TAMAYO backup-Model
TAMAYO backup-Model
ECB
PULLBOX TO
4.80 ELEVATOR ECB
MDP 11 TO ELEVATOR
PANEL 12TH FLOOR
MDP 11
1000 AT
SECTION A-A
REVISION:
OWNER PROJECT TITLE: DATE: SHEET CONTENT: SHEET NO:
Jonas Electrical Contractor REVISION: DATE:
PREPARED BY:
243, Nadres Subd. Poblacion,
Candelaria, Quezon
PROFESSIONAL ELECTRICAL ENGINEER
CHECKED BY: AS - SHOWN E
Email: [email protected] APPROVED BY:
PIR # PRC # FILE NAME:
Contact no: 0998-970-7336 PROJ. NO:
DATE: PLACE: LOCATION: SCALE: