceleration, R the minimum radius of the curve,
3
v is the design speed and t is the time, then c is given as: Ls = v /CR
For a cubic parabola, the value of R for length Ls is given by:
R = Ls N
Safety criteria
Length of the valley curve for headlight distance may be determined for two conditions: length of
the valley curve greater than stopping sight distance and Length of the valley curve less than the
stopping sight distance.
Case 1: Length of valley curve greater than stopping sight distance (L > S)
The total length of valley curve L is greater than the stopping sight distance SSD. The sight
distance available will be minimum when the vehicle is in the lowest point in the valley. This is
because the beginning of the curve will have infinite radius and the bottom of the curve will have
minimum radius which is a property of the transition curve.

Where L is the total length of valley curve, N is the deviation angle in radians or tangent of the
deviation angle or the algebraic difference in grades, and c is the allowable rate of change of
3
centrifugal acceleration which may be taken as 0:6m/sec .

Where N is the deviation angle in radians, h1 is the height of headlight beam, α is the head
beam inclination in degrees and S is the sight distance. The inclination α is = 1 degree.
Case 2- Length of valley curve less than stopping sight distance (L < S)
The length of the curve L is less than SSD. In this case the minimum sight distance is from the
beginning of the curve. The important points are the beginning of the curve and the bottom most
part of the curve. If the vehicle is at the bottom of the curve, then its headlight beam will reach
far beyond the endpoint of the curve whereas, if the vehicle is at the beginning of the curve,

50 | P a g e
Highway Engineering – 18CV52
then the headlight beam will hit just outside the curve. Therefore, the length of the curve is derived
by assuming the vehicle at the beginning of the curve. The case is shown in figure below.

The gradients are very small and are acceptable for all practical purposes. We will not be able to
know prior to which case to be adopted. Therefore both has to be calculated and the one which
satisfies the condition is adopted.

51 | P a g e
Highway Engineering – 18CV52
Important Question

1. What are the requirements of an ideal alignment? Explain factors controlling alignment.
2. What are the special considerations for hilly area alignment?
3. Explain engineering surveys for highway alignment.
4. Explain the process for new project work
5. Explain the factors controlling geometric design of highways
6. Explain pavement surface characteristics.
7. What is Sight Distance? What is the Restrictions to Sight Distance?
8. What is Stopping Sight Distance? Explain the Factors on Which Stopping Sight Distance
Depends.
9. How stopping distance is analyzed?
10. What is Overtaking Zones?
11. What is super elevation? Explain analysis of super elevation.
12. What are objectives of providing extra widening of pavement on horizontal curve?
13. Explain Analysis of Extra Widening On Horizontal Curves.
14. Explain Different Types of Transition Curve.
15. Explain factors influencing the Design of Vertical Alignment.

52 | P a g e
Highway Engineering – 18CV52
MODULE - 3
PAVEMENT MATERIALS
Pavement Materials: Subgrade soil - desirable properties-HRB soil classification determination
of CBR and modulus of subgrade reaction with Problems Aggregates-Desirable properties and
tests, Bituminous materials-Explanation on Tar, bitumen, cutback and emulsion-tests on
bituminous material
Pavement Design: Pavement types, component parts of flexible and rigid pavements and their
functions, ESWL and its determination (Graphical method only)-Examples
Sub Grade Soil
Subgrade soil is an integral part of the road pavement structure which directly receives the traffic
load from the pavement layers. The subgrade soil and its properties are important in the design of
pavement structure. The main function of the subgrade is to give adequate support to thepavement
and for this the subgrade should possess sufficient stability under adverse climate and loading
conditions. The formation of waves, corrugations, rutting and shoving in black top pavements and
the phenomena of pumping, blowing and consequent cracking of cement concrete pavements are
generally attributed due to the poor subgrade conditions.

Properties of Soil
The desirable properties of soil as a highway material are
• Stability
• Incompressibility
• Permanency of strength
• Minimum changes in volume and stability under adverse conditions of weather and
ground water
• Good drainage, and
• Ease of compaction.
The soil should possess adequate stability or resistance to permanent deformation under loads and
should possess resistance to weathering, thus retaining the desired subgrade support. Minimum
variation in volume with variation in water content will ensure minimum variation in differential
expansion and differential strength values of the subgrade. Good drainage is essential to avoid
excessive moisture retention and to reduce the potential frost action. Ease of compaction ensures
higher dry density and strength under particular type and amount of compaction.

Index Properties Of Soil


The soil properties on which their identification and classification are based are known as index
properties. The index properties which are usually used are grain size distribution, liquid limit and
plasticity index.
Grain size distribution is found by mechanical analysis. The components of soils which are coarse
grained may be analyzed by sieve analysis and the soil fines by sedimentation analysis. The grain
size analysis is hence carried out to determine the percentage of individual grain size present in a
soil sample. Dry sieve analysis is carried out only on non-cohesion soil. But if the soil has even a
small fraction of slit or clay with some cohesive property, the small lumps formed cannot be
separated by dry sieving. Therefore, according to the Bureau of Indian

1|Page
Highway Engineering – 18CV52
standards (BIS) specification, ‘wet sieve analysis should be carried out on all such cohesive
soils.
Liquid limit is the maximum water content at which the soil will flow under the application of
very small shearing force. The liquid limit is usually determined in the laboratory using a
mechanical device.
Plastic limit is the minimum moisture content at which the soil remains in a plastic state. Plasticity
index is defined as the numerical difference between liquid limit and plastic limit. Plasticity index
thus indicates the range of moisture content over which the soil is in plastic condition.

Soil Classification Based On Grain Size


The most accepted grain size classification is the M.I.T. (Massachusetts Institute of Technology)
classification system. The Indian Standards Institution (I.S.I) has also adopted the same limits of
M.I.T system for the Indian standard classification system of soil grains. The limits of the grains
size for each component as per this system are shown below.

Soil classification based on grain size


Gravel Sand Silt Clay
Coarse Medium Fine Coarse Medium Fine Coarse Medium Fine
⁞ ⁞ ⁞ ⁞ ⁞ ⁞ ⁞ ⁞ ⁞
⁞ 0.6* 0.2 ⁞ 0.02 0.006 ⁞ 0.0006 0.0002
2.0* 0.06 0.002

Fractions of soils
Larger then 2.00mm size Gravel
Between 2.00mm – 0.06mm size Sand
Between 0.06mm – 0.002mm size Silt
Smaller than 0.002 size Clay

Soil Classification Systems


The various soil classification systems in use in the field of highway engineering are
• Burmister descriptive classification
• Casagrande soil classification
• Unified soil classification of revised casagrande soil classification and I.S. soil classification
systems
• U.S. Public Roads Administration (PRA) classification
• Highway Research Board (HRB) or American Association of State Highway Officials
(AASHO) classification or revised PRA classification
• Federal Aviation Agency (FAA) classification
• Civil Aeronautics Administration (CAA) classification
• Compaction classification

2|Page
Highway Engineering – 18CV52
Highway Research Board (HRB) Classification Of Soils
This is also called Revised Public Roads Administration (PRA) soil classification system. Soils
are divided into seven groups A-1 to A-7. A-1, A-2 and A-3 soils are granular soils, percentage
fines passing 0.074 mm sieve being less than 35 percent. A-4, A-5, A-6 and A-7, soils are fine
grained or silt-clay soils, passing 0.074 mm sieve being greater than 35 percent.
A-1 soils are well graded mixture of stone fragments, gravel coarse sand, fine sand and non-
plastic or slightly plastic soil binder. The soils of this group are subdivided into two subgroups,
A-1-a, consisting predominantly of stone fragments or gravel and A-1-b consisting predominantly
of coarse sand.
A-2 group of soils include a wide range of granular soils ranging from A- 1 to A-3 groups,
consisting of granular soils and up to 35% fines of A-4, A-5, A-6 or A-7 groups. Based on the
fines content, the soils of A-2 groups are subdivided into subgroups A-2-4, A-2-5, A-2-6 and A-
2-7.
A-3 soils consist mainly, uniformly graded medium or fine sand similar to beach sand or desert
blown sand. Stream-deposited mixtures of poorly graded fine sand with some coarse sand and
gravel are also included in this group.
A-4 soils are generally silty soils, non-plastic or moderately plastic in nature with liquid limit
and plasticity index values less than 40 and 10 respectively.
A-5 soils are also silty soils with plasticity index less than 10%, but with liquid limit values
exceeding 40%. These include highly elastic or compressible, soils, usually of diatomaceous of
micaceous character.
A-6 group of soils are plastic clays, having high values of plasticity index exceeding 10% and low
values of liquid limit below 40%; they have high volume change properties with variation in
moisture content.
A-7 soils are also clayey soils as A-6 soils, but with high values of both liquid limit and plasticity
index (LL greater than 40% and plasticity index greater than 10%).

Group Index of Soil


In order to classify the fine grained soils within one group and for judging their suitability as
subgrade material, an indexing system has been introduced in HRB classification known as Group
Index. Group index is function of percentage material, passing 200 mesh sieve (0.074mm), liquid
limit and plasticity index of soil given by equation
G I = 0.2a + 0.005ac + 0.01bd
Where,
a = that portion of material passing 0.074mm sieve, greater than 35 and not exceeding 75 percent
(0 to 40)
b = that portion of material passing 0.074mm sieve, greater than 15 and not exceeding 35 percent
(0 to 40)
c = that value of liquid limit in excess of 40 and less than 60 (0 to 20)
d = that value of plasticity index exceeding 10 and not more than 30 (0 to 20)
The plasticity chart of HRB soil classification system shown in figure below. The soil groups
showing the classification limit of various properties is given in table 6.4.

3|Page
Highway Engineering – 18CV52

Test on Strength Properties Of Soil


Sub grade soil is an integral part of the road pavement structure as it provides the support to the
pavement from beneath. The sub grade soil and its properties are important in the design of

4|Page
Highway Engineering – 18CV52
pavement structure. The main function of the sub grade is to give adequate support to the pavement
and for this the sub grade should possess sufficient stability under adverse climaticand loading
conditions. Therefore, it is very essential to evaluate the sub grade by conducting tests.
The tests used to evaluate the strength properties of soils may be broadly divided into three groups:
• Shear tests
• Bearing tests
• Penetration tests
Shear tests are usually carried out on relatively small soil samples in the laboratory. In order to
find out the strength properties of soil, a number of representative samples from differentlocations
are tested. Some of the commonly known shear tests are direct shear test, triaxial compression test,
and unconfined compression test.
Bearing tests are loading tests carried out on soil sub grade or at formation level in-situ, using a
loading plate of relatively large bearing area. The ratio of the deformation or settlement of the
plate to the diameter of the loaded area is quite small. The results of the bearing tests are influenced
by variations in the soil properties within the stressed soil mass underneath and hence the overall
stability of the part of the soil mass stressed could be studied.
Penetration tests may be considered as small scale bearing tests in which the size of the loaded
area is relatively much smaller and ratio of the penetration to the size of the loaded area is much
greater than the ratios in bearing tests. The penetration tests are carried out in the field or in the
laboratory. The CBR test and cone penetration tests are commonly known penetration tests.

Plate Bearing Test


In plate bearing test, a compressive stress is applied to the soil or pavement layer through rigid
plate’s relatively large size and the deflections are measured for various stress values. The
deflection level is generally limited to a low value, in the order of 1.25 to 5 mm. The plate- bearing
test has been devised to evaluate the supporting power of sub grades or any other pavement layer
by using plates of larger diameter. The plate-bearing test was originally meant tofind the modulus
of sub grade reaction in the Westergard's analysis for wheel load stresses in cement concrete
pavements.
Test Procedure
• The test site is prepared and loose material is removed so that the 75 cm diameter plate
rests horizontally in full contact with the soil sub-grade. The plate is seated accurately
and then a seating load equivalent to a pressure of 0.07 kg/cm2 (320 kg for 75 cm diameter
plate) is applied and released after a few seconds.
• The settlement dial gauge is now set corresponding to zero load.
• A load is applied by means of jack, sufficient to cause an average settlement of about
0.25 mm. When there is no perceptible increase in settlement or when the rate ofsettlement
is less than 0.025 mm per minute (in the case of soils with high moisture content or in
clayey soils) the load dial reading and the settlement dial readings are noted.
• Deflection of the plate is measured by means of deflection dials, placed usually at one-
third points of the plate near its outer edge.
• To minimize bending, a series of stacked plates should be used.

5|Page
Highway Engineering – 18CV52
• Average of three or four settlement dial readings is taken as the settlement of the plate
corresponding to the applied load. Load is then increased till the average settlement
increase to a further amount of about 0.25 mm, and the load and average settlement
readings are noted as before.
• The procedure is repeated till the settlement is about 1.75 mm or more.
• Allowance for worst subgrade moisture and correction for small plate size should be
dealt properly.
Modulus of subgrade reaction
Modulus of subgrade reaction K is defined as the pressure sustained per unit deformation
of subgrade at specified deformation or pressure level, using specified plate size. A graph is plotted
with the mean settlement versus bearing pressure (load per unit area) as shown in Figure. The
pressure p corresponding to a settlement is obtained from this graph. The modulus of subgrade
reaction is calculated from the relation.
𝑝
𝐾= 𝑘𝑔/𝑐𝑚3
0.125

Plate Load Test


Correction for small plate size
In some cases the load capacity may not be adequate to cause 75cm dia plate to settle 0.175cm.
In such a case a plate of smaller dia (say 30cm) may be used. Then K value should be found by
applying a suitable correction for plate size. Assuming the subgrade to be an elastic medium with
modulus of elasticity E (kg/cm2), the theoretical relationship of deformation (cm) under a rigid
plate of radius a (cm) is given by
𝑝𝑎
𝛥 = 1.18
𝐸
𝑝 𝑝×𝐸 𝐸
But, K = = =
𝛥 1.18 𝑝𝑎 1.18 𝑎

If the value of E is taken as constant for a soil then K is inversely proportional to aor Ka is constant
i.e., K a = K1 a1 or K = K1 a1 / a. Hence if the test is carried out with a smaller plate of radius a
and the modulus of subgrade reaction K is found. Then the corrected value of modulus of
subgrade reaction K for standard plate of radius a, is given by

6|Page
Highway Engineering – 18CV52
𝑎1
𝐾 = 𝐾1
𝑎
California Bearing Ratio (CBR) Test

This is a penetration test developed by the California division of highway for evaluating the
stability of soil subgrade and other pavement materials. The test results have been correlated with
flexible pavement thickness requirement for highway and airfield. CBR test may be conducted in
the laboratory on a prepared specimen in a mould or in situ in the field.
The laboratory CBR apparatus consists of
• Cylindrical mould of 150mm dia, 175mm height with 50mm collar height, detachable
perforated base with spacer disc of 148mm dia and 47.7mm thick is used to obtain aspecimen
of exactly 127.3mm height.
• Loading Machine - Compression machine operated at a constant rate of 1.25mm/min.Loading
frame with cylindrical plunger 50mm dia & dial gauge for measuring the deformation due to
application of load.
• Compaction rammer
Type of Compaction No of layers Wt of hammer (kg) Fall (cm) No of blows

Light compaction 3 2.6 31 56


Heavy compaction 5 4.98 45 56
• Annular weight or surcharge weight - 2.5 kg of surcharge wt of 147mm dia are placed
on specimen both at the soaking and testing of prepared samples.
Procedure
• About 5kgs of soil is taken passing though 20mm IS sieve and retained on 4.75mm IS
sieve.
• The soil is mixed with water upto OMC.
• The spacer disc is placed at the bottom of the mould over the base plate & a coarse filter
paper is placed over the spacer disc. Then the moist soil sample is to be compacted over
this in the mould by adopting either IS light compaction or IS heavy compaction.
• For IS heavy compaction 3 equal layers of compacted thickness about 44mm by applying
56 evenly distributed blows from 2.6 kg rammer.
• For IS heavy compaction 5 equal layers of compacted thickness about 26.5mm byapplying
56 evenly distributed blows from 4.89 kg rammer.
• After compacting last layer, the collar is removed and the excess soil above the top of the
mould is evenly trimmed off by means of straight edge (of 5mm thickness).
• Clamps are removed and the mould with compacted soil is lifted leaving below the
perforated base plate & the spacer disc which is removed.
• Then the mould with compacted soil is inverted & placed in position over the base plate.
Now the clamp of the base is tightened. Another filter paper is placed on the top surface of
the sample & the perforated plate with adjustable stem is placed over it.

7|Page
Highway Engineering – 18CV52
• Now surcharge weights of 2.5 or 5kgs are placed over the perforated plate & the whole
mould with the weights is placed in a water tank for soaking such that water can enter the
specimen both from the top & bottom.
• The test set up is kept undisturbed in the water tank to allow soaking of the soil specimen
for full 4 days or 96 hrs.
• The mould is taken out of the water tank & the sample is allowed to drain in a perpendicular
position for 15 min surcharge weight, perforated plate with stem, filter paper is removed.
• Then the specimen is clamped over base plate, surcharge weights are placed on specimens
centrally such that the penetration test could be conducted.
• The mould with base plate is placed under the penetration plunger of loading machine.
• The penetration plunger is seated at the centre of the specimen & is brought in contact with
the top surface of the soil sample by applying a seating load of 4kgs.
• The dial gauge for measuring the penetration values of the plunger is fitted in position.
The dial gauge of proving ring & the penetration dial gauge are set to 0.
• Load is applied on the sample by a standard plunger with dia of 50 mm at the rate of 1.25
mm/min. A load penetration curve is drawn. The load values on standard crushed stones
are 1370 kg and 2055 kg at 2.5 mm and 5.0 mm penetrations respectively.
• The load readings are recorded at penetration of 0, 0.5, 1.0, 1.5, 2, 2.5, 3, 4, 5, 7.5, 10 &
12.5mm.
• In case the load reading starts decreasing before 12.5mm penetration, the max load & the
corresponding penetration values are recorded. After the final reading the load is released
& the mould from loading machine.
• The proving ring calibration factor is noted so that load dial gauge value can be converted
into the load in kg.
• Two typical types of curves may be obtained as shown in fig. The normal curve is with
convexity upwards as for specimen no. 1 and the loads corresponding to 2.5 and 5.0 mm
penetration values are noted. Sometimes a curve with initial upward concavity is obtained,
indicating the necessity of correction as for specimen no. 2. In this casecorrected origin is
established by drawing a tangent from the steepest point on the curve. The load values
corresponding to 2.5 and 5.0mm penetration values from the corrected origin are noted.
• CBR value is expressed as a percentage of the actual load causing the penetrations of 2.5
mm or 5.0 mm to the standard loads mentioned above. Therefore,

Load sustained by thespecimen


CBR,% = Load
• sustained by thestandard aggregates
Two values of CBR will be obtained. If the value of 2.5 mm is greater than that of 5.0
mm penetration, the former is adopted. If the CBR value obtained from test at 5.0 mm
penetration is higher than that at 2.5 mm, then the test is to be repeated for checking. If the
check test again gives similar results, then higher value obtained at 5.0 mm penetration is
reported as the CBR value. The average CBR value of three test specimens is reported as
the CBR value of the sample.
Standard load values on crushed stone aggregates for specified penetration values

8|Page
Highway Engineering – 18CV52
Penetration, mm Standard load, kg Unit Standard load, kg/cm2
2.5 1370 70
5.0 2055 105

Aggregates
Aggregates form the major portion of pavement structure and they form the prime materials used
in pavement construction. Aggregates have to bear stresses occurring due to the wheel loads on
the pavement and on the surface course they also have to resist wear due to abrasive action of
traffic. Aggregate is a collective term for the mineral materials such as sand, gravel, and crushed
stone that are used with a binding medium (such as water, bitumen, Portland cement, lime, etc.)
to form compound materials (such as bituminous concrete and Portland cement concrete).
Aggregate is used for base and sub-base courses for both flexible and rigid pavements. Aggregates
can either be natural or manufactured. Natural aggregates are generally extracted from larger rock
formations through an open excavation (quarry). Extracted rock is typically reduced to usable sizes
by mechanical crushing. Manufactured aggregate is often a by-product of other manufacturing
industries.

Desirable Properties of Road Aggregates


• Strength: The aggregates used in top layers are subjected to (i) Stress action due to traffic
wheel load, (ii) Wear and tear, (iii) crushing. For a high quality pavement, the aggregates
should posse’s high resistance to crushing and to withstand the stresses due to traffic wheel
load.
• Hardness: The aggregates used in the surface course are subjected to constant rubbing or
abrasion due to moving traffic. The aggregates should be hard enough to resist the abrasive
action caused by the movements of traffic. The abrasive action is severe when steel tyred
vehicles moves over the aggregates exposed at the top surface.
• Toughness: Resistance of the aggregates to impact is termed as toughness. Aggregates used
in the pavement should be able to resist the effect caused by the jumping of the steel tyred

9|Page
Highway Engineering – 18CV52
wheels from one particle to another at different levels causes severe impact on the aggregates.
Sever impact like hammering is quite move on water bound macadam roads where stones
protrude out especially after the monsoons. The magnitude of impact would increase with the
roughness of the road surface, speed of vehicle and other vehicular characteristics.
• Durability: The stone used in pavement construction should be durable and should resist
disintegration due to the action of weather. The property of the stones to withstand the adverse
action of weather may be called as soundness. The aggregates are subjected to the physical
and chemical action of rain and bottom water, impurities there-in and that ofatmosphere, hence
it is desirable that the road aggregates used in the construction should be sound enough to
withstand the weathering action.
• Shape of Aggregate: Aggregates which happen to fall in a particular size range may have
rounded, cubical, angular, flaky or elongated particles. It is evident that the flaky andelongated
particles will have less strength and durability when compared with cubical,angular or rounded
particles of the same aggregate. Hence too flaky and too much elongated aggregates should be
avoided as far as possible.
• Adhesion with Bitumen: The aggregates used in bituminous pavements should have less
affinity with water when compared with bituminous materials, otherwise the bituminous
coating on the aggregate will be stripped off in presence of water.

Tests on Aggregates
In order to decide the suitability of the aggregate for use in pavement construction, following tests
are carried out
• Crushing test
• Abrasion test
• Impact test
• Soundness test
• Shape test
• Specific gravity and water absorption test
• Bitumen adhesion test

Crushing Test
This test is standardized by IS:2386 part-IV and used to determine the crushing strength of
aggregates. The aggregate crushing value provides a relative measure of resistance to crushing
under gradually applied crushing load. The test consists of subjecting the specimen of aggregate
in standard mould to a compression test under standard load conditions (Figure).
Dry aggregates passing through 12.5 mm sieves and retained 10 mm sieves are filled in a
cylindrical measure of 11.5 mm diameter and 18 cm height in three layers. Each layer is tampered
25 times with at standard tamping rod. The test sample is weighed (W1) and placed in the test
standard test cylinder of 15.2cm diameter, 14cm height with a base plate in three layers each layer
being tampered again. The plunger is placed on the top of the specimen and a compressive load of
40 tones gradually applied at the rate of 4 tones per minute. Then crushed aggregates are then
sieved through 2.36 mm sieve and weight of passing material is noted (W2).

10 | P a g e
Highway Engineering – 18CV52
The aggregate crushing value is the percentage of the crushed material passing 2.36mm sieve
(W2) in terms of weight of the total sample (W1).
𝑊2
𝐴𝑔𝑔𝑟𝑒𝑔𝑎𝑡𝑒𝐶𝑟𝑢𝑠ℎ𝑖𝑛𝑔𝑉𝑎𝑙𝑢𝑒 = × 100
𝑊1

Aggregate crushing value for good quality aggregate used in base course shall not exceed 45%
and for surface course shall be less than 30%.

Abrasion Test
Due to the movements of traffic on the road stones used in the surface course are subjected to
wearing action at the top. Hence road stones should be hard enough to resist the abrasion due to
traffic. Abrasion test is carried out to test the hardness property of aggregates and to decide
whether they are suitable for different pavement construction works.
Los Angeles abrasion test is a preferred one for carrying out the hardness property and has been
standardized in India (IS:2386 part-IV). The principle of Los Angeles abrasion test is to find the
percentage wear due to relative rubbing action between the aggregate and steel balls used as
abrasive charge.
Los Angeles machine consists of circular drum of internal diameter 700 mm and length 520 mm
mounted on horizontal axis enabling it to be rotated (Figure). An abrasive charge consisting of
cast iron spherical balls of 48 mm diameters and weight 340-445 g is placed in the cylinderalong
with the aggregates. The number of the abrasive spheres varies according to the grading of the
sample. The quantity of aggregates to be used depends upon the gradation and usually rangesfrom
5-10 kg. The cylinder is then locked and rotated at the speed of 30-33 rpm for a total of 500
-1000 revolutions depending upon the gradation of aggregates. After specified revolutions, the
material is sieved through 1.7 mm sieve and passed fraction is expressed as percentage total weight
of the sample. This value is called Los Angeles abrasion value.
A maximum value of 40 percent is allowed for WBM base course in Indian conditions. For
bituminous concrete, cement concrete a maximum value of 30% is specified.

11 | P a g e
Highway Engineering – 18CV52

Impact Test
A test designed to evaluate the toughness of stone or the resistance of aggregate to impact, which
has a different effect than the resistance to gradually increasing compressive stress. The aggregate
impact test is carried out to evaluate the resistance to impact of aggregates.
Aggregates passing 12.5 mm sieve and retained on 10 mm sieve is filled in a cylindrical steel
cup of internal dia 10.2 mm and depth 5 cm which is attached to a metal base of impact testing
machine. The material is filled in 3 layers where each layer is tamped for 25 numbers of blows.
Metal hammer of weight 13.5 to 14 Kg is arranged to drop with a free fall of 38.0 cm by vertical
guides and the test specimen is subjected to 15 number of blows. The crushed aggregate is allowed
to pass through 2.36 mm IS sieve and the impact value is measured as percentage of aggregates
passing sieve (W2) to the total weight of the sample (W1).
𝑊2
𝐴𝑔𝑔𝑟𝑒𝑔𝑎𝑡𝑒𝐼𝑚𝑝𝑎𝑐𝑡𝑉𝑎𝑙𝑢𝑒 = × 100
𝑊1

Aggregates to be used for wearing course, the impact value shouldn't exceed 30 percent. For
bituminous macadam the maximum permissible value is 35 percent. For Water bound macadam
base courses the maximum permissible value defined by IRC is 40 percent.

Soundness Test
Soundness test is intended to study the resistance of aggregates to weathering action, by
conducting accelerated weathering test cycles. The Porous aggregates subjected to freezing and
thawing is likely to disintegrate prematurely. To ascertain the durability of such aggregates, they
are subjected to an accelerated soundness test as specified in IS:2386 part-V. Aggregates of
12 | P a g e
Highway Engineering – 18CV52
specified size are subjected to cycles of alternate wetting in a saturated solution of either sodium
sulphate or magnesium sulphate for 16 - 18 hours and then dried in oven at 105 to 110ᵒC to a
constant weight. After five cycles, the loss in weight of aggregates is determined by sieving out
all undersized particles and weighing. And the loss in weight should not exceed 12 percent when
tested with sodium sulphate and 18 percent with magnesium sulphate solution.

Shape Test
The particle shape of the aggregate mass is determined by the percentage of flaky and elongated
particles in it and by its angularity number. Aggregates which are flaky or elongated aredetrimental
to higher workability.

Flakiness index
The flakiness index is defined as the percentage by weight of aggregate particles whose least
dimension is less than 0.6 times their mean size. This test is applicable to aggregates larger than
6.3 mm. Test procedure had been standardized in India IS:2386 part-I. The sample of aggregate to
be tested is first sieved through a set of sieves and separated into specified size ranges. Now to
separate the flaky material, the aggregates which pass through the appropriate thickness slot of the
thickness gauge are found. The flaky material passing the appropriate slot from each size range of
aggregates are added up and let this total weight of flaky particles be W1 g. If the total weight of
sample taken from the different size ranges is W g, the flakiness index is given by
100𝑊1
𝑓𝑙𝑎𝑘𝑖𝑛𝑒𝑠𝑠𝑖𝑛𝑑𝑒𝑥 = %
𝑊
Elongation index

The elongation index of an aggregate is defined as the percentage by weight of particles whose
greatest dimension (length) is 1.8 times their mean dimension. This test is applicable to aggregates
larger than 6.3 mm. This test is also specified in (IS:2386 Part-I).The sample of aggregate to be
tested is first sieved through a set of sieves and separated into specified size ranges. Now to
separate the elongated material, the aggregates which do not pass through the appropriate
elongated slot of the elongated gauge are found. The elongated material not passing the appropriate
slot from each size range of aggregates are added up and let this total weight of elongated particles
be W1 g. If the total weight of sample taken from the different size ranges is W g, the elongation
index is given by
100𝑊1
𝑒𝑙𝑜𝑛𝑔𝑎𝑡𝑖𝑜𝑛𝑖𝑛𝑑𝑒𝑥 = %
𝑊
Flakiness index and elongation index values in excess of 15% are generally considered
undesirable.

Fig: Flakiness Gauge Fig: Elongation Gauge

13 | P a g e
Highway Engineering – 18CV52
Angularity number
Based on the shape of the aggregate particles, they may be classified as rounded, irregular or partly
rounded, angular and flaky. Angularity or absence of rounding of the particles of an aggregate is
a property which is of importance because it affects the ease of handling a mixtureof aggregate
and binder. The degree of packing of particles of single sized aggregates dependson the shape and
angularity of the aggregate. Hence the angularity of the aggregate can be estimated from the
properties of voids in a sample of aggregate compacted in a particularmanner. The range of
angularity number for aggregates used in construction is 0 to 11. The higher the angularity number,
more angular is the aggregate.
The apparatus for testing the angularity number consists of a metal cylinder of capacity 3 litre,
tamping rod and a metal scoop. The test sample is sieved and a specified size range of the
aggregate, such as 16 – 20mm, 12.5 – 16mm, etc are used for the test. Aggregates are filled in
three layers and each layer is tamped 100 times. The excess aggregates are struck off to the top
level of the cylinder and weight of aggregate with cylinder is taken as W g. then cylinder is emptied
and the weight of the cylinder with water is taken as C g. the specific gravity of aggregate is taken
as G. Therefore, the angularity number is given by
100𝑊
Angularity Number = 67 −
𝐶𝐺𝑎

Specific Gravity and Water Absorption Tests


The specific gravity of an aggregate is considered to a measure of the quality or strength of the
material. Stones having low specific gravity values are generally weaker than those having higher
values. Water absorption is an indicator for the strength of rock. Stones having higher water
absorption values are porous and thus weak. The test is conducted in laboratory by wire basket
method.
About 2kg of dry sample of coarse aggregate is placed in wire basket and immersed in water for
24hours. The sample is weighed in water and the buoyant weight is found (W1). Te empty weight
of basket in suspension with water is found (W2). The aggregates are then taken out, surface dried
well with absorbent cloth is weighed (W3). The aggregates are then dried in an oven at a
temperature 110°C for 24 hours and then the oven dry weight is determined (W4). Specific gravity
is calculated by dividing the dry weight of aggregate by weight of equal volume of water.
𝑊4
𝑠𝑝𝑒𝑐𝑖𝑓𝑖𝑐𝑔𝑟𝑎𝑣𝑖𝑡𝑦 =
(𝑊3 − (𝑊1 − 𝑊2))

Water absorption is expressed as the percent water absorbed in terms of oven dried weight of the
aggregates.
(𝑊3 − 𝑊4)100
𝑤𝑎𝑡𝑒𝑟𝑎𝑏𝑠𝑜𝑟𝑝𝑡𝑖𝑜𝑛 =
𝑊4

Bitumen Adhesion Test


Bitumen adheres well to all normal types of road aggregates provided they are dry and free from
dust. In the absence of water there is practically no adhesion problem of bituminous construction.
Adhesion problem occurs when the aggregate is wet and cold. This problem can bedealt with by
removing moisture from the aggregate by drying and increasing the mixing temperature. Further,
the presence of water cause stripping of binder from the coated aggregates.
14 | P a g e
Highway Engineering – 18CV52
This problem occurs when bitumen mixture is permeable to water. Several laboratory tests are
conducted to arbitrarily determine the adhesion of bitumen binder to an aggregate in the presence
of water. Static immersion test is one specified by IRC and is quite simple. The principle of the
test is by immersing aggregate fully coated with binder in water maintained at 400ᵒC temperature
for 24 hours. IRC has specified maximum stripping value of aggregates should not exceed 5%.

Bituminous Materials
Bituminous binders used in pavement construction works include both bitumen and tar. Bitumen
is a petroleum product obtained by the distillation of petroleum crude where-as road tar is obtained
by the destructive distillation of coal or wood. Both bitumen and tar have similar appearance, black
in colour though they have different characteristics. Both these materials can be used for pavement
works.
Types of bituminous materials
Bituminous material used in highway construction may be broadly divided as
• Bitumen
• Tar

Bitumen
Crude petroleum obtained from different places is quite different in their composition. The portion
of bituminous material present in the petroleum’s may widely differ depending on the source.
Almost all the crude petroleum’s contain considerable amounts of water along with crude oil.
Hence the petroleum should be dehydrated first before carrying out the distillation. General types
of distillation processes are fractional distillation and destructive distillation. In fractional
distillation the various volatile constituents are separated at successively higher temperatures
without substantial chemical change and the residue obtained from this is petroleum bitumen.

Desirable Properties of Bitumen


• The viscosity of the bitumen at the time of mixing with aggregates and compaction of the pre-
mix should be adequate.
• The bituminous binder should become sufficiently viscous on cooling that the compacted
bituminous pavement layer can gain stability and resist deformation under traffic loads.
• In bituminous mix, binder used form ductile thin films around the aggregates to serve as a
satisfactory binder in improving the physical interlocking of the aggregates.
• The bituminous binder used should not be highly temperature susceptible. During the hottest
weather the mix should not become too soft or unstable, and during cold weather the mix
should not become too brittle causing cracks.
• The bitumen binder should have sufficient adhesion with the aggregates in the presence of
water.
• There has to be adequate affinity and adhesion between the bitumen and aggregate used in
mix.

15 | P a g e
Highway Engineering – 18CV52
Tests on Bitumen
There are a number of tests to assess the properties of bituminous materials. The following tests
are usually conducted to evaluate different properties of bituminous materials.
• Penetration test
• Ductility test
• Softening point test
• Specific gravity test
• Viscosity test
• Flash and Fire point test
• Solubility test
• Spot test
• Float test
• Water content test
• Loss on heating test

Penetration Test
It measures the hardness or softness of bitumen by measuring the depth in tenths of a millimeter
to which a standard loaded needle will penetrate vertically in 5 seconds. BIS had standardized the
equipment and test procedure. The penetrometer consists of a needle assembly with a total weight
of 100g and a device for releasing and locking in any position. The bitumen is softened toa pouring
consistency, stirred thoroughly and poured into containers at a depth at least 15 mm in excess of
the expected penetration. The test should be conducted at a specified temperature of 25ᵒC. It may
be noted that penetration value is largely influenced by any inaccuracy with regards to pouring
temperature, size of the needle, weight placed on the needle and the test temperature. A grade of
40/50 bitumen means the penetration value is in the range 40 to 50 at standard test conditions. In
hot climates, a lower penetration grade is preferred. The Figure shows a schematicPenetration Test
setup.

Ductility Test
Ductility is the property of bitumen that permits it to undergo great deformation or elongation.
Ductility is defined as the distance in cm, to which a standard sample or briquette of the material
will be elongated without breaking. Dimension of the briquette thus formed is exactly 1 cm square.
The bitumen sample is heated and poured in the mould assembly placed on a plate.These
samples with moulds are cooled in the air and then in water bath at 27ᵒC temperature. The

16 | P a g e
Highway Engineering – 18CV52
excess bitumen is cut and the surface is leveled using a hot knife. Then the mould with assembly
containing sample is kept in water bath of the ductility machine for about 90 minutes. The sides
of the moulds are removed, the clips are hooked on the machine and the machine is operated.
The rate of pulling is 50mm per minute. The distance up to the point of breaking of thread is the
ductility value which is reported in cm. The ductility value gets affected by factors such as pouring
temperature, test temperature, rate of pulling etc. A minimum ductility value of 75 cm has been
specified by the BIS. Figure shows ductility moulds to be filled with bitumen.

Softening Point Test


Softening point denotes the temperature at which the bitumen attains a particular degree of
softening under the specifications of test. The test is conducted by using Ring and Ball apparatus.
A brass ring containing test sample of bitumen is suspended in liquid like water or glycerin at a
given temperature. A steel ball is placed upon the bitumen sample and the liquid medium is heated
at a rate of 5ᵒC per minute. Temperature is noted when the softened bitumen touches the metal
plate which is at a specified distance below. Generally, higher softening point indicates lower
temperature susceptibility and is preferred in hot climates. Figure shows softening point test setup.

Specific Gravity Test


In paving jobs, to classify a binder, density property is of great use. In most cases bitumen is
weighed, but when used with aggregates, the bitumen is converted to volume using density values.
The density of bitumen is greatly influenced by its chemical composition. Increase in

17 | P a g e
Highway Engineering – 18CV52
aromatic type mineral impurities cause an increase in specific gravity. The specific gravity of
bitumen is defined as the ratio of mass of given volume of bitumen of known content to the mass
of equal volume of water at 27ᵒC. The specific gravity can be measured using either pycnometer
or preparing a cube specimen of bitumen in semi solid or solid state. The specific gravity of
bitumen varies from 0.97 to 1.02.

Viscosity Test
Viscosity denotes the fluid property of bituminous material and it is a measure of resistance to
flow. At the application temperature, this characteristic greatly influences the strength of resulting
paving mixes. Low or high viscosity during compaction or mixing has been observedto result in
lower stability values. At high viscosity, it resists the compactive effort and thereby resulting mix
is heterogeneous, hence low stability values. And at low viscosity instead of providing a uniform
film over aggregates, it will lubricate the aggregate particles. Orifice type viscometers are used to
indirectly find the viscosity of liquid binders like cutbacks and emulsions. The viscosity expressed
in seconds is the time taken by the 50 ml bitumen material topass through the orifice of a cup,
under standard test conditions and specified temperature. Viscosity of a cutback can be measured
with either 4.0 mm orifice at 25ᵒC or 10 mm orifice at25 or 40ᵒC.

Flash and Fire Point Test


At high temperatures depending upon the grades of bitumen materials leave out volatiles and this
volatile catches fire which is very hazardous and therefore it is essential to qualify this temperature
for each bitumen grade. BIS defined the flash point as the temperature at which the vapour of
bitumen momentarily catches fire in the form of flash under specified test conditions. The fire
point is defined as the lowest temperature under specified test conditions at which the bituminous
material gets ignited and burns.
Pensky-Martens closed cup apparatus or open cup are used for conducting the tests. The material
to be tested is filled in the cup up to a filling mark. The bitumen sample is then heated at the rate
of 5°C to 6°C per minute, stirring the specimen. The test flame is applied at intervals depending
upon the expected flash and fire points. The BIS has specified the minimum value of flash point
by open cut test as 220°C.

18 | P a g e
Highway Engineering – 18CV52

Float Test
Normally the consistency of bituminous material can be measured either by penetration test or
viscosity test. But for certain range of consistencies, these tests are not applicable and Float test
is used. The apparatus consists of an aluminum float and a brass collar filled with bitumen to be
tested. The specimen in the mould is cooled to a temperature of 5ᵒC and screwed in to float. The
total test assembly is floated in the water bath at 50ᵒC and the time required for water to pass its
way through the specimen plug is noted in seconds and is expressed as the float value.

Water Content Test


It is desirable that the bitumen contains minimum water content to prevent foaming of the bitumen
when it is heated above the boiling point of water. The water content in bitumen is determined by
mixing known weight of specimen in a pure petroleum distillate free from water, heating and
distilling of the water. The weight of the water condensed and collected is expressed as percentage
by weight of the original sample. The allowable maximum water content should not be more than
0.2% by weight.

Loss on Heating Test


When the bitumen is heated it loses the volatility and gets hardened. About 50gm of the sample
is weighed and heated to a temperature of 163ᵒC for 5hours in a specified oven designed for this
test. The sample specimen is weighed again after the heating period and loss in weight is expressed
as percentage by weight of the original sample. Bitumen used in pavement mixes should not
indicate more than 1% loss in weight, but for bitumen having penetration values 150- 200 up to
2% loss in weight is allowed.

Solubility Test
Pure bitumen is completely soluble in solvents like carbon disulphide and carbon tetrachloride and
any impurities present is analyzed by dissolving the sample in any two solvents. A sample ofabout
2g of bitumen is dissolved in about 100ml of solvent. The solution is filtered and the insoluble
material retained is washed, dried and weighed. It is expressed as a percentage of original samples.
The insoluble material should be preferably less than 1%. In solubility test with carbon
tetrachloride, if black carbonaceous residue is over 0.5%, the bitumen is considered to be cracked.

19 | P a g e
Highway Engineering – 18CV52
Spot Tests
This is a test for detecting over heated or cracked bitumen. This test is considered to be more
sensitive than the solubility test for detection of cracking. About 2g of bitumen is dissolved in
10ml of naphtha. A drop of this solution is taken out and placed on a filter paper, one after one
hour and second after 24 hours after the solution is prepared. If the strain of the spot on the paper
is uniform in colour, the bitumen is accepted as uncracked. But if the spots from brown or black
circle in the centre with an annular ring of lighter colour surrounding it, the bitumen is considered
to be over heated or cracked.

Different Forms of Bitumen

• Cutback Bitumen
Characteristics
Cutback bitumen is obtained by blending bitumen binder with suitable volatile diluents or
solvents in the required proportion to reduce its viscosity to the desired range. The solvent from
the bituminous material will evaporate and the bitumen will bind the aggregate. Cutback bitumen
is used for cold weather bituminous road construction and maintenance. The distillates used for
preparation of cutback bitumen are naphtha, kerosene, diesel oil, and furnace oil. The rate at which
the cutback hardens on the road depends upon the characteristics and quantity ofthe volatile oil
used as the diluents and also on the atmospheric temperature and humidity at the work site.
Cutback bitumen binder of appropriate type and grade is selected for use as track coat without the
need to heat. This binder is particularly preferred for use in sites at sub zerotemperatures and in
regions of high altitude.

Types
There are different types of cutback bitumen like rapid curing (RC), medium curing (MC), and
slow curing (SC). RC is recommended for surface dressing and patchwork. MC is recommended
for premix with less quantity of fine aggregates. SC is used for premix with appreciable quantity
of fine aggregates.
Tests
❖ Kinematic viscosity
❖ Flash point test
❖ Distillation test
❖ Tests on residue from distillation upto 360°C
❖ Viscosity at 60°C
❖ Ductility at 27°C
❖ Matter soluble in Trichloro-ethylene
❖ Water content

• Bitumen Emulsion
Characteristics
Bitumen emulsion is a liquid product in which bitumen is suspended in a finely divided condition
in an aqueous medium and stabilized by suitable material. An emulsion is a two phase system
consisting of two immiscible liquids, the one being dispersed as fine globules in the other. A
small proportion of an emulsifier (half to one percent by weight of emulsion) is used to

20 | P a g e
Highway Engineering – 18CV52
facilitate formation of dispersion and to keep the globules of dispersed in suspension. The function
of this emulsifier is to form a protective coating around the globules of binder, resisting the
coalescence of the globules. Emulsifiers usually adopted are soaps, surface active agents and
colloidal powders. Two common methods followed for the preparation of emulsion are the colloid
mill method and the high speed mixer method.
Types and uses
❖ Three types of bituminous emulsions are available, which are Rapid setting (RS), Medium
setting (MS), and Slow setting (SC).
❖ The main advantage of bitumen emulsion are they can be used without heating for sparing or
preparing mixes, they are particularly useful for patch repair works and can be used even the
surface is wet.
❖ The RC bitumen emulsions are used in spray applications like tack coat, for surface treatments,
surface dressing and penetration macadam.
❖ The MC bitumen emulsion may be used in cold bituminous mixes in which percentage of
coarse aggregates are substantially high, with a desirable gradation of zero percent fines
passing 75 microns sieve and they are also used for surface dressing and penetration macadam.
❖ The SC bitumen emulsion are used for prime coat, slurry seal treatments, recycling works and
on soil stabilization
Tests
❖ Viscosity test – to assess ability to be sprayed through jets
❖ Water content – to estimate the actual binder quantity
❖ Settlement test – to evaluate settlement when left standing undisturbed
❖ Demulsibility test – to find the residue after mixing with calcium chloride as specified
❖ Miscibility test – to assess coagulation due to addition of distilled water
❖ Cement mixing test – to assess stability in presence of fines in aggregates
❖ Coating test – to assess coating of stone aggregates
❖ Sieving test – to measure sedimentation of emulsion during storage
❖ Particle charge - to evaluate the type of chargers

• Bituminous Primers
In bituminous primer the distillate is absorbed by the road surface on which it is spread. The
absorption therefore depends on the porosity of the surface. Bitumen primers are useful on the
stabilized surfaces and water bound macadam base courses. Bituminous primers are generally
prepared on road sites by mixing penetration bitumen with petroleum distillate.

• Modified Bitumen
The viscosity of ordinary paving grade bitumen varies considerably with temperature as a result
the bituminous pavement surface course also becomes susceptible to temperature changes.During
hot weather the bituminous surface course becomes soft resulting in possibility of permanent
deformation and early rutting along the wheel paths of heavy vehicles. During cold weather, the
bituminous pavement surface course becomes too stiff and brittle with the possibility of early
cracking under repeated application of heavy wheel loads. Certain additives or blend of additives
called as bitumen modifiers can improve properties of bitumen and bituminous mixes. Bitumen
treated with these modifiers is known as modified bitumen. It

21 | P a g e
Highway Engineering – 18CV52
reduces temperature susceptibility. Polymer modified bitumen (PMB)/ crumb rubber modified
bitumen (CRMB) should be used only in wearing course depending upon the requirements of
extreme climatic variations. The advantages of using modified bitumen are as follows
❖ Lower susceptibility to daily and seasonal temperature variations
❖ Higher resistance to deformation at high pavement temperature
❖ Better age resistance properties
❖ Higher fatigue life for mixes
❖ Better adhesion between aggregates and binder
❖ Prevention of cracking and reflective cracking

TAR
Tar is the viscous liquid obtained when natural organic materials such as wood and coal carbonized
or destructively distilled in the absence of air. Based on the material from which taris derived, it
is referred to as wood tar or coal tar; the latter is more widely used for road work because it is
superior. Three stages for the production of road tar are
• Carbonization of coal to produce crude tar
• Refining or distillation of crude tar and
• Blending of distillation residue with distillate oil fraction to give the desired road tar.
There are five grades of roads tars, viz., RT- I, RT-2, RT-3, RT-4 and RT-5, based on their
viscosity and other properties. RT-l has the lowest viscosity and is used for surface painting
under exceptionally cold weather as this has very low viscosity. RT-2 is recommended for
standard surface painting under normal Indian climatic conditions. RT-3 may be used for surface
painting, renewal coats and premixing chips for top course and light carpets. RT-4 is generally
used for premixing tar macadam in base course. For grouting purposes RT-5 may be adopted,
which has the highest viscosity among the road tars.
The various tests that are carried out on road tars are listed below
❖ Specific gravity test
❖ Viscosity test on standard tar viscometer
❖ Equiviscous temperature (EVT)
❖ Softening point
❖ Softening point of residue
❖ Float test
❖ Water content
❖ Distillation fraction on distillation upto 200°C, 200°C to 270°C and 270°C to 3 30°C.
❖ Phenols, percent by volume
❖ Naphthalene, percent by weight
❖ Matter insoluble in toluene, percent by weight
The requirements for the five grades of road tars based on the above test results are given by the
ISI.

22 | P a g e
Highway Engineering – 18CV52
Comparison Between Bitumen And Tar

Bitumen Tar
It has black to dark brown color It also has black to dark brown in color
Tar is produced by the destructive distillation
It is natural petroleum product
of coal or wood
It is soluble in carbon disulphide & in
Tar is soluble only in toluene
carbon tetrachloride
It has better weather resisting property It has inferior weather resisting property
Bitumen are less temp susceptible Tar is more temp susceptible
Free carbon content is less Free carbon content is more
neither binds the aggregate well nor retains It binds aggregate more easily &retains it
the presence of water better in the presence of water.

Pavement Design

Requirements of Highway Pavement


The highway pavements have to fulfill two major requirements, namely
• Functional requirements from the point of view of road users
• Structural requirements from the point of view of highway engineer
Functional requirements of road pavement
From the point of view of users of road vehicles, the functional requirements of roadway
pavement is generally limited to the roadway surface condition. The surface
➢ Should be firm and non-yielding under the wheel load
➢ Should have good riding quality
➢ Should be less slippery
Structural requirements of road pavements
➢ The structural design of the pavement is to be carried out considering the various design factors
related to the traffic, topography, soil type, drainage, climatic and environmental factors and
the desirable design life.
➢ Each pavement layer is laid evenly and well compacted
➢ The pavement structure consists of subgrade, sub base, base and surface course

Types Of Pavement
Based on the structural behavior, road pavements are generally classified into two categories
• Flexible pavement
• Rigid pavement
Other types of pavement structures include

23 | P a g e
Highway Engineering – 18CV52
• Semi-rigid pavement or composite pavement
• Interlocking cement concrete block pavement
Flexible Pavements
Flexible pavements will transmit wheel load stresses to the lower layers by grain-to-graintransfer
through the points of contact in the granular structure (Figure). The wheel load acting on the
pavement will be distributed to a wider area, and the stress decreases with the depth. Taking
advantage of these stress distribution characteristic, flexible pavements normally has manylayers.
Hence, the design of flexible pavement uses the concept of layered system. Based on this,flexible
pavement may be constructed in a number of layers and the top layer has to be of best quality to
sustain maximum compressive stress, in addition to wear and tear.
The lower layers will experience lesser magnitude of stress and low quality material can be used.

Flexible pavements are constructed using bituminous materials. These can be either in the form
of surface treatments (such as bituminous surface treatments generally found on low volume
roads) or, asphalt concrete surface courses (generally used on high volume roads such asnational
highways). Flexible pavement layers reflect the deformation of the lower layers on to the surface
layer (e.g., if there is any undulation in sub-grade then it will be transferred to the surface layer).
In the case of flexible pavement, the design is based on overall performance of flexible pavement,
and the stresses produced should be kept well below the allowable stresses of each pavement layer.
Advantages of flexible pavement
• Adaptability to stage construction
• Availability of low-cost types that can be easily built
• Ability to be easily opened and patched
• Easy to repair frost heave and settlement
• Resistance to the formation of ice glaze
Disadvantages of rigid pavement
• Higher maintenance costs
• Shorter life span under heavy use

24 | P a g e
Highway Engineering – 18CV52
• Damage by oils and certain chemicals
• Weak edges that may require curbs or edge devices

Rigid Pavements
Rigid pavements have sufficient flexural strength to transmit the wheel load stresses to a wider
area below. A typical cross section of the rigid pavement is shown in Figure. Compared to flexible
pavement, rigid pavements are placed either directly on the prepared sub-grade or on a single layer
of granular or stabilized material. Since there is only one layer of material between the concrete
and the sub-grade, this layer can be called as base or sub-base course.

Figure: Typical Cross section of Rigid pavement


In rigid pavement, load is distributed by the slab action, and the pavement behaves like an elastic
plate resting on a viscous medium (Figure). Rigid pavements are constructed by Portland cement
concrete (PCC) and should be analyzed by plate theory instead of layer theory, assuming an elastic
plate resting on viscous foundation. Plate theory is a simplified version of layer theory that
assumes the concrete slab as a medium thick plate which is plane before loading and to remain
plane after loading. Bending of the slab due to wheel load and temperature variation and the
resulting tensile and flexural stress.
Advantages of rigid pavement
• Low maintenance costs
• Long life with extreme durability
• High value as a base for future resurfacing with asphalt
• Load distribution over a wide area, decreasing base and sub grade requirements
• Ability to be placed directly on poor soils
• No damage from oils and greases.
• Strong edges
Disadvantages of rigid pavement
• High initial costs
• Joints required for contraction and expansion
• Generally rough riding quality
• High repair costs

25 | P a g e
Highway Engineering – 18CV52

Comparision Between Flexible and Rigid Pavement


Properties Flexible Rigid
Design Empirical method Designed and analyzed by using the elastic
Principle Based on load distribution theory
characteristics of the
components
Material Granular material Made of Cement Concrete either plan,
reinforced or prestressed concrete
Flexural Low or negligible flexible Associated with rigidity or flexural strength
Strength strength or slab action so the load is distributed over
a wide area of subgrade soil.
Normal Elastic deformation Acts as beam or cantilever
Loading
Excessive Local depression Causes Cracks
Loading
Stress Transmits vertical and Tensile Stress and Temperature Increases
compressive stresses to the
lower layers

Design Constructed in number of Laid in slabs with steel reinforcement.


Practice layers.

Temperature No stress is produced Stress is produced


Force of Less. Deformation in the Friction force is High
Friction sub grade is not transferred
to the upper layers.
Opening to Road can be used for traffic Road cannot be used until 14 days of curing
Traffic within 24 hours
Surfacing Rolling of the surfacing is Rolling of the surfacing in not needed.
needed

Components of Flexible Pavements


The components of a typical flexible pavement structure consists of
• Prepared soil subgrade
• Granular sub base cum drainage layer
• Granular base course
• Bituminous binder and surface course
Functions of soil subgrade
• The top soil or sub-grade is a layer of natural soil prepared to receive the stresses from the
layers above. It is essential that at no time soil sub-grade is overstressed.
• It should be compacted to the desirable density, near the optimum moisture content
• To provide an adequate support to the road pavement.
• To provide stability to the road pavement.
• To provide good drainage of rain water percolating through the road pavement
• The minimum thickness of compacted subgrade is 500mm on NH and SH and major arterial
roads and 300mm for rural roads which carry low volume of traffic.

26 | P a g e
Highway Engineering – 18CV52
• The strength test commonly adopted for the evaluation of soil subgrade are CBR, dynamic
cone penetrometer test, triaxial compression or direct shear test and plate bearing test
Functions of granular sub base (GSB) and drainage layer
• The sub-base course is the layer of material beneath the base course and the primaryfunctions
are to provide structural support, improve drainage, and reduce the intrusion of fines from the
sub-grade in the pavement structure
• The aggregates of lower strength having good permeability may be used in the GSB layer
• Coarse graded aggregates with low percentage of fines (less than 5% finer than 0.075mm size)
will serve as a good drainage layer.
• The GSB cum drainage layer is laid above the subgrade covering the full width of the
formation between the longitudinal drains.
• The part of the rain water which may enter into the pavement layers through the shoulders or
the pavement surface will get drained out quickly into the longitudinal or road side drains.
Thus it is possible to retain the subgrade and other pavement layers in relatively dry condition.
Functions of granular base course
• The granular base course is considered as the most important component of flexible pavement
layer which sustains the wheel load stresses and disperses through larger area on to the GSB
layer below
• A good base course enhances the load carrying capacity of the flexible pavement structure.
• Good quality coarse aggregates are generally used in the granular base course of flexible
pavements.
• As per the specifications laid down by the ministry of road transport and highways, govt. of
India (MORTH), the aggregates used in the base course should have low aggregate impact
value (less than 30%) and low los Angeles abrasion value(less than 40%)
Functions of thin bituminous surface
• The thin bituminous surface course prevents the entry of surface water into the pavement layers
during the rains and thus protects the base course and other pavement layers below
• With a good surfacing and an effective drainage layer, it is possible to keep the soil subgrade
in relatively dry condition and retain its stability
• The bituminous surfacing serves as a wearing course for the traffic and provides a dust free
pavement surface under dry weather
• Thin bituminous layers such as surface dressing, 20mm thick pre mixed bituminous carpet
with seal coat and 20mm thick mixed seal surface are commonly adopted in the wearing course
of roads with low traffic volume with less proportion of heavy commercial vehicles.
Functions of thick bituminous binder and surface courses
Surface course is the layer directly in contact with traffic loads and generally contains superior
quality materials. The functions and requirements of this layer are:
• It provides characteristics such as friction, smoothness, drainage, etc. Also it will prevent the
entrance of excessive quantities of surface water into the underlying base, sub-base and sub-
grade,
• It must be tough to resist the distortion under traffic and provide a smooth and skid- resistant
riding surface,

27 | P a g e
Highway Engineering – 18CV52
• It must be water proof to protect the entire base and sub-grade from the weakening effect of
water.
Marshall Stability test and mix design method has been recommended by the IRC for designing
the dense bituminous mixes such as DBM binder course and bituminous concrete surface course
in India.

Components of Rigid Pavements


The components of a typical rigid pavement or cement concrete (CC) pavement structure
consists of
• Compacted soil subgrade at the bottom or lowest layer
• Granular sub base (GSB) course and drainage layer
• Base course
• CC/pavement quality concrete (PQC) pavement slab
Functions of soil subgrade
• To provide an adequate support to the road pavement.
• To provide stability to the road pavement.
• To provide good drainage of rain water percolating through the road pavement
• The strength test commonly adopted for the evaluation of soil subgrade in rigid pavement is
plate bearing test
Functions of GSB and drainage layer
• The sub-base course is the layer of material beneath the base course and the primaryfunctions
are to provide structural support, improve drainage, and reduce the intrusion of fines from the
sub-grade in the pavement structure
• Coarse graded aggregates with low percentage of fines (less than 5% finer than 0.075mm size)
will serve as a good drainage layer.
• An effective drainage layer under the CC pavements has the following benefits
❖ Increase in service life and improved performance of the CC pavements
❖ Prevention of early failures of the rigid pavement due to pumping and blowing
❖ Protection of the subgrade against frost action in frost susceptible areas
Functions of base course
• The granular base course is generally provided under the CC pavement slab in low volume
roads and also in roads with moderate traffic loads.
• For heavy traffic or load, high quality base course materials such as lean cement concrete or
dry lean concrete (DLC) are preferred as base course
• The DLC layer provides a uniform support, high K value and an excellent working platform
for laying the PQC slab with a sensor paver
• A separation layer consisting of a suitable type of membrane is laid over the DLC base
course before laying the PQC slab in order to prevent bonding between the two.

Function of PQC pavement slab


• M40 cement concrete mix with a minimum flexural strength of 45kg/cm2 is recommended
by IRC for use in CC pavements of highways with heavy to very heavy traffic loads.

28 | P a g e
Highway Engineering – 18CV52
• The CC pavement slab is expected to withstand the flexural stresses caused by the heavy traffic
loads and warping effects in the CC slab due to temperature differences between top and
bottom slab caused by daily variation in temperature during the 24 hours cycles.
• The steel reinforcement if any, placed at mid depth of the CC pavement slab is not useful to
take up the flexural/tensile stresses caused by the heavy wheel loads or warping in the slabs.
Therefore high quality CC mix with heavy wheel strength is used for the construction of the
PQC slab of the CC pavements.

Equivalent Single Wheel Load (ESWL)

Equivalent single is wheel load (ESWL) is the wheel load assembly In order to limit the
maximum load on single wheel within the specified limit and to carry greater load it is necessary
to provide dual wheel assembly on the rear axles of heavy road vehicles. Equivalent Single Wheel
Load (ESWL) of the dual wheel load assembly at a depth, 'z' may be defined as the single wheel
load replacement of the dual wheel load assembly which will cause the same magnitudeof
vertical deflection or same value of compressive stress at that depth, a Thus ESWL at any selected
depth, z may be determined based on either equivalent deflection or equivalent stress criterion.
Suppose a dual wheel load assembly causes a certain value of maximum deflection A at a
particular depth z (say, depth z equal to the thickness T of the pavement). As per deflection
criterion the ESWL is that single wheel load having the same contact pressure, p which produces
the same value of maximum deflection A at the depth z.
Similarly as per stress criterion, the ESWL is the single wheel load producing the same value of
maximum stress at the desired depth z as the dual wheel load assembly.
Fig shows the end view of a dual wheel load assembly. This figure also illustrates the stress
overlap on a single layer due to the dual wheels. Let the spacing between the centres of the two
wheels be 'S' and the clear gap between the inner sides of the two wheels be as shown in Fig. In
order to simplify the analysis, the load dispersion is assumed to be at an angle of 45°. Let 'a' be the
radius of the equivalent circular contact area of each wheel. Then S = (d+ 2a).

29 | P a g e
Highway Engineering – 18CV52

Fig. 7.4 Stress overlap due to dual wheels


Up to the depth z - d/2, each wheel load P acts independently. At depths greater than d!2, the
compressive stresses within the pavement due to each load begins to overlap. At depth z = 2S and
above, the overlapped area of compressive stress is considerably high when compared to the total
area covered due to the dual wheel loads. Therefore the total stress due to the dual wheels at any
depth greater than 2S or the ESWL is considered to be equivalent to magnitude 2P.
In order to simplify determination of stresses due to dual wheel load at any desired depth or to
carry out pavement design, the ESWL value is often made use of. The ESWL is usually determined
by the equivalent stress criterion using a simple graphical method. The value of ESWL varies
depending upon the total pavement thickness, which is yet to be designed. Therefore the
determination of design value of ESWL requires trial and error method and the simple graphical
method is a very useful tool. In the simple graphical method, a straight line relationship is assumed
between ESWL and depth on log-log scales. For determining ESWL, theplot is made as shown in
Fig. 7.5.

Two points A and B are plotted on the log-log graph with coordinates of A being (p, d/2) and of
B being (2P, 2S). The straight line AB is considered to be the locus of pogo where any single
wheel load is equivalent to a certain set of dual wheels. In order to design the pavement

30 | P a g e
Highway Engineering – 18CV52
thickness due to dual wheel load assembly by the simplified approach, it is necessary to determine
the ESWL at the depth z which is equal to the pavement thickness T, which is yet to be
determined. Therefore to calculate the ESWL for a dual assembly, it is necessary to assume or
estimate a trial pavement design thickness, say z1. Thus ESWL is obtained at this assumed or trial
thickness from this graph.
If the design thickness so obtained is equal to the assumed thickness, then the ESWL calculations
could be considered as correct for the design of flexible pavement Otherwiseadditional trials are
made by assuming another trial thickness or depth Z2:. The trials are continued until the assumed
thickness z for the determination of ESWL is almost equal to the designed thickness of the
pavement using this particular value of ESWL and this value is accepted as the design value of
ESWL of the dual wheel load assembly.
This ESWL value is made use of for the design of flexible pavement. Any number of trial thickness
values can easily be made using this log-log chart. For pavement thickness values exceeding 2S,
ESWL, is taken as 2P.

31 | P a g e
Highway Engineering – 18CV52

Questions
1. Explain the properties of soil
2. How soil is classified based on its grain size?
3. Explain classification of Soils by Highway Research Board (HRB)
4. Explain Plate Bearing Test
5. Explain California Bearing Ratio (CBR) Test
6. What are the properties of road aggregates? Explain
7. What are the tests conducted on aggregates? Explain.
8. What are the Desirable Properties of Bitumen?
9. Explain tests on bitumen.
10. What are the good requirements for highway?
11. How pavement is classified? Explain.
12. Explain components of rigid pavement.
13. Explain components of flexible pavements.
14. What is Equivalent Single Wheel Load (ESWL)

32 | P a g e
Highway Engineering – 18CV56
MODULE 4

PAVEMENT CONSTRUCTION

Pavement Construction: Design of soil aggregate mixes by Rothfuch’s method. Uses and
properties of bituminous mixes and cement concrete in pavement construction. Earthwork; cutting
and Filling, Preparation of subgrade, Specification and construction of
i) Granular Sub base, ii) WBM Base, iii) WMM base, iv) Bituminous Macadam, v) Dense
Bituminous Macadam vi) Bituminous Concrete, vii) Dry Lean Concrete sub base and PQC viii)
concrete roads
Rothfuch’s Method
This method is used when a number of materials have to be mixed together for obtaining a desired
or design gradation. The desired gradation may be decided either based on recommended grain size
distribution charts or tables or using the below Fuller’s equation.
P= 100 (d/D) n
Where,
D = diameter of largest particle, mm
P = percent finer than diameter ‘d’ (mm) in the material
n = gradation index, which have values ranging from 0.5 to 0.3 depending upon the shape.
On a graph paper, with Y-axis representing percent passing and X-axis representing particle size,
as shown in figure. A diagonal line is drawn from point corresponding to (100 percent passing,
maximum particle size of the material) to a point corresponding to (zero percent passing, smallest
particle size of the materials)
The different particle sizes are marked on X-axis corresponding to the mean values of percentage
finer taken on the Y-axis.
For different materials say A, B and C, sieve analysis has to be done and percentage finer has to
be calculated for each range of particle size for all the materials and grain size distribution curves
of these three materials are plotted as shown in fig and the balancing straight lines of A, B and C
are obtained, allowing only minimum of the areas on either sides of the balancing lines.
The opposite ends of the balancing straight lines of A and B are joined (i.e., zero percent passing of
materials A is joined with 100 percent passing of B). Similarly the opposite ends of balancing lines
of B and C are joined.
The points where these lines meet the desired gradation line represent the proportion in which the
materials A, B and C are to be mixed. These values may be read from the Y-axis by projecting the
points of intersection as shown in fig.

1|Page
Highway Engineering – 18CV56

Properties of Bituminous Mix:


Mix design methods and design requirements form an essential part for all asphalt concrete
mixtures. The agency or authority responsible for paving construction (Department of
Transportation) usually establishes the mix design method and design requirements.
Once these are established, it becomes the responsibility of the Contractor/Producer and his
technician to develop the mix within the framework of the specification requirements.
An asphalt concrete mixture must be designed, produced and placed in order to obtain thefollowing
desirable mix properties:
1. Stability
2. Durability
3. Flexibility
4. Fatigue Resistance
5. Skid Resistance

1. Stability
Stability of an asphalt pavement is its ability to resist shoving and rutting under loads (traffic). A
stable pavement maintains its shape and smoothness under repeated loading; an unstable pavement
develops ruts (channels), ripples (wash boarding or corrugation) and other signs of shifting of the
mixture.
Because stability specifications for a pavement depend on the traffic expected to use the pavement,
the requirements can be established only after a thorough traffic analysis. Stability specifications
should be high enough to handle traffic adequately, but not higher than traffic conditions require.
Too high a stability value produces a pavement that is too stiff and therefore less durable than
desired.
2. Durability

2|Page
Highway Engineering – 18CV56
The durability of an asphalt pavement is its ability to resist factors such as changes in the binder
(polymerization and oxidation), disintegration of the aggregate, and stripping of the binder films
from the aggregate. These factors can be the result of weather, traffic, or a combination of the two.
Generally, durability of a mixture can be enhanced by three methods. They are:
1. Using maximum binder content,
2. Using a dense gradation of stripping-resistant aggregate, and
3. Designing and compacting the mixture for maximum impermeability

3. Impermeability
Impermeability is the resistance of an asphalt pavement to the passage of air and water into or
through it. This characteristic is related to the void content of the compacted mixture, and much of
the discussion on voids in the mix design sections relates to impermeability.
Even though void content is an indication of the potential for passage of air and water through a
pavement, the character of these voids is more important than the number of voids. The size of
voids, whether or not the voids are interconnected, and the access of the voids to the surface of the
pavement all determine the degree of impermeability.

4. Workability
Workability describes the ease with which a paving mixture can be placed and compacted. Mixtures
with good workability are easy to place and compact; those with poor workability are difficult to
place and compact. Workability can be improved by changing mix design parameters, aggregate
source, and/or gradation.

5. Flexibility
Flexibility is the ability of an asphalt pavement to adjust to gradual settlements and movements in
the sub-grade without cracking. Since virtually all sub-grades settle (under loading) or rise (from
soil expansion), flexibility is a desirable characteristic for all asphalt pavements. An open-graded
mix with high binder content is generally more flexible than a dense-graded, low binder content
mix. Sometimes the need for flexibility conflicts with stability requirements, so that trade-offs have
to be made.

6. Fatigue resistance
Fatigue resistance is the pavement’s resistance to repeated bending under wheel loads (traffic).
Research shows that air voids (related to binder content) and binder viscosity have a significant
effect on fatigue resistance. As the percentage of air voids in the pavement increases, either by
design or lack of compaction, pavement fatigue life (the length of time during which an in-service
pavement is adequately fatigue-resistant) is drastically shortened. Likewise, a pavement containing
binder that has aged and hardened significantly has reduced resistance to fatigue.

7. Skid resistance

3|Page
Highway Engineering – 18CV56
Skid resistance is the ability of an asphalt surface to minimize skidding or slipping of vehicle tires,
particularly when wet. For good skid resistance, tire tread must be able to maintain contact with the
aggregate particles instead of riding on a film of water on the pavement surface (hydroplaning).
Skid resistance is typically measured in the field at 40 mi/hr with a standard tread tire under
controlled wetting of the pavement surface.

Bituminous Mix:
Based on the nature of gradation selected for the bitumen mixes, they can be classified into:
1. Dense Graded Bitumen Mixes
2. Semi-Dense Graded Bitumen Mixes
3. Open Graded Bitumen Mixes
4. Gap Graded Bitumen Mixes

1. Dense Graded Bitumen Mixes:


A dense-graded mix is a well-graded HMA mixture intended for general use. When properly
designed and constructed, a dense-graded mix is relatively impermeable. Dense-graded mixes are
generally referred to by their nominal maximum aggregate size. They can further be classified as
either fine-graded or coarse-graded.

2. Semi-Dense Graded Bitumen Mixes:


The semi-dense bituminous concrete mixes have neither dense nor open graded characteristics.
This will create the separation of aggregate and the bitumen in the BM layer. This will cause
stripping and the scaling of SDBC. The scaling later with time will result in the potholes on the
road.

3. Open Graded Bitumen Mixes:

4|Page
Highway Engineering – 18CV56
The open graded Bitumen Mixes have fine aggregates in a minimum amount, hence they are very
permeable to water. They are employed based on specific functions in the base and for surface
mixes.

4. Gap Graded Bitumen Mixes:


The Stone Matrix Asphalt (SMA) is the most commonly used gap graded bituminous mixes. With
the increasing traffic and the high pressure of tires of the vehicles will give large stresses to the road
pavement. The roads are subjected to overloading conditions in certain cases.

Use of Bitumen in Road Construction


The reasons behind the significant application of bitumen in flexible pavements are explained
below:
1. Production of Bitumen is economical
Bitumen is a by-product of crude oil distillation process. Crude oil itself is a composition of
hydrocarbons. The primary products that are available are the petrol, diesel, high octane and
gasoline. When these fuels are refined from the crude oil, the bitumen is left behind. As the primary
product demand is of utmost importance to the society, the bitumen as a by-product has survival for
long. This by product is utilized as a new construction material, without going for any other new
resource.

2. Physical and Rheological Properties of Bitumen bring Versatility


The physical and the chemical properties of Bitumen are found to be a function of load level,
temperature and the duration of loading. It is a thermoplastic and viscoelastic material. These
dependencies make us to truly access the traffic on the road so that a bitumen mix properties can be
varied based on the stress levels calculated. This versatility of bitumen results in a large variety of
bitumen mix, based on the road application.

3. The Melting Point of Bitumen is low

5|Page
Highway Engineering – 18CV56
It is highly appreciable about the fact that bitumen has a favorable melting point that helps in both
surface dressing and wearing resistance with ease. The melting point of the bitumen should not be
too high, that it can be melted easily during laying the pavement. At the same time, bitumen has a
melting point, which would not let the already casted road pave to melt and deform under high
temperatures. In areas of high temperatures, along with this quality of bitumen, the aggregate
composition helps to cover up the effect of large temperature.

4. Bitumen can undergo Recycling


As the melting point of bitumen is favorable, it can be melted back to its original state. This is called
as asphalt recycling process. The torn-up asphalt pieces are taken up to the recycling plant, instead
of sending them to landfills. This recycled mix can be reused. If necessary, the old bitumen is mixed
with new bitumen and new aggregates to make the mix live again.

5. Bitumen gain Adhesive Nature


As explained in the production of bitumen, it is free from hydrocarbon and hence not toxic. The
by product is refined to maximum to get rid of organic materials and impurities. The bitumen has
a highly adhesive nature, which keeps the materials in the road mix bind together under strong
bonds. These become stronger when the mix is set i.e. ready for vehicle movement.

6. Bitumen has Color Variety


The traditional bitumen is black in color. This is because the dense organic material within bitumen
is black in color. Now, when certain pigments are added to bitumen, the color of our choice can be
obtained. These are colored bitumen. It is costly than the normal colored bitumen. The disadvantage
of colored bitumen is that it requires more chemical additives and materials.

Bitumen emulsions:
1. Emulsions are used in bituminous road construction work. They are especially helpful for
maintenance and patch repair works.
2. Emulsion can be used in wet weather even when it is raining.
3. Also emulsions have been used in soil stabilization, particularly for stabilization of sands in
desert areas.
4. A rapid setting type emulsion is suitable for surface dressing and penetration macadam type of
construction.
5. Medium setting type is used for premixing with coarse aggregates.
6. In case of fine aggregates, the surface area of aggregate is more and as a result long duration of
time is required to mix the emulsion. Therefore slow setting emulsion is preferred which gives
sufficient time for uniform blending of the mix.

6|Page
Highway Engineering – 18CV56
Cement concrete in pavement construction:
The contribution of cement and concrete to transportations and particularly to road construction is
considerable. Bridges, tunnels, safety barriers, concrete roads and sound barriers are several
examples of successful cement application. A characteristic of the use of cement in the
aforementioned applications is the small maintenance cost together with the elongation of the
service life of the structure. In road building, cement is also used for the treatment of aggregates
and the stabilization of soils. The production of cement binding mixtures, contributes to the
upgrade of the bearing capacity of sub grade along with an increase of the bearing capacity of the
Pavement layers. This increased bearing capacity provides the ability to construct road surfaces of
lesser thickness and thus of a significantly lower cost.

Due to their high bearing capacity and increased stiffness, their specific property not to deform
under heavy permanent loads, is the reason why concrete pavements are used for:

for vehicles of heavy weight

surface exposure to aggressive attacks (use of toxic materials, welding etc)

fire and better energy consumption during service life (lower intensity lighting required)

unrivalled type of paving for highways, roads of heavy traffic and simple rural and urban roads.
These floors, apart from their ability to withstand permanent deformations and their high bearing
capacity, also enjoy additional advantages, which render them attractive in application:

more visible in concrete roads due to the bright color of the surface in comparison to asphalt road
paving

consumption.

Pavement construction
Preparation of sub-grade:
Sub-grade and the surface of the earth roads are given larger camber of 1in 33 to 1 in 20 because
they need faster drainage to be safe from the moisture. A maximum value of camber of 1 in 20 is
the limit because higher camber will result in the formation of cross ruts and corrosion ofpavement
soils.

7|Page
Highway Engineering – 18CV56
Specifications of Materials:
The earth material used for the construction of earth roads are termed as satisfactory if they possess
the following properties:

Construction steps (Procedure)


Material:
Suitable borrow pits are located by doing the survey of the adjacent land which are easy to reach
and at economical haulage distance. The various organic materials like trees, shrubs and grass roots
are removed before the excavation of the earth.
Location of center line:
The centerline and the road boundaries are marked on the ground by driving the wooden pegs. To
follow the desired vertical profile of the road, reference pegs are also driven at a certain spacing
which depends upon the estimated length of the road construction per day.
Preparation of the sub-grade:
Following steps are necessary for the preparation of the sub-grade:
(a) Clearing site
(b) Excavation and construction of fills
(c) Shaping of sub-grade.

using the mechanical equipment like Bulldozer and scraper etc.


lls may also be done manually or using the excavation,
hauling and compaction equipment. Dozers are considered very useful for haulage of shortdistance.
If the compaction is done manually it will not be sufficient and proper, it should be leftto get
consolidated under atmospheric conditions.
various equipment used by manual labor are shovel, spade, pick-axe, baskets, rammers and hand
rollers.
-grade should be compacted to the desired grade, camber and longitudinal profile.
Pavement construction:
The soil is dumped on the prepared sub-grade and pulverized. The soil may be a mixture of more
than one soil to get the desired properties. The moisture content is checked and if extra moisture is

8|Page
Highway Engineering – 18CV56
needed, is added to bring it to OMC. The soil is mixed, spread and rolled in layers such that the
compaction thickness of each layer does not exceed 10 cm.
The type of roller for compaction is decided based on soil type, desired amount of compaction and
availability of equipment. At Least 95% of dry density of I.S. light compaction is considered
desirable. The camber of the finished surface is checked and corrected when necessary.
Opening to traffic:
The compacted earth surface is allowed to dry out for few days and then is opened to traffic.

Specification and construction of Granular Sub base


Scope
This work shall consist of laying and compacting well graded material on prepared subgrade in
accordance with the requirements of these specifications.
Materials
tural sand, moorum, gravel, crushed stone or
combination thereof depending upon the grading required.

the specific approval of the engineer.


of materials used is 75mm, 53mm and 23.5mm.

Physical requirements

shall have LL and PI not more than 25 and 6%


respectively.
9|Page
Highway Engineering – 18CV56
Strength of sub-base
It shall be ensured prior to actual execution that the material to be used in the sub-base satisfies
the requirements of CBR and other physical requirements when compacted and finished.

Construction operations
Preparation of sub-grade
Prior to the laying of sub-base, the sub-grade shall be prepared by removing all vegetation and other
extraneous matter, lightly sprinkled with water if necessary and rolled with two passes of smooth
wheeled roller.
Spreading and compacting
-base material of grading specified in the contract shall be spread on the prepared sub-
grade with the help of a motor grader of adequate capacity, its blade having hydraulic controls
suitable for initial adjustment and for maintaining the required slope and grade during the operation
or other means as approved by the engineer.
-base material consists of combination of materials, mixing shall be done
mechanically by the mix-in-place.

operations.
Surface finish and quality of work

the drawings or as directed by the engineer, subject to the permitted tolerances (as per section
900).

with section 900.


Measurement for payment
GSB shall be measured as finished work in position in cubic metres.

Specification and construction of Water Bound Macadam (WBM) Base


Scope

bonding together with screening, binding material where necessary and water laid on a properly
prepared sub-grade/ sub-base/ base or existing pavement, as the case may be and finished in
accordance with the requirements of these Specifications and in close conformity with the lines,
grades, cross-sections and thickness as per approved plans or as directed by the Engineer.
ter bound macadam on an existing thin black topped
surface without providing adequate drainage facility for water that would get accumulated at the
interface of existing bituminous surface and water bound macadam.

10 | P a g e
Highway Engineering – 18CV56

Materials
Coarse aggregates: Coarse aggregates shall be either crushed or broken stone, crushed slag, over
burnt (Jhama) brick aggregates or any other naturally occurring aggregates such as kankar and
laterite of suitable quality.
Crushed or broken stone: The crushed or broken stone shall be hard, durable and free from excess
flat, elongated, soft and disintegrated particles, dirt and other deleterious material.
Crushed slag: Crushed slag shall be made from air cooled blast furnace slag. It shall be of angular
shape, reasonably uniform in quality and density and generally free from thin, elongated and soft
pieces, dirt or other deleterious materials. It should also comply with the following requirements;

Over burnt (Jhama) brick aggregates: Jhama brick aggregates shall be made from over burnt
bricks or brick bats and be free from dust and other objectionable and deleterious materials.
Screenings: Screenings to fill voids in the coarse aggregate shall generally consist of the same
material as the coarse aggregate. However, where permitted, predominantly non-plastic material
such as moorum or gravel (other than rounded river borne material) may be used for this purpose
provided liquid limit and plasticity index of such material are below 20 and 6 respectively and
fraction passing 75 micron sieve does not exceed 10 per cent.

11 | P a g e
Highway Engineering – 18CV56
Binding material: Binding material to be used for water bound macadam as a filler material meant
for preventing ravelling, shall comprise of a suitable material approved by the Engineer having a
Plasticity Index (PI) value of less than 6.

Construction operations
Preparation of base:
The surface of the sub-grade/ sub-base/ base to receive the water bound macadam course shall be
prepared to the specified lines and cross fall (camber) arid made free of dust and other extraneous
material.
Spreading coarse aggregates:
The coarse aggregates shall be spread uniformly and evenly upon the prepared sub-grade/sub- base/
base to proper profile. The spreading shall be done from stockpiles along the side of the roadway
or directly from vehicles.
Rolling:
Immediately following the spreading of the coarse aggregate, rolling shall be started with three
wheeled power rollers of 80 to 100 kN capacity or tandem or vibratory rollers of 80 to 100 kN static
weight.
Application of screenings:
After the coarse aggregate has been rolled, screenings to completely fill the interstices shall be
applied gradually over the surface. These shall not be damp or wet at the time of application. Dry
rolling shall be done while the screenings are being spread. The screenings shall be applied at a
slow and uniform rate so as to ensure filling of all voids.
Sprinkling of water and grouting:
After the screenings have been applied, the surface shall be copiously sprinkled with water, swept
and rolled.
Application of binding material:
After the application of screenings the binding material where it is required to be used shall be
applied successively in two or more thin layers at a slow and uniform rate.
Setting and drying:
After the final compaction of water bound macadam course, the pavement shall be allowed to dry
overnight. Next morning hungry spots shall be filled with screenings or binding material as directed.
Surface Finish and Quality Control of Work:
The surface finish of construction shall conform to the requirements of Clause 902. Control on the
quality of materials and works shall be exercised by the Engineer in accordance with Section 900.
Arrangement for Traffic:
During the period of construction, the arrangement of traffic shall be done as per Clause 112.
Measurements for payment:
Water bound macadam shall be measured as finished work in position in cubic metres.

Specification and construction of Wet Mix Macadam (WMM)


1. This work shall consist of laying and compacting clean, crushed, graded aggregate and granular
material, premixed with water, to a dense mass on a prepared subgrade/sub -base/base or

12 | P a g e
Highway Engineering – 18CV56
existing pavement as the case may be in accordance with the requirements of these Specifications.
2. The material shall be laid in one or more layers as necessary to lines, grades and cross -sections
shown on the approved drawings or as directed by the Engineer.
3. The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm.
4. Materials- Coarse aggregates shall be crushed stone. If crushed gravel/shingle is used, not less
than 90 per cent by weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have-at
least two fractured faces.

5. If the water absorption value of the coarse aggregate is greater than 2 per cent, the soundness test
shall be carried out on the material delivered to site.
6. Grading requirements:

7. Materials finer than 425 micron shall have Plasticity Index (PI) not exceeding 6.

13 | P a g e
Highway Engineering – 18CV56
Construction operations
Preparation of base:
The surface of the sub-grade/ sub-base/ base to receive the water bound macadam course shall be
prepared to the specified lines and cross fall (camber) arid made free of dust and other extraneous
material.
Provision of lateral confinement of aggregates:
While constructing wet mix macadam, arrangement shall be made for the lateral confinement of
wet mix. This shall be done by laying materials in adjoining shoulders along with that of wet mix
macadam layer.
Preparation of mix:
Wet Mix Macadam shall be prepared in an approved mixing plant of suitable capacity having
provision for controlled addition of water and forced/positive mixing arrangement like pugmill or
pan type mixer of concrete batching plant.
Spreading of mix:
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared
sub-grade/sub- base/base in required quantities. The mix may be spread either by a payer finisher
or motor grader. For portions where mechanical means cannot be used, manual means as approved
by the Engineer shall be used.
Compaction:
After the mix has been laid to the required thickness, grade and cross fall/camber the same shall
be uniformly compacted, to the full depth with suitable roller. If the thickness of single compacted
layer does not exceed 100 mm, a smooth wheel roller of 80 to 100 kN weight may be used. For a
compacted single layer up to 200 mm, the compaction shall be done with the help of vibratory roller
of minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall
not exceed 5 km/h.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic:
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam
surface till it has dried and the wearing course laid.
Surface Finish and Quality Control of Work:
The surface finish of construction shall conform to the requirements of Clause 902. Control on the
quality of materials and works shall be exercised by the Engineer in accordance with Section 900.
Arrangement for Traffic:
During the period of construction, the arrangement of traffic shall be done as per Clause 112. •
Measurements for payment:
Water bound macadam shall be measured as finished work in position in cubic metres.

Specification and construction of Bituminous Macadam


Scope
This work shall consist of construction in a single course having 50mm to 100mm thickness or in
multiple courses of compacted crushed aggregates premixed with a bituminous binder on a
previously prepared base to the requirements of these Specifications.
14 | P a g e
Highway Engineering – 18CV56

Materials
Bitumen:
The bitumen shall be paving bitumen of Penetration Grade complying with Indian Standard
Specifications.
Coarse aggregates:
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained
on the 2.36 mm sieve. They shall be clean, hard, and durable, of cubical shape, free from dust and
soft or friable matter, organic or other deleterious matter.
Fine aggregates:
Fine aggregates shall consist of crushed or naturally occurring, material, 01 a combination of the
two, passing 2.36 mm sieve and retained on 75 micron sieve. They shall be clean, hard, durable,
dry and free from dust, and soft or friable matter, organic or other deleterious matter.

Construction Operations
Weather and seasonal limitations:
Lying shall be suspended while free-standing water is present on the surface to be covered, or during
rain, fog and dust storms. After rain, the bituminous surface, prime or tack coat, shall be blown off
with a high pressure air jet to remove excess moisture, or the surface left to dry before

15 | P a g e
Highway Engineering – 18CV56
laying shall start. Laying of bituminous mixtures shall not be carried out when the air temperature
at the surface on which it is to be laid is below 10°C.
Preparation of the base:
The base on which bituminous macadam is to be laid shall be prepared, shaped and compacted to
the required profile. A primer coat shall be applied with clause or as directed by the Engineer.
Tack coat:
tack coat in accordance with Clause shall be applied as required by the Contract documents, or as
directed by the Engineer.
Preparation and transportation of the mixture:
Pre-mixed bituminous macadam shall be prepared in a hot mix plant of adequate capacity and
capable of yielding a mix of proper and uniform quality with thoroughly coated aggregates. In order
to ensure uniform quality of the mix and better coating of aggregates, the hot mix plant shall be
calibrated from time to time.
Bituminous materials shall be transported in clean insulated vehicles, and unless otherwise agreed
by the Engineer, shall be covered while in transit or waiting tipping. Subject to the approval of the
Engineer, a thin coating of diesel or lubricating oil may be applied to the interior of the vehicle to
prevent sticking and to facilitate discharge of the material.
Compaction:
Bituminous materials shall be laid and compacted in layers which enable the specified thickness,
surface level, regularity requirements and compaction to be achieved.
Compaction of bituminous materials shall commence as soon as possible after laying. Compaction
shall be substantially completed before the temperature falls below the minimum rolling
temperatures.
Rolling shall commence at the edges and progress towards the centre longitudinally. Rolling shall
continue until all roller marks have been removed from the surface.
Rolling shall be continued until the specified density is achieved, or where no density is specified,
until there is no further movement under the roller.

Surface Finish and Quality Control of Work:


The surface finish of the completed construction shall conform to the requirements of Clause 902.
For control of the quality of materials supplied and the works carried out, the relevant provisions of
Section 900 shall apply.
Protection of the Layer:
The bituminous macadam shall be covered with either the next pavement course or wearing course,
as the case may be, within a maximum of forty-eight hours. If there is to be any delay, the course
shall be covered by a seal coat. The seal coat in such cases shall be considered incidental tothe work
and shall not be paid for separately.
Arrangements for Traffic:

16 | P a g e
Highway Engineering – 18CV56
During the period of construction, arrangements for traffic shall be made in accordance with the
provisions of Clause 112.
Measurement for Payment:
Bituminous macadam shall be measured as finished work in cubic metres, or by weight in metric
tones, where used as regulating course, or square metres at the specified thickness as indicated in
the Contract or shown on the drawings, or as otherwise directed by the Engineer.

Specification and construction of Dense Bituminous Macadam


Scope:
This clause specifies the construction of Dense Graded Bituminous Macadam, (DBM), for use
mainly, but not exclusively, in base/binder and profile corrective courses. DBM is also intended for
use as road base material. This work shall consist of construction in a single or multiple layers of
DBM on a previously prepared base or sub-base. The thickness of a single layer shall be 50mm to
100mm.

Materials
Bitumen:
The bitumen shall be paving bitumen of Penetration Grade complying with Indian Standard
Specifications for "Paving Bitumen" IS: 73.
Coarse aggregates:
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained
on the 2.36 mm sieve. They shall be clean, hard, and durable, of cubical shape, free from dust and
soft or friable matter, organic or other deleterious substances.
Fine aggregates:
Fine aggregates shall consist of crushed or naturally occurring mineral material or a combination of
the two, passing the 2.36mm sieve and retained on the 75 micron sieve. They shall be clean, hard,
durable, dry and free from dust, and soft or friable matter, organic or other deleterious matter.
Filler:
Filler shall consist of finely divided mineral matter such as rock dust, hydrated lime or cement
approved by the Engineer. The filler shall be free from organic impurities and have a Plasticity
Index not greater than 4. The Plasticity Index requirement shall not apply if filler is cement or lime.

17 | P a g e
Highway Engineering – 18CV56

Filler

Aggregate content

18 | P a g e
Highway Engineering – 18CV56
Mixture Design
Requirement for the mixture:
Apart from conformity with the grading and quality requirements for individual ingredients, the
mixture shall meet the requirements set out in Table.

Binder content:
The binder content shall be optimised to achieve the requirements of the mixture set out in the table
and the traffic volume specified in the contract. The Marshall method for determining the optimum
binder be adopted as described in The Asphalt Institute Manual MS-2.
Job mix formula:
The Contractor shall inform the Engineer in writing, at least 20 days before the start of the work, of
the job mix formula proposed for use in the works. While establishing the job mix formula, the
Contractor shall ensure that it is based on a correct and truly representative sample of thematerials
that will actually be used in the work and that the mixture and its different ingredients satisfy the
physical and strength requirements of these Specifications.
Plant trials:
permissible variation in job mix formula: Once the laboratory job mix formula is approved, the
Contractor shall carry out plant trials at the mixer to establish that the plant can be set up to produce
a uniform mix conforming to the approved job mix formula. Once the plant trials have demonstrated
the capability of the plant, and the trials are approved, the laying operation may commence
Laying Trials:
Once the plant trials have been successfully completed and approved, the Contractor shall carry out
laying trials, to demonstrate that the proposed mix can be successfully laid, and compacted. The
laying trial shall be carried out on a suitable area which is not to form part of the works,

19 | P a g e
Highway Engineering – 18CV56
unless specifically approved in writing, by the Engineer. The area of the laying trials shall be a
minimum of 100 sq. m. of construction similar to that of the project road, and it shall be in all
respects, particularly compaction, the same as the project construction, on which the bituminous
material is to be laid.
Weather and seasonal limitations:
Laying shall be suspended while free-standing water is present on the surface to be covered, or
during rain, fog and dust storms. After rain, the bituminous surface, prime or tack coat, shall be
blown off with a high pressure air jet to remove excess moisture, or the surface left to dry before
laying shall start. Laying of bituminous mixtures shall not be carried out when the air temperature
at the surface on which it is to be laid is below 10°C.
Preparation of base:
The base on which Dense Graded Bituminous Material is to be laid shall be prepared in accordance
with Clauses or as directed by the Engineer. The surface shall be thoroughly swept clean by a
mechanical broom, and the dust removed by compressed air. In locations where- mechanical broom
cannot access, other approved methods shall be used as directed by the Engineer.
Prime coat:
Where the material on which the dense bituminous macadam is to be laid is other than a bitumen
bound layer, a prime coat shall be applied, as specified, in accordance with the provisions of Clause
or as directed by the Engineer.
Tack coat:
Where the material on which the dense bituminous macadam is to be placed is a bitumen bound
surface, a tack coat shall be applied as specified, in accordance with the provisions of Clause 503,
or as directed by the Engineer.
Preparation and transportation of the mixture:
Pre-mixed bituminous macadam shall be prepared in a hot mix plant of adequate capacity and
capable of yielding a mix of proper and uniform quality with thoroughly coated aggregates. In order
to ensure uniform quality of the mix and better coating of aggregates, the hot mix plant shall be
calibrated from time to time.
Bituminous materials shall be transported in clean insulated vehicles, and unless otherwise agreed
by the Engineer, shall be covered while in transit or waiting tipping. Subject to the approval of the
Engineer, a thin coating of diesel or lubricating oil may be applied to the interior of the vehicle to
prevent sticking and to facilitate discharge of the material.
Compaction:
Bituminous materials shall be laid and compacted in layers which enable the specified thickness,
surface level, regularity requirements and compaction to be achieved.
Compaction of bituminous materials shall commence as soon as possible after laying. Compaction
shall be substantially completed before the temperature falls below the minimum rolling
temperatures.
Rolling shall commence at the edges and progress towards the centre longitudinally. Rolling shall
continue until all roller marks have been removed from the surface.
Rolling shall be continued until the specified density is achieved, or where no density is specified,
until there is no further movement under the roller.

20 | P a g e
Highway Engineering – 18CV56
Opening to Traffic:
The newly laid surface shall not be open to traffic for at least 24 hrs after laying and completion of
compaction, without the express approval of the Engineer in writing.
Surface Finish and Quality Control of Work:
The surface finish of the completed construction shall conform to the requirements of Clause 902.
For control of the quality of materials supplied and the works carried out, the relevant provisions of
Section 900 shall apply.

Specification and construction of Bituminous Concrete (BC)


Scope:
This clause specifies the construction of Bituminous Concrete, for use in wearing and profile
corrective courses. This work shall consist of construction in a single or multiple layers of
bituminous concrete on a previously prepared bituminous bound surface. Single layers shall be
25mm to 100mm in thickness.
Materials
Bitumen:
The bitumen shall be paving bitumen of Penetration grade complying with Indian Standard
Specification for Paving Bitumen, IS: 73.
Coarse aggregates:
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained
on the 2.36 mm sieve. They shall be clean, hard, and durable of cubical shape, free from dust and
soft or friable matter, organic or other deleterious substances.
Fine aggregates:
Fine aggregates shall consist of crushed or naturally occurring mineral material or a combination of
the two, passing the 2.36mm sieve and retained on the 75 micron sieve. They shall be clean, hard,
durable, dry and free from dust, and soft or friable matter, organic or other deleteriousmatter.
Filler:
Filler shall consist of finely divided mineral matter such as rock dust, hydrated lime or cement
approved by the Engineer. The filler shall be free from organic impurities and have a Plasticity
Index not greater than 4. The Plasticity Index requirement shall not apply if filler is cement or lime.

21 | P a g e
Highway Engineering – 18CV56
Aggregate grading and binder content

Aggregate content

Mix Design

22 | P a g e
Highway Engineering – 18CV56
Requirement for the mixture:
Apart from conformity with the grading and quality requirements for individual ingredients, the
mixture shall meet the requirements set out in Table.
Binder content:
The binder content shall be optimised to achieve the requirements of the mixture set out in the table
and the traffic volume specified in the contract. The marshall method for determining the optimum
binder be adopted as described in The Asphalt Institute Manual MS-2.
Job mix formula:
The Contractor shall inform the Engineer in writing, at least 20 days before the start of the work, of
the job mix formula proposed for use in the works. While establishing the job mix formula, the
Contractor shall ensure that it is based on a correct and truly representative sample of thematerials
that will actually be used in the work and that the mixture and its different ingredients satisfy the
physical and strength requirements of these Specifications.
Plant trials
Permissible variation in job mix formula:
Once the laboratory job mix formula is approved, the Contractor shall carry out plant trials at the
mixer to establish that the plant can be set up to produce a uniform mix conforming to the approved
job mix formula. Once the plant trials have demonstrated the capability of the plant, and the trials
are approved, the laying operation may commence.
Laying Trials:
Once the plant trials have been successfully completed and approved, the Contractor shall carry out
laying trials, to demonstrate that the proposed mix can be successfully laid, and compacted. The
laying trial shall be carried out on a suitable area which is not to form part of the works,unless
specifically approved in writing, by the Engineer. The area of the laying trials shall be a minimum
of 100 sq. m. of construction similar to that of the project road, and it shall be in all respects,
particularly compaction, the same as the project construction, on which the bituminous material is
to be laid.

Construction Operations:
Weather and seasonal limitations:
Laying shall be suspended while free-standing water is present on the surface to be covered, or
during rain, fog and dust storms. After rain, the bituminous surface, prime or tack coat shall be
blown off with a high pressure air jet to remove excess moisture, or the surface left to dry before
laying shall start. Laying of bituminous mixtures shall not be carried out when the air temperature
at the surface on which it is to be laid is below 10°C.
Preparation of base:
The base on which Dense Graded Bituminous Material is to be laid shall be prepared in accordance
with Clauses or as directed by the Engineer. The surface shall be thoroughly swept clean by a
mechanical broom, and the dust removed by compressed air. In locations where- mechanical broom
cannot access, other approved methods shall be used as directed by the Engineer.

23 | P a g e
Highway Engineering – 18CV56
Tack coat:
Where the material on which the dense bituminous macadam is to be placed is a bitumen bound
surface, a tack coat shall be applied as specified, in accordance with the provisions of Clause 503,
or as directed by the Engineer.
Preparation and transportation of the mixture:
Pre-mixed bituminous macadam shall be prepared in a hot mix plant of adequate capacity and
capable of yielding a mix of proper and uniform quality with thoroughly coated aggregates. In order
to ensure uniform quality of the mix and better coating of aggregates, the hot mix plant shall be
calibrated from time to time.
Bituminous materials shall be transported in clean insulated vehicles, and unless otherwise agreed
by the Engineer, shall be covered while in transit or awaiting tipping. Subject to the approval of
the Engineer, a thin coating of diesel or lubricating oil may be applied to the interior of the vehicle
to prevent sticking and to facilitate discharge of the material.
Compaction:
Bituminous materials shall be laid and compacted in layers which enable the specified thickness,
surface level, regularity requirements and compaction to be achieved.
Compaction of bituminous materials shall commence as soon as possible after laying. Compaction
shall be substantially completed before the temperature falls below the minimum rolling
temperatures.
Rolling shall commence at the edges and progress towards the centre longitudinally. Rolling shall
continue until all roller marks have been removed from the surface.
Rolling shall be continued until the specified density is achieved, or where no density is specified,
until there is no further movement under the roller.
Opening to Traffic:
The newly laid surface shall not be open to traffic for at least 24 hrs after laying and completion of
compaction, without the approval of the Engineer in writing.
Surface Finish and Quality Control of Work:
The surface finish of the completed construction shall conform to the requirements of Clause 902.
For control of the quality of materials supplied and the works carried out, the relevant provisions of
Section 900 shall apply.
Arrangements for Traffic:
During the period of construction, arrangements for traffic shall be made in accordance with the
provisions of Clause 112.
Measurement for Payment:
Dense Graded Bituminous Materials shall be measured as finished work either in cubic metres, tons
or by the square metre at a specified thickness as detailed on the Contract drawings, or documents,
or as directed by the Engineer.

Specification and construction of Dry Lean Concrete sub base:


DLC or Dry Lean Concrete is cement concrete with low slump value to be laid for rigid pavement
over sub-base and rolled & compacted by mechanical means.

24 | P a g e
Highway Engineering – 18CV56

• Ordinary Portland cement, Portland Pozzolana Cement or Portland Slag Cement is used for
DLC.
• Coarse aggregate shall consist of Clean, hard, strong, dense, non-porous and durable pieces of
crushed stone or crushed gravel and shall be devoid of pieces of disintegrated stone, soft, flaky,
elongated, very angular or splintery pieces. The maximum size of the coarse aggregate shall be 25
mm.
• The fine aggregate shall consist of clean, natural sand or crushed stone sand or a combination of
the two and shall conform to IS : 383. Fine aggregate shall be free from soft particles, clay, shale,
loam, cemented particles, mica, organic and other foreign matter.
• The coarse and fine aggregates may be obtained in either of the following manner:
• In separate nominal sizes of coarse and fine aggregates and mixed together intimately before use.
• Separately as 25 mm nominal single size, 12.5 mm nominal size graded aggregates - and Fine
• Aggregate of crushed stone dust or sand or a combination of these two.
Aggregate Gradation For Dry Lean Concrete

• Water for mixing and curing of concrete shall be clean and free from injurious amounts of oil,
salt, acid, vegetable matter or other substances harmful to the finished concrete.
• The mix shall be proportioned with a maximum aggregate cement ratio of 15: 1.
• The minimum cement content is 150 kg/cum of concrete.
• The average compressive strength of each consecutive group of 5 cubes made shall not be less
than 10 MPa at 7 days. In addition, the minimum compressive strength of any individual cube shall
not be less than 7.5 MPa at 7 days.
• The batching plant shall be capable of proportioning the materials by weight, each type of
material being weighed separately. The cement from the bulk stock shall be weighed separately

25 | P a g e
Highway Engineering – 18CV56
from the aggregates. The batching and mixing shall be carried out preferably in a forced action
central batching and mixing plant having necessary automatic controls to ensure accurate
proportioning and mixing. Other types of mixers shall be permitted subject to demonstration of their
satisfactory performance during the trial length. The type and capacity of the plant shall be got
approved by the Engineer before commencement of the trial length. The (weighing balances shall
be calibrated by weighing the aggregates, cement, water and admixtures physically either by
weighing with large weighing machine or in a weigh bridge. The accuracy of weighing scales of
the batching plant shall be within ± 2 per cent in the case of aggregates and ±1 per cent in the case
of cement and water.
• Plant mix lean concrete shall be discharged immediately from the mixer, transported directly to
the point where it is to be laid and protected from the weather by covering the tippers / dumpers
with tarpaulin during transit. The concrete shall be transported by tipping trucks, sufficient in
number to ensure a continuous supply of material to feed the laying equipment to work at a uniform
speed and in an uninterrupted manner. The lead of the batching plant to paving site shall be such
that the travel time available from mixing to paving.
• Lean concrete shall be laid/placed mechanically /manually. The concrete shall be laid in one layer
in an even manner without segregation, so that after compaction the total thickness is as specified.
The laying of the two- lane road sub-base may be done either in full width or lane by lane. Preferably
the lean concrete shall be placed and compacted across the full width of the road, by constructing it
in one go or in two lanes running forward simultaneously.

Rolling & Spreading of DLC


• The compaction shall be carried out immediately after the material is laid and leveled with 8 -10
Tonne Static Roller. In order to ensure thorough compaction which is essential, rolling shall be
continued on the full width till there is no further visible movement under the roller and the surface
is closed.
• As soon as the lean concrete surface is compacted, curing shall commence. Curing shall be done
by covering the surface by gunny bags/hessian, which shall be kept continuously moist for 7 days
by sprinkling water.
• The minimum dry density obtained shall be 97% of the dry density achieved during trial length
construction and the density achieved at the edges (i.e. upto 0.5m from the edge) shall be not less
than 95% of the MDD.

26 | P a g e
Highway Engineering – 18CV56
Specification and construction of PQC:
SCOPE:
The Scope of this Segmental Quality Plan/ Methodology shall covers the construction of pavement
quality concrete insertion of dowel bars, tie bars in accordance with the requirement of Technical
Specifications and in conformity with the line, grades and cross sections shown in drawings.
Material Required:
Cement:
Any of the following types of cement may be used with prior approval of the Engineer:
(i) Ordinary Portland cement IS: 269
(ii) Portland Slag Cement IS: 455
(iii) Portland Pozzolana Cement IS: 1489
Cement to be used may preferably be obtained in bulk form. It shall be stored in accordance with
stipulations contained in Clause 1014 and shall be subjected to acceptance test prior to itsimmediate
use.
Coarse Aggregate:
• Aggregates to be used in the construction of PQC will be Crushed aggregates.
• The aggregate complying IS: 383 will be used.
• Max Size of coarse aggregate 25mm as per MoRTH 601.2.3.2 (Fourth Revision: August 2001).
Fine Aggregate:
Clean, natural sand from River Banas form location Triveni 20km form Ladpura will be used. The
material conforming IS: 383 is ensured.

Construction:
Concrete production, transportation, Paving, Texturing and Curing:-
• A batching plant of 120cum per Hr. capacity has to use for Production of Concrete
• Dumpers having hydraulic jack system to unload having capacity 35 Mt (Approx. 9 cum)
concrete will be deploy for transportation of concrete.
• Paving will be carried out in full carriageway width of 8.5 m length.
• The Paver used will be slip from Paver.
• The slip from-paving machine shall compact the concrete by internal vibration and shape it
between the side forms with a conforming plate and oscillating finishing beams.
• The final finish of the surface will be done by super smoother attached to the rear portion of the
Paver.
• Manson Trolley will be placed in between Paver and Texturing and Curing Machine (TCM) for
rectification of any surface defects.
• The alignment of the Paver shall be controlled automatically from the guide wire by 4 set of
level sensors and 2 set of steering sensors attached to the Paver.
• Planning and preparation will be done to pave at least at an average uniform speed of one m /
min.
• The surface of concrete slab will Tine-textured in a direction parallel to the longitudinal axis of
the carriageway.

27 | P a g e
Highway Engineering – 18CV56
• Texturing / Tining will be done with a specified machine specially designed for the purpose for
providing grooves at a uniform spacing of 18 mm to 21mm.
Depth = 3mm to 4mm
Width = 3mm
• Curing of PQC using curing compound will be followed by texturing by the same TCM.
• Curing will be taken care at the edges also.
• The curing compound will be resin based aluminized reflective curing compound.
• After providing initial cut entire PQC will be covered with Hessian cloth and water turned for 14 days
Opening to Traffic:
• No vehicular traffic including contractor's vehicles will be allowed on the finished surface until a
field flexural strength of minimum 4.50 MPa has been achieved where average flexural strength
of minimum 3 specimens should exceed 4.50+1.65 s(s=standard deviation).
• Each series of test specimens for measurement of flexural strength should consists of minimum 3
test specimens.
• Prior to opening to traffic the joints should be sealed and areas adjacent to the pavement should
be completed to a degree that will ensure traffic safety.
Quality Assurance and Control Checks
• As part of Quality Assurance this Segment Quality Plan for PQC has been prepared in line with
the specification provided in relevant MoRTH clauses, Contract Supplementary Technical
Specification and other Codes/ Standard / Specifications etc. elsewhere mentioned in this Plan.
• As a part of Quality Control all the Inspection and Testing requirements for various activities
involved in laying of PQC will be carried out as per relevant MoRTH Specifications & Contract
Technical Specification atc. As described in Inspection and Test Plans attached to this Segment
Quality Plan for PQC.
• These Inspection and Test Plans shall consist of type of Inspection and name of the Test to be
conducted for Product Realization, frequency of testing acceptance criteria and category of
Inspection.
• Inspection and Test Plans should be revised whenever there any change in methodology and
specifications etc.

Construction of Cement Concrete Pavement


Scope:
• The work shall consist of construction of unreinforced, dowel jointed, plain cement concrete
pavement in accordance with the requirements of these Specifications and in conformity with the
lines, grades and cross sections shown on the drawings. The work shall include furnishing of all
plant and equipment, materials and labour and performing all operations in connection with the
work, as approved by the Engineer.
• The design parameters, viz,, thickness of pavement slab, grade of concrete, joint details etc. shall
be as stipulated in the drawings.

28 | P a g e
Highway Engineering – 18CV56
Materials:
• Source of materials: The Contractor shall indicate to the Engineer the source of all materials to
be used in the concrete work with relevant test data sufficiently in advance, and the approval of
the Engineer for the same shall be obtained at least 45 days before the scheduled commencement
of the work. If the Contractor later proposes to obtain materials from a different source, he shall
notify the Engineer for his approval, at least 45 days before such materials are to be used with
relevant test data.
Cement:
• Any of the following types of cement capable of achieving the design strength may be used with
prior approval of the Engineer, but the preference should be to use at least the 43 Grade or higher.
• Ordinary Portland Cement, 33 Grade. IS : 269
• Ordinary Portland Cement, 43 Grade IS : 8112,
• Ordinary Portland Cement, 53 Grade, IS: 12269.
• If the soil around has soluble salts like sulphates in excess of 0.5 per cent, the cement used shall
be sulphate resistant and shall conform to IS:12330.
Admixtures:
Admixtures conforming to IS:6925 and IS: 9103 shall be permitted to improve workability of the
concrete or extension of setting time, on satisfactory evidence that they will not have any adverse
effect on the properties of concrete with respect to strength, volume change, durability and have
no deleterious effect on steel bars. The particulars of the admixture and the quantity to be used,
must be furnished to the Engineer in advance to obtain his approval before use.Satisfactory
performance of the admixtures should be proved both on he laboratory concrete trialmixes and in
trial paving works.
Aggregates:
Aggregates for pavement concrete sha ll be natural material complying with IS : 383 but with a
Los Angeles Abrasion Test result not more than 35 per cent The limits of deleterious materials
shall not exceed the requirements set out in IS : 383.
Coarse aggregate:
Coarse aggregate shall consist of clean, hard, strong, dense, non-porous and durable pieces of
crushed stone or crushed gravel and shall be devoid of pieces of disintegrated stone, soft, flaky,
elongated, very angular or splintery pieces. The maximum size of coarse aggregate shall not
exceed 25 mm for pavement concrete. Continuously graded or gap graded aggregates may be used,
depending on the grading of the fine aggregate. No aggregate which has water absorption more
than 2 per cent shall be used in the concrete mix.
Fine aggregate:
The fine aggregate shall consist of clean natural sand or crushed stone sand or a combination of
the two and shall conform to IS : 383. Fine aggregate shall be free from soft particles, clay, shale,
loam, cemented particles, mica and organic and other foreign matter. The fine aggregate shall not
contain deleterious substances more than the following:
Clay lumps-4.0 per cent, Coal and lignite-10 percent, Material pissing IS Sieve No. 75 micron-
4.0 percent

29 | P a g e
Highway Engineering – 18CV56
Water:
Water used for mixing and curing of concrete shall be clean and free from injurious amount of oil,
sail, acid, vegetable matter or other substances harmful to the finished concrete.
Joint sealing compound:
The joint sealing compound shall be of hot poured, elastomeric type or cold polysulphide type
having flexibility, resistance to age hardening and durability.
Proportioning of Concrete:
After approval by the Engineer of all the materials to be used in the concrete, the Contractor shall
submit the mix design based on weighed proportions of all ingredients for the approval of the
Engineer. The mix design shall be submitted at least 30 days prior to the paving of trial length and
the design shall be based on laboratory trial mixes using the approved materials and methods or
on the basis of any other rational method agreed to by the Engineer.
Cement content:
The cement content shall not be less than 350 kg per cum of concrete. If this minimum cement
content is not sufficient to produce in the field, concrete of the strength specified in the
drawings/design, it shall be increased as necessary without additional compensation under the
Contract. The cement content shall, however, not exceed 425 kg per cum of concrete.
Concrete strength:
While designing the mix in the laboratory, correlation between flexural and compressive strengths
of concrete shall be established on the basis of at least thirty tests on samples. However, quality
control in the field shall be exercised on the basis of flexural strength. It may, however, be
ensured that the materials and mix proportions remain substantially unaltered during the daily
concrete production. The water content shall be the minimum required to provide the agreed
workability for full compaction of the concrete to the required density as determined by the trial
mixes or other means approved by the Engineer and the maximum free water cement ratio shall be
0.50.
Workability:
The workability of the concrete at the point of placing shall be adequate for the concrete to be
fully compacted and finished without undue flow. The optimum workability for the mix to suit the
paving plant being used shall be determined by the Contractor and approved by the Engineer.
Design mix:
The Contractor shall carry out laboratory trials of design mixes with die materials from the approved
sources to be used. Trial mixes shall be made in presence of the Engineer or his representative and
the design mix shall be subject to the approval of the Engineer.
Sub-base:
The cement concrete pavement shall be laid over the sub-base constructed in accordance with the
relevant drawings and Specifications contained in Clause 601. If the sub-base is found damaged at
some places or it has cracks wider than 10 mm, it shall be repaired with fine cement concrete or
bituminous concrete before laying separation layer.

Separation Membrane:
A separation membrane shall be used between the concrete slab and the sub-base. Separation
membrane shall be impermeable plastic sheeting 125 microns thick laid flat without creases.
30 | P a g e
Highway Engineering – 18CV56
Before placing the separation membrane, the sub-base shall be swept clean of all the extraneous
materials using air compressor.
Weather and Seasonal Limitations
Concreting during monsoon months:
When concrete is being placed during monsoon months and when it may be expected to rain,
sufficient supply of tarpaulin or other water proof cloth shall be provided along the line of the work.
Any lime when it rains, all freshly laid concrete which had not been covered for curing purposes
shall be adequately protected. Any concrete damaged by rain shall be removed and replaced. If the
damage is limited to texture, it shall be retextured in accordance with the directives of the Engineer.
Concreting in hot weather:
No concreting shall be done when the concrete temperature is above 30 degree Centigrade.
Side forms and rails:
All side forms shall be of mild steel of depth equal to the thickness of pavement or slightly less to
accommodate the surface regularity of the sub-base.
Batching and mixing:
Batching and mixing of the concrete shall be done at a central batching and mixing plant with
automatic controls, located at a suitable place which takes into account sufficient space for
stockpiling of cement, aggregates and stationary water tanks. This shall be, however, situated at an
approved distance, duly considering the properties of the mix and the transporting arrangements
available with the Contractor.
Hauling and placing of concrete:
Freshly mixed concrete from the central batching and mixing plant shall be transported to the paver
site by means of trucks/tippers of sufficient capacity and approved design in sufficient numbers to
ensure a constant supply of concrete. Covers shall be used for protection of concrete against the
weather.
Placing of Concrete:
Concrete mixed in central mixing plant shall be transported to the site without delay and the concrete
which, in the opinion of the Engineer, has been mixed too long before laying will be rejected and
shall be removed from the site. The total time taken from the addition of the water to the mix, until
the completion of the surface finishing and texturing shall not exceed 120 minutes when concrete
temperature is less than 25°C and 90 minutes when the concrete temperature is between 25°C to
30°C.
Surface texture:
After the final regulation of the slab and before the application of the curing membrane, the
surface of concrete slab shall be brush-textured in a direction at right angles to the longitudinal axis
of the carriageway.

Opening to Traffic
No vehicular traffic shall be allowed to run on the finished surface of a concrete pavement within
a period of 28 days of its construction and until the joints are permanently sealed.
Measurements for Payment:

31 | P a g e
Highway Engineering – 18CV56
Cement Concrete pavement shall be measured as a finished work in square metres with specified
thickness.

32 | P a g e
Highway Engineering – 18CV56
Important Questions

1. Explain rothfuch’s method


2. Explain properties of bitumen.
3. Explain different classification of bituminous mix.
4. What is bitumen emulsion?
5. Explain the use of Bitumen in Road Construction
6. What are the requirements of a good bitumen ?
7. What are the tests conducted on bitumen? Explain any 3.
8. Explain the construction of cement concrete pavements.
9. Explain construction steps for cement concrete pavement slab.
10. Explain the procedure for construction of earth road.
11. Explain the procedure for construction of gravel roads.
12. Explain the procedure for construction of water bound macadam roads.
13. Explain specifications of material for cement concrete pavement slabs.

33 | P a g e
Highway Engineering – 18CV56
MODULE – 5
HIGHWAY DRAINAGE & HIGHWAY ECONOMICS

Introduction
Highway Drainage: Significance and requirements, Surface drainage system and design
Examples, sub surface drainage system, design of filter materials, Types of cross drainage
structures, their choice and location
Highway Economics: Highway user benefits, VOC using charts only-Examples, Economic
analysis - annual cost method-Benefit Cost Ratio method-NPV-IRR methods- Examples, Highway
financing-BOT-BOOT concepts
Highway drainage is the process of removing and controlling excess surface and sub-soil water
within the right of way this includes interception and diversion of water from the road surface and
subgrade. The installation of suitable surface and sub-surface drainage system is an essential part
of highway design and construction.

Importance of Highway Drainage

Significance of Drainage
An increase in moisture content causes decrease in strength or stability of a soil mass the variation
in soil strength with moisture content also depends on the soil type and the mode of stress
application. Highway drainage is important because of the following reasons:-
• Excess moisture in soil subgrade causes considerable lowering of its stability the pavement
is likely to fail due to subgrade failure as discussed in Article 10.1.
• Increase in moisture cause reduction in strength of many pavement materials like
stabilized soil and water bound macadam.
• In some clayey soils variation in moisture content causes considerable variation in flume
of subgrade. This sometimes contributes to pavement failure.
• One of the most important causes of pavement failure by the formation of waves and
corrugations in flexible pavements is due to poor drainage.
• Sustained contact of water with bituminous pavements causes failures due to stripping of
bitumen from aggregates like loosening or detachment of some of the bituminous
pavement layers and formation of pot holes.
• In places where freezing temperatures are prevalent in winter, the presence of water in the
subgrade and a continuous supply of water from the ground water can cause considerable
damage to the pavement due in frost action.

Requirements of Highway Drainage System


• The surface water from the carriageway and shoulder should effectively be drained off
without allowing it to percolate to subgrade.
• The surface water from the adjoining land should be prevented from entering the
roadway. The side drain should have sufficient capacity and longitudinal slope to carry

1|Page
Highway Engineering – 18CV56
away all the surface water collected.
• Flow of surface water across the road and shoulders and along slopes should not cause
formation of cross ruts or erosion.

Surface Drainage
The surface water is to be collected and then disposed off. The water is first collected in
longitudinal drains, generally in side drains and then the water is disposed off at the nearest
stream, valley or water course. Cross drainage structures like culverts and small bridges may be
necessary for the disposal of surface water from the road side drains.

Collection of Surface Water


The water from the pavement surface is removed by providing the camber or cross slope to the
pavement. The rate of this cross slope is decided based on type of pavement surface and amount
rainfall.
where there is restriction of space, Construction of deep open drains may be undesirable. This is
particularly true when the road formation is in cutting. In such cases covered drains or drainage
trenches properly filled with layers of coarse sand and gravel may be used. In urban roads because
of the limitation of land width and also due to the presence of foot path, dividing islandsand other
road facilities, it is necessary to provide underground longitudinal drains. Water drained from the
pavement surface can be carried forward in the longitudinal direction between the kerb and the
pavement for short distances. This water may be collected in catch pits at suitable intervals and lead
through underground drainage pipes. Section of a typical catch pit with grating to prevent the entry of
rubbish into the drainage system.
Drainage of surface water is all the more important in hill roads. Apart from the drainage of water
from the road formation, the efficient diversion and disposal of water flowing down the hill slope
across the road and that from numerous cross streams is an important part of hill road construction.
If the drainage system in hill road is not adequate and efficient, it will result in complex maintenance
problems.

Design of Surface Drainage System


The design of surface drainage system may be divided into two phases:
(i) Hydrologic analysis
(ii) Hydraulic analysis
Once the design runoff Q is determined, the next step is the hydraulic design of drains. The side
drains and partially filled culverts are designed based on the principles of flow through open
channels.

Data for Drainage Design


The following data are to be collected for the design of road side drain:

1. Total road length and width of land from where water is expected to flow on the stretch of
the side drain.

2|Page
Highway Engineering – 18CV56
2. Run-off coefficients of different types of surfaces in the drainage area and their respective
areas (such as paved area, road shoulder area, turf surface, etc.)

Designed Steps

Simplified steps for the design of longitudinal drains of a road to drain off the surface water given
below:
The frequency of return period such as 10 years, 25 years etc. is decided based on finances
available and desired margin of safety, for the design of the drainage system.
The values of coefficients of run-off C1, C2, C3 etc. from drainage areas A1, A2, A3 etc. are found
and the weighted value of C is computed.
Inlet time for the flow of storm water from the farthest point in the drainage area to the drain
inlet along the steepest path of flow is estimated from the distance, slope of the ground and type
of the cover.
Time of flow along the longitudinal drain T2 is determined for the estimated length of longitudinal
drain L upto the nearest cross drainage or a water course and for the allowable velocity of flow V
in the drain i.e., T2 = L.
The total time T for inlet flow and flow along the drain is taken as the time of concentration or the
design value of rain fall duration, T = T1 + T2.
The required depth of flow in the drain is calculated for a convenient bottom width and side slop
of the drain. The actual depth of the open channel drain may be increased slightly to give a free
board. The hydraulic mean radius of flow R is determined.
The required longitudinal slope S of the drain is calculated using Manning‟s formula adopting
suitable value of roughness coefficient ‘n’ drain in a sandy clay soil from the inlet point to the
cross drainage is 540 m. The velocity of flow in the side drain may be assumed as 0.6 rn/sec so
that silting and erosion are prevented. Estimate the design quantity of flow on the side drain for a
ten-year period of frequency of occurrence of the storm.

Cross Drainage
Whenever streams have to cross the roadway, facility for cross drainage is to be provided. Also
often the water from the side drain is taken across by these cross drain in order to divert the water
away from the road, to a water course or valley. The cross drainage structures commonly in use are
culverts and small bridges. When a small stream crosses a road with a linear waterway less than
about six meter, the cross drainage structure provided is called culvert; for higher values of linear
waterway, the structure is called a bridge.

Surface Drainage
Change in moisture content of subgrade are caused by fluctuations in ground water tableseepage
flow, percolation of rain water and movement of capillary water and even watervapour. In sub-
surface drainage of highways, it is attempted to keep the variation of moisture in subgrade soil to
a minimum. However only the gravitational water is drained by the usual drainage systems.

3|Page
Highway Engineering – 18CV56
Lowering of Water Table
The Highest level of water table should be fairly below the level of subgrade, in order that the
subgrade and pavement layers are not subjected to excessive moisture. From practical
considerations it is suggested that the water table should be kept atleast 1.0 to 1.2 m the subgrade.
In places where water table is high (almost at ground level at times) the best remedy isto take the
road formation on embankment of height not less than 1.0 to 1.2 meter. When the formation is to
be at or below the general ground level, it would be necessary to lower the water table.

Highway Economics & Finance

Introduction
Better highway system provides varied benefits to the society. Improvements in highway results in
several benefits to the road users such as :Reduction in vehicle operational cost per unit length of
road. saving travel time and resultant benefits in terms of time cost of vehicles and the passengers
Reduction in accident rates. Improved level of service and ease of driving. Increased comfort to
passengers. Therefore he level of service of a road system may be assessed from the benefits to the
users The improvement in road network also benefits the land owner by providing better access and
consequently enhancing the land value. The cost of improvements in the highway of land, materials,
construction work and for the other facilities should be worked out. From the point of view of
economic justification for the improvements, the cost reductions to the highway users and other
beneficiaries of the improvements during the estimated period should be higher than the investments
made for the improvement. In the planning and design of highways there is increasing need for
analysis to indicate justification of the expenditure required and the comparative worth of proposed
improvements, particularly when various alternatives are being compared.
The government or any other agency finances highway developments. The funds for these are
generally recovered 1ins the road users in the form of direct and indirect taxations.

Highway User Benefits

General Benefits
Several benefits are brought to highway users and others due to the construction of a new highway
or by improving a highway. Road user benefits are the advantages, privileges or savings that
accrue to drivers or owners through the use of one highway facility as compared with the use of
another. The various benefits due to highway improvement may be classified into two categories:
(i) quantifiable or tangible benefits in terms of market values and (ii) non quantifiable or
intangible benefits.

Quantifilab1e Benefits
Various benefits which can be quantified include benefits to road user such as reduction in vehicle
operation cost, time cost and accident cost. The other benefits include enhancement in land value.
These are briefly explained below:

4|Page
Highway Engineering – 18CV56
Saving in vehicle operation cost is due to reduction in fuel and oil consumption and reduction in
wear and tear of tyres and other maintenance costs. A road with sharp curves and steep grades
require frequent speed changes; presence of intersections require stopping idling andaccelerating;
vehicle operation on road stretches with high traffic volume or congestion necessitates speed
changes and stopping and increased travel time.

Non-quantable Benefits
The non-quantifiable benefits due to improvements in highway facilities include reduction in
fatigue and discomfort during travel, increase in comfort and conveniences and improvement in
general amenities, social and educational aspects, development of recreational and medical
services, improved mobility of essential services and defence forces, aesthetic values, etc..

Motor Vehicle Operation Cost


The factors to be considered for evaluating motor vehicle operation cost would differ depending on
the purpose of the analysis. The vehicle may be classified in different groups such as passenger
cars, buses, light commercial vehicles, single unit trucks combination vehicles etc., for the purpose
of cost analysis. The motor vehicle operation costs depend on several factors which may be grouped
.as given below:
Cost dependent on time expressed as cost per year such as interest on capita depreciation cost,
registration fee, insurance charges, garage rent, driver’s license salaries etc. as applicable.
Cost depending on distance driven expressed as cost per vehicle-kilometer. The items which may
be included here are fuel, oil, tyres, maintenance and repairs etc.
Cost dependent on speed include cost of fuel, oil and tyre per vehicle-km-time-cost of vehicles,
travel time value of passengers, etc.
Cost dependent on type of vehicle and its condition. Operation costs of larger vehicles are
comparatively higher. The operation cost of old vehicles maintained in poor condition is also
higher.

Accident costs.
The costs of vehicle operation and time for unit distance may be taken as:

T = a+ (b+c)
Where
a = running cost per unit distance, independent of journey time
b = a fixed hourly cost, dependent on speeds
c = the portion of the running cost which is dependent on speed
pavement surface and its condition, grades, curves and traffic volumes. Also the time costs and
accident costs are taken into consideration.

Example - Calculate the operating cost of a passenger car for 100 km length of a rural highway
with no sharp curves for most economical speed of vehicles operation using the following

5|Page
Highway Engineering – 18CV56
Highway Costs

General
The total Highway Cost for road user benefit analysis is the sum of the capital costs expressed on
an annual basis and the annual cost of maintenance. The total cost for highway improvement is
obtained from the estimate prepared from the preliminary plans. The total cost of each highway
engineering improvement proposal is calculated from the following five components

(i) Right of way


(ii) Grading drainage, minor structures
(iii) Major structures like bridges
(iv) Pavement and appurtenances
(v) Annual cost of maintenance and operation

Computation of total annual highway cost based on summation of the annual cost of individual
items of improvements and their average useful lives is considered to be a proper and accurate
approach. It is difficult to estimate the service lives of highway elements as there are several
variables such as soil, climate topography and traffic. Road life studies enable estimation of lives
of pavements, bridges and other roadway facilities.
(i) Administration (a portion) Personal service, building, equipment operation, office,
insurance etc.
(ii) Highway operation Equipment. building vehicle operation including capital costs of
vehicle.
(iii) Highway maintenance
(iv) Highway capital cost : Cost of highway components such as right of way, damage,
earthwork, drainage system. pavement bridges and traffic services depreciation cost and
interest on investment.
(v) Probable life and salvage value at the end of this period.

The average annual highway cost for a road system may be summed up by the formula.

Ca – H + T + M + Cr
where
Ca = average annual cost of ownership and operation
H = average cost for administration and management at head quarters
T = average annual highway operation cost.
M = average annual highway maintenance cost.
Cr = average annual capital cost of depreciation of investment capital or the capital
recovery with return on capital

The annual cost is considered in the economic assessment of highway projects. Instead of
considering the overall cost of a project the annual repayment of a capital loan plus the interest
over a specified period of time of the annual capital cost is considered in the analysis.

6|Page
Highway Engineering – 18CV56

economical proposal among various alternatives, in the analysis for economic justification of the
proposed improvement, it is required to use judgment such as quantitative selection of the factors
in which annual highway cost depends and the estimation of AADT of each class of vehicle
considering the normal increase in traffic and the generated traffic.

Methods of Analysis
The procedure for the economic evaluation of highway projects consists of qualification for cost
component and the benefits arising out of the project and to evaluate by one of the methods of
analysis.
There are several methods of economic analysis. Some of the common methods are. Annual- cost
Method, Rate-of-Return Method and Benefit-Cost Method.

Annual-Cost Method
The annual cost of each element of capital improvement is found by multiplying by the appropriate
CRF value calculated for the assume life span. The annual cost Cr may be found using the relation

C1 = P. i(1+i)n = P(CRF)

(1+i)n-1

Rate-of-Return Method
There are number of variations for the determination of raw of return of a highway improvement.
In the rate of return method, die interest rate at which two alternative solutions have equal annual
cost is found, If the rate of return of all proposed projects are known, the priority for the
improvement could be established.
Benefit Cost ratio Method
Principle of this method is to assess the merit of a particular scheme by comparing the annual
benefits with the increase in annual cost
Benefit cost ration = Annual benefits from improvement / Annual cost of the improvement
= R – R1 / H1 – H

Where
R = total annual road user cost for existing highway
R1= total annual road user cost for proposed highway improvement
H= total annual cost of existing road
H1 = total annual cost of proposed highway improvement

The benefit-cost ratios are determined between alternate proposals and those plans dub are not
attractive are discarded. Then the benefit cost ratios for various increments of added investment are
computed to arrive at the best proposal. hi order to justify the proposed improvement, the ratio
should be greater than 1.0. However, the choice of interest rate would affect the results of the

7|Page
Highway Engineering – 18CV56
benefit-cost solutions.

Total annual road user cost for proposal B =RB = Rs. 2491,125
Total annual highway cost of proposal C = HC = Rs.3,75,100
Total annual highway cost of proposal C= HC = Rs.2377,245

Benefit – cost ratio

C = RA-RB = 3081,330 - 2377.245 = 704,085 = 3.546

A = HC-HA 375,100 - 176,527 198, 573

Therefore, alternative C is the best one with higher benefit-cost ratio.

Highway Finance
Basic principle in highway financing is that the funds spent on highways are recovered from the
road users. The recovery may be both direct and indirect.
Two general methods of highway financing are:
Pay-as-you-go method
Credit financing method
In pay-as-you-go method, the payment for highway improvements, maintenance and operation
is made from the central revenue. In credit financing method, the payment for highway
improvement is made from borrowed money and this amount and the interests are re-paid from
the future income.

Distribution of highway cost


The question of distributing highway cost among the Government, road-user and other has been
a disputed task in several countries. Many economists are of the view that the financial
responsibility for roads should be assigned only among the beneficiaries on the basis of the benefit
each one receives.
There are several theories suggesting the method of distribution of highway taxes between
passenger cars and other commercial vehicles like the trucks. However in India the annual revenue
from transport has been much higher than the expenditure on road development and maintenance.
Therefore there is no problem of distributing the highway cost among otheragencies. Also the
taxation on vehicles is being considered separately by the states and there seems to be no theory
followed for the distribution of taxes between various classes of vehicles.

Sources of Revenue
The various sources from which funds necessary for highway development and maintenance may
be made available, are listed below:
• Taxes on motor fuel and lubricants.
• Duties and taxes on new vehicles and spare part including tyres

8|Page
Highway Engineering – 18CV56
• Vehicles registration tax.
• Special taxes on commercial vehicles
• Other road user taxes
• Property taxes
• Toll taxes

Other funds set apart for highways

Highway financing in India


The responsibility of financing different roads lies with the Central Government, State
Governments and local bodies including Corporations, Municipalities, District Boards and
Panchayats.
Taxes levied by Central Government for highway financing are:
o Duties arid taxes on motor fuel
o .Excise duty on vehicles and spare parts, tyre etc.
o Excise duty on oils, grease, etc

Taxes levied by the State Governments include:


o Registration fees for vehicles and road tax
o Permits for transport vehicles
o Passenger tax on buses
o Sales tax on vehicle parts tyre etc.
o Fees on driving licenses

Taxes levied by local bodies are mainly the toll tax.


Ever since the introduction of Central Road Fund (CRF) in the year 1929 by taxing motor fuel, this has
been the main source of finance for the State Government to meet the road development needs, without
having to go through the time consuming process of special sanctions each time. However of late the CRF
is also being merged with the general revenue, in March 1976 the Lok Sabha has passed the resolution Of
the Ministry of Transport ensuring the existence of the CRF separately with the specified objectives. An
Amount of not less than 3.5 paise per litre out of the duty of customs and excise on motor spirit would be
set apart towards the CRF for the road development. While utilizing this fund, greater attention would be
given to schemes of all-India importance. Twenty percent of the fund would be retained by the central
Government as reserve. The fund will also be used for road research schemes, traffic studies, economics
surveys and training arrangements for young engineers. The gross revenue from road transport in India
during the sixth plan period 1978-83, 1980-85was about Rupees l2,000 Crores

9|Page
Highway Engineering – 18CV56

Important Questions

1. What is the importance of highway drainage?


2. What are the requirements of highway drainage system
3. Explain the process of collection of surface water from pavement surface.
4. Explain hydrologic analysis.
5. Explain hydraulic analysis.
6. Differentiate between quantifilab1e benefits & non-quantable benefits
7. What is motor vehicle operation cost?
8. How the cost of highway improvement is calculated?
9. What are the methods of economic analysis? Explain any 3.
10. What are the sources of revenue?

10 | P a g e