0% found this document useful (0 votes)
12 views6 pages

Platform Wall and Slab Construction Programme (1)

The document outlines the construction schedule and completion dates for various tasks related to the Tung Chung East Station project, detailing activities from January to February 2025. It includes tasks such as wall panel installation, concrete pouring, and backfilling, with specific dates assigned for each task across different levels. Additionally, it provides notes on construction methods and references to related drawings for further details.

Uploaded by

nepzbro1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views6 pages

Platform Wall and Slab Construction Programme (1)

The document outlines the construction schedule and completion dates for various tasks related to the Tung Chung East Station project, detailing activities from January to February 2025. It includes tasks such as wall panel installation, concrete pouring, and backfilling, with specific dates assigned for each task across different levels. Additionally, it provides notes on construction methods and references to related drawings for further details.

Uploaded by

nepzbro1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

G.L. 4 to 6 G.L.

22 to 24
牆⾝釘板/扎鐵/留筒:1⽉4號⾄1⽉8號 牆⾝釘板/扎鐵/留筒:1⽉9⾄15號
牆⾝落⽯屎: 1⽉9號 牆⾝落⽯屎:1⽉16號
牆⾝拆板清場:1⽉10⾄11號 牆⾝拆板清場:1⽉17⾄19號
Richcloud釘板,卷筒:1⽉12⾄13號 ⽔喉卷筒落⽯屎:1⽉20⾄22號
Richcloud清場:1⽉14號 Richcloud清場:1⽉23⾄24號
回填(發泡膠&泥):1⽉15號⾄18號 回填(發泡膠&泥)1⽉25⾄27號
落草鞋:1⽉19號 落草鞋:1⽉28號
樓⾯扎鐵/閘收⼝:1⽉20⾄23號 樓⾯扎鐵/閘收⼝:2⽉1⾄6號
落樓⾯⽯屎:1⽉24號
⽉台牆⾝及樓⾯⽬標完成⽇期 落樓⾯⽯屎:2⽉7號

G.L. 2 to 4 G.L. 6 to 9 G.L. 9 to 14 G.L. 14 to 20 G.L. 20-22


牆⾝釘板/扎鐵/留筒:已完成 牆⾝釘板/扎鐵/留筒:1⽉7⾄12號 牆⾝釘板/扎鐵/留筒:1⽉5⾄15號 牆⾝釘板/扎鐵/留筒:N/A 牆⾝釘板/扎鐵/留筒:1⽉11⾄15號
牆⾝落⽯屎:已完成 牆⾝落⽯屎:1⽉13號 牆⾝落⽯屎:1⽉16號 牆⾝落⽯屎:N/A 牆⾝落⽯屎:1⽉16號
牆⾝拆板清場:已完成 牆⾝拆板清場:1⽉14⾄18號 牆⾝拆板清場:1⽉17⾄1⽉22號 牆⾝拆板清場:N/A 牆⾝拆板清場:1⽉17⾄19號
⽔喉卷筒落⽯屎: 1⽉9號 ⽔喉卷筒落⽯屎:1⽉19⾄21號 ⽔喉卷筒落⽯屎:1⽉23⾄26號 ⽔喉卷筒落⽯屎:已完成 ⽔喉卷筒落⽯屎:1⽉20⾄22號
Richcloud清場: 1⽉10號 Richcloud清場:1⽉22⾄23號 Richcloud清場:1⽉27⾄28號 Richcloud清場:已完成 Richcloud清場:1⽉23⾄24號
回填(發泡膠&泥): 1⽉10⾄12號 回填(泥): 1⽉24⾄28號 回填(泥)2⽉4⾄13號 回填(膠/泥/Foam):1⽉20⾄28號 回填(發泡膠&泥)1⽉25⾄28號
落草鞋:1⽉13號 落草鞋:1⽉28號 落草鞋:2⽉14號 落草鞋:2⽉3號 落草鞋:1⽉28號
樓⾯扎鐵/閘收⼝: 1⽉14⾄17號 樓⾯扎鐵/閘收⼝:2⽉1號⾄8號 樓⾯扎鐵/閘收⼝:2⽉15⾄21號 樓⾯扎鐵/閘收⼝:2⽉4號⾄13號 樓⾯扎鐵/閘收⼝:2⽉1⾄6號
落樓⾯⽯屎: 1⽉18號 落樓⾯⽯屎:2⽉10號 落樓⾯⽯屎:2⽉22號 落樓⾯⽯屎:2⽉14號 落樓⾯⽯屎:2⽉7號
01 02 03 04 05 06

1 5 10 15 20 25


H
F
Lift井 (不⽤回填)

SEE DRG. 1202/B/TCE/PAC/C36/111


A

電梯井(不⽤回填)
KEY LOCATION PLAN

FOR CONTINUATION
MATCH LINE
Foam conrete (輕⽯屎) GFG7C81a N.T.S.

NOTES:
發泡膠 1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
LAYOUT PLANS REFER TO DRAWINGS NOS.
1202/B/TCE/PAC/C19/121 TO 125,
MASS FILL G 1202/B/TCE/PAC/C10/310, 311, 320, 321,
WITH 1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
TRENCH RESPECTIVELY, UNDER SEPARATE SUBMISSION.
發泡膠

(200)
B.W.
6/01/2025 10:37:20 AM

(USS) 2. FOR MASS FILL ARRANGEMENT AT TRACK EXTENT, PITS


AND TRENCHES, REFER TO MASS FILL PLAN UNDER
SEPARATE SUBMISSION.
3. BACKFILLING SHALL APPLY TO FULL WIDTH BETWEEN
UNDER-PLATFORM WALLS. DEPTH OF BACKFILL MATERIAL

電線井 (不⽤回填)
SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.
GFG7C81b

LEGENDS
Mass⽯屎 F
TRAIN COLLISION DEFLECTOR PLINTH EXTERNAL / NON-LOAD BEARING WALL
(REFER TO NWDSM SECTION 3 (UNDER SEPARATE SUBMISSION)
⽔記井 (不⽤回填) FIGURE 3.5.1)
R.C. WALL (PRIMARY STRUCTURE)
W10 (250) (UNDER SEPARATE SUBMISSION)

E TYPE1 BEARING WALL ABOVE


AIR DUCT. FILLED (UNDER SEPARATE SUBMISSION)
PARTIALLY BELOW THE
TYPE2 BEARING WALL ABOVE
INTERMEDIATE SLAB GEG2C05 GEG3C07 W14 (250) GEG4C09 GEG5C11
(UNDER SEPARATE SUBMISSION)

GBG5C12 COLUMN MARK (PRIMARY STRUCTURE)


GDG6C13 (UNDER SEPARATE SUBMISSION)

D SOIL (19kN/m3)
PRINTED BY: JW

LIFT PIT
W11 (250)

MASS ESCALATOR PIT

W12 (250)
FILL
RAMP FOAM CONCRETE (15kN/m3)
(USS)
HIGH DENSITY EXPANDED
POLYSTYRENE FOAM BOARD (0.09kN/m3)

HIGH DENSITY EXPANDED


POLYSTYRENE FOAM BOARD (0.09kN/m3)
C FILLED PARTIALLY BELOW
THE INTERMEDIATE SLAB
GCG6C14 CABLE PIT / TRENCH

GBG3C06 GBG3C08 W13 (250) GBG4C10 GBG5C12 MASS CONCRETE

WSD PIPE TRENCH PIT


B

TRAIN COLLISION
DEFLECTOR PLINTH
(REFER TO NWDSM
SECTION 3 FIGURE 3.5.1)
A
PART OF CABLE PIT TRENCH.
FILLED PARTIALLY BELOW THE
INTERMEDIATE SLAB
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt

0 1 2 3 4 5
METERS
1 : 100 @A1

DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:

MTR CORPORATION LIMITED 2008 COPYRIGHT IN (SHEET 1 OF 5)


RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
A1 WORKING DRAWING - 1ST ISSUE AR 06DEC24 JZ c MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
MODEL REF. SCALE DRAWING NO. REV.
REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.
1202-W-TCE-PAC-STR-001.rvt As indicated (A1) 1202/W/TCE/PAC/C36/110 A1
06 07 08 09 10 11

1 5 10 15 20 25

SEE DRG. 1202/B/TCE/PAC/C36/112


H

F
A

FOR CONTINUATION
MATCH LINE
GFG7C81a GFG7C81c GFG8C82a GFG8C82c GFG8C82e
KEY LOCATION PLAN
N.T.S.

NOTES:
1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
G

W30 (250)
LAYOUT PLANS REFER TO DRAWINGS NOS.
MASS FILL

W25 (250)
W27 (250) 1202/B/TCE/PAC/C19/121 TO 125,

W29 (250)
WITH TRENCH
1202/B/TCE/PAC/C10/310, 311, 320, 321,
(200)

(USS)

(180)
B.W.

B.W.
1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
RESPECTIVELY, UNDER SEPARATE SUBMISSION.

W4 (250)
6/01/2025 10:37:26 AM

W26 (250) 2. FOR MASS FILL ARRANGEMENT AT TRACK EXTENT, PITS


AND TRENCHES, REFER TO MASS FILL PLAN UNDER
SEPARATE SUBMISSION.
3. BACKFILLING SHALL APPLY TO FULL WIDTH BETWEEN
UNDER-PLATFORM WALLS. DEPTH OF BACKFILL MATERIAL
W28 (250) SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
GFG7C81b GFG7C81d GFG8C82b GFG8C82d GFG8C82f
SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.

F LEGENDS

EXTERNAL / NON-LOAD BEARING WALL


(UNDER SEPARATE SUBMISSION)

R.C. WALL (PRIMARY STRUCTURE)


W10 (250) (UNDER SEPARATE SUBMISSION)
E
TYPE1 BEARING WALL ABOVE
(UNDER SEPARATE SUBMISSION)

TYPE2 BEARING WALL ABOVE


(UNDER SEPARATE SUBMISSION)
GDG6C13 GDG7C15 GDG8C17 GDG9C19 GDG9C19a GDG10C23 GDG11C25
GBG5C12 COLUMN MARK (PRIMARY STRUCTURE)
(UNDER SEPARATE SUBMISSION)
D
SOIL (19kN/m3)
PRINTED BY: JW

LIFT PIT
W12 (250)

MASS FILL ESCALATOR PIT


TO MAKE
UP LIFT
FOAM CONCRETE (15kN/m3)
PIT LEVEL
(USS)
HIGH DENSITY EXPANDED
POLYSTYRENE FOAM BOARD (0.09kN/m3)

HIGH DENSITY EXPANDED


C POLYSTYRENE FOAM BOARD (0.09kN/m3)
FILLED PARTIALLY BELOW
GCG6C14 GCG7C16 GCG8C18 GCG9C20 GCG9C20a GCG10C24 GCG11C26 THE INTERMEDIATE SLAB

CABLE PIT / TRENCH

MASS CONCRETE
LIFT PIT
B
WSD PIPE TRENCH PIT
ESCALATOR PIT

A
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt

0 1 2 3 4 5
METERS
1 : 100 @A1

DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:

MTR CORPORATION LIMITED 2008 COPYRIGHT IN (SHEET 2 OF 5)


RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
A1 WORKING DRAWING - 1ST ISSUE AR 06DEC24 JZ c MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
MODEL REF. SCALE DRAWING NO. REV.
REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.
1202-W-TCE-PAC-STR-001.rvt As indicated (A1) 1202/W/TCE/PAC/C36/111 A1
12 13 14 15 16 17

1 5 10 15 20 25
SEE DRG. 1202/B/TCE/PAC/ C36/111

SEE DRG. 1202/B/TCE/PAC/C36/113


H

F
W1 (250) GFG14C67a
GFG17C79c A
FOR CONTINUATION

FOR CONTINUATION
MATCH LINE

MATCH LINE
GFG14C67b

)
(2
50 KEY LOCATION PLAN
W2 N.T.S.

NOTES:
1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
G LAYOUT PLANS REFER TO DRAWINGS NOS.
W3 (250) 1202/B/TCE/PAC/C19/121 TO 125,
1202/B/TCE/PAC/C10/310, 311, 320, 321,
1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
RESPECTIVELY, UNDER SEPARATE SUBMISSION.
W4 (250)

GFG14C67c
6/01/2025 10:37:28 AM

2. FOR MASS FILL ARRANGEMENT AT TRACK EXTENT, PITS


AND TRENCHES, REFER TO MASS FILL PLAN UNDER
GFG17C79d
SEPARATE SUBMISSION.
3. BACKFILLING SHALL APPLY TO FULL WIDTH BETWEEN
UNDER-PLATFORM WALLS. DEPTH OF BACKFILL MATERIAL
SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
W5 (250) GFG14C81e
SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.

LIFT PIT
F
LEGENDS

EXTERNAL / NON-LOAD BEARING WALL


(UNDER SEPARATE SUBMISSION)

R.C. WALL (PRIMARY STRUCTURE)


E W10 (250) (UNDER SEPARATE SUBMISSION)

TYPE1 BEARING WALL ABOVE


(UNDER SEPARATE SUBMISSION)

TYPE2 BEARING WALL ABOVE


(UNDER SEPARATE SUBMISSION)
GDG12C27 GDG13C29 GDG14C31 GDG15C33 GDG16C35
GBG5C12 COLUMN MARK (PRIMARY STRUCTURE)
D (UNDER SEPARATE SUBMISSION)

SOIL (19kN/m3)
PRINTED BY: JW

LIFT PIT

ESCALATOR PIT

FOAM CONCRETE (15kN/m3)

HIGH DENSITY EXPANDED


POLYSTYRENE FOAM BOARD (0.09kN/m3)

C HIGH DENSITY EXPANDED


POLYSTYRENE FOAM BOARD (0.09kN/m3)
GDG12C28 GDG13C30 GCG14C32 GCG15C34 GCG16C36 FILLED PARTIALLY BELOW
THE INTERMEDIATE SLAB

CABLE PIT / TRENCH

MASS CONCRETE
B
ESCALATOR PIT ESCALATOR PIT LIFT PIT
WSD PIPE TRENCH PIT

A
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt

0 1 2 3 4 5
METERS
1 : 100 @A1

DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:

MTR CORPORATION LIMITED 2008 COPYRIGHT IN (SHEET 3 OF 5)


RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
A1 WORKING DRAWING - 1ST ISSUE AR 06DEC24 JZ c MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
MODEL REF. SCALE DRAWING NO. REV.
REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.
1202-W-TCE-PAC-STR-001.rvt As indicated (A1) 1202/W/TCE/PAC/C36/112 A1
17 18 19 20 21 22

1 5 10 15 20 25

SEE DRG. 1202/B/TCE/PAC/ C36/114


SEE DRG. 1202/B/TCE/PAC/C36/112

H
F

FOR CONTINUATION
MATCH LINE
A
FOR CONTINUATION
MATCH LINE

GFG19C58a W6 (250)
GFG19C58c

GFG17C79a

W7 KEY LOCATION PLAN


(2 N.T.S.
50
)

GGG22C01 NOTES:
1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
LAYOUT PLANS REFER TO DRAWINGS NOS.
1202/B/TCE/PAC/C19/121 TO 125,
GFG19C58d
G 1202/B/TCE/PAC/C10/310, 311, 320, 321,
W8 (250) 1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114
RESPECTIVELY, UNDER SEPARATE SUBMISSION.
6/01/2025 10:37:34 AM

2. FOR MASS FILL ARRANGEMENT AT TRACK EXTENT, PITS


AND TRENCHES, REFER TO MASS FILL PLAN UNDER

W9 (250)

W38 (200)
SEPARATE SUBMISSION.
GFG17C79b 3. BACKFILLING SHALL APPLY TO FULL WIDTH BETWEEN
UNDER-PLATFORM WALLS. DEPTH OF BACKFILL MATERIAL
SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.
GFG19C58b GFG19C58e W10 (250) GGG22C02

LEGENDS
F
EXTERNAL / NON-LOAD BEARING WALL
TRAIN COLLISION (UNDER SEPARATE SUBMISSION)
DEFLECTOR PLINTH
R.C. WALL (PRIMARY STRUCTURE)
(REFER TO NWDSM
W10 (250) (UNDER SEPARATE SUBMISSION)
SECTION 3 FIGURE
3.5.1)
E TYPE1 BEARING WALL ABOVE
(UNDER SEPARATE SUBMISSION)

TYPE2 BEARING WALL ABOVE


GEG22C49 (UNDER SEPARATE SUBMISSION)

GBG5C12 COLUMN MARK (PRIMARY STRUCTURE)


GDG17C37 GDG18C39 GDG19C41 GDG20C43 GDG21C47 (UNDER SEPARATE SUBMISSION)

SOIL (19kN/m3)
D
PRINTED BY: JW

LIFT PIT

ESCALATOR PIT

FOAM CONCRETE (15kN/m3)

HIGH DENSITY EXPANDED


POLYSTYRENE FOAM BOARD (0.09kN/m3)

HIGH DENSITY EXPANDED


POLYSTYRENE FOAM BOARD (0.09kN/m3)
FILLED PARTIALLY BELOW
C
THE INTERMEDIATE SLAB

GCG17C38 GCG18C40 GCG19C42 GDG20C44 GCG21C48 CABLE PIT / TRENCH

MASS CONCRETE
GBG22C50

LIFT PIT WSD PIPE TRENCH PIT


B
LIFT PIT ESCALATOR PIT
TRAIN COLLISION
DEFLECTOR PLINTH
(REFER TO NWDSM
SECTION 3 FIGURE
3.5.1)
A
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt

0 1 2 3 4 5
METERS
1 : 100 @A1

DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:

MTR CORPORATION LIMITED 2008 COPYRIGHT IN (SHEET 4 OF 5)


RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
A1 WORKING DRAWING - 1ST ISSUE AR 06DEC24 JZ c MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
MODEL REF. SCALE DRAWING NO. REV.
REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.
1202-W-TCE-PAC-STR-001.rvt As indicated (A1) 1202/W/TCE/PAC/C36/113 A1
21 22 23 24 25 26

1 5 10 15 20 25

SEE DRG. 1202/B/TCE/PAC/C36/113


F
A

FOR CONTINUATION
MATCH LINE
KEY LOCATION PLAN
N.T.S.

GGG22C01 GGG22C03 W43 (200) GGG22C05 GGG22C07


NOTES:
1. FOR PILE CAP , ANCILLARY BUILDING AND PLATFORM
LAYOUT PLANS REFER TO DRAWINGS NOS.
G 1202/B/TCE/PAC/C19/121 TO 125,

W1
W35 (200) 1202/B/TCE/PAC/C10/310, 311, 320, 321,
1202/B/TCE/PAC/C10/101 TO 105, C10/110 TO 114

W2
MASS FILL
W37 (200) RESPECTIVELY, UNDER SEPARATE SUBMISSION.
6/01/2025 10:37:36 AM

WITH TRENCH
2. FOR MASS FILL ARRANGEMENT AT TRACK EXTENT, PITS
W36 (200) (USS)
AND TRENCHES, REFER TO MASS FILL PLAN UNDER

W38 (200)
SEPARATE SUBMISSION.
3. BACKFILLING SHALL APPLY TO FULL WIDTH BETWEEN
UNDER-PLATFORM WALLS. DEPTH OF BACKFILL MATERIAL
SHALL APPLY FROM PILE CAP TOP LEVEL TO PLATFORM
GGG22C02 GGG22C04 GGG22C06 GGG22C08 SLAB SOFFIT LEVEL UNLESS STATED OTHERWISE.
W31 (200)

LEGENDS
F
TRAIN COLLISION EXTERNAL / NON-LOAD BEARING WALL
DEFLECTOR PLINTH (UNDER SEPARATE SUBMISSION)
(REFER TO NWDSM
R.C. WALL (PRIMARY STRUCTURE)
SECTION 3 FIGURE
W10 (250) (UNDER SEPARATE SUBMISSION)
3.5.1)
E
TYPE1 BEARING WALL ABOVE
(UNDER SEPARATE SUBMISSION)
GEG22C49 GEG23C51 GEG24C53 TYPE2 BEARING WALL ABOVE
(UNDER SEPARATE SUBMISSION)

GBG5C12 COLUMN MARK (PRIMARY STRUCTURE)


GDG21C47 AIR DUCT. FILLED PARTIALLY
(UNDER SEPARATE SUBMISSION)
BELOW THE INTERMEDIATE SLAB
D SOIL (19kN/m3)
PRINTED BY: JW

LIFT PIT
MASS FILL RAMP (USS)

ESCALATOR PIT

FOAM CONCRETE (15kN/m3)

HIGH DENSITY EXPANDED


POLYSTYRENE FOAM BOARD (0.09kN/m3)

HIGH DENSITY EXPANDED


POLYSTYRENE FOAM BOARD (0.09kN/m3)
C FILLED PARTIALLY BELOW
THE INTERMEDIATE SLAB
GCG21C48
CABLE PIT / TRENCH
GBG24C54
GBG22C50 GBG23C52
MASS CONCRETE

LIFT PIT
B WSD PIPE TRENCH PIT

TRAIN COLLISION
DEFLECTOR PLINTH
(REFER TO NWDSM
SECTION 3 FIGURE
3.5.1)
A
MODELNAME: Tung Chung East Station Structural Model
1202-W-TCE-PAC-STR-001.rvt

0 1 2 3 4 5
METERS
1 : 100 @A1

DRAWN JW TITLE
DESIGNED AR CONTRACT 1202 TUNG CHUNG EAST STATION
CHECKED MT
TUNG CHUNG LINE EXTENSION & Associated Enabling Works for Track Diversion
APPROVED JZ
ORIGINATOR TUNG CHUNG EAST STATION - UNDER PLATFORM LEVEL
DATE 06/DEC/2024
DO NOT SCALE DRAWINGS. ALL DIMENSIONS GENERAL ARRANGEMENT PLAN FOR UNDER PLATFORM BACKFILLING
SHALL BE VERIFIED ON SITE.
FILENAME:

MTR CORPORATION LIMITED 2008 COPYRIGHT IN (SHEET 5 OF 5)


RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
A1 WORKING DRAWING - 1ST ISSUE AR 06DEC24 JZ c MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
MODEL REF. SCALE DRAWING NO. REV.
REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY DATE APPROVED
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.
1202-W-TCE-PAC-STR-001.rvt As indicated (A1) 1202/W/TCE/PAC/C36/114 A1

You might also like