The PVsyst simulation report for a grid-connected solar system in Saidia, Morocco, indicates a total system power of 99.6 kWp with an annual energy production of 175.2 MWh. The performance ratio is calculated at 83.17%, with specific production of 1759 kWh/kWp/year. The system consists of 240 PV modules and 3 inverters, with no shading effects considered in the analysis.

Uploaded by

AčhŔaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

.VC0-Report

The PVsyst simulation report for a grid-connected solar system in Saidia, Morocco, indicates a total system power of 99.6 kWp with an annual energy production of 175.2 MWh. The performance ratio is calculated at 83.17%, with specific production of 1759 kWh/kWp/year. The system consists of 240 PV modules and 3 inverters, with no shading effects considered in the analysis.

Uploaded by

AčhŔaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Version 7.2.

11

PVsyst - Simulation report


Grid-Connected System

PVsyst TRIAL
Project: site de saidia
Variant: New simulation variant
No 3D scene defined, no shadings
System power: 99.6 kWp
Saidia - Morocco

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL Author


Project: site de saidia
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11

Project summary
Geographical Site Situation Project settings
Saidia Latitude 35.08 °N Albedo 0.20
Morocco Longitude -2.23 °W
Altitude 11 m

PVsyst TRIAL
Time zone UTC

Meteo data
Saidia
Meteonorm 8.0 (1996-2010), Sat=100% - Synthetic

System summary
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Unlimited load (grid)
Tilt/Azimuth 34 / 0 °

System information
PV Array Inverters

PVsyst TRIAL
Nb. of modules 240 units Nb. of units 3 units
Pnom total 99.6 kWp Pnom total 90.0 kWac
Pnom ratio 1.107

Results summary
Produced Energy 175.2 MWh/year Specific production 1759 kWh/kWp/year Perf. Ratio PR 83.17 %

Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Special graphs 6

PVsyst TRIAL

PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 2/6
Project: site de saidia
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used

PVsyst TRIAL
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 34 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Unlimited load (grid)

PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model AS-M1443-H-415 Model HPC-030HT
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 415 Wp Unit Nom. Power 30.0 kWac
Number of PV modules 240 units Number of inverters 3 units

PVsyst TRIAL
Nominal (STC) 99.6 kWp Total power 90.0 kWac
Modules 24 Strings x 10 In series Operating voltage 300-600 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.11
Pmpp 90.9 kWp
U mpp 380 V
I mpp 239 A

Total PV power Total inverter power


Nominal (STC) 100 kWp Total power 90 kWac
Total 240 modules Number of inverters 3 units
Module area 485 m² Pnom ratio 1.11

Array losses
Thermal Loss factor DC wiring losses Module Quality Loss

PVsyst TRIAL
Module temperature according to irradiance Global array res. 26 mΩ Loss Fraction -0.5 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module mismatch losses Strings Mismatch loss


Loss Fraction 2.0 % at MPP Loss Fraction 0.1 %

IAM loss factor


Incidence effect (IAM): Fresnel AR coating, n(glass)=1.526, n(AR)=1.290

0° 30° 50° 60° 70° 75° 80° 85° 90°


1.000 0.999 0.987 0.962 0.892 0.816 0.681 0.440 0.000

PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 3/6
Project: site de saidia
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11

Main results
System Production
Produced Energy 175.2 MWh/year Specific production 1759 kWh/kWp/year
Performance Ratio PR 83.17 %

PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
January
GlobHor
kWh/m²
89.4
DiffHor
kWh/m²
33.87
Balances and main results

T_Amb
°C
12.16
GlobInc
kWh/m²
144.1
GlobEff
kWh/m²
142.2
EArray
MWh
13.10
E_Grid
MWh
12.48
PR
ratio
0.869
February 104.7 35.56 12.95 149.0 147.0 13.38 12.70 0.856
March 156.0 51.89 14.97 190.6 187.2 16.81 15.99 0.842
April 179.4 69.87 16.62 189.6 185.4 16.63 15.81 0.837
May 205.4 79.11 19.76 194.6 189.7 16.84 15.95 0.823
June 220.7 84.35 23.23 199.9 194.9 17.10 16.19 0.813
July 220.6 86.34 26.52 204.7 199.8 17.28 16.40 0.804
August 201.6 81.14 26.85 204.9 200.7 17.28 16.42 0.805

PVsyst TRIAL
September 158.7 60.59 23.62 181.1 177.4 15.47 14.70 0.815
October 128.4 48.46 20.64 171.2 168.7 14.94 14.21 0.834
November 94.0 31.29 15.76 148.2 146.2 13.22 12.57 0.851
December 81.3 28.51 13.23 136.5 135.0 12.36 11.74 0.863
Year 1840.2 690.98 18.90 2114.5 2074.2 184.41 175.16 0.832

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings

PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 4/6
Project: site de saidia
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11

Loss diagram
1840 kWh/m² Global horizontal irradiation
+14.9% Global incident in coll. plane

PVsyst TRIAL
-1.90% IAM factor on global

2074 kWh/m² * 485 m² coll. Effective irradiation on collectors

efficiency at STC = 20.54% PV conversion

206.8 MWh Array nominal energy (at STC effic.)


-0.45% PV loss due to irradiance level

-7.93% PV loss due to temperature

+0.50% Module quality loss

-2.10% Mismatch loss, modules and strings

-1.11% Ohmic wiring loss

PVsyst TRIAL
184.4 MWh Array virtual energy at MPP

-4.80% Inverter Loss during operation (efficiency)

0.00% Inverter Loss over nominal inv. power


0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.23% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
175.2 MWh Available Energy at Inverter Output
175.2 MWh Energy injected into grid

PVsyst TRIAL

PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 5/6
Project: site de saidia
Variant: New simulation variant

PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11

Special graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL
System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 6/6

You might also like