The document outlines the executed civil and interior work items for the JWC RILT1 project, detailing various types of work, quantities, rates, and amounts. It highlights discrepancies between the bill of quantities (BOQ) and approved mock-ups, as well as additional items required for completion. The total of non-tender items is presented, along with notes on costs and approvals needed for certain changes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views59 pages

Tower-1 Nt Items

The document outlines the executed civil and interior work items for the JWC RILT1 project, detailing various types of work, quantities, rates, and amounts. It highlights discrepancies between the bill of quantities (BOQ) and approved mock-ups, as well as additional items required for completion. The total of non-tender items is presented, along with notes on costs and approvals needed for certain changes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 59

Project :- JWC RILT1

BNP Civil & Interios Work NT Items


As per Executed Work
BNP Remarks dated
Sl No Type of Work Item Description Unit Qty. Rate Amount Qty. Rate Amount
022.01.2025

A Flooring

This is to be done by
other RIL nominated
5 GP2 Grouting two layers of grouting Sqm 950.60 600.00 570,360.00 290.60 600.00 174,360.00
vender. Hence, Not
under BNP Scope.
B Door - -
The BOQ specifies laminate finish, but the Noted as NT &
6 Pelmet approved mock-up is gypsum on ply with a Rmt 594.52 450.00 267,534.00 Considered for further 594.52 450.00 267,534.00
paint finish additional cost working
BOQ specifies acrylic paint finish with
This was Instructed by
laminate backing, whereas the approved
PU paint instead of Gopal
NotedSiras
that
NT, The
&
sample is PU paint finish with paint
7 Acrylic Emulsion on Sqm 3,935.77 350.00 1,377,519.01 approved
Considered door
forframe
furtheris 350.00 350.00
backing. . i.e. SF 300 / SF 400 etc.- As per
Painted Panel made of cost
additional red Meranti
working
design team comments and approval
wood with 4mm Ply &
during mock-up inspection
The approved door frame is made of red skin finish with Veneer -
Meranti wood with 4mm veneer- Earlier Earlier BOQ item, Door
8 Door & Frame BOQ item, Door Frame & Door shutter is Sqm 1,060.00 2,500.00 2,650,000.00 Frame & Door shutter is
finished with 4mm Veneer with Veneer, finished with 4mm
now changed
Balcony to Skin Finish
side Bulkhead / side wall dry veneer Finish, now
Notedtoasskin
changed NT finish
&
cladding. (Not Mentioned). New item not
9 drywall Partition Sqm 348.00 4,500.00 Considered
1,566,000.00 with Veneer.for further
This is to 348.00 4,500.00 1,566,000.00
considered in BOQ ( FR MR drywall board
additional
be Noted cost
as working
NT &
boxing to be executed)
Considered for
Noted as NT & further
Additional item required to be executed on additional cost working
10 ODU Framing Nos 393.00 5,000.00 1,965,000.00 Considered for further 270.00 5,000.00 1,350,000.00
site for IDU installation
additional cost working
Changing of material for toilet sliding track
Noted as NT &
from MS to Aluminium included Hilti HRD –
11 Door Package Rmt 393.00 1,500.00 589,500.00 Considered for further 343.00 1,500.00 514,500.00
Fastener as per QC direction. Section
additional cost working
details as approved by design team.
C Other Area - -

Noted as NT &
Considered for further
additional cost working
Also, RIL informed to
Above ceiling partition on fix glass / metal
keep this item on HOLD
Jali. (BOQ item No. 130 only mentioned
till further clarity on
12 Metal Jali metal Jali with SS hollow frame). : Sqm 95.00 3,500.00 332,500.00 95.00 3,500.00 332,500.00
Metal Jaali . Venders
Additional Aluminium section detail to
who had executed the
support approved by Design team.
work as per previous
instructions can book
these amounts in the
RA bill.

MEP / services marking in partition or floor


(cut out provision are mentioned, Marking
Noted as NT &
not mentioned).-Marking for 1st & 2nd fix on
13 Marking Nos 2,500.00 300.00 750,000.00 Considered for further 1,500.00 300.00 450,000.00
wall panelling /ceiling is executed by ID
additional cost working
vender for accuracy and to maintain line
level.
Additional cost of service template for
services installation. Provision and cutout
Noted as NT &
in gypsum ceiling with additional support
14 Gypsum Celing Sqm 1,800.00 450.00 810,000.00 Considered for further 1,800.00 450.00 810,000.00
for service template is included in line item,
additional cost working
whereas providing ply (8 mm thk) is not
seen in line item.
. The same item is
executed for Motorised
Support for IDU switch installation.
roller blinds too. Noted
15 Electrical Item Additional support provided for AC switch Nos 250.00 400.00 100,000.00 270.00 400.00 108,000.00
as NT & Considered for
socket for IDU.
further additional cost
working
All MEP additional support by aluminium, Noted as NT &
16 Templete template in 12mm thick ply and wooden Nos 1,922.00 4,000.00 7,688,000.00 Considered for further 1,200.00 4,000.00 4,800,000.00
boxing in 18mm thick ply- additional cost working
Provision and cutout in gypsum ceiling with
Noted as NT &
additional support for service template is
17 All Services ply backing Sqm 1,800.00 700.00 1,260,000.00 Considered for further 700.00 700.00
included in line item, whereas providing ply
additional cost working
(8 mm thk) is not seen in line item.
Q/c requirement:- Dynomic 100 sealant Noted as NT &
9. Dymonic 100 sealant
18 required to be used while fixing wall Nos 200.00 300.00 60,000.00 Considered for further 200.00 300.00 60,000.00
for the screw area
panelling at window side additional cost working
ALUMINIUM FRAMING FIXING SCREW :
The Hilti screws are considerably more
expensive, costing approximately four
times (4X) that of the standard screws, Noted as NT &
19 Hilti screws leading to a significant impact on our Nos 50,000.00 14.00 700,000.00 Considered for further 25,000.00 14.00 350,000.00
overall project costs. With a tentative additional cost working
requirement of 450,000 screws, this
presents a considerable commercial
challenge
Seeking Approval on
the texture to work on
Trap Door In all toilet Trap door, with MR board to be replaced
24 Sqm 225.00 1,550.00 348,750.00 costing. Noted as NT & 1,550.00 1,550.00
ceiling & Kitchen area with 8 mm FCB board
Considered for further
additional cost working
Floor marble installation This item is re-
Floor marble installation due to change in
26 due to change in design Sqm 350.00 1,200.00 420,000.00 requested to consider 1,200.00 1,200.00
design for Living/ Dining pattern
for Living/ Dining pattern as Additional ITEM
It was discussed that
this is an NT Item & To
Ardex S1 in living dining
28 Ardex S1 in living dining area. Sqm 350.00 550.00 192,500.00 be Considered for 550.00 550.00
area.
further additional cost
This working
item was not
Housing for AC slot grill discussed but needs to
29 Housing for AC slot grill diffuser. Rmt 750.00 400.00 300,000.00 400.00 400.00
diffuser. be consodered as an
NT Itm.
Aluminium Framing in
Main Lobby for marble
Veneer fixing is Aluminium Framing in Main Lobby for
This item was not
mentioned as marble Veneer fixing is mentioned as
discussed but needs to
30 50x50x1.6mm in BOQ, 50x50x1.6mm in BOQ, But the same is Sqm 1,000.00 225.00 225,000.00 84.81 225.00 19,082.25
be consodered as an
But the same is approved approved as 50x50x2mm. This item will
NT Itm.
as 50x50x2mm. This have thickness variation.
item will have thickness
variation. The Mirror polishing is
under base rate which
Marble Mirror Polishing (17 times) 8 times is in BOQ as the boq
33 Marble Mirror Polishing Sqm 23,225.57 2,200.00 51,096,246.75 2,200.00 2,200.00
rate will be 100/- per sft term is the marble will
be precut & pre-
polished.
12mm Reinforcement
steel for Main lobby 12mm Reinforcement steel for Main lobby This is as per instruction
34 Nos 900.00 200.00 180,000.00 900.00 200.00 180,000.00
Screeding ( Only Screeding ( Only Installation ) by RIL QC team
Installation )

Additional Control joints Additional Control joints for Mani lobby This is as per instruction
35 sqm 350.00 150.00 52,500.00 550.00 150.00 82,500.00
for Mani lobby Screeding Screeding (labour charges) by RIL QC team

Total of Non Tendror items


73,501,409.76 11,071,426.25
Excluding Taxes
Sr. No BOQ No. Location Unit

5.00 two layers of grouting

GP2 Grouting
LEVEL -6
Main Lobby
1.00 Sqm

Total

6.00 The BOQ specifies laminate finish, but the


approved mock-up is gypsum on ply with a
paint finish

Pelmet
LEVEL -12
2BHK-A
1.00 Living Sqm

2.00 Bedroom 1 Sqm

3.00 Master bedroom Sqm

3BHK-A

1.00 Bedroom 2 Rmt

2.00 Living Rmt

3.00 Bedroom 1 Rmt

3.00 Master bedroom Rmt


5 BHK-C

1.00 Bar and Theater Rmt

2.00 Living / Dining Rmt

3.00 Living / Dining Rmt

4.00 Bedroom 3 Rmt

5.00 JR. Master bedroom Rmt

6.00 Bedroom 2 Rmt

7.00 Bedroom 1 Rmt

7.00 Master bedroom Rmt

LEVEL -11

3BHK-A

1.00 Bedroom 2 Rmt

2.00 Living Rmt

3.00 Bedroom 1 Rmt

3.00 Master bedroom Rmt

5 BHK-C

1.00 Bar and Theater Rmt

2.00 Living / Dining Rmt


3.00 Living / Dining Rmt

4.00 Bedroom 3 Rmt

5.00 JR. Master bedroom Rmt

6.00 Bedroom 2 Rmt

7.00 Bedroom 1 Rmt

7.00 Master bedroom Rmt

3BHK-B

1.00 Master bedroom Rmt

2.00 Living Rmt

3.00 Bedroom 2 Rmt

4.00 Bedroom 1 Rmt

Total
The approved door frame is made of red
Meranti wood with 4mm veneer- Earlier BOQ
8.00 item, Door Frame & Door shutter is finished
with 4mm Veneer with Veneer, now changed
to Skin Finish

1.00 5BHK-C Sqm

2.00 5BHK-D Sqm

3.00 3BHK-A Sqm

4.00 3BHK-B Sqm

5.00 2BHK-A Sqm

Total in Sqmt

BOQ specifies acrylic paint finish with laminate


backing, whereas the approved sample is PU
7.00 paint finish with paint backing. . i.e. SF 300 /
SF 400 etc.- As per design team comments
and approval during mock-up inspection

SF-300
Level-11,12 5BHK-C
1.00 Master Bedroom Sqm
Sqm
2.00 Bedroom 1 Sqm
Sqm
3.00 Bedroom 2 Sqm
4.00 J. Master bedroom Sqm
Sqm
5.00 Ent. Foyer Sqm
Sqm
Sqm
Sqm
6.00 Ent. Foyer Sqm
Sqm
7.00 Liviing and dining Sqm
Sqm
8.00 Liviing and dining Sqm
Sqm
9.00 Bar and sitting area Sqm
Sqm
Sqm
10.00 Sqm
Sqm
Total in Sqmt
Total All Floor

3BHK A
1.00 Ent foyer and Family area Sqm
2.00 Family area Sqm
3.00 Living dining Sqm
4.00 Living dining Sqm
5.00 Bed 2 Sqm
6.00 Bed 1 Sqm
7.00 Mast bed Sqm

Total in Sqmt
Total All Floor 12,11,10

3BHK B
1.00 Mast bed Sqm
2.00 Living dining Sqm
Sqm
Sqm
3.00 Study Sqm
4.00 Living dining Sqm
5.00 Living dining Sqm
6.00 Bed 2 Sqm
7.00 Bed1 Sqm

Total in Sqmt
Total All Floor 11,10

Level-12 2BHK
1.00 Ent. Foyer Sqm
2.00 Living dining Sqm
3.00 Living dining Sqm
4.00 Living dining Sqm
5.00 Mast bed Sqm
6.00 Bed 1 Sqm
7.00 Near by lugguage storage Sqm
Level-12 5BHK-D
1.00 Master Bedroom Sqm
Sqm
2.00 Bedroom 1 Sqm
Sqm
3.00 Bedroom 2 Sqm
4.00 J. Master bedroom Sqm
Sqm
5.00 Ent. Foyer Sqm
Sqm
Sqm
Sqm
6.00 Ent. Foyer Sqm
Sqm
7.00 Liviing and dining Sqm
Sqm
8.00 Liviing and dining Sqm
Sqm
9.00 Bar and sitting area Sqm
Sqm
Sqm
10.00 Sqm
Sqm
Total in Sqmt

Total All Floor

Additional item required to be executed on site


10 for IDU installation
5 BHK-C
1 Theater NOS
2 BAR SEATING ROOM NOS
3 DINING NOS
4 LIVING DINING NOS
5 BEDROOM-3 NOS
6 KITCHEN NOS
7 F.STAFF NOS
8 UTILITY NOS
9 F.STAFF NOS
11 POOJA/ENTRANCE NOS
12 CORRIDOOR NOS
13 JR MASTER BEDROOM NOS
14 BEDROOM-2 NOS
15 BEDROOM-1 NOS
16 NANNY NOS
17 MASTER BEDROOM NOS
Total

3 BHK-A
1 BEDROOM-2 NOS
2 LIVING DINING NOS
3 FAMILY NOS
4 ENTERANCE FOYAR NOS
5 BEDRROOM-1 NOS
6 MASTER BEDROOM NOS
7 KITCHEN NOS
TOTAL

5 BHK-D

1 LIVING NOS
2 LIVING DINING NOS
3 MASTER BEDROOM NOS
4 OFFICE NOS
5 FOYAR NOS
6 KITCHEN NOS
7 UTILITY NOS
8 4 STAFF NOS
9 NANNY NOS
10 STUDY NOS
11 JNR MASTER BEDROOM NOS
12 BEDROOM-3 NOS
13 BEDROOM-2 NOS
14 BEDROOM-1 NOS
15 CORRIDOR NOS
TOTAL

3 BHK-B

1 MASTER BEDROOM NOS


2 LIVING DINING NOS
3 STUDY NOS
4 FOYAR NOS
5 STAFF UTILITY NOS
6 KITCHEN NOS
7 BEDROOM-1 NOS
8 BEDROOM-2 NOS
TOTAL

2BHK-A
1 FOYAR NOS
2 LIVING DINING NOS
3 KITCHEN NOS
4 BEDROOM-2 NOS
5 BEDROOM-1 NOS
TOTAL

TOTAL

MEP / services marking in partition or floor (cut


out provision are mentioned, Marking not
mentioned).-Marking for 1st & 2nd fix on wall
panelling /ceiling is executed by ID vender for accuracy
and to maintain line level.

All MEP services marking, additional support


by aluminium, template in 12mm thick ply and
wooden boxing in 18mm thick ply-
16

SR.N 5 BHK-C
1 THEATER Nos
2 THEATER Nos
3 THEATER TOILET Nos
4 STORAGE Nos
5 STORAGE Nos
6 BAR SEATING ROOM Nos
7 DINING Nos
8 LIVING DINING Nos
9 BEDROOM-3 Nos
10 BEDROOM-3 Nos
11 DRESS-3 Nos
12 TOILET-3 Nos
13 STORAGE Nos
14 POWDER TOILET Nos
15 CORIDOOR Nos
16 CORIDOOR Nos
17 KITCHEN Nos
18 KITCHEN Nos
19 UTILITY Nos
20 F.STAFF Nos
21 F.STAFF TOILET Nos
22 M.STAFF Nos
23 M.STAFF TOILET Nos
24 POOJA Nos
25 STUDY Nos
26 STUDY Nos
27 ENTRANCE Nos
28 JR MASTER BEDROOM Nos
29 JR MASTER BEDROOM Nos
30 JR HIS DRESS Nos
31 JR MASTER DRESS Nos
32 JR HER DRESS Nos
33 BEDROOM-2 Nos
34 BEDROOM-2 Nos
35 BEDROOM-2 Nos
36 DRESS-2 Nos
37 TOILET-2 Nos
38 CORIDOOR Nos
39 CORIDOOR Nos
40 NANNY Nos
41 NANNY TOILET Nos
42 BEDRROM-1 Nos
43 BEDRROM-1 Nos
44 BEDRROM-1 Nos
45 TOILET-1 Nos
46 MASTER HIS DRESS Nos
47 MASTER TOILET Nos
48 MASTER CORIDOOR Nos
49 MASTER CORIDOOR Nos
50 MASTER BEDROOM Nos
51 HER DRESS Nos

TOTAL

3BHK-B

1 BEDROOM-2 Nos
2 BEDROOM-2 Nos
3 BEDROOM-2 Nos
4 TOILET-2 Nos
5 POWER RM Nos
6 BEDROOM-1 Nos
7 BEDROOM-1 Nos
8 DRESS -1 Nos
9 TOILET-1 Nos
10 LIVING DINING Nos
11 LIVING DINING Nos
12 MASTER BEDROOM Nos
13 MASTER BEDROOM Nos
14 CORIDOOR Nos
15 MASTER DRESS Nos
16 MASTER TOIET Nos
17 STUDY Nos
18 STUDY Nos
19 STUDY Nos
20 FOYAR Nos
21 KITCHEN Nos
22 KITCHEN Nos
23 STAFF UTILITY Nos
24 STAFF BATH Nos

TOTAL

3BHK-A

1 BEDROOM-2 Nos
2 BEDROOM-2 Nos
3 BEDROOM-2 Nos
4 TOILET-2 Nos
5 POWER RM Nos
6 BEDROOM-1 Nos
7 BEDROOM-1 Nos
8 DRESS -1 Nos
9 TOILET-1 Nos
10 LIVING DINING Nos
11 LIVING DINING Nos
12 MASTER BEDROOM Nos
13 MASTER BEDROOM Nos
14 CORIDOOR Nos
15 MASTER DRESS Nos
16 MASTER TOIET Nos
17 STUDY Nos
18 STUDY Nos
19 STUDY Nos
20 FOYAR Nos
21 KITCHEN Nos
22 KITCHEN Nos
23 STAFF UTILITY Nos
24 STAFF BATH Nos

TOTAL

SR.N 5 BHK-D
1 THEATER Nos
2 THEATER Nos
3 THEATER TOILET Nos
4 STORAGE Nos
5 STORAGE Nos
6 BAR SEATING ROOM Nos
7 DINING Nos
8 LIVING DINING Nos
9 BEDROOM-3 Nos
10 BEDROOM-3 Nos
11 DRESS-3 Nos
12 TOILET-3 Nos
13 STORAGE Nos
14 POWDER TOILET Nos
15 CORIDOOR Nos
16 CORIDOOR Nos
17 KITCHEN Nos
18 KITCHEN Nos
19 UTILITY Nos
20 F.STAFF Nos
21 F.STAFF TOILET Nos
22 M.STAFF Nos
23 M.STAFF TOILET Nos
24 POOJA Nos
25 STUDY Nos
26 STUDY Nos
27 ENTRANCE Nos
28 JR MASTER BEDROOM Nos
29 JR MASTER BEDROOM Nos
30 JR HIS DRESS Nos
31 JR MASTER DRESS Nos
32 JR HER DRESS Nos
33 BEDROOM-2 Nos
34 BEDROOM-2 Nos
35 BEDROOM-2 Nos
36 DRESS-2 Nos
37 TOILET-2 Nos
38 CORIDOOR Nos
39 CORIDOOR Nos
40 NANNY Nos
41 NANNY TOILET Nos
42 BEDRROM-1 Nos
43 BEDRROM-1 Nos
44 BEDRROM-1 Nos
45 TOILET-1 Nos
46 MASTER HIS DRESS Nos
47 MASTER TOILET Nos
48 MASTER CORIDOOR Nos
49 MASTER CORIDOOR Nos
50 MASTER BEDROOM Nos
51 HER DRESS Nos

TOTAL

2BHK-A

1 FOYAR NOS
2 LIVING DINING NOS
3 KITCHEN NOS
4 BEDROOM-2 NOS
5 BEDROOM-1 NOS
TOTAL

TOTAL

Q/c requirement:- Dynomic 100 sealant required to be


18 used while fixing wall panelling at window side

SR.N Tower-1
1 Nos
2
3
TOTAL

ALUMINIUM FRAMING FIXING SCREW : The Hilti


screws are considerably more expensive, costing
approximately four times (4X) that of the standard
screws, leading to a significant impact on our overall
project costs. With a tentative requirement of 450,000
screws, this presents a considerable commercial
19 challenge

SR.N Tower-1
1 Nos
2
3
TOTAL
No Length Width Height Quantity

1.00 950.60 950.60

Sqm 950.60

1.00 8.53 8.53

1.00 4.36 4.36

1.00 4.10 4.10

1.00 3.99 3.99

1.00 8.55 8.55

1.00 3.88 3.88

1.00 4.52 4.52


1.00 5.16 5.16
-
1.00 4.12 4.12

1.00 8.37 8.37

1.00 3.95 3.95

1.00 4.20 4.20

1.00 4.12 4.12

1.00 4.85 4.85

1.00 6.17 6.17


78.87

1.00 3.99 3.99

1.00 8.55 8.55

1.00 3.88 3.88

1.00 4.52 4.52

1.00 5.16 5.16


-
1.00 4.12 4.12
1.00 8.37 8.37

1.00 3.95 3.95

1.00 4.20 4.20

1.00 4.12 4.12

1.00 4.85 4.85

1.00 6.17 6.17

1.00 4.28 4.28


-
1.00 8.53 8.53

1.00 4.38 4.38

1.00 4.06 4.06

415.65

Sqm 594.52
36.00 1.00 2.40 86.40 6.00 518.40
-
28.00 1.00 2.40 67.20 1.00 67.20
-
16.00 1.00 2.40 38.40 5.00 192.00
-
16.00 1.00 2.40 38.40 4.00 153.60
-
12.00 1.00 2.40 28.80 1.00 28.80

1,060.00

1.00 7.00 2.90 20.30


1.00 7.20 2.90 20.88
1.00 4.00 2.90 11.60
1.00 3.07 2.90 8.90
2.00 4.02 2.90 23.32
1.00 4.77 2.90 13.83
1.00 3.78 2.90 10.96
1.00 1.35 2.90 3.92
1.00 5.50 2.90 15.95
1.00 5.40 2.90 15.66
1.00 1.80 2.90 5.22
1.00 0.95 2.80 2.66
1.00 14.70 2.90 42.63
1.00 16.96 2.90 49.19
-1.00 0.90 2.90 -2.61
1.00 3.07 2.90 8.90
1.00 1.94 2.90 5.63
1.00 12.00 2.90 34.80
-1.00 1.05 2.90 -3.05
1.00 3.27 2.90 9.48
1.00 5.30 2.90 15.37
1.00 4.40 2.90 12.76
326.31
1,957.83

1.00 15.80 2.90 45.82


1.00 8.47 2.90 24.56
1.00 5.60 2.90 16.24
1.00 6.92 2.90 20.07
1.00 4.40 2.90 12.76
1.00 5.15 2.90 14.94
1.00 4.88 2.90 14.15

148.54
742.69

1.00 8.57 2.90 24.85


1.00 6.90 2.90 20.01
-1.00 0.90 2.90 -2.61
1.00 5.98 2.90 17.34
1.00 4.24 2.90 12.30
1.00 3.80 2.90 11.02
1.00 0.98 2.90 2.84
1.00 4.02 2.90 11.66
1.00 4.43 2.90 12.85

110.26
551.29

2.00 4.20 2.90 24.36


1.00 6.50 2.90 18.85
1.00 7.33 2.90 21.26
1.00 4.36 2.90 12.64
1.00 5.00 2.90 14.50
1.00 4.30 2.90 12.47
1.00 1.23 2.90 3.57

1.00 7.00 2.90 20.30


1.00 7.20 2.90 20.88
1.00 4.00 2.90 11.60
1.00 3.07 2.90 8.90
2.00 4.02 2.90 23.32
1.00 4.77 2.90 13.83
1.00 3.78 2.90 10.96
1.00 1.35 2.90 3.92
1.00 5.50 2.90 15.95
1.00 5.40 2.90 15.66
1.00 1.80 2.90 5.22
1.00 0.95 2.80 2.66
1.00 14.70 2.90 42.63
1.00 16.96 2.90 49.19
-1.00 0.90 2.90 -2.61
1.00 3.07 2.90 8.90
1.00 1.94 2.90 5.63
1.00 12.00 2.90 34.80
-1.00 1.05 2.90 -3.05
1.00 3.27 2.90 9.48
1.00 5.30 2.90 15.37
1.00 4.40 2.90 12.76
433.95

3,685.77

2.00 2.00
2.00 2.00
2.00 2.00
3.00 3.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
2.00 2.00
1.00 1.00
2.00 2.00
1.00 1.00
1.00 1.00
1.00 1.00
2.00 2.00
Nos 24.00 144.00

1.00 1.00
3.00 3.00
1.00 1.00
1.00 1.00
1.00 1.00
2.00 2.00
1.00 1.00
Nos 10.00 50.00

1.00 1.00
3.00 3.00
2.00 2.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
Nos 18.00

1.00 1.00
3.00 3.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
Nos 31.00 124.00
1.00 1.00
3.00 3.00
1.00 1.00
1.00 1.00
1.00 1.00
Nos 7.00

393.00

6.00 6.00
1.00 1.00
2.00 2.00
2.00 2.00
1.00 1.00
6.00 6.00
6.00 6.00
9.00 9.00
5.00 5.00
2.00 2.00
2.00 2.00
3.00 3.00
2.00 2.00
2.00 2.00
3.00 3.00
1.00 1.00
6.00 6.00
1.00 1.00
2.00 2.00
2.00 2.00
1.00 1.00
3.00 3.00
1.00 1.00
2.00 2.00
11.00 11.00
1.00 1.00
2.00 2.00
7.00 7.00
1.00 1.00
2.00 2.00
4.00 4.00
2.00 2.00
6.00 6.00
1.00 1.00
2.00 2.00
2.00 2.00
3.00 3.00
6.00 6.00
1.00 1.00
2.00 2.00
1.00 1.00
5.00 5.00
1.00 1.00
2.00 2.00
3.00 3.00
2.00 2.00
6.00 6.00
3.00 3.00
1.00 1.00
7.00 7.00
4.00 4.00

Nos 159.00 954.00

5.00 5.00
1.00 1.00
2.00 2.00
2.00 2.00
1.00 1.00
6.00 6.00
1.00 1.00
1.00 1.00
4.00 4.00
17.00 17.00
1.00 1.00
6.00 6.00
1.00 1.00
4.00 4.00
2.00 2.00
3.00 3.00
4.00 4.00
1.00 1.00
1.00 1.00
2.00 2.00
5.00 5.00
1.00 1.00
2.00 2.00
1.00 1.00

Nos 74.00 296.00

5.00 5.00
1.00 1.00
2.00 2.00
2.00 2.00
1.00 1.00
6.00 6.00
1.00 1.00
1.00 1.00
4.00 4.00
17.00 17.00
1.00 1.00
6.00 6.00
1.00 1.00
4.00 4.00
2.00 2.00
3.00 3.00
4.00 4.00
1.00 1.00
1.00 1.00
2.00 2.00
5.00 5.00
1.00 1.00
2.00 2.00
1.00 1.00

Nos 74.00 370.00


6.00 6.00
1.00 1.00
2.00 2.00
2.00 2.00
1.00 1.00
6.00 6.00
6.00 6.00
9.00 9.00
5.00 5.00
2.00 2.00
2.00 2.00
3.00 3.00
2.00 2.00
2.00 2.00
3.00 3.00
1.00 1.00
6.00 6.00
1.00 1.00
2.00 2.00
2.00 2.00
1.00 1.00
3.00 3.00
1.00 1.00
2.00 2.00
11.00 11.00
1.00 1.00
2.00 2.00
7.00 7.00
1.00 1.00
2.00 2.00
4.00 4.00
2.00 2.00
6.00 6.00
1.00 1.00
2.00 2.00
2.00 2.00
3.00 3.00
6.00 6.00
1.00 1.00
2.00 2.00
1.00 1.00
5.00 5.00
1.00 1.00
2.00 2.00
3.00 3.00
2.00 2.00
6.00 6.00
3.00 3.00
1.00 1.00
7.00 7.00
4.00 4.00

Nos 159.00

3.00 3.00
15.00 15.00
4.00 4.00
11.00 11.00
10.00 10.00
Nos 43.00

1,922.00

200.00 200.00
-
-
Nos 200.00

50,000.00 50,000.00
-
-
Nos 50,000.00
Sr. No BOQ No. Location Unit No Length

5.00 two layers of grouting

GP2 Grouting
LEVEL -6
Main Lobby
1.00 Sqm 1.00 290.60

Total

6.00 The BOQ specifies laminate


finish, but the approved mock-up
is gypsum on ply with a paint
finish

Pelmet
LEVEL -12
2BHK-A
1.00 Living Sqm 1.00 8.53

2.00 Bedroom 1 Sqm 1.00 4.36

3.00 Master bedroom Sqm 1.00 4.10

3BHK-A

1.00 Bedroom 2 Rmt 1.00 3.99

2.00 Living Rmt 1.00 8.55

3.00 Bedroom 1 Rmt 1.00 3.88

3.00 Master bedroom Rmt 1.00 4.52

5 BHK-C

1.00 Bar and Theater Rmt 1.00 5.16

2.00 Living / Dining Rmt 1.00 4.12


3.00 Living / Dining Rmt 1.00 8.37

4.00 Bedroom 3 Rmt 1.00 3.95

5.00 JR. Master bedroom Rmt 1.00 4.20

6.00 Bedroom 2 Rmt 1.00 4.12

7.00 Bedroom 1 Rmt 1.00 4.85

7.00 Master bedroom Rmt 1.00 6.17

LEVEL -11

3BHK-A

1.00 Bedroom 2 Rmt 1.00 3.99

2.00 Living Rmt 1.00 8.55

3.00 Bedroom 1 Rmt 1.00 3.88

3.00 Master bedroom Rmt 1.00 4.52

5 BHK-C

1.00 Bar and Theater Rmt 1.00 5.16

2.00 Living / Dining Rmt 1.00 4.12

3.00 Living / Dining Rmt 1.00 8.37

4.00 Bedroom 3 Rmt 1.00 3.95

5.00 JR. Master bedroom Rmt 1.00 4.20

6.00 Bedroom 2 Rmt 1.00 4.12

7.00 Bedroom 1 Rmt 1.00 4.85

7.00 Master bedroom Rmt 1.00 6.17


3BHK-B

1.00 Master bedroom Rmt 1.00 4.28

2.00 Living Rmt 1.00 8.53

3.00 Bedroom 2 Rmt 1.00 4.38

4.00 Bedroom 1 Rmt 1.00 4.06

Total

BOQ specifies acrylic paint finish


with laminate backing, whereas
the approved sample is PU paint
7.00 finish with paint backing. . i.e. SF
300 / SF 400 etc.- As per design
team comments and approval
during mock-up inspection

SF-300
Level-11,12 5BHK-C
1.00 Master Bedroom Sqm 1.00 7.00
Sqm 1.00 7.20
2.00 Bedroom 1 Sqm 1.00 4.00
Sqm 1.00 3.07
3.00 Bedroom 2 Sqm 2.00 4.02
4.00 J. Master bedroom Sqm 1.00 4.77
Sqm 1.00 3.78
5.00 Ent. Foyer Sqm 1.00 1.35
Sqm 1.00 5.50
Sqm 1.00 5.40
Sqm 1.00 1.80
6.00 Ent. Foyer Sqm 1.00 0.95
Sqm 1.00 14.70
7.00 Liviing and dining Sqm 1.00 16.96
Sqm -1.00 0.90
8.00 Liviing and dining Sqm 1.00 3.07
Sqm 1.00 1.94
9.00 Bar and sitting area Sqm 1.00 12.00
Sqm -1.00 1.05
Sqm 1.00 3.27
10.00 Sqm 1.00 5.30
Sqm 1.00 4.40
Total in Sqmt
Total All Floor

3BHK A
1.00 Ent foyer and Family area Sqm 1.00 15.80
2.00 Family area Sqm 1.00 8.47
3.00 Living dining Sqm 1.00 5.60
4.00 Living dining Sqm 1.00 6.92
5.00 Bed 2 Sqm 1.00 4.40
6.00 Bed 1 Sqm 1.00 5.15
7.00 Mast bed Sqm 1.00 4.88

Total in Sqmt
Total All Floor 12,11,10

3BHK B
1.00 Mast bed Sqm 1.00 8.57
2.00 Living dining Sqm 1.00 6.90
Sqm -1.00 0.90
Sqm 1.00 5.98
3.00 Study Sqm 1.00 4.24
4.00 Living dining Sqm 1.00 3.80
5.00 Living dining Sqm 1.00 0.98
6.00 Bed 2 Sqm 1.00 4.02
7.00 Bed1 Sqm 1.00 4.43

Total in Sqmt
Total All Floor 11,10

Level-12 2BHK
1.00 Ent. Foyer Sqm 2.00 4.20
2.00 Living dining Sqm 1.00 6.50
3.00 Living dining Sqm 1.00 7.33
4.00 Living dining Sqm 1.00 4.36
5.00 Mast bed Sqm 1.00 5.00
6.00 Bed 1 Sqm 1.00 4.30
7.00 Near by lugguage storage Sqm 1.00 1.23
Level-12 5BHK-D
1.00 Master Bedroom Sqm 1.00 7.00
Sqm 1.00 7.20
2.00 Bedroom 1 Sqm 1.00 4.00
Sqm 1.00 3.07
3.00 Bedroom 2 Sqm 2.00 4.02
4.00 J. Master bedroom Sqm 1.00 4.77
Sqm 1.00 3.78
5.00 Ent. Foyer Sqm 1.00 1.35
Sqm 1.00 5.50
Sqm 1.00 5.40
Sqm 1.00 1.80
6.00 Ent. Foyer Sqm 1.00 0.95
Sqm 1.00 14.70
7.00 Liviing and dining Sqm 1.00 16.96
Sqm -1.00 0.90
8.00 Liviing and dining Sqm 1.00 3.07
Sqm 1.00 1.94
9.00 Bar and sitting area Sqm 1.00 12.00
Sqm -1.00 1.05
Sqm 1.00 3.27
10.00 Sqm 1.00 5.30
Sqm 1.00 4.40
Total in Sqmt

Total All Floor

Additional item required to be


executed on site for IDU
10 installation
5 BHK-C
1 Theater NOS 2.00
2 BAR SEATING ROOM NOS 2.00
3 DINING NOS 2.00
4 LIVING DINING NOS 3.00
5 BEDROOM-3 NOS 1.00
6 KITCHEN NOS 1.00
7 F.STAFF NOS 1.00
8 UTILITY NOS 1.00
9 F.STAFF NOS 1.00
11 POOJA/ENTRANCE NOS 2.00
12 CORRIDOOR NOS 1.00
13 JR MASTER BEDROOM NOS 2.00
14 BEDROOM-2 NOS 1.00
15 BEDROOM-1 NOS 1.00
16 NANNY NOS 1.00
17 MASTER BEDROOM NOS 2.00
Total

3 BHK-A
1 BEDROOM-2 NOS 1.00
2 LIVING DINING NOS 3.00
3 FAMILY NOS 1.00
4 ENTERANCE FOYAR NOS 1.00
5 BEDRROOM-1 NOS 1.00
6 MASTER BEDROOM NOS 2.00
7 KITCHEN NOS 1.00
TOTAL

5 BHK-D

1 LIVING NOS 1.00


2 LIVING DINING NOS 3.00
3 MASTER BEDROOM NOS 2.00
4 OFFICE NOS 1.00
5 FOYAR NOS 1.00
6 KITCHEN NOS 1.00
7 UTILITY NOS 1.00
8 4 STAFF NOS 1.00
9 NANNY NOS 1.00
10 STUDY NOS 1.00
11 JNR MASTER BEDROOM NOS 1.00
12 BEDROOM-3 NOS 1.00
13 BEDROOM-2 NOS 1.00
14 BEDROOM-1 NOS 1.00
15 CORRIDOR NOS 1.00
TOTAL

3 BHK-B

1 MASTER BEDROOM NOS 1.00


2 LIVING DINING NOS 3.00
3 STUDY NOS 1.00
4 FOYAR NOS 1.00
5 STAFF UTILITY NOS 1.00
6 KITCHEN NOS 1.00
7 BEDROOM-1 NOS 1.00
8 BEDROOM-2 NOS 1.00
TOTAL

2BHK-A

1 FOYAR NOS 1.00


2 LIVING DINING NOS 3.00
3 KITCHEN NOS 1.00
4 BEDROOM-2 NOS 1.00
5 BEDROOM-1 NOS 1.00
TOTAL

TOTAL

All MEP services


marking, additional
support by aluminium,
template in 12mm thick
ply and wooden boxing in
18mm thick ply-
16

SR.N 5 BHK-C
1 THEATER Nos 6.00
2 THEATER Nos 1.00
3 THEATER TOILET Nos 2.00
4 STORAGE Nos 2.00
5 STORAGE Nos 1.00
6 BAR SEATING ROOM Nos 6.00
7 DINING Nos 6.00
8 LIVING DINING Nos 9.00
9 BEDROOM-3 Nos 5.00
10 BEDROOM-3 Nos 2.00
11 DRESS-3 Nos 2.00
12 TOILET-3 Nos 3.00
13 STORAGE Nos 2.00
14 POWDER TOILET Nos 2.00
15 CORIDOOR Nos 3.00
16 CORIDOOR Nos 1.00
17 KITCHEN Nos 6.00
18 KITCHEN Nos 1.00
19 UTILITY Nos 2.00
20 F.STAFF Nos 2.00
21 F.STAFF TOILET Nos 1.00
22 M.STAFF Nos 3.00
23 M.STAFF TOILET Nos 1.00
24 POOJA Nos 2.00
25 STUDY Nos 11.00
26 STUDY Nos 1.00
27 ENTRANCE Nos 2.00
28 JR MASTER BEDROOM Nos 7.00
29 JR MASTER BEDROOM Nos 1.00
30 JR HIS DRESS Nos 2.00
31 JR MASTER DRESS Nos 4.00
32 JR HER DRESS Nos 2.00
33 BEDROOM-2 Nos 6.00
34 BEDROOM-2 Nos 1.00
35 BEDROOM-2 Nos 2.00
36 DRESS-2 Nos 2.00
37 TOILET-2 Nos 3.00
38 CORIDOOR Nos 6.00
39 CORIDOOR Nos 1.00
40 NANNY Nos 2.00
41 NANNY TOILET Nos 1.00
42 BEDRROM-1 Nos 5.00
43 BEDRROM-1 Nos 1.00
44 BEDRROM-1 Nos 2.00
45 TOILET-1 Nos 3.00
46 MASTER HIS DRESS Nos 2.00
47 MASTER TOILET Nos 6.00
48 MASTER CORIDOOR Nos 3.00
49 MASTER CORIDOOR Nos 1.00
50 MASTER BEDROOM Nos 7.00
51 HER DRESS Nos 4.00

TOTAL

3BHK-B

1 BEDROOM-2 Nos 5.00


2 BEDROOM-2 Nos 1.00
3 BEDROOM-2 Nos 2.00
4 TOILET-2 Nos 2.00
5 POWER RM Nos 1.00
6 BEDROOM-1 Nos 6.00
7 BEDROOM-1 Nos 1.00
8 DRESS -1 Nos 1.00
9 TOILET-1 Nos 4.00
10 LIVING DINING Nos 17.00
11 LIVING DINING Nos 1.00
12 MASTER BEDROOM Nos 6.00
13 MASTER BEDROOM Nos 1.00
14 CORIDOOR Nos 4.00
15 MASTER DRESS Nos 2.00
16 MASTER TOIET Nos 3.00
17 STUDY Nos 4.00
18 STUDY Nos 1.00
19 STUDY Nos 1.00
20 FOYAR Nos 2.00
21 KITCHEN Nos 5.00
22 KITCHEN Nos 1.00
23 STAFF UTILITY Nos 2.00
24 STAFF BATH Nos 1.00

TOTAL

3BHK-A

1 BEDROOM-2 Nos 5.00


2 BEDROOM-2 Nos 1.00
3 BEDROOM-2 Nos 2.00
4 TOILET-2 Nos 2.00
5 POWER RM Nos 1.00
6 BEDROOM-1 Nos 6.00
7 BEDROOM-1 Nos 1.00
8 DRESS -1 Nos 1.00
9 TOILET-1 Nos 4.00
10 LIVING DINING Nos 17.00
11 LIVING DINING Nos 1.00
12 MASTER BEDROOM Nos 6.00
13 MASTER BEDROOM Nos 1.00
14 CORIDOOR Nos 4.00
15 MASTER DRESS Nos 2.00
16 MASTER TOIET Nos 3.00
17 STUDY Nos 4.00
18 STUDY Nos 1.00
19 STUDY Nos 1.00
20 FOYAR Nos 2.00
21 KITCHEN Nos 5.00
22 KITCHEN Nos 1.00
23 STAFF UTILITY Nos 2.00
24 STAFF BATH Nos 1.00

TOTAL
SR.N 5 BHK-D
1 THEATER Nos 6.00
2 THEATER Nos 1.00
3 THEATER TOILET Nos 2.00
4 STORAGE Nos 2.00
5 STORAGE Nos 1.00
6 BAR SEATING ROOM Nos 6.00
7 DINING Nos 6.00
8 LIVING DINING Nos 9.00
9 BEDROOM-3 Nos 5.00
10 BEDROOM-3 Nos 2.00
11 DRESS-3 Nos 2.00
12 TOILET-3 Nos 3.00
13 STORAGE Nos 2.00
14 POWDER TOILET Nos 2.00
15 CORIDOOR Nos 3.00
16 CORIDOOR Nos 1.00
17 KITCHEN Nos 6.00
18 KITCHEN Nos 1.00
19 UTILITY Nos 2.00
20 F.STAFF Nos 2.00
21 F.STAFF TOILET Nos 1.00
22 M.STAFF Nos 3.00
23 M.STAFF TOILET Nos 1.00
24 POOJA Nos 2.00
25 STUDY Nos 11.00
26 STUDY Nos 1.00
27 ENTRANCE Nos 2.00
28 JR MASTER BEDROOM Nos 7.00
29 JR MASTER BEDROOM Nos 1.00
30 JR HIS DRESS Nos 2.00
31 JR MASTER DRESS Nos 4.00
32 JR HER DRESS Nos 2.00
33 BEDROOM-2 Nos 6.00
34 BEDROOM-2 Nos 1.00
35 BEDROOM-2 Nos 2.00
36 DRESS-2 Nos 2.00
37 TOILET-2 Nos 3.00
38 CORIDOOR Nos 6.00
39 CORIDOOR Nos 1.00
40 NANNY Nos 2.00
41 NANNY TOILET Nos 1.00
42 BEDRROM-1 Nos 5.00
43 BEDRROM-1 Nos 1.00
44 BEDRROM-1 Nos 2.00
45 TOILET-1 Nos 3.00
46 MASTER HIS DRESS Nos 2.00
47 MASTER TOILET Nos 6.00
48 MASTER CORIDOOR Nos 3.00
49 MASTER CORIDOOR Nos 1.00
50 MASTER BEDROOM Nos 7.00
51 HER DRESS Nos 4.00

TOTAL

2BHK-A

1 FOYAR NOS 3.00


2 LIVING DINING NOS 15.00
3 KITCHEN NOS 4.00
4 BEDROOM-2 NOS 11.00
5 BEDROOM-1 NOS 10.00
TOTAL

TOTAL

Q/c requirement:- Dynomic


100 sealant required to be
used while fixing wall
18 panelling at window side
SR.N Tower-1
1 Nos 200.00
2
3
TOTAL

ALUMINIUM FRAMING
FIXING SCREW : The Hilti
screws are considerably more
expensive, costing
approximately four times (4X)
that of the standard screws,
leading to a significant impact
on our overall project costs.
With a tentative requirement
of 450,000 screws, this
presents a considerable
commercial challenge
19

SR.N Tower-1
1 Nos 25,000.00
2
3
TOTAL

Aluminium Framing in Main


Lobby for marble Veneer
fixing is mentioned as
50x50x1.6mm in BOQ, But
the same is approved as
50x50x2mm. This item will
30 have thickness variation.

Main lobby
1.00 SQM 1.00 6.00
2.00 SQM -1.00 1.60
3.00 SQM 1.00 3.70
4.00 SQM 1.00 6.10
5.00 SQM -1.00 2.40
6.00 SQM 1.00 8.00

TOTAL
Width Height Quantity RA

290.60

Sqm 290.60

8.53

4.36

4.10

3.99

8.55

3.88

4.52

5.16
-
4.12
8.37

3.95

4.20

4.12

4.85

6.17
78.87

3.99

8.55

3.88

4.52

5.16
-
4.12

8.37

3.95

4.20

4.12

4.85

6.17
4.28
-
8.53

4.38

4.06

415.65

Sqm 494.52

2.90 20.30
2.90 20.88
2.90 11.60
2.90 8.90
2.90 23.32
2.90 13.83
2.90 10.96
2.90 3.92
2.90 15.95
2.90 15.66
2.90 5.22
2.80 2.66
2.90 42.63
2.90 49.19
2.90 -2.61
2.90 8.90
2.90 5.63
2.90 34.80
2.90 -3.05
2.90 9.48
2.90 15.37
2.90 12.76
326.31
1,957.83

2.90 45.82
2.90 24.56
2.90 16.24
2.90 20.07
2.90 12.76
2.90 14.94
2.90 14.15

148.54
742.69

2.90 24.85
2.90 20.01
2.90 -2.61
2.90 17.34
2.90 12.30
2.90 11.02
2.90 2.84
2.90 11.66
2.90 12.85

110.26
551.29

2.90 24.36
2.90 18.85
2.90 21.26
2.90 12.64
2.90 14.50
2.90 12.47
2.90 3.57

2.90 20.30
2.90 20.88
2.90 11.60
2.90 8.90
2.90 23.32
2.90 13.83
2.90 10.96
2.90 3.92
2.90 15.95
2.90 15.66
2.90 5.22
2.80 2.66
2.90 42.63
2.90 49.19
2.90 -2.61
2.90 8.90
2.90 5.63
2.90 34.80
2.90 -3.05
2.90 9.48
2.90 15.37
2.90 12.76
433.95

3,685.77

2.00
2.00
2.00
3.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
2.00
Nos 24.00 144.00

1.00
3.00
1.00
1.00
1.00
2.00
1.00
Nos 10.00 50.00

1.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Nos 18.00

1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
Nos 31.00 124.00

1.00
3.00
1.00
1.00
1.00
Nos 7.00

343.00

6.00
1.00
2.00
2.00
1.00
6.00
6.00
9.00
5.00
2.00
2.00
3.00
2.00
2.00
3.00
1.00
6.00
1.00
2.00
2.00
1.00
3.00
1.00
2.00
11.00
1.00
2.00
7.00
1.00
2.00
4.00
2.00
6.00
1.00
2.00
2.00
3.00
6.00
1.00
2.00
1.00
5.00
1.00
2.00
3.00
2.00
6.00
3.00
1.00
7.00
4.00

Nos 159.00 954.00

5.00
1.00
2.00
2.00
1.00
6.00
1.00
1.00
4.00
17.00
1.00
6.00
1.00
4.00
2.00
3.00
4.00
1.00
1.00
2.00
5.00
1.00
2.00
1.00

Nos 74.00 296.00

5.00
1.00
2.00
2.00
1.00
6.00
1.00
1.00
4.00
17.00
1.00
6.00
1.00
4.00
2.00
3.00
4.00
1.00
1.00
2.00
5.00
1.00
2.00
1.00

Nos 74.00 370.00


Nos -

Nos -

1,720.00
200.00
-
-
Nos 200.00

25,000.00
-
-
Nos 25,000.00

4.00 24.00
2.20 -3.52
3.70 13.69
4.00 24.40
2.40 -5.76
4.00 32.00

Sqm 84.81