storm-sewer-system-design_compress
storm-sewer-system-design_compress
University
College of Engineering and
Architecture
Main Campus II, Bajumpandan,
Dumaguete City
ENGR. Ph.D.
INSTRUCTOR
Page |
TABLE OF CONTENTS
I. INTRODUCTION .........................................................................................................3
2.0 COEFFICIENTS.........................................................................................................4
4.0 FORMULA/EQUATIONS.........................................................................................6
I. INTRODUCTION
Design the storm sewer system of the proposed subdivision site development plan below for a
10-year return period.
4.0 FORMULA/EQUATIONS
4.1 RAINFALL INTENSITY FORMULA
122.6𝑇𝑇
𝑖𝑖 =
(𝑡𝑡 + 1)0.83
where,
i = rainfall intensity (mm/hr)
T = return period
t = inlet time (min)
4.2 RUNOFF DISCHARGE FORMULA
𝑄𝑄 = 0.278
𝐶��𝑖�� 𝐴
𝐴
where,
𝑖𝑖 =
𝑚𝑚𝑚𝑚
ℎ𝑟
𝑟
𝐴𝐴 =
𝑘��𝑚
��2
𝐶𝐶 = Runoff
Coefficient
𝑄𝑄 =
3
𝑚𝑚
𝑠𝑠
𝐴��𝑅�
� 3 𝑆��
𝑛
2
𝑛
𝑉𝑉 =
21 1
𝑅�� 3 𝑆
2
𝑛
��
𝑛
𝛽𝛽
��
2
360
If the pipe is flowing, less than 50% of the Pipe Area,
𝜋� 1
𝐴𝐴 = �𝑟 − [𝑟�� 2 sin(𝛽��)]
2
𝛽𝛽
��
2
360
𝑃𝑃 =
𝜋𝜋𝑟��(𝛽
��)
180
𝑑𝑑 = 𝑟𝑟 − [𝑟𝑟 cos �
𝛽��
2
�], if beta
(β) is less than 180
Figure 4: Partially Flowing
𝑑𝑑 = 𝑟𝑟 + [𝑟𝑟 cos
Pipe
𝛽��
2
� �], if beta
(β) is greater than 180
6.0 VELOCITY
The calculated velocity must not exceed the allowable maximum velocity to avoid any erosion,
and must not go below the minimum velocity, to avoid anything settling in the pipe.
V. DESIGN COMPUTATIONS
� 𝑡��𝑖𝑖1
��𝑠𝑠𝑈� 7 mins
= 𝑡����1
=
T = 10 years
i = 218.236 mm/hr
2
km
C= 0.83 Atotal 0.0014
L= 35 m
𝑄𝑄 = 0.278𝐶��𝑖��𝐴𝐴
3
Q = 0.070699 m /s
n = 0.013 So = 0.00804
1 𝜋��𝐷�� 2 𝐷𝐷 2 1
𝑄𝑄 = ( )( )3 𝑆�� 2
𝑛𝑛 4
4
D = 0.277913 m
D = 277.9133 mm
*Computed Pipe Size
D = 300 mm
*Commercial Pipe
Size r = 0.15 m
Areafull = 0.060661 m
Area = 0.070686 m
Since it is more than 50% the pipe is flowing more than half full
Page |
5
𝐴
�
3
=
�
2
𝑃
�
�
3
𝜋�� 1
𝐴𝐴 =
𝑟��2 2 𝑟�� sin(360 − 𝛽��)
2
𝛽𝛽
+
360
𝑃𝑃 =
𝜋�� 5
𝑟��
3
𝛽𝛽
180
0.010252 = 0.000196 (β) + 0.01125 sin (360 - β)
𝜋𝜋 0.15 2
𝛽𝛽
)3
(
18
0
Note : For complex equations, the use of calculator is needed to solve beta ( β ).
0.0103 = 0.0103
𝜋��𝑟��2 𝛽𝛽 1
𝐴𝐴 = + 𝑟��2 sin(360 − 𝛽��)
360 2
2
𝜋��𝑟��𝛽𝛽
A = 0.051817 m
𝑃𝑃 =
180
P = 0.586587 m
1 2 1
Page |
𝑉𝑉 = 𝑅�� 3 𝑆�� 2
𝑛
𝑛
V = 1.367842 m/s *Velocity is "> V min " and "< V max ".
Page |
t= 35 = 25.5877 seconds
1.367842
= 0.42646
min
Invert Elevation
MH 1 Elev. = 92.0625
m
� 𝑡��𝑖𝑖3
��𝑠𝑠𝑈� 5 mins
= 𝑡����3
=
T = 10 years
i = 277.093 mm/hr
2
km
C= 0.83 Atotal 0.00075
L= 35 m
𝑄𝑄 = 0.278𝐶��𝑖��𝐴𝐴
3
Q = 0.047952 m /s
n = 0.013 So = 0.00732
1 𝜋��𝐷�� 𝐷𝐷 2 1 2
𝑄𝑄 = ( )( )3 𝑆�� 2
𝑛𝑛 4
4
D = 0.24449 m
D = 244.4899 mm
*Computed Pipe Size
D = 300 mm
*Commercial Pipe
Size r = 0.15 m
Areafull = 0.046947 m
Area = 0.070686 m
Since it is more than 50% the pipe is flowing more than half full
Page |
5
𝐴
=
0.007285 �
3
�
2
Since, 𝑃
�
3
�
𝜋�� 1
𝐴𝐴 = 𝑟�� 𝑟��2 sin(360 − 𝛽��)
2
2
𝛽𝛽
+
360
𝑃𝑃 = 5
𝜋�� 3
𝑟��
𝛽𝛽
180
0.007285 = 0.000196 (β) + 0.01125 sin (360 - β)
𝜋�� 0.15 2
𝛽𝛽
)3
(
180
Note : For complex equations, the use of calculator is needed to solve beta ( β ).
0.0073 = 0.0073
𝜋��𝑟��2 𝛽𝛽 1
𝐴𝐴 = 𝑟��2 sin(360 − 𝛽��)
+ 2
360
𝑃𝑃 =
2
A = 0.039598 m
𝜋��𝑟��𝛽𝛽 180 Page |
P = 0.499689 m
1 2 1
𝑉𝑉 = 𝑅�� 3 𝑆�� 2
𝑛
𝑛
V = 1.214442 m/s *Velocity is "> V min " and "< V max ".
Page |
𝜃
𝑑𝑑 = 𝑟𝑟 + [𝑟����𝑜��𝑠𝑠 ]
2
d = 0.164204 m
𝐿��𝑈��𝑛��𝐿��𝑡��ℎ
Solve Sewer Flow Time.
𝑡𝑡 =
𝑉𝑉𝑈��𝐸��𝑜����𝑖��𝑡��𝑦
35 = 28.8198 seconds
t=
1.214442
= 0.48033 min
Invert Elevation
MH 3 Elev. = 92.1938 m
��𝑠��𝑈𝑈 𝑡��𝑖��3 𝑡�
Solve for the Time of Concentration & Rainfall Intensity :
5 mins 6 mins
= �𝑖�
�4
=
𝑡��𝑐3−4 =
𝑡�
𝑡��𝑖��3 +
0.48033 mins
�𝑓3
𝑡��𝑓3 =
t c3-4 = 5.480 min
t i4 = 6 min *Use this the highest
T = 10 years
i = 243.814 mm/hr
2
km
C= 0.83 Atotal 0.00051
L= 28 m
𝑄𝑄 =
0.278𝐶��𝑖��𝐴𝐴
3-4
3
Q = 0.0286914 m /s +Q
3 3
Q = 0.0286914 m /s + 0.04795 m /s
3
Q = 0.0766437 m /s
n = 0.013 So = 0.00558
1 𝜋��𝐷�� 𝐷𝐷 2 1
2
𝑄𝑄 = ( )( )3 𝑆�� 2
𝑛𝑛 4
4
D = 0.3067175 m
D = 306.71747 mm
*Computed Pipe Size
D = 350 mm
*Commercial Pipe
Size r = 0.175 m
Areafull = 0.0738868 m
Area = 0.0962113 m
5
𝐴
0.013336 �
3
=
�
2
𝑃
�
3
�
Since,
𝜋� 1
𝐴𝐴 = + 𝑟�� 2 sin(360 − 𝛽��)
�𝑟 2
𝑃𝑃 = 𝛽𝛽
��
2
360 5
3
𝜋�
𝑟𝛽𝛽
�𝑟
180
0.013336 =
𝜋𝜋 0.175
0.00026725 (β) + 0.01531 sin (360 - β)
2
𝛽𝛽
)3
(
18
0
Note : For complex equations, the use of calculator is needed to solve beta ( β ).
𝐿��
Solve Sewer Flow Time.
𝑡𝑡 = 𝑈��
𝑛��𝐿
t= ��𝑡 = 22.8231 seconds
𝑉𝑉𝑈�
��ℎ
𝑜���
�𝐸��
�𝑖��𝑡
��𝑦
28
1.2268264
= 0.38039 min
Invert Elevation
MH 4 Elev. = 91.9375 m
𝑡��𝑖��2 =
��𝑠��𝑈𝑈 7 mins
*Use the highest
T = 10 years
i = 209.028 mm/hr
2
km
C= 0.83 Atotal 0.00107
L= 30 m
𝑄𝑄 =
0.278𝐶��𝑖��𝐴𝐴
3
4-2 + Q 1-2
Q= 0.0518 m /s + Q
3 3 3
Q= 0.0518 m /s + 0.0766 m /s + 0.0707 m /s
3
Q = 0.19914 m /s
n = 0.013 So = 0.00458
1 𝜋��𝐷�� 2 𝐷𝐷 2 1
𝑄𝑄 = ( )( )3 𝑆�� 2
𝑛𝑛 4
4
D = 0.45537 m
D = 455.365 mm
*Computed Pipe Size
D = 525 mm
*Commercial Pipe
Size r = 0.2625 m
Areafull = 0.16286 m
5
𝐴
0.038254 �
3
=
�
Since,
2
𝑃
�
�
3
𝜋��+𝑟�� 2 𝛽𝛽 1 2
𝐴𝐴 = sin(360 − 𝛽��)
360 2
𝑟𝑟
𝜋��𝑟𝑟
𝛽𝛽
𝑃𝑃 =
180 5
3
0.038254 = 𝜋𝜋 0.26
0.0006 (β) + 0.034 sin (360 - β)
𝛽𝛽
2
( 180 ) 3
Note : For complex equations, the use of calculator is needed to solve beta ( β ).
β = 204.77 *Beta is greater than 180
ϴ = 155.23
𝜃
𝑑𝑑 = 𝑟𝑟 − [𝑟𝑟��𝑜𝑜𝑠𝑠 ] , if beta (β) is less than 180
2
𝜃
𝑑𝑑 = 𝑟𝑟 + [𝑟𝑟��𝑜𝑜𝑠𝑠 ]
2 , if beta (β) is greater than 180
0.0383 =0.0383
Checking if its equal or not, through substitution.
𝜋��𝑟��2 𝛽𝛽 1
𝐴𝐴 = + 𝑟��2 sin(360 − 𝛽��)
360 2
A= 0.14 m2
𝜋�
�𝑟
�
𝛽
�𝛽
𝑃𝑃 =
180
P = 0.93815 m
1 2 1
𝑉𝑉 =
𝑛𝑛 𝑅�� 3 𝑆�� 2 Page |
V= 1.448 m/s *Velocity is "> V min " and "< V max ".
Page |
𝜃
𝑑𝑑 = 𝑟𝑟 + [𝑟𝑟��𝑜𝑜𝑠𝑠 ]
2
d= 0.3188 m
𝐿𝐿𝑈𝑈𝑛��𝐿��𝑡��ℎ
𝑡𝑡 =
𝑉��𝑈𝑈𝐸��𝑜𝑜��𝑖��𝑡��𝑦
30 = 20.72 seconds
t=
1.45
= 0.3454 min
Invert Elevation
MH 2 Elev. = 91.7812 m
� 𝑡��𝑖𝑖5
��𝑠𝑠𝑈� 7 mins
= 𝑡����5
=
T = 10 years
i = 218.236 mm/hr
2
km
C= 0.83 Atotal 0.000441
L= 28
𝑄𝑄 = 0.278𝐶��𝑖��𝐴𝐴
m
3
Q = 0.022207 m /s
n = 0.013 So = 0.00379
1 𝜋��𝐷�� 2 𝐷𝐷 2 1
𝑄𝑄 = ( )( )3 𝑆�� 2
𝑛𝑛 4
4
D = 0.207234 m
D = 207.2343 mm
*Computed Pipe Size
D = 300 mm
*Commercial Pipe Size
r= 0.15 m
Areafull = 0.03373 m
Area = 0.070686 m
Since it is less than 50% the pipe is flowing less than half full
Page |
5
𝐴
0.004688 �
3
=
�
2
𝑃
�
3
�
Since,
𝜋��− 𝑟�� 2 𝛽𝛽 1
𝐴𝐴 = sin(𝛽��) 2
360
𝑟𝑟
2
𝜋��𝑟𝑟
𝑃𝑃 𝛽𝛽
=
180
5
3
0.004688 = 𝜋𝜋 0.15 β2
0.000196 (β) - 0.01125 sin (β)
)3
(
18
0
Note : For complex equations, the use of calculator is needed to solve beta ( β ).
β = 162.4537 *Beta is less than 180
β
𝑑𝑑 = 𝑟𝑟 − [𝑟����𝑜��𝑠𝑠 ] , if beta (β) is less than 180
2
𝛽𝛽
𝑑𝑑 = 𝑟𝑟 + [𝑟����𝑜��𝑠𝑠 ] , if beta (β) is greater than 180
2
𝜋��𝑟��2 𝛽𝛽 1
𝐴𝐴 = + 𝑟��2 sin(360 − 𝛽��)
360 2
2
𝜋��𝑟��𝛽𝛽
A = 0.028506 m
𝑃𝑃 =
180
P = 0.425303 m
1 2 1
𝑉𝑉 =
𝑛𝑛 𝑅�� 3 𝑆�� 2 Page |
V = 0.781687 m/s *Velocity is "> V min " and "< V max ".
Page |
𝛽𝛽
Calculate Depth of Flow.
𝑑𝑑 = 𝑟𝑟 − ]
2
[𝑟𝑟��𝑜𝑜𝑠
𝑠
d= 0.1271 m
𝐿𝐿𝑈𝑈𝑛��𝐿��𝑡��ℎ
Solve Sewer Flow Time.
𝑡𝑡 =
𝑉��𝑈𝑈𝐸��𝑜𝑜��𝑖��𝑡��𝑦
t= 28 = 35.82 seconds
0.781687
= 0.597 min
Invert Elevation
MH 5 Elev. = 91.75 m
𝑡��𝑖��𝑉� =
�����𝑓��
��𝑙 =
𝑡��𝑖��5 +
*Use the highest time
𝑡��𝑐5−𝑉𝑉
7.597 mins
=
T = 10 years
i = 197.911 mm/hr
𝑄𝑄 = 0.278𝐶��𝑖��𝐴𝐴
3
Q = 0.03932 m /s
3