ABSTRACT
System stability study is the important parameter of economic, reliable and secure power system planning
and operation. Power system studies are important during the planning and conceptual design stages of the
project as well as during the operating life of the plant periodically. This paper presents the power system
stability analysis for IEEE- 9 bus test system. The fault is created on different busses and transient stability
is analyzedfor different load and generation conditions. The critical clearing time (CCT) is calculated by
using time domain classical extended equal area criterion method. The system frequency and voltage
variation is observed for different fault locations and CCT. The IEEE-9 bus test system is simulated and
stability is analyzed on ETAP software.
KEYWORDS
Critical Clearing Time (CCT), ETAP, Extended Equal Area Criterion (EEAC), Frequency Stability, IEEE-9
Bus Test System, Load Flow Study, Load Shedding, Transient Stability.
1. INTRODUCTION
Electric power system stability analysis has been recognized as an important and challenging
problem for secure system operation. When large disturbances occur in interconnected power
system, the security of these power systems has to be examined. Power system security depends
on detailed stability studies of system to check and ensure security.
In order to determine the stability status of the power system for each contingency of any
disturbance occurs in power system, many stability studies are defined [1]. Power system stability
analysis may involve the calculation of Critical Clearing time (CCT) for a given fault which is
defined as the maximum allowable value of the clearing time for which the system remains to be
stable. The power system shall remain stable if the fault is cleared within this time. However, if
the fault is cleared after the CCT, the power system is most likely to become unstable. Thus, CCT
estimation is an important task in the transient stability analysis for a given contingency. In this
paper for the Transient Stability Analysis, an IEEE 9 Bus system is considered.
Critical clearing time (CCT) in a way measures the power systems Transient stability. It denotes
the secure and safe time margin for clearing the contingency, usually three-phase ground-fault.
The larger the value of CCT, the power system has ample time to clear the contingency. CCT
depends on generator inertias, line impedances, grid topology, and power systems operating
conditions, fault type and location. For a single machine infinite bus power system, CCT
calculation is straightforward. While for the case of multi-machine power systems, CCT is always
DOI : 10.14810/ecij.2014.3204 41
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
obtained by repeating time-domain simulations, and hence the evaluation of CCT can only be
done off-line The Load Flow study and Transient Stability study is discussed and performed for
the IEEE-9 Bus test system simulated on ETAP 7.5.1.
i. The nature of the resulting instability mode indicated by the observed instability on certain
system variables.
ii. The size of the disturbance which consequently influences the tool used to assess the system
stability.
iii. The time margin needed to assess system stability.
3. SWING EQUATION
The swing equation governs the motion of the machine rotor relating the inertia torque to the
resultant of the mechanical and electrical torques on the rotor i.e.[5]
= − , = 1,2,3, … … … … . . , (1)
Where,
%
= + &' cos( − )+ ! sin( − )$(2)
42
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
With:
= rotor angle of the i-th machine;
= inertia coefficient of the i-th machine;
, = mechanical and electrical power of the i-th machine;
= voltage behind the direct axis transient reactance;
, ! = real and imaginary part of the ij-th element of the nodal admittance matrix reduced at
the nodes which are connected to generators
The following steps are taken for stability studies of multimachine system[6]:
1. From the pre-fault load flow data determined ( voltage behind transient reactance for all
generators. This establishes generator emf magnitudes ( which remain constant during
the study and initial rotor angle) (* = angle)( ( ). Also record prime mover inputs to
*
generators,)) ( = /0 .
2. Augmented the load flow network by the generator transient reactance. Shift network
buses behind the transient reactance.
3. Find1234 for various network conditions-during, post fault (faulted line cleared), after line
reclosure.
4. For faulted mode, found generator outputs from power angle equation = +
1 cos( − − 5 ) and solve swing equations.
5. The above step is repeated for post fault mode and after line reclosure mode.
6. Examined ( ) plots of all generators and established the answer to the stability question.
The following preliminary calculation steps are needed for transient stability analysis of
multi-machine system[4]:
Let 6 = 17
6
6 = 8 %:
0
6 1 1%< 7%
8 % : = ; %% =; =
0 1<% 1<< 7<
43
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
The matrix >1%% − 1%< 1<< ?' 1<% @ is the desired reduced 1234 matrix. It is ( × ) matrix where
is the number of generators.
When large disturbances occur in power system, there is no availability of generalized criteriafor
determining system stability. Hence the experimental approach for the solution of transient
stability problem is all about listing of all important severe disturbances along with their possible
locations to which the system is likely to be subjected.
A plot of power angle and t (time) is called the swing curve which is obtained by numerical
solution of the swing equation in the presence of large severe disturbances. If starts to decrease
after reaching a maximum value, it is normally assumed that the system is stable and the
oscillation of around the equilibriumpoint will decay and finally die out. Important
severedisturbances are a short circuit fault or a sudden loss of load [3].
DB C
B C = )))))))))))))))))(3)
B C
B C =E (4)
DB C
D< C
< C = (5))
< C
< C =E (6)
D< C
On the basis of above assumption, a multi-machine system can be transformed into equivalent
two-machine system. After which, the two machine equivalent is reduced to a single machine
infinite bus system. The equivalent One-machine-Infinite-Bus (OMIB) system model is given by
the following equation:
= − = −I B + JK sin( − L)M))(7)
44
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
Where,
B C < C
=
O
O =E
&'
δ = δQRS − δTRS
< C DB C − B C D< C
=
O
JK = VW + X
W
L = ) tan?' Z [
X
< C − B C
W= E
O DB C, D< C
< C − B C
X= E !
O DB C, D< C
Where 0 denotes original (pre-fault), D during fault, and P post-fault, B< is the critical clearing
time.
The transient stability margin:)c = \JBB − \_ B , at the critical clearing time B< , c = \JBB −
\_ B = 0
Solving the equations (13) & (14), the critical clearing angle B< can be computed. The value of
critical clearing time (CCT) can be computed [17] by following formula:
e
B< = df ( B< − *) (10)
g `h
Where,
i = generator output before fault
* = pre-fault angle
45
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
In this paper IEEE 9 bus system is used as the test system, which is simulated on ETAP 7.5.1.
The single line diagram (SLD) of the simulated test system on ETAP is shown in Fig 2. For this
test system generator and load parameters are given in appendix. The total generation is 313MW
and total load is 312.5MW. The test system contains 6 lines connecting the bus bars in the system
with the generator connected to network through step-up transformer at 230kV transmission
voltage.
It is good practice to have periodic and updated load flow study for every installation. The
purpose of load flow study is
i. To calculate bus voltage levels tocompare to equipment ratings anddistribution system
operatingrequirements
ii. To calculate branch current flows for comparing it to equipment ampacity ratings and
protective device triplevels.
Depending upon the type of plant there can be many load flow cases to study. The objective is to
identify the best and worst operating conditions. Several load flow solution algorithms used in
industry such as Gauss-Seidel, Newton-Raphson and current injection. There is requirement of at
least one swing bus in the network for all the Load flow solution algorithms. The utility point of
service is always modeled as swing bus.
The result of load flow analysis when all generators and loads are operating at rated power is
given in Table.1. Calculation of critical clearing time (CCT) by using EEAC for different
generation and loading condition at the different fault locations are shown in Table. 2.
46
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
This CCT is then used to operate the circuit breakers near the faulted bus and hence the
corresponding generators are removed from the system. This creates the generation – load
imbalance and hence the system frequency is affected.
When the frequency of the system crosses the permissible limit after the fault has occurred, the
frequency protection scheme is activated. The frequency stability of the system is enhanced using
Load Shedding.
For the above mentioned generation – loading conditions, load shedding was performed till the
system frequency stability is regained. The bus frequency and bus voltage plots for the three cases
are shown in Fig. 3- Fig 8.
120
110
100
% Bus Voltage
90
80
70
60
50
0 5 10 15 20 25 30
Time(sec)
At t= 1.0 sec 3phase faultoccurred at bus 1, the circuit breaker 1 and 4 are operated before the
CCT calculated for the case i.e. at 1.36 sec. As a result generator 1 is removed from the system
47
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
and the power imbalance condition arises. Due to this the load shedding scheme is activated and
an amount of 68 MW load is curtailed to regain the system stability. Similarly when the fault
occurs at bus 2 and 3 leading to generator 2 and 3 outage respectively, the load of 150MW and 84
MW is shed from the system.
120
110
100
%Bus voltage 90
80
70
60
50
40
30
20
0 5 10 15 20 25 30
Time(sec)
110
100
90
%Bus Voltage
80
70
60
50
40
0 5 10 15 20 25 30
Time(sec)
102
101.5
101
100.5
% Frequency
100
99.5
99
98.5
98
97.5
0 5 10 15 20 25 30
Time(sec)
Fig.6 Bus frequencyafter load shedding when fault has occurred at bus1
48
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
103
102
% Bus frequency
101
100
99
98
97
0 5 10 15 20 25 30
Time(sec)
Fig.7 Bus frequency after load shedding when fault has occurred at bus2
103
102
% Bus Frequency
101
100
99
98
97
0 5 10 15 20 25 30
Time(sec)
Fig.8 Bus frequency after load shedding when fault has occurred at bus3
6. CONCLUSION
Transient stability analysis has been performed on ETAP software. The Critical Clearing time
(CCT) i.e. the maximum allowable value of the clearing time for which the system remains to be
stable is calculated for a given fault. System frequency and voltage is analyzed for different
loading conditions and faults on busses. The excess amount of load has to be shedded to maintain
system stability.
APPENDEX
Generator data of IEEE 9 bus system
Parameter G1 G2 G3
Operation mode Swing Voltage control Voltage
control
Rated MVA 80 220 110
KV 16.5 18 13.8
Power factor 0.90 0.85 0.85
Type Hydro Thermal Thermal
Speed 1500 1500 1500
' 5.6 5.6 5.6
T do
' 3.7 3.7 3.7
T qo
49
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
REFERENCES
[1] Mihirig, A.M., Wvong, M. D., "Transient stability analysis of multi-machine power systems by
catastrophe theory," Generation, Transmission and Distribution, IEE Proceedings C, vol.136, no.4,
pp.254-258, Jul 1989.
[2] P. Kundur, Power System Stability and Control, New York: McGraw-Hill, 1994 pp 104-120.
[3] Thomas P. Smith, “Power System Studies for Cement Plants”, IEEE Industry Applications Magazine,
pp. 56-65 July-Aug 2007
[4] IEEE/CIGRE Joint Task Force on Stability Terms and Definitions, “Definitions and Classification of
Power System Stability,” IEEE Trans. on Power Systems, vol. 19, no. 3, August 2004, pp. 1387-1401
[5] Anderson, P. M., and Fouad, A. A., "Power System Control and Stability", New York: Wiley
Interscience, 2002. pp. 34 -56.
[6] D. P. Kothari, I. J. Nagrath, "Modern Power System Analysis",India: Tata McGraw-Hill Publishing
Company Limited, 2003. pp.433-510.
[7] Xue Y., VanCutsem T., Ribbens-Pavella, M., “Extended Equal Area Criterion,
Justifications,Generalization, Applications”, IEEE Trans. on Power Systems, 1989, vol.4, no.1, pp.44-
52
[8] Xue Y., Wehenkel L., Pavella M., et al: Extended Equal Area Criterion Revisited, IEEE Trans.
PowerSystems, 1992, vol.7, no.3, pp.1012-1022
[9] Xue Y., PavellaM.:Critical Cluster Identification in Transient Stability Studies, IEE Proc. Pt. C, 1993,
vol.140, pp. 481-480
[10] Xue Y., Rousseax P, Gao Z, Wehenkel L., Pavella M., Belhomme M., Euxibie E., Heilbronn B.:
Dynamic Extended Equal Area Criterion. Part 1: Basic Formulation, Athens Power Technol., 1993
[11] Y. Xue and M. Pavella, “Extended equal-area criterion: an analytical ultra-fast method for transient
stability assessment and preventive control of power systems,” International Journal of Electrical
Power & Energy Systems, vol. 11, no. 2, pp. 131–149, Apr. 1989.
[12] Pai, M. A., “Energy function analysis for power system stability”, Kluwer Academic Publishers
Boston/London, 1931
[13] Ibrahim M. El-Amin, Abdul-Aziz M. Al-Shames, “Transient stability assessment using artificial
neural networks” Electric Power System Research,1997, pp. 7-16
[14] Kato, Y., Iwamoto, S., "Transient stability preventive control for stable operating condition with
desired CCT," Power Engineering Society General Meeting, 2003, IEEE , vol.3, no., pp. 4 vol. 2666,
13-17 July 2003 doi: 10.1109/PES.2003.1267434
[15] Dong, Y., Pota, H.R., "Transient stability margin prediction using equal-area criterion ," Generation,
Transmission and Distribution, IEE Proceedings C , vol.140, no.2, pp.96-104, Mar 1993
50
Electrical & Computer Engineering: An International Journal (ECIJ) Volume 3, Number 2, June 2014
[16] Krishna, D.R., Murthy, K., Rao, G.G., "Application of Artificial Neural Networks in Determining
Critical Clearing Time in Transient Stability Studies," Power System Technology and IEEE Power
India Conference, 2008, POWERCON 2008, Joint International Conference on , vol., no., pp.1-6, 12-
15 Oct. 2008
Authors
Renuka Kamdar was born in Bhopal, India in 1987. She has received her BE degree
(Electrical and Electronics Engineering) from Oriental Institute of Science and
Technology, Bhopal in 2009 and M. Tech degree (Power System) from MANIT Bhopal
in 2013. She is presently working as a JRF in MANIT, Bhopal
51