.VC0-Report
.VC0-Report
11
PVsyst TRIAL
Project: site de saidia
Variant: New simulation variant
No 3D scene defined, no shadings
System power: 99.6 kWp
Saidia - Morocco
PVsyst TRIAL
PVsyst TRIAL
PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11
Project summary
Geographical Site Situation Project settings
Saidia Latitude 35.08 °N Albedo 0.20
Morocco Longitude -2.23 °W
Altitude 11 m
PVsyst TRIAL
Time zone UTC
Meteo data
Saidia
Meteonorm 8.0 (1996-2010), Sat=100% - Synthetic
System summary
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
PVsyst TRIAL
Nb. of modules 240 units Nb. of units 3 units
Pnom total 99.6 kWp Pnom total 90.0 kWac
Pnom ratio 1.107
Results summary
Produced Energy 175.2 MWh/year Specific production 1759 kWh/kWp/year Perf. Ratio PR 83.17 %
Table of contents
Project and results summary 2
General parameters, PV Array Characteristics, System losses 3
Main results 4
Loss diagram 5
Special graphs 6
PVsyst TRIAL
PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 2/6
Project: site de saidia
Variant: New simulation variant
PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11
General parameters
Grid-Connected System No 3D scene defined, no shadings
PV Field Orientation
Orientation Sheds configuration Models used
PVsyst TRIAL
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 34 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model AS-M1443-H-415 Model HPC-030HT
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 415 Wp Unit Nom. Power 30.0 kWac
Number of PV modules 240 units Number of inverters 3 units
PVsyst TRIAL
Nominal (STC) 99.6 kWp Total power 90.0 kWac
Modules 24 Strings x 10 In series Operating voltage 300-600 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.11
Pmpp 90.9 kWp
U mpp 380 V
I mpp 239 A
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
PVsyst TRIAL
Module temperature according to irradiance Global array res. 26 mΩ Loss Fraction -0.5 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 3/6
Project: site de saidia
Variant: New simulation variant
PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11
Main results
System Production
Produced Energy 175.2 MWh/year Specific production 1759 kWh/kWp/year
Performance Ratio PR 83.17 %
PVsyst TRIAL
Normalized productions (per installed kWp) Performance Ratio PR
PVsyst TRIAL
January
GlobHor
kWh/m²
89.4
DiffHor
kWh/m²
33.87
Balances and main results
T_Amb
°C
12.16
GlobInc
kWh/m²
144.1
GlobEff
kWh/m²
142.2
EArray
MWh
13.10
E_Grid
MWh
12.48
PR
ratio
0.869
February 104.7 35.56 12.95 149.0 147.0 13.38 12.70 0.856
March 156.0 51.89 14.97 190.6 187.2 16.81 15.99 0.842
April 179.4 69.87 16.62 189.6 185.4 16.63 15.81 0.837
May 205.4 79.11 19.76 194.6 189.7 16.84 15.95 0.823
June 220.7 84.35 23.23 199.9 194.9 17.10 16.19 0.813
July 220.6 86.34 26.52 204.7 199.8 17.28 16.40 0.804
August 201.6 81.14 26.85 204.9 200.7 17.28 16.42 0.805
PVsyst TRIAL
September 158.7 60.59 23.62 181.1 177.4 15.47 14.70 0.815
October 128.4 48.46 20.64 171.2 168.7 14.94 14.21 0.834
November 94.0 31.29 15.76 148.2 146.2 13.22 12.57 0.851
December 81.3 28.51 13.23 136.5 135.0 12.36 11.74 0.863
Year 1840.2 690.98 18.90 2114.5 2074.2 184.41 175.16 0.832
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 4/6
Project: site de saidia
Variant: New simulation variant
PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11
Loss diagram
1840 kWh/m² Global horizontal irradiation
+14.9% Global incident in coll. plane
PVsyst TRIAL
-1.90% IAM factor on global
PVsyst TRIAL
184.4 MWh Array virtual energy at MPP
PVsyst TRIAL
PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 5/6
Project: site de saidia
Variant: New simulation variant
PVsyst V7.2.11
VC0, Simulation date:
05/03/25 15:52
with v7.2.11
Special graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
System Output Power Distribution
PVsyst TRIAL
PVsyst TRIAL
05/03/25 PVsyst Evaluation mode Page 6/6