WFP Water Tanker Work Daily Report 2
WFP Water Tanker Work Daily Report 2
Total 47.88
Remark :- See under this page for the on site delivered materials.
Prepared by
Unit
No. Description Unit Qty Amount No
Price
1
1
Total -
DAILY REPORT
Reporting Date :- 14 Dec 2024
71.50
Checked by Approved by
-
Project :- WFP Water Tanker Stand Projct
Owner :- BMD Engineering
Location :- Juba, South Sudan
Total 36.08
Remark :- See under this page for the on site delivered materials.
Prepared by
Unit
No. Description Unit Qty Amount No
Price
1
1
Total -
DAILY REPORT
Reporting Date :- 16 Dec 2024
52.00
Checked by Approved by
-
Project :- WFP Water Tanker Stand Projct
Owner :- BMD Engineering
Location :- Juba, South Sudan
Total 32.42
Remark :- See under this page for the on site delivered materials.
Prepared by
Unit
No. Description Unit Qty Amount No
Price
1
1
Total -
DAILY REPORT
Reporting Date :- 17 Dec 2024
492.63
Checked by Approved by
-
-
Excess amount of
cement and
construction
materials utilized
-
ANALYSIS SHEET FOR DIRECT & INDIRECT
PROJECT: CONCRETE WORK
WORK ITEM: FOOTING C-25 Concrete Mix 1:2:3 W/C Ratio=0.5
TOTAL QUANTITY OF WORK ITEM: 1m 3
A= Materials Unit Cost 89.89 $/m3 B=Manpower Unit Cost (PC rate)
Direct Cost of work item = A+B+C =
Overhead Cost:
Profit Cost:
Total Unit Cost :
UF: UTILIZATION FACTOR
*: INCLUSIVE OF WASTAGE, TRANSPORTING, HANDLING, ETC.
**: INCLUSIVE OF BENEFITS, TRAVEL SUBSIDES AND COST OF OVERTIME RELATED TO TARGETED
DIRECT & INDIRECT UNIT COSTS
LABOUR HOURLY OUTPUT: 1.12 m3 / hr.
EQUIPEMENT:
RESULT: 122.31 $/m3