registered, click 1) The probability of getting a multiple of 2 on throwing a dice once is: 1 point
to check your
payment status 1/6
¼
½
1/3
Course
outline
2) The probability distribution function corresponding to tossing of a coin will be a: 1 point
Week 0 () 95.20%
99.73%
Week-1
99.10%
Introduction
96.78%
to Total
Quality
Management 4) The key process input variables (KPIV) and key process output variables are 1 point
() developed during the phase.
Define
Week 2-
Introduction Analyze
https://onlinecourses.nptel.ac.in/noc25_mg74/unit?unit=26&assessment=112 1/4
2/27/25, 6:54 PM Total Quality Management - I - - Unit 5 - Week 2-Introduction to Total Quality Management - II
to Total Measure
Quality
Improve
Management
- II () 5) Presence of after every stage of DMAIC allows for review of project 1 point
and incorporation of suggestions.
Lecture 6:
Introduction to Review gate
Concepts of
Toll gate
Probability
(unit? Decision gate
unit=26&lesso None of the above
n=27)
Lecture 7: Six 6) For new product development, the chosen methodology should be 1 point
Sigma
Overview DMADV
(unit? DMAIC
unit=26&lesso
Structured Design Methodology
n=28)
DMIE
Lecture 8:
DMAIC for
7) Failure Mode and Effects Analysis, which prioritizes different sources of error, is 1 point
Problem
Solving (unit? used in stage.
unit=26&lesso
Define
n=29)
Measure
Lecture 9:
Improve
DMAIC
exmaples and Analyze
DMADV (unit?
unit=26&lesso 8) Inspection of incoming/outgoing items is an example of . 1 point
n=30)
Prevention Cost
Lecture 10:
Quality Appraisal Cost
Improvement
(unit? Internal Failure Cost
unit=26&lesso
External Failure Cost
n=31)
Quiz: Week 2: 9) The Toyota Production System is based on two pillars namely 1 point
Assignment 2 and .
(assessment?
name=112) Kaizen, Six Sigma
https://onlinecourses.nptel.ac.in/noc25_mg74/unit?unit=26&assessment=112 2/4
2/27/25, 6:54 PM Total Quality Management - I - - Unit 5 - Week 2-Introduction to Total Quality Management - II
11) While the first generation of Six sigma focused on , the third 1 point
generation of six sigma focused on .
Increasing productivity
Reducing cost
Both a and b
None of the above
13) An unbiased dice is rolled once. The probability of getting a number greater than 4 1 point
is:
¼
1/6
½
1/3
14) In a six sigma improvement project the least experienced individuals are: 1 point
Green Belt
Black belts
Red Belts
Master Black Belts
16) Which of the following is not a target of Total Quality Management: 1 point
Customer Satisfaction
Reducing manpower
Continuous Cost Reduction
Continuous Operational Improvement
17) In DMAIC, redesigning of process to either remove bottlenecks or to reduce waste 1 point
takes place in the stage.
Define
https://onlinecourses.nptel.ac.in/noc25_mg74/unit?unit=26&assessment=112 3/4
2/27/25, 6:54 PM Total Quality Management - I - - Unit 5 - Week 2-Introduction to Total Quality Management - II
Measure
Improve
Control
18) The standard normal distribution has mean= and standard deviation= 1 point
.
1,0
0,1
0,0
1,1
Define
Measure
Improve
Control
You may submit any number of times before the due date. The final submission will be
considered for grading.
Submit Answers
https://onlinecourses.nptel.ac.in/noc25_mg74/unit?unit=26&assessment=112 4/4