0% found this document useful (0 votes)
2 views

FEB.sangram

The document contains daily work details for employees Sangram Konduskar and Shrikant S. Patil, outlining their activities at the Eastern Express Highway site for the months of February 2025 and January, November, and December 2024. Each entry lists specific work activities conducted on various dates, including excavation, casting, and site visits. The records also note holidays, leave days, and are signed off by the employees and checked by supervisors.

Uploaded by

shrikantdream75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

FEB.sangram

The document contains daily work details for employees Sangram Konduskar and Shrikant S. Patil, outlining their activities at the Eastern Express Highway site for the months of February 2025 and January, November, and December 2024. Each entry lists specific work activities conducted on various dates, including excavation, casting, and site visits. The records also note holidays, leave days, and are signed off by the employees and checked by supervisors.

Uploaded by

shrikantdream75
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

DAILY WORK DETAILS

NAME OF EMPLOYEE: SANGRAM KONDUSKAR


SITE OFFICE : Eastern Express Highway AE-158,159,163,E-323 (T WARD)
MONTH : FEBRUARY 2025
DATE WORK ACTIVITES /DETAILS
E-323(T WARD) Drain excavation Raja industrial estat
2/1/2025
SUNDAY
2/2/2025
E-323(T WARD) Road excavation Raja industrial estat
2/3/2025
E-323(T WARD) Duct excavation Raja industrial estat
2/4/2025
E-323(T WARD) Drain pcc, duct soling Raja industrial estat
2/5/2025
E-323(T WARD) Drain Raft casting Raja industrial estat
2/6/2025
E-323(T WARD) Drain wall casting, road excavation Raja industrial estat
2/7/2025
E-323(T WARD) Drain Wall casting Raja industrial estat
2/8/2025
SUNDAY
2/9/2025
E-323(T WARD) Duct encasment concrete Raja industrial estat
2/10/2025
E-323(T WARD) site visit curing of drain wall Raja industrial estat
2/11/2025
E-323(T WARD) Drain wall casting, Duct encasment Raja industrial estat
2/12/2025
E-323(T WARD) Drain Slab casting ( ch-130) Raja industrial estat
2/13/2025
E-323(T WARD) Drain pcc casting ( ch-180) Raja industrial estat
2/14/2025
E-323(T WARD) site visit curing of drain wall Raja industrial estat
2/15/2025
SUNDAY
2/16/2025
E-323(T WARD) Duct encasment soling Raja industrial estat
2/17/2025
E-323(T WARD) Duct encasment concrete Raja industrial estat
2/18/2025
E-323(T WARD) Road soling Raja industrial estat
2/19/2025
E-323(T WARD) Drain Slab steel Reinforcment Raja industrial estat
2/20/2025
E-323(T WARD) Duct encasment concrete Raja industrial estat
2/21/2025
E-323(T WARD) Drain Slab casting ( ch-180) Raja industrial estat
2/22/2025
SUNDAY
2/23/2025
SITE OFFICE : Eastern Express Highway AE-158,159,163,
2/24/2025
E-323(T WARD) site visit curing of drain wall Raja industrial estat
2/25/2025
E-323(T WARD) Duct line excavation(ch-420 ) Raja industrial estat
2/26/2025
E-323(T WARD) site visit curing of drain wall Raja industrial estat
2/27/2025
Inventory of MCW EEH
2/28/2025

SIGNATURE OF EMPLOYEE CHECKED BY TC


Remark

SITE OFFICE : Eastern Express Highway AE-1

Day + Night

APPROVED BY
astern Express Highway AE-153,158,159,163
DAILY WORK DETAILS
NAME OF EMPLOYEE: Shrikant S. Patil
SITE OFFICE : Eastern Express Highway AE-158,159,163
MONTH : JANUARY 2025
DATE WORK ACTIVITES /DETAILS
1/1/2025 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/2/2025 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/3/2025 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/4/2025 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
Sunday
1/5/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/6/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/7/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/8/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/9/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/10/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/11/2025
Sunday
1/12/2025
Leave Compesation Date- 30/11/2024 (1/12/2024 Mention)
1/13/2025
Leave Compesation With CL.
1/14/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/15/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/16/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/17/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/18/2025
Sunday
1/19/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/20/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/21/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/22/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/23/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/24/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/25/2025
Sunday
1/26/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/27/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/28/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/29/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/30/2025
AE-158 AE-159 AE-163 Eastern Express Highway Project Works
1/31/2025

SIGNATURE OF EMPLOYEE CHECKED BY TC


Remark

SITE OFFICE : Eastern Express Highway AE-15

APPROVED BY
Express Highway AE-153,158,159,163
DAILY WORK DETAILS
NAME OF EMPLOYEE: Shrikant S. Patil
SITE OFFICE : Eastern Express Highway AE-153,158,159,163
MONTH : NOEMBER 2024
DATE WORK ACTIVITES /DETAILS
10/28/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10/29/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10/30/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10/31/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
01-11-24 Divali Fesitval (Holyday)
02-11-24 Divali Fesitval (Holyday)
03-11-24 Sunday
04-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
05-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
06-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
07-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
08-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
09-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10-11-24 Sunday
11-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
12-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
13-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
14-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
15-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
16-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
17-11-24 Sunday
18-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
19-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
20-11-24 Voting
21-11-24 Leave ( Compensation Date 5/09/24
22-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
23-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
24-11-24 Sunday
25-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
26-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
27-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
28-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
29-11-24 Sunday
30-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
SIGNATURE OF EMPLOYEE CHECKED BY TC
Remark
October month
Balance
Attendance
SITE OFFICE : Eastern Express Highway AE-15
APPROVED BY
Express Highway AE-153,158,159,163
DAILY WORK DETAILS
NAME OF EMPLOYEE: Shrikant S. Patil
SITE OFFICE : Eastern Express Highway AE-158,159
MONTH : DECEMBER 2024
DATE WORK ACTIVITES /DETAILS
01-12-24 Sunday
02-12-24 AE-158 AE-159 Eastern Express Highway Project Works
03-12-24 AE-158 AE-159 Eastern Express Highway Project Works
04-12-24 AE-158 AE-159 Eastern Express Highway Project Works
05-12-24 AE-158 AE-159 Eastern Express Highway Project Works
06-12-24 AE-158 AE-159 Eastern Express Highway Project Works
07-12-24 AE-158 AE-159 Eastern Express Highway Project Works
08-12-24 Sunday
09-12-24 AE-158 AE-159 Eastern Express Highway Project Works
10-12-24 AE-158 AE-159 Eastern Express Highway Project Works
11-12-24 AE-158 AE-159 Eastern Express Highway Project Works
12-12-24 AE-158 AE-159 Eastern Express Highway Project Works
13-12-24 AE-158 AE-159 Eastern Express Highway Project Works ,Bc laying south
bound at Godrej
14-12-24 AE-158 AE-159 Eastern Express Highway Project Works
15-12-24 Sunday
16-12-24 LEAVE (COMPENSATION DATE- C. L.
17-12-24 LEAVE (COMPENSATION DATE- C. L.
18-12-24 LEAVE (COMPENSATION DATE-13/12/24
19-12-24 AE-158 AE-159 Eastern Express Highway Project Works
20-12-24 AE-158 AE-159 Eastern Express Highway Project Works
21-12-24 AE-158 AE-159 Eastern Express Highway Project Works
22-12-24 Sunday
23-12-24 AE-158 AE-159 Eastern Express Highway Project Works
24-12-24 AE-158 AE-159 Eastern Express Highway Project Works
25-12-24 AE-158 AE-159 Eastern Express Highway Project Works
26-12-24 AE-158 AE-159 Eastern Express Highway Project Works
27-12-24 AE-158 AE-159 Eastern Express Highway Project Works
28-12-24 AE-158 AE-159 Eastern Express Highway Project Works
29-12-24 Sunday
30-12-24 AE-158 AE-159 Eastern Express Highway Project Works

SIGNATURE OF EMPLOYEE CHECKED BY TC


Remark
Night (30/11/24

Day & Night

APPROVED BY
DAILY WORK DETAILS
NAME OF EMPLOYEE: Shrikant S. Patil
SITE OFFICE : Eastern Express Highway AE-153,158,159,163
MONTH : NOEMBER 2024
DATE WORK ACTIVITES /DETAILS
10/28/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10/29/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10/30/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10/31/2024 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
01-11-24 Divali Fesitval (Holyday)
02-11-24 Divali Fesitval (Holyday)
03-11-24 Sunday
04-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
05-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
06-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
07-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
08-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
09-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
10-11-24 Sunday
11-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
12-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
13-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
14-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
15-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
16-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
17-11-24 Sunday
18-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
19-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
20-11-24 Voting
21-11-24 Leave ( Compensation Date 5/09/24
22-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
23-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
24-11-24 Sunday
25-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
26-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
27-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
28-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
29-11-24 Sunday
30-11-24 AE-153 AE-158 AE-159 AE-163 Eastern Express Highway Project Works
SIGNATURE OF EMPLOYEE CHECKED BY TC
Remark
October month
Balance
Attendance
SITE OFFICE : Eastern Express Highway AE-15
APPROVED BY
Express Highway AE-153,158,159,163
DAILY WORK DETAILS
NAME OF EMPLOYEE: Nityanad Reddy
SITE OFFICE : Eastern Express Highway 159 Ulve Plant
MONTH : M 2024
DATE WORK ACTIVITES /DETAILS
01-11-24
02-11-24
03-11-24 Sunday
04-11-24
05-11-24
06-11-24
07-11-24
08-11-24
09-11-24
10-11-24 Sunday
11-11-24
12-11-24
13-11-24
14-11-24
15-11-24
16-11-24
17-11-24 Sunday
18-11-24
19-11-24
20-11-24
21-11-24
22-11-24
23-11-24
24-11-24 Sunday
25-11-24
26-11-24
27-11-24
28-11-24
29-11-24 Sunday
30-11-24

SIGNATURE OF EMPLOYEE CHECKED BY TC


Remark

APPROVED BY
Name 01 dec. 2 dec. 3 dec. 4 dec. 5 dec. 6 dec. 7 dec. 8 dec.
Shrikant Patil Site SUNDAY P P P P P P SUNDAY
Sangram Konduskar Site SUNDAY L L L L L L SUNDAY
Mayur Somavanshi Site SUNDAY P P SUNDAY
Nityanand Reddy Plant SUNDAY P P P P P P SUNDAY
kalpesh Sonavane Site SUNDAY P P P L L L SUNDAY
9 dec. 10 dec. 11 dec. 12 dec. 13 dec. 14 dec. 15 dec. 16 dec. 17 dec. 18 dec. 19 dec. 20 dec. 21 dec.
SUNDAY
SUNDAY
SUNDAY
SUNDAY
SUNDAY
22 dec. 23 dec. 24 dec. 25 dec. 26 dec. 27 dec. 28 dec. 29 dec. 30 dec. 31 dec.
SUNDAY SUNDAY
SUNDAY SUNDAY
SUNDAY SUNDAY
SUNDAY SUNDAY
SUNDAY SUNDAY

You might also like