0% found this document useful (0 votes)
21 views1 page

Quotation-5x5x12-26 02 2025

This document is a quotation for construction materials and services for a project named 'Working at Culvert - 5x5x12'. The total cost is ₹8,29,427.50 after a 30% discount, with a detailed breakdown of items and construction costs included. The quotation is valid until a specified date and requires customer acceptance to proceed.

Uploaded by

hitcollage2014
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

Quotation-5x5x12-26 02 2025

This document is a quotation for construction materials and services for a project named 'Working at Culvert - 5x5x12'. The total cost is ₹8,29,427.50 after a 30% discount, with a detailed breakdown of items and construction costs included. The quotation is valid until a specified date and requires customer acceptance to proceed.

Uploaded by

hitcollage2014
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

My Company name Quotation

My company slogan

Date February 26, 2025


Insert Your Logo Valid Until [Date]
Quote # [100]
Customer ID [ABC12345]

Customer: Quote/Project Description


[Name] Working at Culvert - 5x5x12
[Company Name]
[Street Address]
[City, ST ZIP Code]
[Phone]

Description Line Total


PURCHASE ITEM
1. Shuttering Ply-1200*2400-55 pcs -Rs. 3000/pcs 1,65,000.00
2. Bottom -3"x4"x8' - 75 pcs ( for Slab) -50 cft., Rs. 600/cft. 30,000.00
3. Bottom -2"x3"x8' - 176 pcs (for Shuttering makibng )-58 cft., Rs. 600/cft 34,800.00
4. Bottom / Bolly -4"x4"x16' - 275 pcs (for slab)-489 cft.,Rs. 600/cft. 2,93,400.00
5. Bottom / Bolly -4"x4"x16' - 100 pcs ( for internal support)-178 cft.,Rs.600/cft 1,06,800.00
6. Bottom / Bolly -3"x3"x8' - 120 pcs (for external support )-60 cft.,Rs.600/cft 36,000.00
7. Bottom -2"x3"x8' - 66 pcs (for Slab)-22 cft,Rs.600/cft 13,200.00
8. Nail - 25 kgs (1 inch to 5 inch) 2,125.00
TOTAL 6,81,325.00
CONSTRUCTION COST
1.M/S Steel- 6.25 M.T (for Cutting ,Bending and Binding)-8500/ton 37,500.00
2.Concrete & Shuttering -Rs.2500/Cum. (upto M-30) Qty-126 cum 3,15,000.00

TOTAL 3,52,500.00

Special Notes and Instructions Subtotal ₹ 10,33,825.00

Discount(30% of ₹ 2,04,397.50
Once signed, please Fax, mail or e-mail it to the provided address. purchase cost)

TOTAL BILL ₹ 8,29,427.50

The rate of quotation are only for Box Culvert ,Retraining


wall,Catchpit,Appron Price are not include in Quotation Price.

Above information is not an invoice and only an estimate of services/goods described above.
Payment will be collected in prior to provision of services/goods described in this quote.

Please confirm your acceptance of this quote by signing this document

Signature Print Name Date


Thank you for your business!
Should you have any enquiries concerning this quote, please contact John Doe on 0-000-000-0000
111 Street, Town/City, County, ST, 00000
Tel: 0-000-000-0000 Fax: 0-000-000-0000 E-mail: [email protected] Web: www.yourcompanysite.com

You might also like