Bolt EV Bolt AV
Pre-production Volume (units) 1000 3500
Projected Annual Volume (units) 30,000 10,000
Project Life Cyce in Years (eff. 2019 MY) 5 5
Logistics Information
China Mexico California, US
Taxes/ Duties - Paid on total manufacturing
3.60% 0.80% 0.00%
cost (material + labor)
Border Processing Fees (per shipment) $200.00 $200.00 $0.00
Min Days of Inventory Required at Orion 8 5 3
Max Days of Inventory allowed at Orion 14 11 9
Shipping Plan (door to door - Ex Works) 40' Sea Container Consolidation 53' Truck Consolidation 53' Truck Consolidation
% of volume x full container cost +
Logistics Cost Calculation taxes and fees $/lb + taxes and fees $/lb
Full Container Cost $ 4,995.23 $ - $ -
Total Container Volume (cubic feet) 2376 - -
Transportaion Cost Rate ($/100lbs) $ - $ 3.18 $ 3.18
Minimum Transportation Cost $ - $ 75 $ 50
Transit Time (days) 26 7 4
Germany
2.97%
$200.00
8
14
40' Sea Container Consolidation
% of volume x full container cost +
taxes and fees
$ 3,813.98
2376
$ -
$ -
25
Current Bidlist Report
As Of Date 22-Jul-2016
Brake e-Boost module Suppliers
RANK
Country Risk SUPPLIER QUALITY
Lead Region
Disruptions
MMOG/LE
Mfg.Duns
Location
Service
Quality
Rating
Name
Major
Price
PPM
12
Mo. 6 Mo.
Jun
15 Plant Recall
Sourceable
Rosie Automotive
90 92.5 5 Y G International SHANGHAI, CN - CN 888999777 GMAP 7 0 0
80 99.8 5 Y Y Elroy International SILAO, MX 444555888 GMNA 26 0 1
98 97.8 1 G G R.U.D.I. Braking Systems SAN DIEGO, US - CA 222555456 GMNA 3 0 0
Orbitty International
Manufacturing &
2 Y R Technology Co. MUNICH, DE 111222333 GMOV
Non Sourceable
65 37.5 5 Y G H-B Automotive SHANGHAI, CN - CN 966812137 GMAP 1122 1 1
Performance Criteria
<80 R 7-10 R R >7 >1
Y 4-6 Y Y 3.5-7 1
>=80 G 1-3 G G,NR <=3.4 0
If Price Rank is RED for FRR you must have an Approval by GPSC Supply Risk Mgt
If MMOG/LE rank is RED, Buyer must alert the MMOG/LE team if supplier is to be included on an RFQ package.
If Service is RED with CCA PRRs, sourcing is prohibited. Submit Waiver to leadership for approval.
If Quality Ranking is Blank or RED, Sourcing requires SQ Leadership Approval
ist Report
22-Jul-2016
odule Suppliers
QUALITY SERVICE
TS16949 Cert.
Financial Supplier
Launch PRR's
Supply Chain
Total PRR's
CCA Rating
Production
ISO14001
Shipping
Diversity
Rating-FRR Excellence
PRR's
PRR's
NBH
Award
Open Open
able
0 1 1 0 Y N 1 3 2 N N Y
2 4 0 2 Y N 3 2 6 Y Y N
2 1 0 0 Y N 1 1 0 Y N Y
Y N 2 Y N
ceable
10 7 0 5 N Y 5 3 17 N N
Performance Criteria
>2 >4 >2 >1 N Y 4,5 4,5,6,7 >4 N N
1-2 1-4 1-2 1 3 3 1-4 N
0 0 0 0 Y N 1,2 1,2 0 Y Y Y
NOTE: You must select the material designation in order for all the formulas to work correctly
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.105 2.8660 2.8660
HOUSING M 1 Kilograms 0.274 2.8660 2.8660
EV HARDWARE COMPONENT M 1 Kilograms 0.187 8.6000 8.6000
CONNECTION LINES P 2 Kilograms 0.321 2.2500 4.5000
FASTENER CLIPS P 2 Kilograms 0.11 0.1500 0.3000
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.0800 0.1600
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.105 3.1020 3.1020
HOUSING M 1 Kilograms 0.274 3.2480 3.2480
EV HARDWARE COMPONENT 1 P 1 Kilograms 0.187 7.8000 7.8000
EV HARDWARE COMPONENT 2 P 1 Kilograms 0.155 5.6000 5.6000
CONNECTION LINES P 2 Kilograms 0.321 1.9500 3.9000
FASTENER CLIPS P 2 Kilograms 0.11 0.1600 0.3200
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.0800 0.1600
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.129 3.5000 3.5000
HOUSING M 1 Kilograms 0.299 3.7500 3.7500
EV HARDWARE COMPONENT 1 M 1 Kilograms 0.187 8.0000 8.0000
EV HARDWARE COMPONENT 2 M 1 Kilograms 0.155 5.7500 5.7500
CONNECTION LINES P 2 Kilograms 0.321 4.2000 8.4000
FASTENER CLIPS P 2 Kilograms 0.11 0.3200 0.6400
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.2000 0.4000
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.105 3.1020 3.1020
HOUSING M 1 Kilograms 0.274 3.2480 3.2480
EV HARDWARE COMPONENT 1 M 1 Kilograms 0.187 7.6000 7.6000
EV HARDWARE COMPONENT 2 M 1 Kilograms 0.155 4.9900 4.9900
CONNECTION LINES P 2 Kilograms 0.321 2.3500 4.7000
FASTENER CLIPS P 2 Kilograms 0.11 0.1600 0.3200
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.0800 0.1600
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.105 2.8660 2.8660
HOUSING M 1 Kilograms 0.274 2.8660 2.8660
AV HARDWARE COMPONENT 1 M 1 Kilograms 0.187 8.6000 8.6000
AV HARDWARE COMPONENT 2 M 1 Kilograms 0.155 5.2000 5.2000
CONNECTION LINES P 2 Kilograms 0.321 2.2500 4.5000
FASTENER CLIPS P 2 Kilograms 0.11 0.1500 0.3000
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.0800 0.1600
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.105 3.1020 3.1020
HOUSING M 1 Kilograms 0.274 3.2480 3.2480
AV HARDWARE COMPONENT 1 P 1 Kilograms 0.187 7.8000 7.8000
AV HARDWARE COMPONENT 2 P 1 Kilograms 0.155 5.6000 5.6000
AV HARDWARE COMPONENT 3 P 1 Kilograms 1.842 6.8000 6.8000
CONNECTION LINES P 2 Kilograms 0.321 2.3500 4.7000
FASTENER CLIPS P 2 Kilograms 0.11 0.1600 0.3200
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.0800 0.1600
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.129 3.5000 3.5000
HOUSING M 1 Kilograms 0.299 3.7500 3.7500
AV HARDWARE COMPONENT 1 M 1 Kilograms 0.187 8.0000 8.0000
AV HARDWARE COMPONENT 2 M 1 Kilograms 0.155 5.7500 5.7500
AV HARDWARE COMPONENT 3 P 1 Kilograms 1.842 5.3000 5.3000
CONNECTION LINES P 2 Kilograms 0.321 4.2000 8.4000
FASTENER CLIPS P 2 Kilograms 0.11 0.3200 0.6400
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.2000 0.4000
(1) (2) (3) (4) (5) (6) (7a) (8) (9) (7b)
QUANTITY OF Unit of
Item Description M/D/P Mass Unit Cost Material Total Supplier Country of Mfg Handling Cost
PCS measure
COVER M 1 Kilograms 0.105 3.1020 3.1020
HOUSING M 1 Kilograms 0.274 3.2480 3.2480
AV HARDWARE COMPONENT 1 M 1 Kilograms 0.187 7.6000 7.6000
AV HARDWARE COMPONENT 2 M 1 Kilograms 0.155 4.9900 4.9900
AV HARDWARE COMPONENT 3 M 1 Kilograms 1.842 5.8000 5.8000
CONNECTION LINES P 2 Kilograms 0.321 2.3500 4.7000
FASTENER CLIPS P 2 Kilograms 0.11 0.1600 0.3200
SCREW (COVER/HOUSING) P 2 Kilograms 0.15 0.0800 0.1600
Load Configuration
Boxes/Layer 9 6 6 6
Standard Shipment (layers) 8 14 14 14
Load Configuration
Boxes/Layer 7 9 9 9
Standard Shipment (layers) 4 6 6 6
Software Investment
Bolt EV
Bolt AV
Total Cost of Software
Tooling Investment
Bolt EV
Bolt AV
Total Cost of Tooling
Logistics Cost
Bolt EV (independent)
Bolt AV (independent)
Total Logistics Cost (combined)