Addendum 01
Addendum 01
S.No Tender Document Page No. Clause No / Item No Addendum / Corrigendum Remarks
Following dates have been revised:
1. Tender documents on sale
Volume-1: Replace pages 2, 3, 4 with 2R, 3R,
1. 2, 3, 4 1.1.2 2. Last date for issuing addendum
Notice Inviting Tender 4R respectively
3. Tender submission start & end date
4. Date & Time of Opening of Tender
Page 1 of 1
Contract D2C-02; Part Design and Construction of Viaduct of Length 7.298 kms. from Chainage 1202.782 m to
Chainage 8501.25 m including seven (07) stations (Only platforms) namely Pushp Vihar, Saket District Court, Pushpa
Bhawan, Chirag Delhi, GK-1, Andrews Ganj and Lajpat Nagar including Pre-Engineered Building Structure in all
stations of Lajpat Nagar to Saket G Block Corridor of Delhi MRTS Phase-IV Project
Delhi Metro Rail Corporation (DMRC) Ltd. invites online open e-tenders from eligible
applicants, who fulfill qualification criteria as stipulated in Clause 1.1.3 of NIT, for the
work “Contract D2C-02; Part Design and Construction of Viaduct of Length 7.298 kms. from
Chainage 1202.782 m to Chainage 8501.25 m including seven (07) stations (Only platforms)
namely Pushp Vihar, Saket District Court, Pushpa Bhawan, Chirag Delhi, GK-1, Andrews Ganj
and Lajpat Nagar including Pre-Engineered Building Structure in all stations of Lajpat Nagar to
Saket G Block Corridor of Delhi MRTS Phase-IV Project”.
The brief scope of the work is provided in Employer’s Requirement – Functional (Volume-3).
To facilitate payment of Tender Fee and Tender Security through RTGS, NEFT & IMPS, the details
of bank account of DMRC is mentioned below:
i. The tenders for this contract will be considered only from those tenderers (proprietorship firms,
partnerships firms, companies, corporations, consortia or joint ventures) who meet requisite
eligibility criteria prescribed in the sub-clauses of Clause 1.1.3 of NIT. In the case of a JV or
Consortium, all members of the Group shall be jointly and severally liable for the performance of
whole contract.
Performance of each JV/Consortium partner shall also be judged on quarterly basis. In case, the
performance of the partner(s) is not found satisfactory, actions as deemed appropriate by the
Employer may be taken including termination of contract or termination of any of JV/Consortium
member(s) from the contract i.e. Part Termination of the contract. In case of part termination of
contract, the Performance Security(ies) submitted by the member(s) for their portion of work in
contract as per their share in JV/Consortium shall be forfeited and the scope of the work/duties
assigned to the defaulting JV/Consortium member(s). In such a case, remaining works
pertaining to the scope of defaulting member of JV, may be completed by other member(s) of JV
in the following manner:
(i) At their own, if they have adequate technical competence to the satisfaction of
Employer.