Electrical Inspection Report SA Side 08-September-2024

The KFCA Project Inspection Report details the completion of preventive maintenance and reactive maintenance tasks for various emergency generators and electrical systems as of September 8, 2024. All listed tasks, including inspections and repairs, have been completed successfully. The report is approved by the QHSE Manager and includes documentation for multiple work orders.

Uploaded by

yali0405007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views4 pages

Electrical Inspection Report SA Side 08-September-2024

The KFCA Project Inspection Report details the completion of preventive maintenance and reactive maintenance tasks for various emergency generators and electrical systems as of September 8, 2024. All listed tasks, including inspections and repairs, have been completed successfully. The report is approved by the QHSE Manager and includes documentation for multiple work orders.

Uploaded by

yali0405007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

KFCA Project – Inspection Report

Location: SA Side Service Type: Electrical Date: 08-September-2024


Preventive Maintenance Inspection

Sr. Bldg. No:


W.O Number Description Observations Photo Required Action Status Remarks
No Location:

Weekly Inspection of Emergency


SA23-Service PM Task has Been
1 WO27862241 Generator(DOOSAN-500KVA@ 220/380V)- PM completed
Bldg. Done
ZN5-Bldg.# SA23-Service Bldg.

Weekly Inspection of Emergency


SA23-Service PM Task has Been
2 WO27862269 Generator(HIMOINSA-1000KVA@ PM completed
Bldg. Done
220/380V)-ZN5-Bldg.# SA23-Service Bldg.

SA24-Service Preventive Maintenance of Emergency PM Task has Been


4 WO27859440 PM completed
Bldg. Generator Done

SA24-Service Weekly Inspection of Emergency PM Task has Been


5 WO27862045 PM completed
Bldg. Generator(CUMMINS-500KVA@ 220/380V) Done

SA24-Service Weekly Inspection of Emergency PM Task has Been


6 WO27862073 PM completed
Bldg. Generator(HIMOINSA-1000KVA@ 220/380V) Done

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 1 of 4
KFCA Project – Inspection Report

SA24-Service Preventive Maintenance of Emergency PM Task has Been


7 WO27859427 PM completed
Bldg. Generator Done

SA24-Service Preventive Maintenance of Generator PM Task has Been


8 WO27859485 PM completed
Bldg. Batteries Done

SA98-Service Weekly Inspection of Emergency PM Task has Been


9 WO27862213 PM completed
Bldg. Generator(HIMOINSA-1000KVA@ 220/380V) Done

SA20-Service Preventive Maintenance of Fire Alarm PM Task has Been


10 WO27964702 PM completed
Bldg. System Done

Preventive Maintenance of Fire Alarm PM Task has Been


11 SA-05 WO27964714 PM completed
System Done

Reactive/Corrective Maintenance Inspection

Sr.
Bldg. No: W.O Number Description Observations Photo Required Action Status Remarks
No

Restore normal power supply line for


RM tasks have
1 SA02 WO28484338 Backup UPS at SA -02 IMMIGRATION RM Completed
been done
Server room DEPARTURE SIDE

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 2 of 4
KFCA Project – Inspection Report

Clear Off the Wrong Alarm Notification at SA RM tasks have


2 SA05 WO28445078 RM Completed
-05 been done

Check/repair the defective switch for the


RM tasks have
3 VIPC WO28445081 road barrier at the location of the VIP RM Completed
been done
IMMIGRATION CABIN

Cover the Exposed Wire for an outlet at the


RM tasks have
4 SCCA WO28484341 SCCA CUSTOM YARD ARRIVAL PROCEDURE RM Completed
been done
AREA

Check/Repair of defective Parking lights at RM tasks have


5 SA04 WO28484350 RM Completed
Police Department been done

Additional Reactive/Corrective Maintenance Inspection

Sr.
Bldg. No: W.O Number Description Observations Photo Required Action Status Remarks
No
Additional Work - Connecting Electrical wire
of newly installed mixer for SMBS Tank for RM tasks have
1 SA-24 WO28484344 RM Completed
both new R.O. PLANT and old RO Plant. SA been done
24 R.O. PLANT
Additional Work - Repair of faulty road
RM tasks have
2 SICD WO28484346 barrier at SICD CARGO IMMIGRATION RM Completed
been done
DEPARTURE CABIN

Additional Work - Repair of faulty Road RM tasks have


3 SICA WO28378890 RM Completed
Barrier Cabin# G9 been done

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 3 of 4
KFCA Project – Inspection Report
Additional Work - Check/Repair of defective
RM tasks have
4 SICA WO28429161 lighting switch at IMMIGRATION CABIN RM Completed
been done
ARRIVAL - CABIN # G9. Side SA
Additional Work-BARRIER NOT WORKING.
RM tasks have
5 SCCD WO28429173 M228-SA-ZN4-SCCD-00-1011 CUSTOM RM Completed
been done
DEPARTURE # 10
Additional Work - Check/Repair the fire
RM tasks have
6 SICD WO28445083 alarm at IMMIGRATION CABIN DEPARTURE RM Completed
been done
Side SA
Inspected By
Olive Arabia O&M Contractor
Yasir Safari

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 4 of 4