The document provides a weekly service and washing performance report from February 15 to February 21, 2025, detailing the number of units serviced and washed against planned targets. It includes percentages of achievement, discrepancies, and breakdowns by type of equipment. Overall, the service achievement was 128.57% and washing achievement was 80.95%.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
18 views1 page
W3 Feb 25PS
The document provides a weekly service and washing performance report from February 15 to February 21, 2025, detailing the number of units serviced and washed against planned targets. It includes percentages of achievement, discrepancies, and breakdowns by type of equipment. Overall, the service achievement was 128.57% and washing achievement was 80.95%.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
SERVICE HARI INI AKURASI SERVICE SESUAI CODE UNIT 15 Feb 25
TANGGAL PLAN PS ACH PS PERIODE
TIDAK SESUAI PENJADWALA POPULASI JUMLAH UNIT SESUAI CODE % CODE UNIT N ULANG BELUM SERVICE CLOSE % 21 Feb 25 SERVICE UNIT PLAN PS PLAN PS PERIODE 1 SERVICE
Sab, 15 Feb 25 7 8 114,29% 0 8 3 4 3 42,86% 54
PLANT ACTUAL Min, 16 Feb 25 8 13 162,50% 2 11 2 4 4 50,00% 100,00%
Sen, 17 Feb 25 9 10 111,11% 1 9 5 3 6 66,67% 31
CLOSE AKURASI Sel, 18 Feb 25 5 5 100,00% 1 4 1 3 2 40,00% SERVICE 57,41%
Rab, 19 Feb 25 5 9 180,00% 0 9 3 2 3 60,00% 25
OPEN Kam, 20 Feb 25 10 12 120,00% 2 10 4 4 6 60,00% 46,30%