QUESTIONNAIRE
QUESTIONNAIRE
2. A process through which a civil engineer is selected above other competitors based
on proposal o innovative approach to solving a client's needs.
A. EMPLOYMENT
B. DESIGN COMPETITION
C. PRIME PROFESSIONAL PRACTICE
D. OBLIGATION OF THE CLIENT
3.It states that an engineer may only ask for, suggest, or propose a professional commis
sion or a contingency basis in situations when their professional judgment would not be
compromised.
A. CANON 5c
B. PICE CODE
C. ETHICS
D. ALL OF THE ABOVE
5. One of The most important decisions made during the development of an engineering
projectSec 1.6 Selection of Civil Engineer 1. One of The most important decisions made
during the development of an engineering project .
6. In dispute is not resolved in conciliation between parties within the prescribed time
then the matter in dispute be refer to?
A. Consolidation
B. Contraction
C. Proclamation
D. Arbitration
A. Large firms
B. Competing firms
C. Solicitation firms
D. Short firms
8. Institution that supports procedure as those specified by CIAP documents 101 and
102, order 1644, and PD 1594 as amended.
A. PNP
B. PRC
C. PICE
D. PMA
SECTION 2 2.2 CONSULTATIONS, RESEARCH, INVESTIGATIONS, AND REPORT
1. These services usually precede the authorization of a capital project and may involve
extensive investigations, analysis of conditions, and comparison of several possible
plan.
A. Planning Studies
B. Appraisals, Valuations, And Rate Studies
C. Preliminary And Feasibility Investigations And Reports
D. NOTA
2. These services may include investigations and analysis existing conditions; capital
and operating costs; overhead costs and costs of financing; and revenues as needed to
evaluate a property or to recommend establishment of prospective rates.
A. Planning Studies
B. Appraisals, Valuations, and Rate Studies
C. Assistance In Financial Matters
D. Direct Personal Service
4. The civil engineer may be engaged by a client who is planning issue bonds,
particularly revenue bonds, to finance a capital project.
TRUE OR FALSE :
5.Services provided by civil engineering can be grouped into five broad categories.
6.One of the types of infrastructure under the domain of civil engineering, pursuant to
RA 544, as amended, is Tunnels.
8. A civil engineer may be employed for any position or function in any commercial or
institutional organization.
SECTION 3.2 — BASIS FOR SELECTION
1. The professional and ethical reputatuin pf the Civil Engineer and his ____ as
determined by the inquiries to previous clients and references.
A. partner
B. staff
C. contractor
D. apprentice
A. level of report
B. level of effort
C. level of aggrement
D. level of discipline
4. If the client follows this procedure, the net effect is as outlined in ______ provided
that the client and the best qualified consulting Civil Engineer have extensive
discussions to reach full agreement on the scope of services.
SECTION 1:
SECTION 2.
TRUE OR FALSE
SECTION 3
1. 1.B- Staff
2. 2.C- Investigation, interview, and inquirieS
3. 3.B- Level of effort
4. 4.C- Qualifications-based selection procedure