0% found this document useful (0 votes)
15 views

ACCOMPLISHMENT REPORT

The accomplishment report outlines the Gulayan sa Paaralan project at Danggayon Integrated School for the school year 2024-2025, detailing activities such as area mapping, soil preparation, planting, harvesting, and garden maintenance. Each project component includes specific activities, time frames, and responsible persons involved. The report emphasizes the collaboration among students, teachers, and the school head to promote vegetable gardening and feeding programs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

ACCOMPLISHMENT REPORT

The accomplishment report outlines the Gulayan sa Paaralan project at Danggayon Integrated School for the school year 2024-2025, detailing activities such as area mapping, soil preparation, planting, harvesting, and garden maintenance. Each project component includes specific activities, time frames, and responsible persons involved. The report emphasizes the collaboration among students, teachers, and the school head to promote vegetable gardening and feeding programs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Department of Education
Region XI
Schools Division of Davao de Oro
Monkayo West District
Monkayo, Davao de Oro
DANGGAYON INTEGRATED SCHOOL
____________________________________________________________________________________________________________________________
GULAYAN SA PAARALAN
ACCOMPLISHMENT REPORT
School Year: 2024-2025

SOURCE PERSONS
PROJECT COMPONENT ACTIVITIES ACTUAL OUTPUT TIME FRAME BUDGET
OF FUND RESPONSIBLE
 Students
 Identifying the prospect  BOD
land area.  Teachers
I. Area Mapping  Directed each group with August 2024 -  School Head
their respective areas. (Spearhead: TLE
 Cleaning the land area. Teachers and
Coordinator)
 Prepared tools and
September - Personal
II. Soil/Land Preparation materials needed in making
October 2024 Fund/MOOE
a Garden Plot.
 Planting of vegetables.
November 2024 Personal
III. Planting  Weeding the garden area.
- January 2025 Fund/MOOE
 Applying of soil fertilizers.
 Channeling harvested
vegetables to feeding February -
IV. Harvesting -
activities/program to March 2025
students.
 Replanting April - May Personal
V. Garden Maintenance
 2025 Fund/MOOE
Prepared by:

DONNEH RAY D. BASILLO


__________________________________________________________________________________________

DANGGAYON INTEGRATED SCHOOL


School I.D. No.: 501652
Sitio Danggayon, Casoon, Monkayo, Davao de Oro
Republic of the Philippines
Department of Education
Region XI
Schools Division of Davao de Oro
Monkayo West District
Monkayo, Davao de Oro
DANGGAYON INTEGRATED SCHOOL
____________________________________________________________________________________________________________________________
GPP Coordinator / Teacher I

Reviewed and Approved by:

APRIL R. ATIENZA, EdD


Head Teacher III

__________________________________________________________________________________________

DANGGAYON INTEGRATED SCHOOL


School I.D. No.: 501652
Sitio Danggayon, Casoon, Monkayo, Davao de Oro

You might also like