0% found this document useful (0 votes)
18 views1 page

W3 Feb 25PS

The document provides a weekly service and washing performance report from February 15 to February 21, 2025, detailing the number of units serviced and washed against planned targets. It includes percentages of achievement, discrepancies, and breakdowns by type of equipment. Overall, the service achievement was 128.57% and washing achievement was 80.95%.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

W3 Feb 25PS

The document provides a weekly service and washing performance report from February 15 to February 21, 2025, detailing the number of units serviced and washed against planned targets. It includes percentages of achievement, discrepancies, and breakdowns by type of equipment. Overall, the service achievement was 128.57% and washing achievement was 80.95%.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SERVICE HARI INI AKURASI SERVICE SESUAI CODE UNIT 15 Feb 25

TANGGAL PLAN PS ACH PS PERIODE


TIDAK SESUAI PENJADWALA POPULASI
JUMLAH UNIT SESUAI CODE
% CODE UNIT N ULANG BELUM SERVICE CLOSE % 21 Feb 25
SERVICE UNIT PLAN PS
PLAN PS PERIODE 1 SERVICE

Sab, 15 Feb 25 7 8 114,29% 0 8 3 4 3 42,86% 54


PLANT ACTUAL
Min, 16 Feb 25 8 13 162,50% 2 11 2 4 4 50,00% 100,00%

Sen, 17 Feb 25 9 10 111,11% 1 9 5 3 6 66,67% 31


CLOSE AKURASI
Sel, 18 Feb 25 5 5 100,00% 1 4 1 3 2 40,00%
SERVICE 57,41%

Rab, 19 Feb 25 5 9 180,00% 0 9 3 2 3 60,00% 25


OPEN
Kam, 20 Feb 25 10 12 120,00% 2 10 4 4 6 60,00% 46,30%

Jum, 21 Feb 25 12 15 125,00% 6 9 1 5 7 58,33% 72


ACTUAL
EXECUTED PS
ACHIEVMENT 56 72 128,57% 12 60 19 25 31 55,36% 133,33%

PLAN JUMLAH TYPE EGI ACH WASHING 15 Feb 25


TANGGAL WASHING UNIT %
PERIODE
UNIT WASHING GENSET
Mega Tower Mini Tower Tower Lamp
CM HV CM P 21 Feb 25
(MG) (MT) (TL)

Sab, 15 Feb 25 12 8 66,67% 4 1 0 3 0 0 84


PLANT WASHING
Min, 16 Feb 25 12 13 108,33% 9 1 0 0 3 0 100,00%

Sen, 17 Feb 25 12 10 83,33% 4 2 1 2 0 0 68


CLOSE WASHING
Sel, 18 Feb 25 12 4 33,33% 3 0 0 1 0 0 80,95%

Rab, 19 Feb 25 12 9 75,00% 0 1 2 1 4 0 16


OPEN WASHING
Kam, 20 Feb 25 12 11 91,67% 5 2 0 4 0 0 19,05%

Jum, 21 Feb 25 12 13 108,33% 2 1 3 2 5 0

Achievement 84 68 80,95% 27 8 6 13 12 0