assignment 2
assignment 2
RIB VAULT
L8ARREL VAULTS 2 GROIN VAUTS 3.REI NFORCED CONCRETE 4.CYLINDRICHL
BAR REL BARREL VAULT
BARREL VAULT
PANEL RI
BARREL
ROOF LIGHTG VAU LT PARABOLA
STIFFEMNG
BENM
PEIMORCED (oNCRETE
VALLEY BFAM
500N300 REINFORCEO
cONCRETE dUMN
A
BARREL VAULT LOAD TRANSFER RE INSORCED CONCRETE NORT
LIGHT BARREL VAOLT
CONOID CUTTER 5CREE DED
10 FALLS cORRUGATEO CURVES
REINFORCEO
REINFORCEO
CONCREE EoEE FAN VAULT
CONCRETE
5EAM
EDGE BONAM
copPER SEURE D
CONO ID ANT ICLASTIc WITH CLTP
HYPERBOLO ID DOME
PARABOLOID 06 MM cOPPE K
TRANSVERSE
BARREL VAULT LoZENGE LASHLNG AND
ULTIPLE BARRELS OUFSIOE
RIDGE RI FIXING CLIPS
5TIFENIN SFFENER
BEAM
CoLUMNS
RIDGE PANEL
ABUTMENT GROIN LONG TUDAL RI6 Co PPER
PANEL EPANSTON 3aINT THE LAZY'S
RIDGE RI8