Abd-Pipa Distribusi Row 50-B Utara Tahap 2-PT Bima

The document contains the as-built drawings for the distribution pipe network at Row 50-B North, Phase 2, in BSD Barat, dated October 2024. It includes details about bike lanes, pedestrian pathways, and drainage systems, along with measurements and existing curb designs. Additionally, it notes that land boundary measurements in the area are still in progress.

Uploaded by

Indy Print Shop
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views11 pages

Abd-Pipa Distribusi Row 50-B Utara Tahap 2-PT Bima

The document contains the as-built drawings for the distribution pipe network at Row 50-B North, Phase 2, in BSD Barat, dated October 2024. It includes details about bike lanes, pedestrian pathways, and drainage systems, along with measurements and existing curb designs. Additionally, it notes that land boundary measurements in the area are still in progress.

Uploaded by

Indy Print Shop
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

PT.

BUMI SERPONG DAMAI

AS BUILT DRAWING
JARINGAN PIPA DISTRIBUSI
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

OKTOBER 2024
Bike lane
(Tahap 2a)

Pedestrian
(Tahap 2b)

Rencana ujung kanstin berm


(to confirm on site)
Bike lane
(Tahap 2a)
STOP STOP

STOP
STOP
STOP STOP

Bike lane
(Tahap 2a)

Pedestrian
(Tahap 2b)

STOP

STOP
Kanstin
eksisting
Pelebaran 1 lajur
untuk belok kanan STOP
STOP

STOP

STOP
STOP

STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Rencana kanstin Kanstin
TO DRAINAGE
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan

STOP
WO

Ø80
TO DRAINAGE

Kanstin
eksisting STOP

STOP

Pelebaran 1 lajur Pengukuran Batas lahan


aktual di area ini masih
dalam proses

untuk belok kanan


STOP
STOP STOP

STOP

STOP
STOP

STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Kanstin
TO DRAINAGE Rencana kanstin
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan

AS BUILT DRAWING
LAY OUT

JARINGAN PIPA DISTRIBUSI


Ø80
WO
ROW 50-B UTARA TAHAP 2
TO DRAINAGE
BSD BARAT TAHAP II-3

PT. BUMI SERPONG DAMAI


STOP

STOP

Pengukuran Batas lahan


aktual di area ini masih
dalam proses

STOP

STOP

Revisi lebar badan jalan di


rencana u-turn ini
(dari 3m menjadi 4m)

01
STOP

STOP
STOP
08
09 WO
Bike lane
(Tahap 2a)
Rencana ujung kanstin berm
(to confirm on site)

WO
STOP STOP

STOP
STOP
STOP STOP

Ø50 Bike lane


(Tahap 2a)

Pedestrian
(Tahap 2b)

Ø80 06 TO DRAINAGE
10 STOP

STOP
TO DRAINAGE STOP
Kanstin
eksisting
Pelebaran 1 lajur
untuk belok kanan STOP

STOP
STOP

STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Rencana kanstin Kanstin
TO DRAINAGE
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan

WO

Ø80
TO DRAINAGE

STOP

STOP

Pengukuran Batas lahan


aktual di area ini masih
dalam proses

STOP

STOP

AS BUILT DRAWING
LAY OUT

JARINGAN PIPA DISTRIBUSI


ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

WO

Ø80 PT. BUMI SERPONG DAMAI


TO DRAINAGE

02
Rencana ujung kanstin berm
(to confirm on site)
Bike lane
(Tahap 2a)
STOP STOP

STOP
STOP
STOP STOP

Bike lane
(Tahap 2a)

Pedestrian
(Tahap 2b)

STOP

STOP
Kanstin
eksisting
Pelebaran 1 lajur
untuk belok kanan STOP
STOP

STOP
STOP

STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Rencana kanstin Kanstin
TO DRAINAGE
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan

WO

Ø80
TO DRAINAGE

STOP

STOP

Pengukuran Batas lahan


aktual di area ini masih
dalam proses

STOP

STOP

AS BUILT DRAWING
TABEL KOORDINAT

JARINGAN PIPA DISTRIBUSI


ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

PT. BUMI SERPONG DAMAI

03
Keterangan :

KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE

Residential Area

24.00

24.00

STOP
STOP
Ø50

8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50

8.00 Phase 1 149.360m² HYDRANT

3867 m²
13.50

Phase 2 5.983m²

18.00
2.416m²
28.35

7.00

R1.00

6.00
R8.00
3.102m²
3.92

13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE

3059 m² R 3.867m²

12.00
Ø50
######m² 10.941m²

16.00
Sub total 29.368m²

TOTAL = 178.728

18.00
8.00
3102 m² HYDRANT

TO DRAINAGE

Ø50

12.00
2.00 2.00

13.50
7.00

9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910

50.00

4.50
2.10 5.00

4.50
16.00
STOP

18.00
10.25

STOP
HYDRANT

35.
5983 m²

Jl. BSD Raya Barat

60.00
55.25

00
14.50 10.25

8.00
7.00
8.00

STOP
STOP 4.00

15.50

4.00

STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara

STOP

STOP
1 01

4.00
STOP 02
04 03
4.00

STOP
08 10.25

Jl. BSD Raya Barat


09 14.50 07 05 X: 55.00
8.00 6.50 #########
Y:######## 3.00
8.00 Ø50
Ø80 55.25 06 TO DRAINAGE
10 10.25
TO DRAINAGE

0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25

0+540
8.00 8.00

13

PIPA DISTRIBUSI

0+520
16.00
HDPE Ø300

0+500
P = 87 Meter 14 2.00 2.00

0+480
7.00 7.00
10.25 13.50
9.00

PIPA DISTRIBUSI

0+460
50.00
HDPE Ø600

2.00
0+440
15
P = 381 Meter

0+420
16.00

0+400
P P P P

6.00 6.00 6.00 6.00

0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE

Ø80 16
TO DRAINAGE

0+360
9.00

X: -8541.451
0+340

Y: 1714.984 0+320
+37.70
34.27

34.30

17 0+300

PIPA DISTRIBUSI BUS DROP

0+280
59 60 61

HDPE Ø600
58

ENTRANCE
BIKE LANE
57

6.00
20.00
3.50 56

P
18 55

2.50
54

P
0+260
19
P = 381 Meter 20
53

P
3.00

8.00 6.50 52

4.13
20.00
2.59

3
21 3.50 51

0+240
50

ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22

6.00
49
6.00 6.00 48 6.00 6.00 6.00
23

2.50
47 R8.00

24.00

5.50
46

0+220
24

R8.00
P P P P P P P P P P P P P

1.50
7.00 7.00
45

R8.00
25 43
44

42
39
40

R8.00

0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE

33 34
27 51.00
35

8.00 6.50
28 9.00
32
31
30

0+180
27 28
29

P
26
25 24
21

P
22
23
20 19
18

P
0+160

3.74
15
16
14 17

53.57
13
9
12
10 ENTRANCE
9.00 8

0+140
3 11

7
9.00
4 6
5

50.00

0+120
2

0+100
16.00
1

0+080

0+060 P P P

0+040

0+020

ENTRANCE
0+000
34.64

9.00

INTERKONEKSI
8.00 3.10

3.10
12.00
STOP

R15.00
34

R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50

32

90°
STOP

45° NO REVISION DATE BY


DRAWING TITLE:
STOP

Ø80 AS BUILT DRAWING


Jl. BSD Raya Barat

DETAIL JUNCTION
45°

PROJECT:

JARINGAN PIPA DISTRIBUSI


ROW 50-B UTARA TAHAP 2
90° BSD BARAT TAHAP II-3

OWNER:
45°

90° PT. BUMI SERPONG DAMAI


4.67

OWNER
CHECKED BY APPROVED BY KNOWN BY

DATE: DATE: DATE:

CONTRACTOR:

R1
CONTRACTOR
DRAWING BY SUBMITED BY

TOFIK
DATE: DATE: DATE:

DRAWING NO: SHEET: SCALE:

04 -
Keterangan :

KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE

Residential Area

24.00

24.00

STOP
STOP
Ø50

8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50

8.00 Phase 1 149.360m² HYDRANT

3867 m²
13.50

Phase 2 5.983m²

18.00
2.416m²
28.35

7.00

R1.00

6.00
R8.00
3.102m²
3.92

13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE

3059 m² R 3.867m²

12.00
Ø50
######m² 10.941m²

16.00
Sub total 29.368m²

TOTAL = 178.728

18.00
8.00
3102 m² HYDRANT

TO DRAINAGE

Ø50

12.00
2.00 2.00

13.50
7.00

9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910

50.00

4.50
2.10 5.00

4.50
16.00
STOP

18.00
10.25

STOP
HYDRANT

35.
5983 m²

Jl. BSD Raya Barat

60.00
55.25

00
14.50 10.25

8.00
7.00
8.00

STOP
STOP 4.00

15.50

4.00

STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara

STOP

STOP
1 01

4.00
STOP 02
04 03
4.00

STOP
08 10.25

Jl. BSD Raya Barat


09 14.50 07 05 X: 55.00
8.00 6.50 #########
Y:######## 3.00
8.00 Ø50
Ø80 55.25 06 TO DRAINAGE
10 10.25
TO DRAINAGE

0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25

0+540
8.00 8.00

13

PIPA DISTRIBUSI

0+520
16.00
HDPE Ø300

0+500
P = 87 Meter 14 2.00 2.00

0+480
7.00 7.00
10.25 13.50
9.00

PIPA DISTRIBUSI

0+460
50.00
HDPE Ø600

2.00
0+440
15
P = 381 Meter

0+420
16.00

0+400
P P P P

6.00 6.00 6.00 6.00

0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE

Ø80 16
TO DRAINAGE

0+360
9.00

X: -8541.451
0+340

Y: 1714.984 0+320
+37.70
34.27

34.30

17 0+300

PIPA DISTRIBUSI BUS DROP

0+280
59 60 61

HDPE Ø600
58

ENTRANCE
BIKE LANE
57

6.00
20.00
3.50 56

P
18 55

2.50
54

P
0+260
19
P = 381 Meter 20
53

P
3.00

8.00 6.50 52

4.13
20.00
2.59

3
21 3.50 51

0+240
50

ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22

6.00
49
6.00 6.00 48 6.00 6.00 6.00
23

2.50
47 R8.00

24.00

5.50
46

0+220
24

R8.00
P P P P P P P P P P P P P

1.50
7.00 7.00
45

R8.00
25 43
44

42
39
40

R8.00

0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE

33 34
27 51.00
35

8.00 6.50
28 9.00
32
31
30

0+180
27 28
29

P
26
25 24
21

P
22
23
20 19
18

P
0+160

3.74
15
16
14 17

53.57
13
9
12
10 ENTRANCE
9.00 8

0+140
3 11

7
9.00
4 6
5

50.00

0+120
2

0+100
16.00
1

0+080

0+060 P P P

0+040

0+020

ENTRANCE
0+000
34.64

9.00

8.00 3.10

3.10
12.00
STOP

R15.00
34

R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50

32

DETAIL PEMASANGAN
GATE VALVE & FITTING NO
DRAWING TITLE:
REVISION DATE BY

AS BUILT DRAWING
A DETAIL PEMASANGAN GATE VALVE

PROJECT:

JARINGAN PIPA DISTRIBUSI


ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

B B OWNER:

PT. BUMI SERPONG DAMAI

A OWNER
CHECKED BY APPROVED BY KNOWN BY

TAMPAK ATAS POTONGAN B-B POTONGAN A-A


NTS NTS NTS

DATE: DATE: DATE:

CONTRACTOR:

CONTRACTOR
DRAWING BY SUBMITED BY

TOFIK
DATE: DATE: DATE:

DRAWING NO: SHEET: SCALE:

05 -
Keterangan :

KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE

Residential Area

24.00

24.00

STOP
STOP
Ø50

8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50

8.00 Phase 1 149.360m² HYDRANT

3867 m²
13.50

Phase 2 5.983m²

18.00
2.416m²
28.35

7.00

R1.00

6.00
R8.00
3.102m²
3.92

13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE

3059 m² R 3.867m²

12.00
Ø50
######m² 10.941m²

16.00
Sub total 29.368m²

TOTAL = 178.728

18.00
8.00
3102 m² HYDRANT

TO DRAINAGE

Ø50

12.00
2.00 2.00

13.50
7.00

9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910

50.00

4.50
2.10 5.00

4.50
16.00
STOP

18.00
10.25

STOP
HYDRANT

35.
5983 m²

Jl. BSD Raya Barat

60.00
55.25

00
14.50 10.25

8.00
7.00
8.00

STOP
STOP 4.00

15.50

4.00

STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara

STOP

STOP
1 01

4.00
STOP 02
04 03
4.00

STOP
08 10.25

Jl. BSD Raya Barat


09 14.50 07 05 X: 55.00
8.00 6.50 #########
Y:######## 3.00
8.00 Ø50
Ø80 55.25 06 TO DRAINAGE
10 10.25
TO DRAINAGE

0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25

0+540
8.00 8.00

13

PIPA DISTRIBUSI

0+520
16.00
HDPE Ø300

0+500
P = 87 Meter 14 2.00 2.00

0+480
7.00 7.00
10.25 13.50
9.00

PIPA DISTRIBUSI

0+460
50.00
HDPE Ø600

2.00
0+440
15
P = 381 Meter

0+420
2.00

16.00

0+400
P P P P

6.00 6.00 6.00 6.00

0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE

Ø80 16
TO DRAINAGE

0+360
9.00

X: -8541.451
0+340

Y: 1714.984 0+320
+37.70
34.27

34.30

17 0+300

PIPA DISTRIBUSI BUS DROP

0+280
59 60 61

HDPE Ø600
58

ENTRANCE
BIKE LANE
57

6.00
20.00
3.50 56

P
18 55

2.50
54

P
0+260
19
P = 381 Meter 20
53

P
3.00

8.00 6.50 52

4.13
20.00
2.59

3
21 3.50 51

0+240
50

ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22

6.00
49
6.00 6.00 48 6.00 6.00 6.00
23

2.50
47 R8.00

24.00

5.50
46

0+220
24

R8.00
P P P P P P P P P P P P P

1.50
7.00 7.00
45

R8.00
25 43
44

42
39
40

R8.00

0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE

33 34
27 51.00
35

8.00 6.50
28 9.00
32
31
30

0+180
27 28
29

P
26
25 24
21

P
22
23
20 19
18

P
0+160

3.74
15
16
14 17

53.57
13
9
12
10 ENTRANCE
9.00 8

0+140
3 11

7
9.00
4 6
5

50.00

0+120
2

0+100
16.00
1

0+080

0+060 P P P

0+040

0+020

ENTRANCE
0+000
34.64

9.00

5.00
8.00 3.10

3.10
12.00
STOP

R15.00
34

R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50

32

A 2.00
A
NO REVISION DATE BY
DRAWING TITLE:

AS BUILT DRAWING
TAMPAK ATAS
NTS DETAIL PEMASANGAN WASH OUT

PROJECT:

JARINGAN PIPA DISTRIBUSI


ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

OWNER:
2.00

5.00

PT. BUMI SERPONG DAMAI


5.00

3.00 5.00
OWNER
2.00
CHECKED BY APPROVED BY KNOWN BY

DATE: DATE: DATE:

CONTRACTOR:

POTONGAN A-A
NTS

CONTRACTOR
DETAIL WASH OUT DRAWING BY SUBMITED BY

TOFIK
DATE: DATE: DATE:

DRAWING NO: SHEET: SCALE:

06 -
Keterangan :

0,5 ND.

0,5 ND. KEY MAP


DIURUG SEBELUM PERCOBAAN 0,5 ND. 8.00
6.50 7.00
9.00

10.75
9.75

STOP
166.66 49.84 13.00 20.00 57.50
STOP TO DRAINAGE

Residential Area

24.00

24.00

STOP
STOP
Ø50

8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50

8.00 Phase 1 149.360m² HYDRANT

3867 m²
13.50

Phase 2 5.983m²

18.00
2.416m²
28.35

7.00

R1.00

6.00
R8.00
3.102m²
3.92

13.50
13.50
ROW 24

0,5 ND.
7.00 7.00

#####m² 3.059m² TO DRAINAGE

3059 m² R 3.867m²

12.00
Ø50
######m² 10.941m²

16.00
Sub total 29.368m²

TOTAL = 178.728

18.00
8.00
3102 m² HYDRANT

TO DRAINAGE

Ø50

12.00
2.00 2.00

13.50
7.00

9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910

50.00

4.50
2.10 5.00

4.50
16.00
STOP

18.00
10.25

STOP
HYDRANT

35.
5983 m²

Jl. BSD Raya Barat

60.00
55.25

00
14.50 10.25

8.00
7.00
8.00

STOP
STOP 4.00

15.50

4.00

STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara

STOP

STOP
1 01

4.00
STOP 02
04 03
4.00

STOP
08 10.25

Jl. BSD Raya Barat


09 14.50 07 05 X: 55.00
8.00 6.50 #########
Y:######## 3.00
8.00 Ø50
Ø80 55.25 06 TO DRAINAGE
10 10.25
TO DRAINAGE

0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25

0+540
8.00 8.00

13

PIPA DISTRIBUSI

0+520
16.00
HDPE Ø300

0+500
P = 87 Meter 14 2.00 2.00

0+480
7.00 7.00
10.25 13.50
9.00

PIPA DISTRIBUSI

0+460
50.00
HDPE Ø600

2.00
0+440
15
P = 381 Meter

0+420
16.00

0+400
P P P P

ND.
ND.
6.00 6.00 6.00 6.00

0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE

Ø80 16
TO DRAINAGE
ND.1

0+360
9.00

ND.2
X: -8541.451
0+340

Y: 1714.984 0+320
+37.70
34.27

34.30

ND
17 0+300

PIPA DISTRIBUSI BUS DROP

0+280
D
59 60 61

HDPE Ø600
58

ENTRANCE
BIKE LANE
57

6.00
20.00
3.50 56

P
18 55

2.50
D
54

P
0+260
19
P = 381 Meter 20
53

P
3.00

8.00 6.50 52

4.13
20.00
2.59

3
21 3.50 51

0+240
50

ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22

6.00
49
6.00 6.00 48 6.00 6.00 6.00
23

2.50
47 R8.00

24.00

5.50
46

0+220
24

R8.00
P P P P P P P P P P P P P

1.50
7.00 7.00
45

R8.00
25 43
44

42
39
40

R8.00

0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE

33 34
27 51.00
35

8.00 6.50
28 9.00
32
31
30

0+180
27 28
29

P
D
26
25 24
21

P
22
23
20 19
18

P
0+160

3.74
15
16
14 17

53.57
13
9
12
10 ENTRANCE
9.00 8

0+140
3 11

7
9.00

D
4 6
5

50.00

0+120
2

0+100
16.00
1

0+080

0+060 P P P

0+040

0+020

ENTRANCE
0+000
34.64

9.00

8.00 3.10

3.10
12.00
STOP

R15.00
34

R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50

C
32
C

C
C
E
0,5 ND. Y

E E
NO REVISION DATE BY
POTONGAN G-G POTONGAN H-H Y DRAWING TITLE:
E

AS BUILT DRAWING
POTONGAN B-B DETAIL THRUST BLOCK
ND.

PROJECT:
E
JARINGAN PIPA DISTRIBUSI
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

B
OWNER:
ND.1

ND
ND.2

ND.
B
B

E
PT. BUMI SERPONG DAMAI

A
E
E
DENAH OWNER
DENAH A
CHECKED BY APPROVED BY KNOWN BY
ND.

DENAH DENAH

REDUCER CAP TEE BEND 90 HORIZONTAL DATE: DATE: DATE:

CONTRACTOR:
ND.1 ND.2 A B C D E VOL. ND. A B C D E VOL. ND. A B C D E VOL. ND. A B C D E VOL.
mm mm mm mm mm mm mm m3 mm mm mm mm mm mm m3 mm mm mm mm mm mm m3 mm mm mm mm mm mm m3

90 60 100 TIDAK MEMAKAI THRUST BLOCK


60 200 0,005 60 100 200 50 200 200 0,005 63 100 200 50 200 200 0,005
100 200 50 200
110 90 100 TIDAK MEMAKAI THRUST BLOCK
100 90 100 300 100 250 250 0,012 90 100 400 150 350 300 0,025
90 300 100 250 250 0,012
160 110 150 350 100 350 300 0,024 110 100 400 150 350 300 0,026 110 100 500 200 450 400 0,052
110 100 400 150 350 300 0,026
200 160 200 500 150 450 300 0,046 160 150 650 250 600 500 0,116 160 150 850 360 700 550 0,190
160 150 650 250 600 500 0,116
200 100 200 700 250 600 500 0,135 200 200 900 350 800 700 0,295 200 200 1100 450 900 700 0,401
200 200 900 350 800 700 0,295
250 200 250 550 150 500 400 0,072 250 250 1150 450 950 800 0,526 250 250 1450 600 1100 800 0,759
250 250 1150 450 950 800 0,526
250 150 250 850 300 750 600 0,244 300 300 1400 550 1150 850 0,837 300 300 1700 700 1300 850 1,189
300 300 1400 550 1150 850 0,837
300 250 300 600 150 550 450 0,096 350 350 1650 650 1300 950 1,267 350 350 2050 850 1500 950 1,794
300
350
200
300
300
350
1000
650
350
150
850
650
700
550
0,380
0,144
350
400
350
400
1650
1900
650
750
1300
1450
950
1000
1,267
1,747 400
500
400
500
1900
2900
750
1200
1450
1950
1000
1150
1,747
2,691
400
500
400
500
2300
2900
950
1200
1650
1950
1000
1150
2,379
2,691
CONTRACTOR
500 500 2900 1200 1950 1150 2,691
350 250 350 1050 350 900 700 0,431 600 600 3500 1450 2200 1300 4,147 600 600 3500 1450 2200 1300 4,147
400 350 400 700 150 700 600 0,179
600
700
600
700
3500
4100
1450
1700
2200
2400
1300
1450
4,147
5,916 700 700 4100 1700 2400 1450 5,916 700 700 4100 1700 2400 1450 5,916 DRAWING BY SUBMITED BY
400 300 400 1100 350 950 700 0,484

TOFIK
DATE: DATE: DATE:

DRAWING NO: SHEET: SCALE:

DETAIL PEMASANGAN
GATE VALVE & FITTING 07 -
A
Keterangan :

TROTOAR
JALAN

1300
PIPA HDPE PIPA HDPE

1900
BEND 45 BEND 45

PIPA HDPE PIPA HDPE


KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE

Residential Area
BEND 45 BEND 45

24.00

24.00

STOP
STOP
Ø50

8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50

8.00 Phase 1 149.360m² HYDRANT

3867 m²
13.50

Phase 2 5.983m²

18.00
2.416m²
28.35

7.00

R1.00

6.00
R8.00
3.102m²
3.92

13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE

3059 m² R 3.867m²

12.00
Ø50
######m² 10.941m²
PIPA HDPE

16.00
Sub total 29.368m²

TOTAL = 178.728

18.00
8.00
3102 m²
THRUST BLOCK THRUST BLOCK TO DRAINAGE
HYDRANT

Ø50

12.00
2.00 2.00

13.50
7.00

9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910

50.00

4.50
2.10 5.00

4.50
16.00
STOP

18.00
10.25

STOP
HYDRANT

35.
5983 m²

Jl. BSD Raya Barat

60.00
55.25

00
14.50 10.25

8.00
7.00
8.00

STOP
STOP 4.00

15.50

4.00

STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara

STOP

STOP
1 01

4.00
STOP 02
04 03
4.00

STOP
08 10.25

Jl. BSD Raya Barat


09 14.50 07 05 X: 55.00
8.00 6.50 #########
Y:######## 3.00
8.00 Ø50
Ø80 55.25 06 TO DRAINAGE
10 10.25
TO DRAINAGE

0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25

0+540
8.00 8.00

13

PIPA DISTRIBUSI

0+520
16.00
VARIABLE HDPE Ø300

0+500
P = 87 Meter 14 2.00 2.00

0+480
7.00 7.00
10.25 13.50
9.00

PIPA DISTRIBUSI

0+460
50.00
HDPE Ø600

2.00
0+440
15
P = 381 Meter

0+420
16.00

0+400
P P P P

6.00 6.00 6.00 6.00

0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE

Ø80 16
TO DRAINAGE

0+360
9.00

X: -8541.451
0+340

Y: 1714.984 0+320
+37.70
34.27

34.30

17 0+300

PIPA DISTRIBUSI BUS DROP

0+280
59 60 61

HDPE Ø600
58

ENTRANCE
BIKE LANE
57

6.00
20.00
3.50 56

P
18 55

2.50
54

P
0+260
19
P = 381 Meter 20
53

P
3.00

8.00 6.50 52

4.13
20.00
2.59

3
21 3.50 51

0+240
50

ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22

6.00
49
6.00 6.00 48 6.00 6.00 6.00
23

2.50
47 R8.00

24.00

5.50
46

0+220
24

R8.00
P P P P P P P P P P P P P

1.50
7.00 7.00
45

R8.00
25 43
44

42
39
40

R8.00

0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE

33 34
27 51.00
35

8.00 6.50
28 9.00
32
31
30

0+180
27 28
29

P
DETAIL PEMYEBERANGAN PIPA DI JALAN
26
25 24
21

P
22
23
20 19
18

P
0+160

3.74
15
16
14 17

53.57
13
9
12
10 ENTRANCE
9.00 8

0+140
3 11

7
9.00
4 6
5

50.00

0+120
2

0+100
16.00
1

0+080

0+060 P P P

0+040

0+020

ENTRANCE
0+000
34.64

9.00

NTS 3.10
8.00

STOP
12.00
3.10

R15.00
34

R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50

32

DASAR PASANGAN BATU KALI 1 PC : 3 PS NO REVISION DATE BY

< 900
PIPA HDPE
PIPA HDPE
PIPA HDPE
DRAWING TITLE:
PIPA HDPE

100

200

AS BUILT DRAWING
STANDARD PENYEBRANGAN PIPA
PIPA HDPE

VARIABLE

PROJECT:

JARINGAN PIPA DISTRIBUSI


PENYEBRANGAN PIPA MELALUI SALURAN KECIL TYPE A ROW 50-B UTARA TAHAP 2
NTS
BSD BARAT TAHAP II-3
DASAR PASANGAN

1000
PIPA HDPE BATU KALI PIPA HDPE PIPA HDPE
1PC : 3PS
OWNER:

MIN. 1.300
PIPA HDPE KLEM 6x100 PIPA HDPE

1000
BEND 45 BEND 45
> 900

PIPA HDPE PIPA HDPE

PT. BUMI SERPONG DAMAI


2000

THRUST BLOCK

BEND 45
100
200

PIPA HDPE
THRUST BLOCK

OWNER
THRUST BLOCK
CHECKED BY APPROVED BY KNOWN BY
VARIABLE

LEBAR SALURAN

DENAH
PENYEBRANGAN PIPA MELALUI SALURAN KECIL TYPE B NTS
NTS
DATE: DATE: DATE:

CONTRACTOR:

PIPA HDPE
400
MIN. 1.500

PIPA HDPE
PIPA HDPE 3° 3° PIPA HDPE
200

CONTRACTOR
GORONG-GORONG
DRAWING BY SUBMITED BY

1000 LEBAR GORONG-GORONG 1000 TOFIK

PENYEBRANGAN PIPA MELALUI GORONG-GORONG TYPE C DATE: DATE: DATE:


NTS DRAWING NO: SHEET: SCALE:

08 -
Keterangan :

property line

property line
KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE

Residential Area

24.00

24.00

STOP
STOP
Ø50

8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50

8.00 Phase 1 149.360m² HYDRANT

3867 m²
13.50

Phase 2 5.983m²

18.00
2.416m²
28.35

7.00

R1.00

6.00
R8.00
3.102m²
3.92

13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE

3059 m² R 3.867m²

12.00
Ø50
######m² 10.941m²

16.00
Sub total 29.368m²

TOTAL = 178.728

18.00
8.00
3102 m² HYDRANT

TO DRAINAGE

Ø50

12.00
2.00 2.00

13.50
7.00

9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910

50.00

4.50
2.10 5.00

4.50
16.00
STOP

18.00
10.25

STOP
HYDRANT

35.
5983 m²

Jl. BSD Raya Barat

60.00
55.25

00
14.50 10.25

8.00
7.00
8.00

STOP
STOP 4.00

15.50

4.00

STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara

STOP

STOP
1 01

4.00
STOP 02
04 03
4.00

STOP
08 10.25

Jl. BSD Raya Barat


09 14.50 07 05 X: 55.00
8.00 6.50 #########
Y:######## 3.00
8.00 Ø50
Ø80 55.25 06 TO DRAINAGE
10 10.25
TO DRAINAGE

0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25

0+540
8.00 8.00

13

PIPA DISTRIBUSI

0+520
16.00
HDPE Ø300

0+500
P = 87 Meter 14 2.00 2.00

0+480
7.00 7.00
10.25 13.50
9.00

PIPA DISTRIBUSI

0+460
50.00
HDPE Ø600

2.00
0+440
15
P = 381 Meter

0+420
16.00

0+400
P P P P

6.00 6.00 6.00 6.00

0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE

Ø80 16
TO DRAINAGE

0+360
9.00

X: -8541.451
0+340

Y: 1714.984 0+320
+37.70
34.27

34.30

17 0+300

PIPA DISTRIBUSI BUS DROP

0+280
59 60 61

HDPE Ø600
58

ENTRANCE
BIKE LANE
57

6.00
20.00
3.50 56

P
18 55

2.50
54

P
0+260
19
P = 381 Meter 20
53

P
3.00

8.00 6.50 52

4.13
20.00
2.59

3
21 3.50 51

0+240
50

ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22

6.00
49
6.00 6.00 48 6.00 6.00 6.00
23

2.50
47 R8.00

24.00

5.50
46

0+220
24

R8.00
P P P P P P P P P P P P P

1.50
7.00 7.00
45

R8.00
25 43
44

42
39
40

R8.00

0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE

33 34
27 51.00
35

8.00 6.50
28 9.00
32
31
30

0+180
27 28
29

P
26
25 24
21

P
22
23
20 19
18

P
0+160

3.74
15
16
14 17

53.57
13
9
12
10 ENTRANCE
9.00 8

0+140
3 11

7
9.00
4 6
5

50.00

0+120
2

0+100
16.00
1

0+080

0+060 P P P

0+040

0+020

ENTRANCE
0+000
34.64

9.00

8.00 3.10

3.10
12.00
STOP

R15.00
34

R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50

32

EL. KAVLING 85 85 EL. KAVLING


0.00 0.00

0.20 0.20

0.40

0.60
TRANCE 50 0.40

0.60

0.80

1.00
50 KABEL
1000x1000
0.80

1.00
DUCTING TM
1.20 1.20

1.40 1.40

1.60 1.60

NO REVISION DATE BY
1.80 1.80

2.00

2.20
35 200 350 350 350 400 35 330 35 400 350 350 350 200 35 2.00

2.40

2.60

2.80

3.00
6.50 2.00 14.50 4.00 14.50 2.00 6.50 200
DRAWING TITLE:
100

2.75
50.00 2.75
AS BUILT DRAWING
POTONGAN MELINTANG JALAN &

ROW 50 Full Development - Berm 6.5m DETAIL ROW 50

PROJECT:
DETAIL 1
JARINGAN PIPA DISTRIBUSI
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

OWNER:

85 PT. BUMI SERPONG DAMAI


EL. KAVLING
0.00

0.20 OWNER
0.40

0.60
TRANCE CHECKED BY APPROVED BY KNOWN BY
0.80

1.00
50 KABEL
1000x1000
DUCTING TM
1.20

1.40

1.60
DATE: DATE: DATE:
1.80

2.00

2.20
35 CONTRACTOR:

2.40

2.60

2.80

3.00
6.50 2.00 CONTRACTOR
100 DRAWING BY SUBMITED BY

TOFIK

DETAIL 1 2.75 DATE:

DRAWING NO:

08
DATE:

SHEET:
DATE:

SCALE:

-
Keterangan :

KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE

Residential Area

24.00

24.00

STOP
STOP
Ø50

8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50

8.00 Phase 1 149.360m² HYDRANT

3867 m²
13.50

Phase 2 5.983m²

18.00
2.416m²
28.35

7.00

R1.00

6.00
R8.00
3.102m²
3.92

13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE

3059 m² R 3.867m²

12.00
Ø50
######m² 10.941m²

16.00
Sub total 29.368m²

TOTAL = 178.728

18.00
8.00
3102 m² HYDRANT

TO DRAINAGE

Ø50

12.00
2.00 2.00

13.50
7.00

9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910

50.00

4.50
2.10 5.00

4.50
16.00
STOP

18.00
10.25

STOP
HYDRANT

35.
5983 m²

Jl. BSD Raya Barat

60.00
55.25

00
14.50 10.25

8.00
7.00
8.00

STOP
STOP 4.00

15.50

4.00

STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara

STOP

STOP
1 01

4.00
STOP 02
04 03
4.00

STOP
08 10.25

Jl. BSD Raya Barat


09 14.50 07 05 X: 55.00
8.00 6.50 #########
Y:######## 3.00
8.00 Ø50
Ø80 55.25 06 TO DRAINAGE
10 10.25
TO DRAINAGE

0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25

0+540
8.00 8.00

13

PIPA DISTRIBUSI

0+520
16.00
HDPE Ø300

0+500
P = 87 Meter 14 2.00 2.00

0+480
7.00 7.00
10.25 13.50
9.00

PIPA DISTRIBUSI

0+460
50.00
HDPE Ø600

2.00
0+440
15
P = 381 Meter

0+420
16.00

0+400
P P P P

6.00 6.00 6.00 6.00

0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE

Ø80 16
TO DRAINAGE

0+360
9.00

X: -8541.451
0+340

Y: 1714.984 0+320
+37.70
34.27

34.30

17 0+300

PIPA DISTRIBUSI BUS DROP

0+280
59 60 61

HDPE Ø600
58

ENTRANCE
BIKE LANE
57

6.00
20.00
3.50 56

P
18 55

2.50
54

P
0+260
19
P = 381 Meter 20
53

P
3.00

8.00 6.50 52

4.13
20.00
2.59

3
21 3.50 51

0+240
50

ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22

6.00
49
6.00 6.00 48 6.00 6.00 6.00
23

2.50
47 R8.00

24.00

5.50
46

0+220
24

R8.00
P P P P P P P P P P P P P

1.50
7.00 7.00
45

R8.00
25 43
44

42
39
40

R8.00

0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE

33 34
27 51.00
35

8.00 6.50
28 9.00
32
31
30

0+180
27 28
29

P
26
25 24
21

P
22
23
20 19
18

P
0+160

3.74
15
16
14 17

53.57
13
9
12
10 ENTRANCE
9.00 8

0+140
3 11

7
9.00
4 6
5

50.00

0+120
2

0+100
16.00
1

0+080

0+060 P P P

0+040

0+020

ENTRANCE
0+000
34.64

9.00

8.00 3.10

3.10
12.00
STOP

R15.00
34

R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50

32

NO REVISION DATE BY
DRAWING TITLE:

AS BUILT DRAWING
STANDARD PEMASANGAN PIPA

1775
PROJECT:

2525
JARINGAN PIPA DISTRIBUSI

2625
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3

OWNER:

PT. BUMI SERPONG DAMAI

OWNER
CHECKED BY APPROVED BY KNOWN BY

150
650
DATE: DATE: DATE:

CONTRACTOR:

100
100 650 100
CONTRACTOR
DRAWING BY SUBMITED BY
500

GALIAN PIPA DISTRIBUSI DATE:


TOFIK

DRAWING NO:
DATE:

SHEET:
DATE:

SCALE:

10 -