Platform Wall and Slab Construction Programme (1)
Platform Wall and Slab Construction Programme (1)
22 to 24
牆⾝釘板/扎鐵/留筒:1⽉4號⾄1⽉8號 牆⾝釘板/扎鐵/留筒:1⽉9⾄15號
牆⾝落⽯屎: 1⽉9號 牆⾝落⽯屎:1⽉16號
牆⾝拆板清場:1⽉10⾄11號 牆⾝拆板清場:1⽉17⾄19號
Richcloud釘板,卷筒:1⽉12⾄13號 ⽔喉卷筒落⽯屎:1⽉20⾄22號
Richcloud清場:1⽉14號 Richcloud清場:1⽉23⾄24號
回填(發泡膠&泥):1⽉15號⾄18號 回填(發泡膠&泥)1⽉25⾄27號
落草鞋:1⽉19號 落草鞋:1⽉28號
樓⾯扎鐵/閘收⼝:1⽉20⾄23號 樓⾯扎鐵/閘收⼝:2⽉1⾄6號
落樓⾯⽯屎:1⽉24號
⽉台牆⾝及樓⾯⽬標完成⽇期 落樓⾯⽯屎:2⽉7號
1 5 10 15 20 25
泥
H
F
Lift井 (不⽤回填)
電梯井(不⽤回填)
KEY LOCATION PLAN
FOR CONTINUATION
MATCH LINE
Foam conrete (輕⽯屎) GFG7C81a N.T.S.
NOTES:
發泡膠 1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
LAYOUT PLANS REFER TO DRAWINGS NOS.
1202/B/TCE/PAC/C19/121 TO 125,
MASS FILL G 1202/B/TCE/PAC/C10/310, 311, 320, 321,
WITH 1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
TRENCH RESPECTIVELY, UNDER SEPARATE SUBMISSION.
發泡膠
(200)
B.W.
6/01/2025 10:37:20 AM
電線井 (不⽤回填)
SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.
GFG7C81b
LEGENDS
Mass⽯屎 F
TRAIN COLLISION DEFLECTOR PLINTH EXTERNAL / NON-LOAD BEARING WALL
(REFER TO NWDSM SECTION 3 (UNDER SEPARATE SUBMISSION)
⽔記井 (不⽤回填) FIGURE 3.5.1)
R.C. WALL (PRIMARY STRUCTURE)
W10 (250) (UNDER SEPARATE SUBMISSION)
D SOIL (19kN/m3)
PRINTED BY: JW
LIFT PIT
W11 (250)
W12 (250)
FILL
RAMP FOAM CONCRETE (15kN/m3)
(USS)
HIGH DENSITY EXPANDED
POLYSTYRENE FOAM BOARD (0.09kN/m3)
TRAIN COLLISION
DEFLECTOR PLINTH
(REFER TO NWDSM
SECTION 3 FIGURE 3.5.1)
A
PART OF CABLE PIT TRENCH.
FILLED PARTIALLY BELOW THE
INTERMEDIATE SLAB
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt
0 1 2 3 4 5
METERS
1 : 100 @A1
DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:
1 5 10 15 20 25
F
A
FOR CONTINUATION
MATCH LINE
GFG7C81a GFG7C81c GFG8C82a GFG8C82c GFG8C82e
KEY LOCATION PLAN
N.T.S.
NOTES:
1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
G
W30 (250)
LAYOUT PLANS REFER TO DRAWINGS NOS.
MASS FILL
W25 (250)
W27 (250) 1202/B/TCE/PAC/C19/121 TO 125,
W29 (250)
WITH TRENCH
1202/B/TCE/PAC/C10/310, 311, 320, 321,
(200)
(USS)
(180)
B.W.
B.W.
1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
RESPECTIVELY, UNDER SEPARATE SUBMISSION.
W4 (250)
6/01/2025 10:37:26 AM
F LEGENDS
LIFT PIT
W12 (250)
MASS CONCRETE
LIFT PIT
B
WSD PIPE TRENCH PIT
ESCALATOR PIT
A
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt
0 1 2 3 4 5
METERS
1 : 100 @A1
DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:
1 5 10 15 20 25
SEE DRG. 1202/B/TCE/PAC/ C36/111
F
W1 (250) GFG14C67a
GFG17C79c A
FOR CONTINUATION
FOR CONTINUATION
MATCH LINE
MATCH LINE
GFG14C67b
)
(2
50 KEY LOCATION PLAN
W2 N.T.S.
NOTES:
1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
G LAYOUT PLANS REFER TO DRAWINGS NOS.
W3 (250) 1202/B/TCE/PAC/C19/121 TO 125,
1202/B/TCE/PAC/C10/310, 311, 320, 321,
1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
RESPECTIVELY, UNDER SEPARATE SUBMISSION.
W4 (250)
GFG14C67c
6/01/2025 10:37:28 AM
LIFT PIT
F
LEGENDS
SOIL (19kN/m3)
PRINTED BY: JW
LIFT PIT
ESCALATOR PIT
MASS CONCRETE
B
ESCALATOR PIT ESCALATOR PIT LIFT PIT
WSD PIPE TRENCH PIT
A
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt
0 1 2 3 4 5
METERS
1 : 100 @A1
DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:
1 5 10 15 20 25
H
F
FOR CONTINUATION
MATCH LINE
A
FOR CONTINUATION
MATCH LINE
GFG19C58a W6 (250)
GFG19C58c
GFG17C79a
GGG22C01 NOTES:
1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
LAYOUT PLANS REFER TO DRAWINGS NOS.
1202/B/TCE/PAC/C19/121 TO 125,
GFG19C58d
G 1202/B/TCE/PAC/C10/310, 311, 320, 321,
W8 (250) 1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
RESPECTIVELY, UNDER SEPARATE SUBMISSION.
6/01/2025 10:37:34 AM
W9 (250)
W38 (200)
SEPARATE SUBMISSION.
GFG17C79b 3. BACKFILLING SHALL APPLY TO FULL WIDTH BETWEEN
UNDER-PLATFORM WALLS. DEPTH OF BACKFILL MATERIAL
SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.
GFG19C58b GFG19C58e W10 (250) GGG22C02
LEGENDS
F
EXTERNAL / NON-LOAD BEARING WALL
TRAIN COLLISION (UNDER SEPARATE SUBMISSION)
DEFLECTOR PLINTH
R.C. WALL (PRIMARY STRUCTURE)
(REFER TO NWDSM
W10 (250) (UNDER SEPARATE SUBMISSION)
SECTION 3 FIGURE
3.5.1)
E TYPE1 BEARING WALL ABOVE
(UNDER SEPARATE SUBMISSION)
SOIL (19kN/m3)
D
PRINTED BY: JW
LIFT PIT
ESCALATOR PIT
MASS CONCRETE
GBG22C50
0 1 2 3 4 5
METERS
1 : 100 @A1
DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:
1 5 10 15 20 25
FOR CONTINUATION
MATCH LINE
KEY LOCATION PLAN
N.T.S.
W1
W35 (200) 1202/B/TCE/PAC/C10/310, 311, 320, 321,
1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
W2
MASS FILL
W37 (200) RESPECTIVELY, UNDER SEPARATE SUBMISSION.
6/01/2025 10:37:36 AM
WITH TRENCH
2. FOR MASS FILL ARRANGEMENT AT TRACK EXTENT, PITS
W36 (200) (USS)
AND TRENCHES, REFER TO MASS FILL PLAN UNDER
W38 (200)
SEPARATE SUBMISSION.
3. BACKFILLING SHALL APPLY TO FULL WIDTH BETWEEN
UNDER-PLATFORM WALLS. DEPTH OF BACKFILL MATERIAL
SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
GGG22C02 GGG22C04 GGG22C06 GGG22C08 SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.
W31 (200)
LEGENDS
F
TRAIN COLLISION EXTERNAL / NON-LOAD BEARING WALL
DEFLECTOR PLINTH (UNDER SEPARATE SUBMISSION)
(REFER TO NWDSM
R.C. WALL (PRIMARY STRUCTURE)
SECTION 3 FIGURE
W10 (250) (UNDER SEPARATE SUBMISSION)
3.5.1)
E
TYPE1 BEARING WALL ABOVE
(UNDER SEPARATE SUBMISSION)
GEG22C49 GEG23C51 GEG24C53 TYPE2 BEARING WALL ABOVE
(UNDER SEPARATE SUBMISSION)
LIFT PIT
MASS FILL RAMP (USS)
ESCALATOR PIT
LIFT PIT
B WSD PIPE TRENCH PIT
TRAIN COLLISION
DEFLECTOR PLINTH
(REFER TO NWDSM
SECTION 3 FIGURE
3.5.1)
A
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt
0 1 2 3 4 5
METERS
1 : 100 @A1
DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME: