Trainees Recod Book (TRB) BOOKLET

The document is a Trainee's Record Book for June Reynie C. Alcoba, detailing their training in Electrical Installation and Maintenance (EIM – NC II) from January 13 to February 7, 2025. It outlines the tasks completed under the guidance of trainer Roberto S. Domagtoy, including various electrical installation activities and the corresponding dates and evaluations. Additionally, it includes feedback regarding another trainee's performance and emphasizes the importance of safety and professionalism in the workplace.

Uploaded by

Juzielou Resare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views12 pages

Trainees Recod Book (TRB) BOOKLET

The document is a Trainee's Record Book for June Reynie C. Alcoba, detailing their training in Electrical Installation and Maintenance (EIM – NC II) from January 13 to February 7, 2025. It outlines the tasks completed under the guidance of trainer Roberto S. Domagtoy, including various electrical installation activities and the corresponding dates and evaluations. Additionally, it includes feedback regarding another trainee's performance and emphasizes the importance of safety and professionalism in the workplace.

Uploaded by

Juzielou Resare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Department of Education

Division of Surigao del Norte

Placer National High School


Magsaysay, Placer, Surigao del Norte

TRAINEE’S RECORD BOOK

Trainee’s No: 2025-0001

NAME : ALCOBA, JUNE REYNIE C.


QUALIFICATION : EIM – NC II

TRAINING DURATION : JANUARY 13- FEBRUARY 7, 2025

INDUSTRY TRAINER : ROBERTO S. DOMAGTOY


Instructions:
This Trainees’ Record Book (TRB) is intended to serve as record of all
accomplishment/task/activities while undergoing training in the industry. It will eventually
become evidence that can be submitted for portfolio assessment and for whatever purpose
it will serve you. It is therefore important that all its contents are viably entered by both the
trainees and instructor.
The Trainees’ Record Book contains all the required competencies in your chosen
qualification. All you have to do is to fill in the column “Task Required” and “Date
Accomplished” with all the activities in accordance with the training program and to be
taken up in the school and with the guidance of the instructor. The instructor will likewise
indicate his/her remarks on the “Instructors Remarks” column regarding the outcome of the
task accomplished by the trainees. Be sure that the trainee will personally accomplish the
task and confirmed by the instructor.
It is of great importance that the content should be written legibly on ink. Avoid any
corrections or erasures and maintain the cleanliness of this record.
This will be collected by your trainer and submit the same to the Vocational
Instruction Supervisor (VIS) and shall form part of the permanent trainee’s document on file.

THANK YOU.
NOTES:
As the facilitator, I visited the trainees who are undergoing industry training. I was called by
the supervisor EMANUEL R. ADLAO and he provides feedback pertaining one of my
trainees which he said that Jolo G. Ablo was sometimes didn’t follow safety procedures in
doing work, he has a rude behavior toward his superiors or trainers that sometimes made
them mad at him and reporting to the workplace late.
With this unremarkable feedback, I called the attention of Jolo G. Ablo and explain to
him the importance of following safety procedures in doing work, emphasize the
importance of good relationship towards superiors or trainer and a piece of advice on the
importance of punctuality or reporting in the workplace on time as industry worker as
trainee.
Unit of Competency: 1. PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING
WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING
AND AUXILIARY SYSTEMS
Task/Activity Required Date Instructors
Accomplished Remarks
Learning Outcome
1. Install 1.1 Correct drawings are January 14, Satisfactory
electrical 2025
interpreted based on job
metallic /nonmetallic requirements
(PVC
conduit) 1.2 Correct quantities of
conduit, fittings and accessories
are determined as per job
requirements
1.3 Tools and equipment are
selected as per job
requirements
1.4 Conduit is assembled
ensuring that fittings are fully
inserted and tightened as per
job requirements
1.5 Conduit is bent with bends
not exceeding 90° as per job
requirements
1.6 Conduit couplings and
elbows are installed as per job
requirements
1.7 Conduit is threaded in line
with job requirements
1.8 Safety procedures are
followed in line with standard
operating procedures (SOPs)
2. Install wire 2.1 Correct drawings are January 16, Satisfactory
ways and 2025
interpreted to determine job
cable tray requirements
2.2 Correct quantities of
materials are selected as per
job requirements
2.3 Tools and equipment are
selected as per job
requirements
2.4 Wire ways and cable trays
are installed as per job
requirements.
2.5 Safety procedures are
followed in line with SOPs
3. Install 3.1 Correct drawings are January 18, Satisfactory
auxiliary 2025
interpreted to determine job
terminal requirements
cabinet and
distribution 3.2 Correct quantities of
panel materials are selected as per
job requirements
3.3 Tools and equipment are
selected as per job
requirements
3.4 Auxiliary terminal cabinet is
installed as per job
requirements
3.5 Auxiliary main distribution
frame is installed as per job
requirements
3.6 Safety procedures are
followed in line with SOPs
4. Prepare for 4.1 Necessary tools, January 20, Satisfactory
cable pulling and equipment, 2025
installation materials and personal
protective equipment (PPE)
are prepared in line with job
requirements.
4.2 Cable pulling & installation
requirements and constraints
from plan and site inspection
are identified as per job
requirements.
4.3 Cable lay out & installation
equipment is set up in
accordance with
manufacturer's and job
requirements.
4.4 Site is made safe and secure
for cable installation.
4.5 Suitable protective clothing
is selected and required safety
devices are used
4.6 Support structure is
assessed as safe for normal
working conditions.

5. Perform wiring 5.1 Safety procedures are January 22, Satisfactory


and cabling followed based on safety 2025
lay out regulations PPE are identified
and selected in line with safety
requirements
5.2 Tools, equipment, pulling
compound and safety
requirements are identified
and obtained for the lay out
and installation.
5.3 Pulling materials is properly
installed and tensioned to
required specifications
5.4 Cable is secured
permanently to support
structure in accordance with
standard installation
procedures
5.5 Bending radius and loops
tolerance is observed for cable
materials at all times
5.6 Schedule of wire cutting
lists is followed based on
estimates, quantity and sizes to
avoid wastage.
5.7 Further instructions are
sought if unplanned events or
conditions occur
5.8 Checking of quality of work
is done in accordance with
instructions and requirements.
6. Notify 6.1 Final checks are made to January 23, Excellent
completion of ensure that work conforms
work with instructions and job 2025
requirements
6.2 Supervisor is notified upon
completion of work
6.3 Tools, equipment and any
surplus resources and materials
are, where appropriate,
cleaned, checked and returned
to storage in accordance with
established procedures
6.4 Work area is cleaned up
and made safe according to
OHSA regulations

DOMAGTOY
Trainee’s Signature Trainer’s Signature
Unit of Competency: 2. INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION,
POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION
AND GROUNDING SYSTEMS

Learning Task/Activity Required Date Instructors


Outcome Accomplished Remarks
1. Plan and 1.1 Instructions for the January 24, 2025 Satisfactory
prepare work preparation of the work
activity are communicated
and confirmed to ensure clear
understanding
1.2 Tools, equipment and PPE
needed to install electrical
wiring is identified, checked
to ensure they work correctly
as intended and are safe to
use in accordance with
established procedures
1.3 Materials needed for work
are obtained in accordance
with established procedures.
2. Install 2.1 Safety procedures are January 27-28, Satisfactory
electrical 2025
followed in line with job
protective requirements
devices
2.2 Correct procedures for
installation of electrical
protective devices are
performed in line with job
requirements and PEC
2.3 Schedule of work is
followed to ensure work is
completed in an agreed time,
to a quality standard and with
a minimum waste
2.4 Further instructions are
sought from a supervisor if
unplanned events or
conditions occur
2.5 On-going checks of quality
of work is done in accordance
with instructions and
requirements
3. Install 3.1 Safety procedures are January 29, 2025 Satisfactory
lighting followed
fixture and 3.2 Correct procedures for
auxiliary
outlet. installation of lighting fixture
and auxiliaries are performed
in line with job requirements
3.3 Schedule of work is
followed to ensure work is
completed in an agreed time,
to a quality standard and with
a minimum waste
3.4 Further instructions are
sought from a supervisor if
unplanned events or
conditions occur.
3.5 On-going checks of quality
of work is undertaken in
accordance with instructions
and requirements.
4. Notify 4.1 Final checks are made to January 30, 2025 Satisfactory
completion of ensure the work conforms
work. with instructions and
requirements
4.2 Supervisor is notified
upon completion of work
4.3 Tools, equipment and any
surplus resources and
materials are, where
appropriate, cleaned, checked
and returned to storage in
accordance with established
procedures
4.4 Work area is cleaned and
made safe

_____________________ ROBERT S. DOMAGTOY


Trainee’s Signature Trainer’s Signature
Unit of Competency: 3. INSTALL WIRING DEVICES OF FLOOR AND WALL MOUNTED
OUTLETS, LIGHTING FIXTURE/SWITCHES AND AUXILLIARY
OUTLETS

Learning Task/Activity Required Date Instructors


Outcome Accomplished Remarks
1. Select 1.1 Drawings are read and January 31, 2025 Satisfactory
wiring interpreted to determine job
devices requirements
1.2 Correct type and quantity
of wiring devices and
consumable items are
identified in line with job
requirements
1.3 Tools and equipment are
selected in line with job
requirements
1.4 Correct PPE are identified
and selected in line with
safety requirements
2. Install wiring 2.1 Safety procedures are February 3-4, Satisfactory
Devices followed based on safety 2025
regulations
2.2 Correct procedures for
installation of wiring devices
are performed in line with
job requirements
2.3 Schedule of work is
followed based on agreed
time, quality standard and
minimum wastage
2.4 Further instructions are
sought if unplanned events
or conditions occur
2.5 On-going checking of
quality of work is done in
accordance with instructions
and requirements.
3. Install 3.1 Safety procedures are February 5-6, Satisfactory
lighting followed 2025
fixture/ 3.2 Correct procedures for
switches
installation of lighting
fixtures/switches are
performed in line with job
requirements
3.3 Schedule of work is
followed to ensure work is
completed in an agreed time,
to a quality standard and
with a minimum waste
3.4 Further instructions are
sought from a supervisor if
unplanned events or
conditions occur
3.5 On-going checks of
quality of work are
undertaken in accordance
with instructions and
requirements
4. Notify 3.1 Safety procedures are February 7, 2025 Satisfactory
completion followed
of work 3.2 Correct procedures for
installation of lighting
fixtures/switches are
performed in line with job
requirements
3.3 Schedule of work is
followed to ensure work is
completed in an agreed time,
to a quality standard and
with a minimum waste
3.4 Further instructions are
sought from a supervisor if
unplanned events or
conditions occur
3.5 On-going checks of
quality of work is undertaken
in
accordance with instructions

_____________________ ROBERT S. DOMAGTOY


Trainee’s Signature Trainer’s Signature