KEY PLAN
ITEM DESCRIPITION KKS CATEGORY ITEM DESCRIPITION KKS CATEGORY ITEM DESCRIPITION KKS CATEGORY
58
01 GAS TURBINE BUILDING 11UMB10 100 ADMINISTRATION BUILDING 00UYC10 200 RIVER WATER INTAKE PUMPING AREA 00UGA01 ,87
40
PLANT NORTH
22
º
AL
02 STEAM TURBINE BUILDING 10UMA10 101 SOCIAL BUILDING 00UYD10 201 RIVER WATER INTAKE ELECTRICAL BUILDING 00UBB30 OG
R
GE RTH
AP
HIC
NO
1 03 HRSG AREA 11/12UHA 102 CAR PARK AREA 00UZD 202 RIVER WATER INTAKE AND DISCHARGE PITS 00UGA02
WEST EAST
1
SOUTH
04 STEP-UP TRANSFORMER AREA 10/11/12UBE 103 WAREHOUSE BUILDING 00USU10 203 NATIONAL GUARD CAR BOX 00UZD10
05 UNIT AUXILIARY TRANSFORMER AREA 11/12UBD 104 WORKSHOP BUILDING 00UST10 204 NATIONAL GUARD BUILDING 00UYF10
06 MAIN ELECTRICAL AND CONTROL BUILDING 00UCA10 105 RIVER WATER PRETREATMENT AREA 00UGA03 205 NATIONAL GUARD GATEHOUSE 00UYE40
07 CLOSED COOLING WATER SYSTEM AREA 00UPB 106 CHEMICAL STORAGE & DOSING 6 00UGM 206 SPARE
08 BYPASS STACK AREA 11/12UHH 107 MAIN GATE HOUSE 00UYE10 207 SEWAGE LIFTING PITS 00UGV
UP
11 OILY WATER POND 00UGU 110 WATER TREATMENT PLANT AND ZLD BUILDING 00UGD10
12 MAIN PIPE RACK (00ULY10) 00ULY10 111 SERVICE WATER STORAGE AREA 00UGC01
13 MECHANICAL DRAFT COOLING TOWER AREA 00URA 112 WTP WATER STORAGE AREA 6 00UGC02
14 SAMPLING STRUCTURE 00ULW 113 POTABLE WATER STORAGE AREA 00UGG NOTES:
2 2
15 CHEMICAL DOSING STRUCTURE 00ULV 114 WATER PUMPS AREA 00UGC03
1. LOCAL COORDINATES MENTIONED IN THIS DRAWING REFER TO POWER PLANT LOCAL COORDINATES.
16 FEEDWATER PUMPS AREA 11/12ULA 115 SEWAGE TREATMENT PLANT AREA 00UGV FOR AIS LOCAL COORDINATES REFER TO DRAWING SIR-C1-00-AE_-EDW-IDM-05610
2. LEVEL IN LOCAL COORDINATES SYSTEM REFERS TO MEAN SEA LEVEL
17 N2 BOTTLES STORAGE SHELTER 00UTG10 116 OILY WATER SEPARATOR 00UGU10
3. E= 0.000 m N= 0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO EG= 508853.400 m
18 AIR COMPRESSORS AREA 00UTF 117 REGULATION POOL 00UGT01 NG= 4449146.238 m IN UTM.
4. ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
19 LAYDOWN AREA 00USX 118 REUSE POOL 00UGT02 5. A FREE HEIGHT OF 6M FROM THE TOP OF THE ROAD TO THE BOTTOM OF THE PIPE BRIDGES WILL BE
20 ATMOSPHERIC DRAIN TANK AREA 10ULJ 119 EVAPORATION PONDS 00UGW CONSIDERED
6. PERIMETER CONCRETE WALL HEIGHT 3M
6
21 CIRCULATING WATER PUMPS AREA 00URD 120 SOFTENED WATER POOL 00UGT03 7. FINAL GROUND LEVELS: AIS AREA= +310,70
POWER BLOCK AREA= +312,30
22 SELF CLEANING FILTERS AREA 10UPH 121 CENTRAL FIRE BRIGADE STATION 00USG
BOP AREA= +314,00
23 HVAC HOT WATER BOILER 00USA10 122 COOLING WATER MAKE UP PUMPS STRUCTURE 00UGC04 WATER INTAKE AREA= +316,00
24 SELECTIVE CATALYTIC REDUCTION (SCR) AREA 11/12UHQ01 123 STORM WATER COLLECTION BASIN 3 00UGH03 REFERENCE DRAWINGS:
25 AMMONIA STORAGE AREA FOR SCR 11UHQ02 124 UNDERGROUND SEWAGE COLLECTION BASIN 00GRR20
1. FOR PLOT PLAN SEE DWG: SIR-C1-00-Y__-GDW-IDM-00100
26 AUXILIARY BOILER AREA 10UTH 6 125 FIRE BRIGADE STORAGE BUILDING 00USU20 2. FOR AIS GENERAL LAYOUT SIR-C1-00-AE_-EDW-IDM-05610
3. FOR ROADS LAYOUT SEE DWG: SIR-C1-00-UZ_-GDW-IDM-01141
27 H2 GENERATION PLANT AREA 00UTG01 126 FORCED MECHANICAL EVAPORATION AREA 00UGW
4. FOR LAYOUT BY AREAS SEE:
3 3
28 ELECTRICAL BUILDING COOLING TOWER 00UBB10 SIR-C1-00-Y__-GDW-IDM-00181 GENERAL ARRANGEMENT HRSG AREA (ZONE 1)
6 SIR-C1-00-Y__-GDW-IDM-00182 GENERAL ARRANGEMENT TRANSFORMERS AREA (ZONE 2)
29 AUXILIARY RACK 00ULY20 SIR-C1-00-Y__-GDW-IDM-00183 GENERAL ARRANGEMENT AUXILIARY BOILER AREA (ZONE 3)
30 ELECTRICAL DIESEL GENERATORS AREA (EDG) 00UBQ SIR-C1-00-Y__-GDW-IDM-00184 GENERAL ARRANGEMENT MAIN ELECTRICAL BUILDING AREA (ZONE 4)
SIR-C1-00-Y__-GDW-IDM-00185 GENERAL ARRANGEMENT CCW PUMPS AND H2 GENERATION AREA
31 FUEL GAS COMPRESSORS SHELTER 6 00UES10 (ZONE 5)
SIR-C1-00-Y__-GDW-IDM-00186 GENERAL ARRANGEMENT GAS AREA (ZONE 6)
32 GT CONTROL PACKAGE STRUCTURE 11/12UMB01
SIR-C1-00-Y__-GDW-IDM-00187 GENERAL ARRANGEMENT WTP AND COOLING TOWER AREA (ZONE 7)
33 CONDENSATE STORAGE TANK AREA 10ULC SIR-C1-00-Y__-GDW-IDM-00188 GENERAL ARRANGEMENT EVAPORATION PONDS EAST SIDE AREA
(ZONE 8)
34 FUEL GAS FILTERING AREA 00UEN02
SIR-C1-00-Y__-GDW-IDM-00189 GENERAL ARRANGEMENT EVAPORATION PONDS WEST SIDE AREA
35 STORM WATER COLLECTION BASIN 2 00UGH02 6 (ZONE 9)
SIR-C1-00-Y__-GDW-IDM-00180 GENERAL ARRANGEMENT RIVER WATER INTAKE AREA (ZONE 10)
36 SECONDARY GATE HOUSE 00UYE20/30
SIR-C1-00-Y__-GDW-IDM-00190 GENERAL ARRANGEMENT COLD VENT STACK AREA (ZONE 11)
37 CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) 11/12UHT 5. FOR NATIONAL GUARD SECURITY STRUCTURE, LOOKOUT TOWER AND TRENCH SHELTER, SEE
DRAWING: SIR-C1-00-Y__-GDW-IDM-00141
38 HRSG ELECTRICAL BUILDING 11/12UBB20
3000
47 INDUSTRIAL GASES BOTTLES SHELTER GT AREA 11UTG20
OWNER´S ENGINEER:
2000
6
EPC CONTRACTOR:
5 5
DESIGNER:
10500
SIRDARYA CCPP
PERIMETER SECURITY INSTALLATION
6 11-05-2022 WHERE INDICATED E.Z.B. B.R.F. E.L.B.
TYPICAL SECTION 5 26-11-2021 WHERW INDICATED R.C.T. B.R.F. E.L.B.
SCALE: 1/50 4 20-08-2021 WHERE INDICATED G.O.S. B.R.F. E.L.B.
SIZE SCALE 3 28-04-2021 UPDATED AS PER O/OE's COMMENTS G.O.S. B.R.F. E.L.B.
ISSUED
FOR INFORMATION FOR CONSTRUCTION
X FOR APPROVAL AS-BUILT
FOR ASKING QUOTATION-PURCHASING
39
N=2200.000
PERIMETER SECURITY INSTALLATION. SEE DETAIL
KEY PLAN
PERIMETER CONCRETE WALL
58
FENCE COLD VENT STACK AREA SEE SHEET 3 PERIMETER FENCE 6 ,87
40
PLANT NORTH
22
º
AL
E=5000.000
E=4800.000
E=4850.000
E=4900.000
E=4950.000
E=5050.000
E=5100.000
E=5150.000
E=5200.000
HIC
R AP
OG
GE RTH
58 OBSERVATION NO
PLANT NORTH
22 SOUTH
A L
IC
PH MUSHROOM-SHAPED SENTRY
RA
E OG H SHELTER 6
G R T
NO
UP
SOUTH
NOTES:
2 2
MUSHROOM-SHAPED SENTRY 1. LOCAL COORDINATES MENTIONED IN THIS DRAWING REFER TO POWER PLANT LOCAL COORDINATES.
SHELTER FOR AIS LOCAL COORDINATES REFER TO DRAWING SIR-C1-00-AE_-EDW-IDM-05610
N=2100.000 UP
GT INLET MANIFOLT
10 5. A FREE HEIGHT OF 6M FROM THE TOP OF THE ROAD TO THE BOTTOM OF THE PIPE BRIDGES WILL BE
FENCE CONSIDERED
BY-PASS STACK
HRSG STACK
6. PERIMETER CONCRETE WALL HEIGHT 3M
18
E=4905.650
E=4961.910
E=5000.000
34 7. FINAL GROUND LEVELS: AIS AREA= +310,70
31
POWER BLOCK AREA= +312,30
6
BOP AREA= +314,00
6 WATER INTAKE AREA= +316,00
07 REFERENCE DRAWINGS:
N=2050.000
22 29 49 1. FOR PLOT PLAN SEE DWG: SIR-C1-00-Y__-GDW-IDM-00100
6
2. FOR AIS GENERAL LAYOUT SIR-C1-00-AE_-EDW-IDM-05610
3. FOR ROADS LAYOUT SEE DWG: SIR-C1-00-UZ_-GDW-IDM-01141
4. FOR LAYOUT BY AREAS SEE:
3 SIR-C1-00-Y__-GDW-IDM-00181 GENERAL ARRANGEMENT HRSG AREA (ZONE 1)
3
41 09 6
ET ET
37 SIR-C1-00-Y__-GDW-IDM-00182 GENERAL ARRANGEMENT TRANSFORMERS AREA (ZONE 2)
47
IP TP TP
24 32 SIR-C1-00-Y__-GDW-IDM-00183 GENERAL ARRANGEMENT AUXILIARY BOILER AREA (ZONE 3)
25 40 SIR-C1-00-Y__-GDW-IDM-00184 GENERAL ARRANGEMENT MAIN ELECTRICAL BUILDING AREA (ZONE 4)
SIR-C1-00-Y__-GDW-IDM-00185 GENERAL ARRANGEMENT CCW PUMPS AND H2 GENERATION AREA
(ZONE 5)
03 08 29 SIR-C1-00-Y__-GDW-IDM-00186 GENERAL ARRANGEMENT GAS AREA (ZONE 6)
GT 12 AXIS MUSHROOM-SHAPED SENTRY
N=2005.000 SHELTER SIR-C1-00-Y__-GDW-IDM-00187 GENERAL ARRANGEMENT WTP AND COOLING TOWER AREA (ZONE 7)
N=2000.000 SIR-C1-00-Y__-GDW-IDM-00188 GENERAL ARRANGEMENT EVAPORATION PONDS EAST SIDE AREA
6
14 (ZONE 8)
13 45
A
SIR-C1-00-Y__-GDW-IDM-00189 GENERAL ARRANGEMENT EVAPORATION PONDS WEST SIDE AREA
B
C
(ZONE 9)
38 05 04 SIR-C1-00-Y__-GDW-IDM-00180 GENERAL ARRANGEMENT RIVER WATER INTAKE AREA (ZONE 10)
44 6 SIR-C1-00-Y__-GDW-IDM-00190 GENERAL ARRANGEMENT COLD VENT STACK AREA (ZONE 11)
16
5. FOR NATIONAL GUARD SECURITY STRUCTURE, LOOKOUT TOWER AND TRENCH SHELTER, SEE
01 6
41 12 DRAWING: SIR-C1-00-Y__-GDW-IDM-00141
ET ET
37
IP TP TP
17 24 32 11
40
03 08
4 N=1950.000 GT 11 AXIS 0 5 10 50 70m 4
N=1950.000 SCALE 1:750
A
OWNER:
A
38
B
C
6
R.P. 05 04
44
15 16
40
14
M
14 17 09
15 MUSHROOM-SHAPED SENTRY
SHELTER OWNER´S ENGINEER:
10%
10%
10%
10%
N=1900.000
26
33 43 02 04
10%
10%
10%
LP-TURBINE L1 N=1893.470
LP-BEARING L1 N=1890.020
REAR EPC CONTRACTOR:
20 LP-TURBINE L2 N=1886.120
5 28 Y G
5
6
HEA-200
HEA-200
HEA-200 HEA-200
21 HEA-200
46 DESIGNER:
HEA-200
HEA-200
HEA-200
19
M
06
M
48
N=1850.000 PROJECT:
6 207
6
42
30
6
OBSERVATION
SIRDARYA CCPP
TOWER-5
6 11-05-2022 WHERE INDICATED E.Z.B. B.R.F. E.L.B.
TRENCH-SHELTERS
5 26-11-2021 WHERW INDICATED R.C.T. B.R.F. E.L.B.
4 20-08-2021 WHERE INDICATED G.O.S. B.R.F. E.L.B.
SIZE SCALE 3 28-04-2021 UPDATED AS PER O/OE's COMMENTS G.O.S. B.R.F. E.L.B.
E=5004.000
E=4985.180
ISSUED
MUSHROOM-SHAPED SENTRY PERIMETER SECURITY INSTALLATION. SEE DETAIL FOR INFORMATION FOR CONSTRUCTION
ST AXIS
SHELTER SHELTER
SHELTER SHELTER X FOR APPROVAL AS-BUILT
N=1800.000 PERIMETER FENCE
FOR ASKING QUOTATION-PURCHASING
PERIMETER CONCRETE WALL OBSERVATION
6 TOWER-15 DRAWING NUMBER: SHEET: DRAWING NAME:
2 PLAN LAYOUT
SIR-C1-00-Y__-GDW-IDM-00110 NEXT: POWER PLANT
3 POWER BLOCK AREA
KEY PLAN
E=4750.000
E=4250.000
E=4300.000
E=4350.000
E=4400.000
E=4450.000
E=4500.000
E=4550.000
E=4600.000
E=4650.000
E=4700.000
58
58 ,87
40
PLANT NORTH
22
,8 74
º
AL
02 HIC
PLANT NORTH
R AP
OG
GE RTH
WEST EAST
SOUTH
UP
PLANNED CO₂ PRODUCTION AREA
NOTES:
2 2
N=2200.000
1. LOCAL COORDINATES MENTIONED IN THIS DRAWING REFER TO POWER PLANT LOCAL COORDINATES.
FOR AIS LOCAL COORDINATES REFER TO DRAWING SIR-C1-00-AE_-EDW-IDM-05610
2. LEVEL IN LOCAL COORDINATES SYSTEM REFERS TO MEAN SEA LEVEL
3. E= 0.000 m N= 0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO EG= 508853.400 m
NG= 4449146.238 m IN UTM.
4. ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
5. A FREE HEIGHT OF 6M FROM THE TOP OF THE ROAD TO THE BOTTOM OF THE PIPE BRIDGES WILL BE
CONSIDERED
6 6. PERIMETER CONCRETE WALL HEIGHT 3M
7. FINAL GROUND LEVELS: AIS AREA= +310,70
N=2150.000
POWER BLOCK AREA= +312,30
BOP AREA= +314,00
207 WATER INTAKE AREA= +316,00
NATIONAL GUARD PERIMETER
CONCRETE WALL. SEE DEATIL
REFERENCE DRAWINGS:
M
3 N=2100.000 6 3
N2
SIR-C1-00-Y__-GDW-IDM-00181 GENERAL ARRANGEMENT HRSG AREA (ZONE 1)
115
6 SIR-C1-00-Y__-GDW-IDM-00182 GENERAL ARRANGEMENT TRANSFORMERS AREA (ZONE 2)
125
122
6 SIR-C1-00-Y__-GDW-IDM-00183 GENERAL ARRANGEMENT AUXILIARY BOILER AREA (ZONE 3)
10%
123
6 112 111 SIR-C1-00-Y__-GDW-IDM-00185 GENERAL ARRANGEMENT CCW PUMPS AND H2 GENERATION AREA
105 124
118 120 117
(ZONE 5)
108
J
J
10%
M
SIR-C1-00-Y__-GDW-IDM-00187 GENERAL ARRANGEMENT WTP AND COOLING TOWER AREA (ZONE 7)
SLOPE
SIR-C1-00-Y__-GDW-IDM-00188 GENERAL ARRANGEMENT EVAPORATION PONDS EAST SIDE AREA
6
N=2050.000 (ZONE 8)
M
SIR-C1-00-Y__-GDW-IDM-00189 GENERAL ARRANGEMENT EVAPORATION PONDS WEST SIDE AREA
M
(ZONE 9)
M
|| || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || | |
M
|| || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || |
|
|| || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || |
M
106 5. FOR NATIONAL GUARD SECURITY STRUCTURE, LOOKOUT TOWER AND TRENCH SHELTER, SEE
DRAWING: SIR-C1-00-Y__-GDW-IDM-00141
110
M
|| || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || |
|
|
N=2000.000 109
119
4 116 4
M
OWNER:
207
6 6
M
N=1950.000
126 126 103 104
M
119 OWNER´S ENGINEER:
102
6
EPC CONTRACTOR:
N=1900.000 TRENCH-SHELTERS
5 5
MUSHROOM-SHAPED SENTRY SHELTER
Cial hostelra del norte Bilbao
119 101
OBSERVATION 100 DESIGNER:
TOWER-6 207
6
102
6 6 6 PROJECT:
N=1850.000
126
SIRDARYA CCPP
126 126
ISSUED
PERIMETER FENCE FOR INFORMATION FOR CONSTRUCTION
PERIMETER CONCRETE WALL X FOR APPROVAL AS-BUILT
FOR ASKING QUOTATION-PURCHASING
E=3750.000
E=3800.000
E=3850.000
E=3900.000
E=3950.000
E=4000.000
E=4050.000
E=4100.000
E=4150.000
KEY PLAN
58
,87
40
PLANT NORTH
22
º
AL
HIC
R AP
58 OG
GE RTH
NO
PLANT NORTH
2º PERIMETER CONCRETE WALL SOUTH
WATER INTAKE AREA
PERIMETER FENCE COLD VENT STACK AREA
AL
H IC MUSHROOM-SHAPED
R AP
OG H SENTRY SHELTER
E
G RT
NO N=2250.000
MUSHROOM-SHAPED SENTRY SHELTER
WEST EAST
UP
SOUTH
NOTES:
2 2
39 1. LOCAL COORDINATES MENTIONED IN THIS DRAWING REFER TO POWER PLANT LOCAL COORDINATES.
N=2200.000
FOR AIS LOCAL COORDINATES REFER TO DRAWING SIR-C1-00-AE_-EDW-IDM-05610
2. LEVEL IN LOCAL COORDINATES SYSTEM REFERS TO MEAN SEA LEVEL
FENCE 3. E= 0.000 m N= 0.000 m LOCAL COORDINATES CENTER CORRESPONDS TO EG= 508853.400 m
207
NG= 4449146.238 m IN UTM.
E=4800.000
E=4850.000
4. ALL LEVELS AND COORDINATES ARE IN METERS, UNLESS OTHERWISE NOTED.
5. A FREE HEIGHT OF 6M FROM THE TOP OF THE ROAD TO THE BOTTOM OF THE PIPE BRIDGES WILL BE
CONSIDERED
204
6. PERIMETER CONCRETE WALL HEIGHT 3M
7. FINAL GROUND LEVELS: AIS AREA= +310,70
POWER BLOCK AREA= +312,30
6
COLD VENT STACK AREA BOP AREA= +314,00
SCALE: 1/750 WATER INTAKE AREA= +316,00
INTAKE CANAL
REFERENCE DRAWINGS:
4 4
PERIMETER SECURITY INSTALLATION. SEE DETAIL
OWNER´S ENGINEER:
EPC CONTRACTOR:
MUSHROOM-SHAPED SENTRY SHELTER
5 5
DESIGNER:
PROJECT:
SIRDARYA CCPP
OBSERVATION
6 11-05-2022 WHERE INDICATED E.Z.B. B.R.F. E.L.B.
TOWER-8 6 5 26-11-2021 WHERW INDICATED R.C.T. B.R.F. E.L.B.
4 20-08-2021 WHERE INDICATED G.O.S. B.R.F. E.L.B.
SIZE SCALE 3 28-04-2021 UPDATED AS PER O/OE's COMMENTS G.O.S. B.R.F. E.L.B.
ISSUED
FOR INFORMATION FOR CONSTRUCTION
X FOR APPROVAL AS-BUILT
WATER INTAKE AREA FOR ASKING QUOTATION-PURCHASING
SCALE: 1/1000
0 10 20 30 40 50 100m DRAWING NUMBER: SHEET: DRAWING NAME:
SCALE 1:1000 4 PLAN LAYOUT
0 5 10 50 70m
SIR-C1-00-Y__-GDW-IDM-00110 NEXT: POWER PLANT
SCALE 1:750
- WATER INTAKE AREA