0% found this document useful (0 votes)
4 views2 pages

Assessment Question October 2012

The document is an examination paper for a Master's program in Construction Management at Nepal Engineering College, dated October 11, 2012. It covers various topics related to construction management in developing countries, including factors of underdevelopment, interdependence between countries, belief systems, construction technologies, stakeholder participation, and project maintenance. The paper consists of multiple questions that require in-depth discussion and analysis of these themes in the context of Nepal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views2 pages

Assessment Question October 2012

The document is an examination paper for a Master's program in Construction Management at Nepal Engineering College, dated October 11, 2012. It covers various topics related to construction management in developing countries, including factors of underdevelopment, interdependence between countries, belief systems, construction technologies, stakeholder participation, and project maintenance. The paper consists of multiple questions that require in-depth discussion and analysis of these themes in the context of Nepal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Nepal Engineering College

October 11, 2012


Level: Master Full Marks: 100
Program: MSc. Construction Management Pass Mark: 60
Subject: Construction Management in Developing Countries Time: 4 hours
Attempt all the questions.
1. a) Discuss five major factors of underdevelopment of a country. Explain these factors in context of Nepal,
linking the effects of these factors on construction management. (10)
b) Discuss the heterogeneity of developing countries in terms of (a) Population and geographic size, (b)
Language and religion (c) Experiences in the colonial era (d) Levels of education and (e) Natural resource
endowments. (5)
2. a) How does the interdependence between developing and developed countries influence the
construction project management in a developing country? Explain with specific examples. (7)
b) Discuss the needs of the developed countries from the developing countries. How are these needs
fulfilled, and how are these needs related to construction project management of developing countries?
(8)
3. a) What role, do you think, the belief system of Nepalese society, like the predestination (purba janmako
karmako phal) is playing in Nepal being one of the least developed countries? How does this type of
belief system affect the safety measures taken by a contractor against accidents and disasters in a
construction project management? Suggest ways to improve the safety measures in a construction
project site. (5)
b) Discuss, with specific examples, the social, economic, political, legal and technological factors
influencing project environment in a developing country. (10)
4. a) What are the reasons for the lack of focus on development of appropriate construction technologies
for developing countries, despite the fact that there are hundreds of technicians and engineers now in
developing countries, like Nepal, with decades of experience? (5)
b) Discuss the relative merits and demerits of labor based technologies in infrastructure development
project in a remote area in a developing country. (10)
5. a) Discuss the stages of stakeholder participation in a construction project. Do you think all types of
stakeholders should be involved in all stages of construction project? (10)
b) Discuss the objectives of project maintenance? What needs to be done during the planning and design
phases to ensure smooth maintenance of a project? (5)
6. a) What specific steps need to be taken to bring the focus on preventive maintenance, rather than
corrective maintenance, in Nepalese construction project management practices? (5)
b) Discuss the different phases of a project audit. Which phase is most crucial in the project audit, and
why? (5)
c) Discuss the five factors that affect success of a project implementation. (5)
7. Write short notes on any two: (5 X 2 = 10)
a. Change in trends in pre-construction phase of construction project
b. Three major objectives of national development
c. Role of attitude in project implementation
Marks distribution according to the unit and lecture hours weightage
Unit Lecture Question Marks of Total
Weightag no. question
e
(%)
1. Development Concept 17 1a, 1b, 7b 10+5+5 20
2. Linkage between Developed & Developing Countries 6 2a 7 7
3. Needs of Developed & Developing Countries 6 2b 8 8
4. Culture Aspects 6 3a, 7c 5+5 10
5. Project Environment 11 3b 10 10
6. Technology Choice 14 4 15 15
7. Participatory Approach 11 5a 10 10
8. Project Operation and Maintenance 11 5b, 6a 5+5 10
9. Recent Trends in Project Management 6 7a 5 5
10. Project Evaluation and Auditing 11 6b, 6c 5+5 10
Total 105*
* (due to extra question in Question No.7)