As the facilitator, I visited the trainees who are undergoing industry training. I was called by
the supervisor EMANUEL R. ADLAO and he provides feedback pertaining one of my
trainees which he said that Jolo G. Ablo was sometimes didn’t follow safety procedures in
doing work, he has a rude behavior toward his superiors or trainers that sometimes made
them mad at him and reporting to the workplace late.
With this unremarkable feedback, I called the attention of Jolo G. Ablo and explain to
him the importance of following safety procedures in doing work, emphasize the
importance of good relationship towards superiors or trainer and a piece of advice on the
importance of punctuality or reporting in the workplace on time as industry worker as
trainee.
Unit of Competency: 1. PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING
WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING
AND AUXILIARY SYSTEMS
Task/Activity Required Date Instructors
Accomplished Remarks
Learning Outcome
1. Install 1.1 Correct drawings are January 14, Satisfactory
electrical 2025
interpreted based on job
metallic /nonmetallic requirements
(PVC
conduit) 1.2 Correct quantities of
conduit, fittings and accessories
are determined as per job
requirements
1.3 Tools and equipment are
selected as per job
requirements
1.4 Conduit is assembled
ensuring that fittings are fully
inserted and tightened as per
job requirements
1.5 Conduit is bent with bends
not exceeding 90° as per job
requirements
1.6 Conduit couplings and
elbows are installed as per job
requirements
1.7 Conduit is threaded in line
with job requirements
1.8 Safety procedures are
followed in line with standard
operating procedures (SOPs)
2. Install wire 2.1 Correct drawings are January 16, Satisfactory
ways and 2025
interpreted to determine job
cable tray requirements
2.2 Correct quantities of
materials are selected as per
job requirements
2.3 Tools and equipment are
selected as per job
requirements
2.4 Wire ways and cable trays
are installed as per job
requirements.
2.5 Safety procedures are
followed in line with SOPs
3. Install 3.1 Correct drawings are January 18, Satisfactory
auxiliary 2025
interpreted to determine job
terminal requirements
cabinet and
distribution 3.2 Correct quantities of
panel materials are selected as per
job requirements
3.3 Tools and equipment are
selected as per job
requirements
3.4 Auxiliary terminal cabinet is
installed as per job
requirements
3.5 Auxiliary main distribution
frame is installed as per job
requirements
3.6 Safety procedures are
followed in line with SOPs
4. Prepare for 4.1 Necessary tools, January 20, Satisfactory
cable pulling and equipment, 2025
installation materials and personal
protective equipment (PPE)
are prepared in line with job
requirements.
4.2 Cable pulling & installation
requirements and constraints
from plan and site inspection
are identified as per job
requirements.
4.3 Cable lay out & installation
equipment is set up in
accordance with
manufacturer's and job
requirements.
4.4 Site is made safe and secure
for cable installation.
4.5 Suitable protective clothing
is selected and required safety
devices are used
4.6 Support structure is
assessed as safe for normal
working conditions.
DOMAGTOY
Trainee’s Signature Trainer’s Signature
Unit of Competency: 2. INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION,
POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION
AND GROUNDING SYSTEMS