Consent to operate (CTO) under section 25 /26 of the Water (Prevention & Control of Pollution) Act, 1974 and
under section 21 of the Air (Prevention & Control of Pollution) Act, 1981
1. Application (s) dated 2024-03-22 of M/s. Maa Janki Coke Industries, Occupier Name :Sri Rakesh
Choudhary for consent under section 25 (1)(b)/25 (1) (c)/26 of the Water (Prevention & Control of
Pollution) Act, 1974 and under section 21(1) of the Air (Prevention & Control of Pollution) Act,1981..
(a) The content of Consent-to-Establish (CTE), vide ref no D-3100 (N), dated 03.10.2013 for the
production capacity of Soft Coke -50 TPD.
(b) The content Consent to Establish (CTE) vide ref. no. JSPCB/HO/RNC/CTE-15766903/2023/246, dated
09.04.2023 for the production of Soft Coke -50 TPD in Mauza-Saldaha(200), Plot No.- 395, 396 399 and
400, Khata No.:09 having area- 1.67 acres with investment as 60.00 Lac.
(c) The content of Consent to Operate (CTO), vide ref. no. JSPCB/HO/RNC/CTO-16054328/2023/836,
dated 07.05.2023 for the production of Soft Coke -50 TPD valid upto 31.03.2024 Mauza- Saldaha No.-
200, Plot Nos.- 395, 396 399 and 400 , Khata No.:09 having area- 1.67 Acre with investment as 60.00
Lacs.
(d) The content of Registered land sale deed no. 9375/8847/2007 dated 12.09.2007 made Sri Charku
Mahato and Smt. Sangeeta Choudhary for plot no.- 395, 396, 399, 400, Khata No.- 09 having area- 1.67
Acre made on 12.09.2007.
(e) The content of Inspection Report (IR), vide ref. no. 601, dated 30.03.2024 issued by Regional Officer,
Regional Office, Dhanbad.
3. The consent is granted under section 25 / 26 of the Water (Prevention & Control of Pollution) Act, 1974
and under section 21 of the Air (Prevention & Control of Pollution) Act, 1981 to operate the project in
Mauza -Saldaha No.-200 , P S -Saldaha , District -DHANBAD , as follows:
Before Mauza - 1.67 60.00 Lacs Soft Coke -50 TPD 31/03/2028
Expansion Saldaha No.- Acre
200, Plot Nos.-
395, 396 399
and 400, Khata
No.:09
(A) Specific Conditions:
1. That, the occupier shall operate Pollution Control Device (APCD) i.e. wet scrubber regularly and shall
maintain height of stack of at least 30 mtr from the ground level and maintain the standard of particulate
matters/ dust concentration in stack emission of 150 mg/Nm3.
2. That, the occupier shall re-circulate the scrubbing water and reuse after proper settling and treatment
andin no case it shall be discharged out of premises.
3. That, the occupier shall ensure that there shall be no leakage from the doors of the ovens and doors must
remain sealed in order to minimize the fugitive emissions.
4. That, the occupier shall do unloading of Coal in such a covered area that fugitive emissions shall be
minimum and fixed type water sprinkling system must be installed in this area.
5. That, the occupier shall make Work area and transport roads concrete/ black top.
6. That, the occupier shall not do open burning of coal for making Soft Coke by “Porah Vidhi”. This is
punishable under Air (Prevention & Control of Pollution) Act, 1981, if he (they) is found making Soft Coke
by “Porah Vidhi” Consent to operate order shall be revoked with immediate effect and punitive action will
be initiated against the proprietor and the plant.
7. That, the occupier shall maintain proper housekeeping within the premises.
8. That, the occupier shall purchase raw material only from valid source and shall maintain record of it and
shall show the record to the Inspecting Officer during inspection.
9. That, the occupier shall inform to Regional Office-Cum- Lab, Hazaribagh and Head Office, JSPC Board,
at Ranchi within 24 hrs from the time of closure or opening of the plant.
10. That, the occupier shall submit point wise compliance report of condition of this Consent to operate 120
days prior to the date of expiry of this consent.
11. That, the occupier shall if be found violating the Consent to Operate at any point of time during
inspection of the plant by the competent authority, the Consent to Operate shall be revoked as per provision
of the acts.
12. That, the occupier shall submit online applications for renewal of consent under section 25 of the Water
(Prevention & Control of Pollution) Act, 1974 and under section 21 of the Air (Prevention & Control of
Pollution) Act, 1981 again 120 days prior to the date of expiry of this consent with documents showing
compliance of all of the above conditions.
(B) General Conditions :
(1) That, the occupier shall maintain the National Ambient Air Quality Standard given below:
Concentration in Ambient Air
SN Parameter Standard
(3) That, the occupier shall keep process effluent in close-circuit and the quality of effluent from other
sources in conformity with the standard (s) and the discharge quantity as below:
SN Parameter Standard
(5) That, the occupier shall keep D G Set(s) within acoustic enclosure and shall keep the height(s) of
exhaust pipe(s) as per Central Pollution Control Board norm.
(6) That, the occupier shall install and maintain Central Ground Water Board/ State Ground Water
Directorate approved system of rain water harvesting-cum-ground water recharge and submit the
photographic view of the structures within a month.
(7) That, the occupier shall grow and maintain greenery of the project in the periphery and other available
spaces and shall continue enhancing its plant density and biodiversity.
(8) That, the occupier shall submit environmental statement with supporting stoichiometric calculations
analyses reports, every year latest by 30th September of the next financial year.
(9) That, the occupier shall submit report(s) duly monitored and issued by an NABL accredited / ISO
9001:2008 and OHSAS 18001:2007 certified laboratory in compliance sub-para (2), (3), (4) and (5) of
paragraph 3 of this CTO yearly at required periodicity.
(10) That, this CTO is valid subjected to the validity of mining Lease/Mining
Plan/Ecofriendly/Environmental Clearance, if applicable. In case of no renewal of Mining
Lease/Mining Plan, this consent shall be treated as revoked automatically.
(11) That, this CTO is issued from the environmental angle only and does not absolve the occupier from
other statutory obligations prescribed under any other law or any other instrument in force. The sole
and complete responsibility to comply with these conditions laid down in all other laws for the time-
being in force, rests with the industry/ unit/ occupier.
(12) That, this CTO shall not in any way, adversely affect or jeopardize the legal proceeding , if any,
instituted in the past or that could be , instituted against you by the State Board for violation of the
provisions of the Act or the Rules made there under.
(13) That, the occupier shall comply with all applicable provisions of the Water (Prevention & Control of
Pollution) Act, 1974; the Water (Prevention & Control of Pollution) Cess Act, 1977; the Air
(Prevention & Control of Pollution) Act, 1981; and the Environment (Protection) Act, 1986 and Rules
made there under.
4. That, this CTO shall not absolve the occupier from making compliance of other statutory prescribed
under any law or direction of courts or any other instrument for the time being in force.
5. That, this CTO is being issued on the basis of information/ documents/ certificate submitted by the
unit. This CTO will be revoked if any of the information/documents/certificates/undertaking given
by the occupier is found false/fictitious/forged in future.
6. The Order shall be valid subject to compliance of all other legal requirements applicable to the unit.
7. The State Board reserve the right to revoke, withdraw or make any reasonable variation / change /
alteration in conditions of this consent.
Digitally signed by
Sanjay Kumar Sanjay Kumar Srivastava
This is issued with the approval of the Competent authority Srivastava Date: 2024.04.22
17:36:50 +05'30'
[Sanjay Kumar Srivastava]
Section Head, Dhanbad
Memo No. : JSPCB/HO/RNC/CTO- Dated : 2024-04-22
18365246/2024/747
Copy to: M/s. Maa Janki Coke Industries, At-Saldaha, Rajganj Road, P.O. Rajganj, Distt. Dhanbad
(Jharkhand)./ Director of Industries, Government of Jharkhand, Ranchi / Deputy Commissioner, Dhanbad /
Director of Mines, Government of Jharkhand, Ranchi / Chief Inspector of Factories, Ranchi / D.F.O.,
Dhanbad / D.M.O., Dhanbad/ R.O., Dhanbad for information & ensuring compliance of the above.
Digitally signed by
Sanjay Kumar Sanjay Kumar Srivastava
[Sanjay Kumar Srivastava]
Srivastava Date: 2024.04.22
17:37:15 +05'30'
Section Head, Dhanbad