3) IBM Power10 Scale-out Level 2 Quiz_ Attempt review_2

The document is a review of an IBM Power10 Scale-out Level 2 quiz that the user completed, indicating they passed with a score of 75% or higher. It includes a summary of questions answered correctly and incorrectly, along with feedback on specific topics related to IBM Power10 technology. The quiz covers various aspects of the IBM Power10 servers, including memory architecture, error correction, encryption, and AI capabilities.

Uploaded by

vfxhollic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
334 views11 pages

3) IBM Power10 Scale-out Level 2 Quiz_ Attempt review_2

The document is a review of an IBM Power10 Scale-out Level 2 quiz that the user completed, indicating they passed with a score of 75% or higher. It includes a summary of questions answered correctly and incorrectly, along with feedback on specific topics related to IBM Power10 technology. The quiz covers various aspects of the IBM Power10 servers, including memory architecture, error correction, encryption, and AI capabilities.

Uploaded by

vfxhollic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

25. 1. 10.

오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

IBM Power10 Scale-out Level 2


Quiz Back Next

You must receive a score of 75% or higher on the quiz to complete


the course.
Started on Friday, January 10, 2025, 12:25 AM
State Finished
Completed on Friday, January 10, 2025, 12:42 AM
Time taken 16 mins 57 secs
Feedback Congratulations, you passed the quiz!

Question 1

Incorrect

Points out of 1.00

What is the maximum number of peripheral component


interconnect express (PCIe) Gen5 capable slots available in
the IBM Power10 scale-out server?

7
5

6
8

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 1/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 2

Correct

Points out of 1.00

Back Next

These preferred differential dual in-line memory module


(DIMM) cards deliver two times better memory reliability and
availability compared to standard x86 DIMMS, which is
essential because DIMM failures can cause system outages.
On the IBM Power10 platform, what is the architecture for
these DIMMS called?

Open Memory Interface (OMI) 


Reliability and Memory Retention System (RMRS)

IBM Power Memory feature code (IPM fc)


IBM Memory Saver (IMS)

Question 3

Correct

Points out of 1.00

What is the IBM trademarked name for IBM Power10’s


advanced error checking and correcting (ECC) computer
memory technology?

Chipkill 
Transparent Memory Encryption

Active Memory Mirroring


Matrix Math Accelerator (MMA)

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 2/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 4

Correct

Points out of 1.00

Back Next

Workloads benefit from cryptographic algorithm acceleration,


allowing encryption algorithms like AES, SHA2, and SHA3 to
run significantly faster on IBM Power10 than they did on IBM
POWER9-based systems (on a per-core basis). How many
more crypto engines are available in every IBM Power10 core?

Four times (4x) 


Two times (2x)

Three times (3x)


Six times (6x)

Question 5

Correct

Points out of 1.00

Over time the need for flexible IT that does not sacrifice
performance or operational efficiency. Many companies
accelerated their digital transformation/modernization plans
during the pandemic to ensure they could stay competitive
and meet their customer's evolving needs. Which offering
from IBM helps client accelerate their digital transformation?

OpenShift Containers
RedHat OpenShift 
IBM Container Linux
IBM Power Containers

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 3/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 6

Incorrect

Points out of 1.00

Back Next

You're speaking with a client about how IBM has optimized


math libraries so that AI tools can benefit from the
acceleration provided by IBM's Power10's Matrix Math
Accelerator (MMA) units. This client asks how they can benefit
from MMA. How do you reply?

Deep learning and machine learning 

Statistical deep learning and inferencing


Machine learning
Statistical machine learning and inferencing

Question 7

Correct

Points out of 1.00

You're introducing a new seller to IBM Power sales


opportunities, and they ask about which use cases for edge
computing that would make good opportunities to pursue.
How do you respond?

Recommend they consider clients who are capturing 


data in remote places with sensors that require
analysis outside the datacenter.
Inform the client that they will need to purchase edge
software to manage their edge use cases.
Suggest they investigate the workloads the client is
already running on-premises to see if it can be moved out
to the edge.
Explore the all the applications a client runs on their
enterprise platforms and identify the most critical one to
test out in an edge use case.

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 4/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 8

Correct

Points out of 1.00

Back Next

Pools 2.0 enables a group of IBM Power10 scale-out servers


to be defined as the pool of collective Base Capacity
(purchased) resources. Additional capacity over and above the
pool’s aggregate Base (purchased) resource is charged as
Metered Capacity by the minute. Which application enables
clients to monitor their Base and Metered Capacity across the
pool, providing summary and sophisticated drill-down views of
real-time and historical resource consumption by the virtual
machine (VM)?

Cloud Management Console (CMC) 

Hardware Management Console (HMC)


IBM Management Console
Integrated Virtualization Management (IVM)

Question 9

Correct

Points out of 1.00

IBM Power10 is designed for availability with redundancy and


reliability built-in. In the S1024 model, the redundant power
and cooling system with multiple fans and concurrent
maintenance will keep running even if up to how many power
supplies fail?

Up to 3 power supplies

Up to 1 power supply
Up to 2 power supplies 
Up to 4 power supplies

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 5/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 10

Correct

Points out of 1.00

Back Next

The IBM Power10 scale-out servers offer tremendous


consolidation capabilities for clients, regardless of whether
they are transitioning from x86 servers or migrating from
earlier generations of IBM Power servers. Your client asks
what the maximum cores and memory supported in an IBM
Power10 scale-out system is. How do you reply?

40 cores, 4TB
48 cores, 2TB
40 cores, 8TB
48 cores, 8TB 

Question 11

Correct

Points out of 1.00

Respondents of the ITIC annual report of hardware and server


operating system reliability consistently rate IBM Power as the
most reliable server in its class. According to ITIC's 2021
report, up to how much more unplanned downtime do
common x86 based servers have when compared against IBM
Power servers?

700%
2700% 
2000%
1000%

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 6/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 12

Incorrect

Points out of 1.00

Back Next

IBM Cloud Pak for Data (CP4D) can be used to provide an


efficient and agile data fabric solution to clients. Based on IBM
internal testing of Db2 Warehouse running in CP4D hosted on
the IBM Power10 scale-out S1022 server, executing a sample
analytics workload, clients can achieve lower solution costs
over 3 years when compared with leading x86 solutions. How
much percent lower solution costs can clients achieve?

40% 
50%
10%
57%

Question 13

Correct

Points out of 1.00

As the world is set to deploy AI everywhere, clients are having


to expand from how quickly and accurately they build and
train AI models to include how rapidly they can implement
those models and gain insights, deliver scoring, and make
inferences. Operationalizing AI inferencing directly on the IBM
Power10 processor-based system brings AI closer to data.
What is this capability referred to as?

AI at the point of data 


AI data gravity
AI scoring
AI inferencing

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 7/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 14

Correct

Points out of 1.00

Back Next

You're talking to a client about how IBM Power10 provides


simplified encryption and supports end-to-end security
without impacting performance for a seamless user
experience. This client asks how IBM Power10 achieves this
without impacting performance. How do you reply?

Encryption is handled in firmware


Encryption is handled in hardware and software
Encryption is handled in software
Encryption is handled in hardware 

Question 15

Correct

Points out of 1.00

A client is discussing their need to manage the data being


collected by sensors at the edge, across a broad expanse of
property. They explain that in some of the farther locations, it
can be difficult to obtain an internet signal, and this slows
their ability to complete their work. They ask you how can IBM
Power systems overcome this issue?

Suggest the client make an investment into improving the


network, so they have a stronger signal to utilize for their
sensors.
You ask them why they are deploying sensors out of range
of a strong network connect.
Recommend they build out smaller data centers in the
remote locations to mitigate this issue.

You explain that once an IBM Power system has been 


activated it will initiate a “call home” alert that will
send IBM an update. Even if the network connect is
lost, the system will continue to work.

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 8/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 16

Correct

Points out of 1.00

Back Next

A client is interested in learning more about the flexible


support options with the scale-out server purchase above the
base warranty period. What are the three tiers of IBM Power
Expert Care?

Small, Medium and Large


Level 1, Level 2 and Level 3
Bronze, Silver and Gold
Basic, Advanced, and Premium 

Question 17

Correct

Points out of 1.00

You're preparing for a meeting with a retail client with a new


member of your account team, and they ask about an example
of an edge use case to share with the client. What do you
suggest?

The client should review success stories and use cases on


edge deployments at local hospitals for ideas on the right
use cases for edge workloads.
Suggest the client will appreciate streamlining all their
enterprise resource management (ERP) workloads
handled in their main data center for the enterprise.
The client can run security checks on the data coming 
from their sensors and security cameras at their point-
of-sale system for faster analytics that is more cost
effective.
Tell your colleague, that all workloads are the same and
they should propose their clients preferred workloads as
edge use cases, so they can create new opportunities.

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 9/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 18

Correct

Points out of 1.00

Back Next

The IBM Power10 processor-based servers were designed


with security in mind for now and the future. This includes
support for upcoming cryptography techniques that permit
computations on encrypted data without decrypting the data
first. What is this capability referred to as?

Fast Homomorphic Encryption


Fully Homomorphic Encryption 
Frictionless Hybrid Encryption
Full Homogenous Encryption

Question 19

Incorrect

Points out of 1.00

The IBM Power10 scale-out servers come with support for a


built-in hypervisor for enterprise-class virtualization. What
hypervisor(s) do the IBM Power10 scale-out servers support?

KVM

Xen
IBM PowerVM and KVM 
IBM PowerVM

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 10/11
25. 1. 10. 오후 2:44 IBM Power10 Scale-out Level 2 Quiz: Attempt review

Question 20

Correct

Points out of 1.00

Back Next

What component(s) of the IBM Power10 AI software stack


provides the capability to train AI models on x86 or other
platforms and deploy on IBM Power without any changes,
giving clients the ability to build on commodity hardware but
deploy on enterprise servers?

OMI interface
QoS
ONNX runtime 

SIMD

https://learn.ibm.com/mod/quiz/review.php?attempt=3655805&cmid=314661#question-3672380-13 11/11