0% found this document useful (0 votes)
2 views7 pages

Activity 2.5 - If Functions

The document contains multiple spreadsheets with examples of inventory management, employee compensation, and training status. It outlines conditions for stock status, commission calculations based on experience, and criteria for employee probation and pay raises. Additionally, it includes a detailed facilities inventory with project IDs, item descriptions, quantities, and costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views7 pages

Activity 2.5 - If Functions

The document contains multiple spreadsheets with examples of inventory management, employee compensation, and training status. It outlines conditions for stock status, commission calculations based on experience, and criteria for employee probation and pay raises. Additionally, it includes a detailed facilities inventory with project IDs, item descriptions, quantities, and costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Place your answers in the blue cells.

There are a total of four spreadsheets in this workbook.

Ex. 01
If qty. is equal to 0, output "Reorder", otherwise "In Stock"
Item Quantity Status
Pipe 0 Reorder
Valve 8 In Stock
Flange 0 Reorder

Ex. 02
If a staff member has at least 5 years of experience, they earn their base income plus 8% commission.
If they have less than 5 years of experience, they earn their base income plus 5% commission.
Use absolute references for the commission rates.
Staff Yrs. Exp. Base Income Total Commission
Fred 4 $ 4,375.00 $ 4,593.75 5%
Bob 8 $ 3,890.00 $ 4,201.20 8%
Sally 5 $ 4,150.00 $ 4,482.00 8%
Cathy 7 $ 4,400.00 $ 4,752.00 8%
Place your answers in the blue cells.

Ex. 01
If the staff member has greater than or equal to 6 months at the company
AND they have completed training, then output "Yes" to probation over, otherwise "No".
Staff Months at Company Training completed? Probation over?
Bob Smith 7 No No
Sally O'Malley 4 Yes No
Jason G. 4 No No
Jenny D. 9 Yes Yes

Ex. 02
If the staff member has greater than four years at the company
OR they have won an award, then "Yes" to raising pay, otherwise "No".
Staff Years at Company Won Award? Raise pay?
Bob Smith 3 Yes Yes
Sally O'Malley 8 Yes Yes
Jason G. 7 No Yes
Jenny D. 2 No No
Facilities Inventory

Project ID Date Item Ordered Quantity Cost / Item $


AA_2983-33 January 13, 2022 Separator A6 8 $ 14,382.00
CC_7732-a7 January 23, 2022 Pipeline 20' ID 10" OD 11" 5 $ 110.00
CC_7732-a7 February 10, 2022 Separator A6 11 $ 14,382.00
CC_7732-a7 February 25, 2022 Dehydrator 5 $ 8,790.00
EF_5593-g2 March 8, 2022 Instrumentation 8 $ 6,740.00
HH-2193-89 March 20, 2022 Pipeline 20' ID 10" OD 11" 12 $ 110.00
EF_5593-g2 April 5, 2022 Pipeline 20' ID 10" OD 11" 18 $ 110.00
AA_2983-33 April 17, 2022 Instrumentation 5 $ 6,740.00
AA_2983-33 April 27, 2022 Skid 5 $ 2,290.00
AA_2983-33 May 11, 2022 Instrumentation 13 $ 6,740.00
AA_2983-33 May 26, 2022 Pipeline 20' ID 10" OD 11" 6 $ 110.00
HH-2193-89 June 12, 2022 Dehydrator 8 $ 8,790.00
EF_5593-g2 June 23, 2022 Skid 10 $ 2,290.00
EF_5593-g2 July 16, 2022 Dehydrator 4 $ 8,790.00
CC_7732-a7 August 22, 2022 Separator A6 4 $ 14,382.00
HH-2193-89 September 23, 2022 Separator A6 7 $ 14,382.00
HH-2193-89 October 14, 2022 Skid 10 $ 2,290.00
CC_7732-a7 October 28, 2022 Instrumentation 3 $ 6,740.00
EF_5593-g2 November 15, 2022 Instrumentation 21 $ 6,740.00
AA_2983-33 December 2, 2022 Skid 7 $ 2,290.00
AA_2983-33 January 13, 2022 Level 2 Pump 4 $ 5,430.00
HH-2193-89 January 23, 2022 Skid 19 $ 2,290.00
EF_5593-g2 February 10, 2022 Skid 12 $ 2,290.00
EF_5593-g2 February 25, 2022 Separator A6 2 $ 14,382.00
EF_5593-g2 March 8, 2022 Level 2 Pump 5 $ 5,430.00
EF_5593-g2 March 20, 2022 Dehydrator 9 $ 8,790.00
HH-2193-89 April 5, 2022 Level 2 Pump 3 $ 5,430.00
AA_2983-33 April 17, 2022 Level 2 Pump 17 $ 5,430.00
AA_2983-33 April 27, 2022 10" Valve 2 $ 4,800.00
AA_2983-33 May 11, 2022 Separator A6 14 $ 14,382.00
EF_5593-g2 May 26, 2022 Instrumentation 6 $ 6,740.00
EF_5593-g2 June 12, 2022 Level 2 Pump 4 $ 5,430.00
CC_7732-a7 June 23, 2022 Separator A6 7 $ 14,382.00
CC_7732-a7 July 16, 2022 Level 2 Pump 1 $ 5,430.00
CC_7732-a7 August 22, 2022 Dehydrator 8 $ 8,790.00
AA_2983-33 September 23, 2022 10" Valve 1 $ 4,800.00
HH-2193-89 October 14, 2022 Instrumentation 9 $ 6,740.00
AA_2983-33 October 28, 2022 Separator A6 9 $ 14,382.00
HH-2193-89 November 15, 2022 Level 2 Pump 6 $ 5,430.00
CC_7732-a7 December 2, 2022 Dehydrator 3 $ 8,790.00
HH-2193-89 January 13, 2022 Dehydrator 7 $ 8,790.00
CC_7732-a7 January 23, 2022 10" Valve 9 $ 4,800.00
CC_7732-a7 February 10, 2022 Pipeline 20' ID 10" OD 11" 2 $ 110.00
HH-2193-89 February 25, 2022 10" Valve 1 $ 4,800.00
HH-2193-89 March 8, 2022 10" Valve 8 $ 4,800.00
HH-2193-89 March 20, 2022 Separator A6 11 $ 14,382.00
HH-2193-89 April 5, 2022 10" Valve 7 $ 4,800.00
AA_2983-33 April 17, 2022 Pipeline 20' ID 10" OD 11" 2 $ 110.00
AA_2983-33 April 27, 2022 10" Valve 8 $ 4,800.00
HH-2193-89 May 11, 2022 Skid 8 $ 2,290.00
EF_5593-g2 May 26, 2022 10" Valve 9 $ 4,800.00
HH-2193-89 June 12, 2022 Separator A6 11 $ 14,382.00
CC_7732-a7 June 23, 2022 10" Valve 16 $ 4,800.00
HH-2193-89 July 16, 2022 10" Valve 13 $ 4,800.00
AA_2983-33 August 22, 2022 Skid 22 $ 2,290.00
AA_2983-33 September 23, 2022 Separator A6 14 $ 14,382.00
AA_2983-33 October 14, 2022 Instrumentation 9 $ 6,740.00
AA_2983-33 October 28, 2022 Pipeline 20' ID 10" OD 11" 14 $ 110.00
EF_5593-g2 November 15, 2022 Pipeline 20' ID 10" OD 11" 12 $ 110.00
EF_5593-g2 December 2, 2022 Dehydrator 15 $ 8,790.00
ry

Sub-total $ Tax - 5% GST $ Total $


Only use SUMIF, COUNTIF and AVERAGEIF (or pl
$ 115,056.00 $ 5,752.80 $ 120,808.80 answer the questions below.
$ 550.00 $ 27.50 $ 577.50
$ 158,202.00 $ 7,910.10 $ 166,112.10 11 How many times does "Separator A6
$ 43,950.00 $ 2,197.50 $ 46,147.50 3 How many times does "Skid" show u
$ 53,920.00 $ 2,696.00 $ 56,616.00 33 How many items have a cost less tha
$ 1,320.00 $ 66.00 $ 1,386.00 85604.05 What is the average of items totallin
$ 1,980.00 $ 99.00 $ 2,079.00 62345 What is the average sub-total for ins
$ 33,700.00 $ 1,685.00 $ 35,385.00 74671.3939 What is the average sub-total for pip
$ 11,450.00 $ 572.50 $ 12,022.50 What is total for the AA_2983-33 pro
$ 87,620.00 $ 4,381.00 $ 92,001.00 (Challenge) What is the total cost of
$ 660.00 $ 33.00 $ 693.00
$ 70,320.00 $ 3,516.00 $ 73,836.00
$ 22,900.00 $ 1,145.00 $ 24,045.00
$ 35,160.00 $ 1,758.00 $ 36,918.00
$ 57,528.00 $ 2,876.40 $ 60,404.40
$ 100,674.00 $ 5,033.70 $ 105,707.70
$ 22,900.00 $ 1,145.00 $ 24,045.00
$ 20,220.00 $ 1,011.00 $ 21,231.00
$ 141,540.00 $ 7,077.00 $ 148,617.00
$ 16,030.00 $ 801.50 $ 16,831.50
$ 21,720.00 $ 1,086.00 $ 22,806.00
$ 43,510.00 $ 2,175.50 $ 45,685.50
$ 27,480.00 $ 1,374.00 $ 28,854.00
$ 28,764.00 $ 1,438.20 $ 30,202.20
$ 27,150.00 $ 1,357.50 $ 28,507.50
$ 79,110.00 $ 3,955.50 $ 83,065.50
$ 16,290.00 $ 814.50 $ 17,104.50
$ 92,310.00 $ 4,615.50 $ 96,925.50
$ 9,600.00 $ 480.00 $ 10,080.00
$ 201,348.00 $ 10,067.40 $ 211,415.40
$ 40,440.00 $ 2,022.00 $ 42,462.00
$ 21,720.00 $ 1,086.00 $ 22,806.00
$ 100,674.00 $ 5,033.70 $ 105,707.70
$ 5,430.00 $ 271.50 $ 5,701.50
$ 70,320.00 $ 3,516.00 $ 73,836.00
$ 4,800.00 $ 240.00 $ 5,040.00
$ 60,660.00 $ 3,033.00 $ 63,693.00
$ 129,438.00 $ 6,471.90 $ 135,909.90
$ 32,580.00 $ 1,629.00 $ 34,209.00
$ 26,370.00 $ 1,318.50 $ 27,688.50
$ 61,530.00 $ 3,076.50 $ 64,606.50
$ 43,200.00 $ 2,160.00 $ 45,360.00
$ 220.00 $ 11.00 $ 231.00
$ 4,800.00 $ 240.00 $ 5,040.00
$ 38,400.00 $ 1,920.00 $ 40,320.00
$ 158,202.00 $ 7,910.10 $ 166,112.10
$ 33,600.00 $ 1,680.00 $ 35,280.00
$ 220.00 $ 11.00 $ 231.00
$ 38,400.00 $ 1,920.00 $ 40,320.00
$ 18,320.00 $ 916.00 $ 19,236.00
$ 43,200.00 $ 2,160.00 $ 45,360.00
$ 158,202.00 $ 7,910.10 $ 166,112.10
$ 76,800.00 $ 3,840.00 $ 80,640.00
$ 62,400.00 $ 3,120.00 $ 65,520.00
$ 50,380.00 $ 2,519.00 $ 52,899.00
$ 201,348.00 $ 10,067.40 $ 211,415.40
$ 60,660.00 $ 3,033.00 $ 63,693.00
$ 1,540.00 $ 77.00 $ 1,617.00
$ 1,320.00 $ 66.00 $ 1,386.00
$ 131,850.00 $ 6,592.50 $ 138,442.50
NTIF and AVERAGEIF (or plural versions) to
wer the questions below.

y times does "Separator A6" show up in the list?


y times does "Skid" show up in the list with a quantity of 12 or more?
y items have a cost less than $6,000?
he average of items totalling over $30,000?
he average sub-total for instrumentation?
he average sub-total for pipelines with a quantity greater than 7?
otal for the AA_2983-33 project, but only for quantities greater than 10?
e) What is the total cost of both Level 2 Pumps and 10" Valves?

You might also like