CS_CO5
CS_CO5
Start of Production
structured in the BOM
All parts are digitally
dened and stable
Here, a first list of parts is
known
1998
INGENUM project
1997
Merge with
Product Informa on Management project
1996
DMU project launched
1993/94
DMU of engine bay
Pre 1992
First sub-assembly in packaging
Design Dene Architecture & Verify, Validate, Adjust
Explore System Design Product & Process Pilot Serial Life
System Solu ons Product & Process
Close Pilot
Generate Program Build Project Pilot Project Ac vi es
Project Serial Life
Gather
Stakeholder
Requirements
Analyse Requirements (System /Sub- Design & Support A er Sales & Service
system)
Develop Advanced
Concepts & Integrate
Design Func onal & System
Technical Innova on Approve the
Architectures
Product
Design Physical Architectures
Verify & Validate
Perform Physical Design Product
Manage Congura on