walls & columns at upper basement

The document is an inspection request form for the 12-storey office complex project for the Church of Pentecost, focusing on the inspection of steel rebars in walls and columns. It includes details about the contractor, representatives, and required signatures for approval. Additionally, it outlines specific construction notes and requirements related to materials and methods to be used in the project.

Uploaded by

lucio444
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

walls & columns at upper basement

The document is an inspection request form for the 12-storey office complex project for the Church of Pentecost, focusing on the inspection of steel rebars in walls and columns. It includes details about the contractor, representatives, and required signatures for approval. Additionally, it outlines specific construction notes and requirements related to materials and methods to be used in the project.

Uploaded by

lucio444
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION REQUEST FORM

Project Name: 12- Storey Office


complex for Church of Dwg Ref:
Pentecost,Shiashie

Activity: Inspection of Steel rebars


Location/Grid: Between 5a- Level: Upper Basement
for Walls and Columns 11/A3a-F2

Contractor: China State Hualong Construction Ltd.


Contractor’s Representative on Site: Emmanuel Siaw and Dickson Fosu
Architectural Electrical Firefighting CIVIL
Department:
Mechanical Plumbing Structural Others (Specify)

Contractor Engineer’s Name: Jiang Wanku Signature: Date:7/30/24 Time:

Structural Engineer: Signature: Date: Time:

Electrical Engineer (NOC for activity): Signature: Date: Time:


Mechanical Engineer (NOC for activity): Signature: Date: Time:
Plumbing Engineer (NOC for activity): Signature: Date: Time:

Below portion for COP Representative use only


Approved as
Status: Approved Revise and Re-submit Rejected
noted
Date Received by
COPR:
Time Received by
COPR:
____________________________________________________________________________
____________________________________________________________________________
Comments

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Below portion for COP Project Manager use only

Approved as
Status: Approved Revise and Resubmit Rejected
noted

Comments: -

Inspection Raised By Inspected By CPR Reviewed by CPM

Signature: Signature: Signature:

Name: Name: Name:

Date: Date: Date:


NOTES
1. This drawing should be read in conjunction with
all architectural drawings
1 2 3 3a 3b 4 4a 5 5a 6 6a 6b 7 7a 8 8a 9 9a 10 10a 11 12 2. Concrete mix proportion to have minimum
1000 90625 crushing strength of 35N/mm2 at 28 days
3. Consult the engineer before commencement of
4250 3100 construction or any changes made.
1000 7500 9500 4650 2625 2225 3250 625 7900 3250 2450 2400 4750 3250 4900 2375 5625 2800 2675 10525
4. Use steel reinforcement of characteristic
strength (H) =500N/mm2
E3IX 5. Maintain minimum cover to steel as follows
Foundation = 50mm
Bases = 50mm
Blinding = 100mm
Columns = 40mm
Walls = 40mm
E3VIII 1950 4000 2150 4000 300
Beams = 25mm
Staircase = 25mm
A1 A1 Slab = 25mm
750 1250 625

6. All blockwork are non-load bearing:

300

750 1875
°
A2 23

50
250 1200 675
A3a 7. All dimensions are in millimetres unless

19
VOID otherwise
A3a

2750

3700
VOID

1700

1700
'B' STAIRCASE TYPE 2
A 8. Coarse aggregates shall consist of crushed

00
rock of either granite, basalt or quarzite
A

40
375

250
1000 6875 3900 5125 2975 4000 4000 4000 4000 4000 4000 A3 9. Fine aggregates shall consist of sand or

2850

2850
VOID
5000

crushed rock of one or more of types given

1875 4625
57
above or crushed gravel and sand

19

250
A5

9451
300 250 2400 250 2425 300 10. The steel shall be of high tensile steel
E3VII bars complying with the current B.S. 4449

°
23
11. Mechanical vibrators shall be used
B B

500

3700

3700

4450
throughout all concreting operations

1750
VOID 12. Max. size of aggregates shall be 20mm
graded down to 10mm
B1a 13. Aggregates shall not contain any harmful
5700

250
material in sufficient quantity to adversely affect
1 1

20
the strength, wear resistance or durability of

3950
00
91 the concrete.

2800
4500

4500
6

250
16
VOID 14 . water used for the concrete mix must

1250
VOID

00
1850 600 necessarily be potable.
C C
275

250
35
15. Cement shall be ordinary portland cememt to

VOID
00

3525
B.S. 12 or B.S. 146

250
0
3300

3300
60

450

3200
23°

14
1
1451

6
D

3750
'A'

6300
5800

250
300
250 5001200
D1a
3000

7500

7500
36625

36625
2750
7500 9500 9500 7500

250 2400 250


750MM DIA 3 3
450

E E

1375
1500
1500 2000 4400 1600
R= 907
5
E1
75
R= 165

3880
6388

2955

2955
8500

23°

2 E2
450

3245
3795
4300
F
F

250
0
00

2800
8
R =1 F1

3000
2500
F2

300
VOID

°
23

E3VI
8500

23
4209
°

77

2627
280
R= STAIRCASE TYPE 1

5250
600 75
83 E3I
G 300
R=
70
G
23 2 °
00
°
1767 23
1767 1767 1767

23° 23°

E3V
9
E3II 7
225 600
225 400
E3IIa
E3IIb
E3IV E3III

375
3

50 250
A3a
G. A. OF UPPER BASEMENT

750
1600

850
D

1125
A

500
375

75
DETAIL 'A' DETAIL 'B'

6a 6b 7 7a
2450 2400 4750
REV. No. DATE BY REVISION
250 500 1200 500 250 475 1200 475 250
PEC CONSULT LIMITED
P. O. BOX WY 1512
KWABENYA - ACCRA
entalists,Planners 8 9 10 10a Consulting Engineers,Environmentalists,Planners
8000 8000 2800 125 1425 175 6900 Management Consultants,Research,Training & Dev.

350
600 600 250 PROJECT
PROPOSED NEW HEAD OFFICE

2150
1450
COMPLEX AT SHIASHIE, ACCRA
GREATER ACCRA REGION

350
CLIENT
350

350

THE CHURCH OF PENTECOST


2000 2000 2000 2000 2000
DWG. DWG No.
G. A. OF
UPPER BASEMENT
SECTION 2 - 2 SECTION 3 - 3 ST
SECTION 1 - 1 DATE SCALE 09
JAN. 2024 1 :100, 1: 50
DRAWN DESIGNED
R. M. G. A.
CHECKED APPROVED JOB No.
G. A. E. O. A. PEC / BS / P- 40069

You might also like