TAMAYO backup-Model

The document outlines the electrical layout for an elevator system, including specifications for 2'' EMT elbows and pipes connecting various components. It details the connections from the elevator panel to pull boxes and the finish lines on the 11th and 12th floors. The document is prepared by Jonas Electrical Contractor and includes contact information and professional credentials.

Uploaded by

dave
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

TAMAYO backup-Model

The document outlines the electrical layout for an elevator system, including specifications for 2'' EMT elbows and pipes connecting various components. It details the connections from the elevator panel to pull boxes and the finish lines on the 11th and 12th floors. The document is prepared by Jonas Electrical Contractor and includes contact information and professional credentials.

Uploaded by

dave
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ECB

ECB

2'' EMT ELBOW 2'' EMT ELBOW


1.000.77
MACHINE ROOM FLOOR FINISH
LINE

PULLBOX TO
4.80 ELEVATOR ECB

2'' EMT ELBOW


ELEVATORS
PULL
2'' EMT ELBOW
BOX AREA
ELEVATOR PANEL TO
PULLBOX AT ELEVATOR
ELEVATOR FLOOR 12TH
PANEL125AT

4.02 2'' EMT inch. pipe

12TH FLOOR FINISH LINE

2'' EMT pipe

MDP 11 TO ELEVATOR
PANEL 12TH FLOOR

MDP 11
1000 AT

11TH FLOOR FINISH LINE

1.46 2.80 4.8

SECTION A-A
REVISION:
OWNER PROJECT TITLE: DATE: SHEET CONTENT: SHEET NO:
Jonas Electrical Contractor REVISION: DATE:
PREPARED BY:
243, Nadres Subd. Poblacion,
Candelaria, Quezon
PROFESSIONAL ELECTRICAL ENGINEER
CHECKED BY: AS - SHOWN E
Email: [email protected] APPROVED BY:
PIR # PRC # FILE NAME:
Contact no: 0998-970-7336 PROJ. NO:
DATE: PLACE: LOCATION: SCALE: