0% found this document useful (0 votes)
33 views1 page

Kijabe strt grill quotation

Shamenek Investments Ltd has provided a quotation for fabrication works related to the design and supply of security grills, totaling 107,000.00. The quotation includes detailed costs for materials and labor, with a validity period of 30 days from the date issued. For further details, clients are encouraged to contact the company directly.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

Kijabe strt grill quotation

Shamenek Investments Ltd has provided a quotation for fabrication works related to the design and supply of security grills, totaling 107,000.00. The quotation includes detailed costs for materials and labor, with a validity period of 30 days from the date issued. For further details, clients are encouraged to contact the company directly.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

General Construction and Property Development

Building Renovation Interior works Demolishion Specialised works


Shamenek Investments Ltd
pin: p052174433s

Quotation
As requested, below is the quotation. kindly contact us for more details
Issued to Client Date 03 August 2024
Validity period 30 days Draw check to Shamenek investiments ltd
Delivery to Kijabe str Nairobi Terms

Item Particulars Qty Unit Unit cost Amount

Quotation for fabrication works

1. Design the proposed security grill ,supply the required materials and fabricate to
specifications.

Materials
A. Supply and fix ms tubes 40x40x2mm 5 pcs 1,400 7,000.00
B. Supply and fix ms tubes 40x25x2mm 16 pcs 1,100 17,600.00
C. Supply and fix black sheet 2440x1200x2mm 7 pcs 5,600 39,200.00
D. Supply and fix ms flat bars 2 pcs 900 1,800.00
E. Supply R 12 bar 1 pcs 1350 1,350.00
H. Accessories 4,300.00
I. Supply and apply paint to specs 6,000.00

Total for materials 77,250.00

4. Add Labor charges & logistics 20,000.00

This total 107,250.00


Roud off 107,000.00

Prepared by :
s.i .l marketimg team Grand Total 107,000.00

Shamenek Investments Limited