11.12.2024 3X3 Pump House Gad and Str. - R1
11.12.2024 3X3 Pump House Gad and Str. - R1
CLIENT GWSSB
AGENCY DIVYA ENTERPRISE,RAJKOT
STRUCTURAL CONSULTANT PARSHWA CONSULTANCY
DOCUMENT TITLE 3x3 PUMP HOUSE
PREPARED BY WAPCOS LIMITED
Nos. 3x3 PUMP HOUSE REPLY ON 09.12.2024
1 KINDLY PROVIDE GAD AND STR. DESIGN IN SEPARATE SHEET PROVIDED GAD AND STR. DESIGN IN SEPARATE SHEET
2 ADD NOTE: FLORING SHOULD BE PROVIDED WITH POLISH KOTA STONE 25 MM THICK ADDED NOTE: FLORING SHOULD BE PROVIDED WITH POLISH KOTA STONE 25
3 ADD NOTE: PROVIDE MS DOOR AND WINDOW WITH MS JALI ADDED NOTE: PROVIDE MS DOOR AND WINDOW WITH MS JALI
ADD NOTE: INSIDE PLASTER PROVIDED WITH 15 MM THICK CM 1:1.5 NIRU FINSHED WATER PROOFING
4 ADDED NOTE: INSIDE PLASTER PROVIDED WITH 15 MM THICK CM 1:1.5 NIRU
COMPOUND.
ADD NOTE: PROVIDE 20 MM THICK SAND FACED CEMENT PLASTER (GUTAKA), 12 MM THICK BACKING
ADDED NOTE: PROVIDE 20 MM THICK SAND FACED CEMENT PLASTER (GUTAK
5 COAT OF CM 1:3 (1 CEMENT : 3 SAND) AND 8 MM THICK FINISHING COAT OF CM 1:1 (1 CEMENT : 1
1:3 (1 CEMENT : 3 SAND) AND 8 MM THICK FINISHING COAT OF CM 1:1 (1 CEM
SAND)
ADD NOTE: 2 COAT WEATHER PROOF EXTERIOR (APEX) PAINT WITH PRIMER SHOULD BE APPLIED. ADDED NOTE: 2 COAT WEATHER PROOF EXTERIOR (APEX) PAINT WITH PRIME
6
(APPROVED BRAND) & INTERNAL – DISTEMPER OF APPROVED BRAND AND QUALITY & INTERNAL – DISTEMPER OF APPROVED BRAND AND QUALITY
7 UPDATE NOTE: LAP LENGTH SHOULD BE 50XDIA. UPDATED NOTE: LAP LENGTH SHOULD BE 50XDIA.
WATER PROOFING TREATMENT, PLINTH PROTECTION AND INSCTICIDE PEST CONTROL TRETMENT ADDED NOTE: WATER PROOFING TREATMENT, PLINTH PROTECTION AND INS
8
PROVIDE AS PER DEPARTMENT REQUIRMENT PROVIDE AS PER DEPARTMENT REQUIRMENT
ADD NOTE: SUPPORT OF CHAJJA SHALL BE REMOVED ONLY AFTER ABOVE WALL / WALL AND SLAB ADDED NOTE: SUPPORT OF CHAJJA SHALL BE REMOVED ONLY AFTER ABOVE
9
ACHIEVES ITS FULL STRENGTH STRENGTH
10 PROVIDE ONE MORE WINDOW IN THE RIGHT SIDE GRID PROVIDED ONE MORE WINDOW IN THE RIGHT SIDE GRID
9 UPDATE SCHEDULE OF OPENING WITH THE MATERIAL MENTION IN REMARK AND SILL HEIGHT UPDATED SCHEDULE OF OPENING WITH THE MATERIAL MENTION IN REMARK
SBC IS CONSIDER 100KN/SQ.MT AT 2Mt. DEPTH , DURING THE EXECUTION LOOSE SOIL OR WATER
SBC IS CONSIDER 100KN/SQ.MT AT 2Mt. DEPTH , DURING THE EXECUTION LO
10 TABLE FOUND THEN WORK SHALL BE STOP AND SAME SHALL BE INFORMED TO CONCERNED
WORK SHALL BE STOP AND SAME SHALL BE INFORMED TO CONCERNED AUTH
AUTHORITY AND DESIGNER.
11 SEISMIC DEFINITION UPDATE AS PER LATEST CODE IN STAAD UPDATED SEISMIC DEFINITION AS PER LATEST CODE IN STAAD
APPLIED BRICK MASONARY LOAD FOUND INCORRECT KINDLY CHECK AND RECTIFY ALSO ADD THE
12 REVISED BRICK MASONARY LOAD AND ADDED CALCULATION IN REPORT
CALCULATION IN THE REPORT
FINISH LOAD CONSIDER IN THE DESIGN REPORT BUT NOT APPLIED IN THE STAAD MODEL KINDLY CHECK FINISHED LOAD IS ALREADY CONSIDERED IN TOTAL DEAD LOAD APPLIED i.e. 6
14
AND UPDATE CALCULATION IN REPORT.
N 09.12.2024 observation
ENTION IN REMARK AND SILL HEIGHT AS PER DATA SHEET Door should be MS Door and MS window
with MS Jali, update information in table
THE EXECUTION LOOSE SOIL OR WATER TABLE FOUND THEN
CONCERNED AUTHORITY AND DESIGNER.
OKAY
AAD OKAY
ON IN REPORT
OKAY
LOAD APPLIED i.e. 6.125 KN/M . KINDLY REFER RESPECTIVE
2
OKAY