Cem
Cem
PRESENTED BY
OSAMA KHALID
2016-CIV-329
PRESENTED TO
SIR MOHSIN
UET LAHORE
CONTENTS
WHAT IS CONSTRUCTION MANAGEMENT?
CONSTRUCTION MANAGEMENT
• ACT OF MANAGING THE CONSTRUCTION PROCESS
PROJECT MANAGER
• A PERSON IN CHARGE OF OVERALL PROJECT PLANNING AND EXECUTION OF A PROJECT
IS CALLED PROJECT MANAGER.
LEADERSHIP
PROBLEM EFFECTIVE
SOLVING COMMUNICATION
CONFLICT PLANNING
RESOLUTION
DESIGN MANAGER
• A DESIGN AND BUILD MANAGER MANAGES ALL THE PROCESSES IN RELATION TO PRODUCING A
SET OF DRAWINGS THAT A BUILDING CAN BE BUILT FROM.
MANAGING
DESIGN TEAM
DESIGN DESIGN
PROCESS CONSULTANTS
CLIENT DESIGN
REQUIREMENTS PROCESS
QUANTITY SURVEYOR
• THE QUANTITY SURVEYOR IS THE PERSON RESPONSIBLE FOR FIGURING OUT JUST WHAT A
CONSTRUCTION PROJECT IS GOING TO COST.
FINANCES
CONSTRUCTION
WITHIN BUDGET
COSTS
INSURANCE
PRODUCTION REPLACEMENT
ESTIMATES
SCHEDULAR
• A PROJECT SCHEDULE IDENTIFIES WHAT WORK NEEDS TO BE COMPLETED,
WHEN AND BY WHOM; CONSTRUCTABILITY ISSUES; AND KEY PROJECT
INTERFACES.
THE CREATOR
THE
REPORTING ON
COORDINATOR
IDENTIFYING
THE
ACTIVITIES
SUPPORTER
IMPACTING
CONTRACT MANAGER
• CONTRACT MANAGER IS THE PERSON WHO MANAGES THE CONTRACTS MADE WITH THE
CUSTOMERS, VENDORS, PARTNERS OR EMPLOYEES.
OVERSEE
PROJECTS
DOCUMENTING
AND AGREEING NEGOTIATING
THE TERMS
CHANGES
ENSURING
COMPLIANCE
CONSTRUCTION MANAGEMENT PROCESS GROUPS
An idea for a project will be A project plan, project Resources' tasks are
carefully examined to
charter and/or project scope distributed and teams are
determine whether or not it
benefits the organization. may be put in writing, informed of responsibilities.
During this phase, a decision outlining the work to be This is a good time to bring
making team will identify if performed. up important project related
the project can realistically be ❖ PRIORITIZE THE PROJECT information.
completed. ❖ CALCULATE A BUDGET ❖ CONSTERUCTION
❖ CONCEPT ❖ SCHEDULE ❖ RESOURCE
❖ SURVEY ❖ DETERMINATION OF MANAGEMENT
❖ FEASIBILITY RESOURCES
CONTROLLING CLOSING
BUSINESS ALTERNATIVES
• “THE PROCESSES THAT ARE USED TO HELP ENSURE THE TIMELY COMPLETION OF
THE PROJECT”
PLAN SCOPE COLLECT DEFINE SCOPE CREATE WBS VALIDATE SCOPE CONTROL SCOPE
MANAGEMENT REQUIRENMENTS
HUMAN RESOURSES MANAGEMENT
• “THE PROCESSES INVOLVED WITH IDENTIFYING, ANALYZING, AND CONTROLLING RISKS FOR
THE PROJECT”
• “THE PROCESSES INVOLVED WITH THE MANAGEMENT OF MATERIALS REQUIRED FOR THE
CONSTRUCTION PROCESS”
DISPOSAL OF
MATERIAL STORE INVENTORY INSPECTION SCRAP AND
PLANNING PURCHASING KEEPING CONTROL AND PRESERVATION
DESPATCHING OF SURPLUS
MATERIAL
PROJECT PROCUREMENT MANAGEMENT
3. SCOPE
4. QUALITY COST SCOPE
TIME AND COST RELATIONSHIP
0%