Drawing List and Codes
Drawing List and Codes
DRAWING INSTRUCTIONS
August 2022
INDEX
1 INTRODUCTION .................................................................................................................. 3
2 DRAWING CODIFICATION ................................................................................................. 4
3 DRAWINGS LIST ................................................................................................................. 8
3.1 Electrical ....................................................................................................................... 8
3.1.1 Low Voltage ........................................................................................................... 8
3.1.2 Medium and High Voltage ..................................................................................... 9
3.2 Power Systems ........................................................................................................... 10
3.2.1 Delivery Station ................................................................................................... 10
3.2.2 Evacuation Line ................................................................................................... 10
3.2.3 Substation ......................................................................................................... 10
3.3 Monitoring & Security System ..................................................................................... 10
3.3.1 Security System................................................................................................... 10
3.3.2 Monitoring and Control System ........................................................................... 12
3.4 Civil & Structures ......................................................................................................... 15
1 INTRODUCTION
The goal of this document is to present and explain the drawing codification for drawings
issued by CoE (Center of Expertise).
2 DRAWING CODIFICATION
The different fields of drawing code can be seen in the table below. Each field must be separated
by an underscore ( _ ).
In the following tables are the details of each field composing the drawing code.
Code generated by the Quality Control department, composed by three letters and two
numbers.
TABLE 2 – PROJECT CODE DETAILS
PROJECT STAGE
DV Development
CM Commercial
EX Execution
AB As Built
WR Warranty
OM O&M
Power Systems Delivery Station (DS), Evacuation Line (EVL), Substation (SBS)
Monitoring & Security Monitoring & Control System (MON), Security System (SEC)
VERSION
3.1 Electrical
4
These drawings are for the Execution stage, therefore is omitted the solution field.
DRAWING DESIGNATION DRAWING TYPE & NR.
DC Cable - DC Protection Boxes to Inverter - TCx LV_251
3.2.3 Substation
DRAWING DESIGNATION DRAWING TYPE & NR.
Substation Layout Details SBS_101