Abd-Pipa Distribusi Row 50-B Utara Tahap 2-PT Bima
Abd-Pipa Distribusi Row 50-B Utara Tahap 2-PT Bima
AS BUILT DRAWING
JARINGAN PIPA DISTRIBUSI
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3
OKTOBER 2024
Bike lane
(Tahap 2a)
Pedestrian
(Tahap 2b)
STOP
STOP
STOP STOP
Bike lane
(Tahap 2a)
Pedestrian
(Tahap 2b)
STOP
STOP
Kanstin
eksisting
Pelebaran 1 lajur
untuk belok kanan STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Rencana kanstin Kanstin
TO DRAINAGE
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan
STOP
WO
Ø80
TO DRAINAGE
Kanstin
eksisting STOP
STOP
STOP
STOP
STOP
STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Kanstin
TO DRAINAGE Rencana kanstin
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan
AS BUILT DRAWING
LAY OUT
STOP
STOP
STOP
01
STOP
STOP
STOP
08
09 WO
Bike lane
(Tahap 2a)
Rencana ujung kanstin berm
(to confirm on site)
WO
STOP STOP
STOP
STOP
STOP STOP
Pedestrian
(Tahap 2b)
Ø80 06 TO DRAINAGE
10 STOP
STOP
TO DRAINAGE STOP
Kanstin
eksisting
Pelebaran 1 lajur
untuk belok kanan STOP
STOP
STOP
STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Rencana kanstin Kanstin
TO DRAINAGE
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan
WO
Ø80
TO DRAINAGE
STOP
STOP
STOP
STOP
AS BUILT DRAWING
LAY OUT
WO
02
Rencana ujung kanstin berm
(to confirm on site)
Bike lane
(Tahap 2a)
STOP STOP
STOP
STOP
STOP STOP
Bike lane
(Tahap 2a)
Pedestrian
(Tahap 2b)
STOP
STOP
Kanstin
eksisting
Pelebaran 1 lajur
untuk belok kanan STOP
STOP
STOP
STOP
STOP
STOP
STOP
08
09 WO Pelebaran
WO jalan Pelebaran 1 lajur
Ø50 untuk belok kanan
Ø80 06 TO DRAINAGE
10 Rencana kanstin Kanstin
TO DRAINAGE
desain awal eksisting
Pelebaran
Pelebaran 1 lajur jalan
untuk belok kanan
WO
Ø80
TO DRAINAGE
STOP
STOP
STOP
STOP
AS BUILT DRAWING
TABEL KOORDINAT
03
Keterangan :
KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE
Residential Area
24.00
24.00
STOP
STOP
Ø50
8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50
3867 m²
13.50
Phase 2 5.983m²
18.00
2.416m²
28.35
7.00
R1.00
6.00
R8.00
3.102m²
3.92
13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE
3059 m² R 3.867m²
12.00
Ø50
######m² 10.941m²
16.00
Sub total 29.368m²
TOTAL = 178.728
18.00
8.00
3102 m² HYDRANT
TO DRAINAGE
Ø50
12.00
2.00 2.00
13.50
7.00
9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910
50.00
4.50
2.10 5.00
4.50
16.00
STOP
18.00
10.25
STOP
HYDRANT
35.
5983 m²
60.00
55.25
00
14.50 10.25
8.00
7.00
8.00
STOP
STOP 4.00
15.50
4.00
STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
STOP
STOP
1 01
4.00
STOP 02
04 03
4.00
STOP
08 10.25
0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25
0+540
8.00 8.00
13
PIPA DISTRIBUSI
0+520
16.00
HDPE Ø300
0+500
P = 87 Meter 14 2.00 2.00
0+480
7.00 7.00
10.25 13.50
9.00
PIPA DISTRIBUSI
0+460
50.00
HDPE Ø600
2.00
0+440
15
P = 381 Meter
0+420
16.00
0+400
P P P P
0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE
Ø80 16
TO DRAINAGE
0+360
9.00
X: -8541.451
0+340
Y: 1714.984 0+320
+37.70
34.27
34.30
17 0+300
0+280
59 60 61
HDPE Ø600
58
ENTRANCE
BIKE LANE
57
6.00
20.00
3.50 56
P
18 55
2.50
54
P
0+260
19
P = 381 Meter 20
53
P
3.00
8.00 6.50 52
4.13
20.00
2.59
3
21 3.50 51
0+240
50
ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22
6.00
49
6.00 6.00 48 6.00 6.00 6.00
23
2.50
47 R8.00
24.00
5.50
46
0+220
24
R8.00
P P P P P P P P P P P P P
1.50
7.00 7.00
45
R8.00
25 43
44
42
39
40
R8.00
0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE
33 34
27 51.00
35
8.00 6.50
28 9.00
32
31
30
0+180
27 28
29
P
26
25 24
21
P
22
23
20 19
18
P
0+160
3.74
15
16
14 17
53.57
13
9
12
10 ENTRANCE
9.00 8
0+140
3 11
7
9.00
4 6
5
50.00
0+120
2
0+100
16.00
1
0+080
0+060 P P P
0+040
0+020
ENTRANCE
0+000
34.64
9.00
INTERKONEKSI
8.00 3.10
3.10
12.00
STOP
R15.00
34
R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50
32
90°
STOP
DETAIL JUNCTION
45°
PROJECT:
OWNER:
45°
OWNER
CHECKED BY APPROVED BY KNOWN BY
CONTRACTOR:
R1
CONTRACTOR
DRAWING BY SUBMITED BY
TOFIK
DATE: DATE: DATE:
04 -
Keterangan :
KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE
Residential Area
24.00
24.00
STOP
STOP
Ø50
8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50
3867 m²
13.50
Phase 2 5.983m²
18.00
2.416m²
28.35
7.00
R1.00
6.00
R8.00
3.102m²
3.92
13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE
3059 m² R 3.867m²
12.00
Ø50
######m² 10.941m²
16.00
Sub total 29.368m²
TOTAL = 178.728
18.00
8.00
3102 m² HYDRANT
TO DRAINAGE
Ø50
12.00
2.00 2.00
13.50
7.00
9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910
50.00
4.50
2.10 5.00
4.50
16.00
STOP
18.00
10.25
STOP
HYDRANT
35.
5983 m²
60.00
55.25
00
14.50 10.25
8.00
7.00
8.00
STOP
STOP 4.00
15.50
4.00
STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
STOP
STOP
1 01
4.00
STOP 02
04 03
4.00
STOP
08 10.25
0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25
0+540
8.00 8.00
13
PIPA DISTRIBUSI
0+520
16.00
HDPE Ø300
0+500
P = 87 Meter 14 2.00 2.00
0+480
7.00 7.00
10.25 13.50
9.00
PIPA DISTRIBUSI
0+460
50.00
HDPE Ø600
2.00
0+440
15
P = 381 Meter
0+420
16.00
0+400
P P P P
0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE
Ø80 16
TO DRAINAGE
0+360
9.00
X: -8541.451
0+340
Y: 1714.984 0+320
+37.70
34.27
34.30
17 0+300
0+280
59 60 61
HDPE Ø600
58
ENTRANCE
BIKE LANE
57
6.00
20.00
3.50 56
P
18 55
2.50
54
P
0+260
19
P = 381 Meter 20
53
P
3.00
8.00 6.50 52
4.13
20.00
2.59
3
21 3.50 51
0+240
50
ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22
6.00
49
6.00 6.00 48 6.00 6.00 6.00
23
2.50
47 R8.00
24.00
5.50
46
0+220
24
R8.00
P P P P P P P P P P P P P
1.50
7.00 7.00
45
R8.00
25 43
44
42
39
40
R8.00
0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE
33 34
27 51.00
35
8.00 6.50
28 9.00
32
31
30
0+180
27 28
29
P
26
25 24
21
P
22
23
20 19
18
P
0+160
3.74
15
16
14 17
53.57
13
9
12
10 ENTRANCE
9.00 8
0+140
3 11
7
9.00
4 6
5
50.00
0+120
2
0+100
16.00
1
0+080
0+060 P P P
0+040
0+020
ENTRANCE
0+000
34.64
9.00
8.00 3.10
3.10
12.00
STOP
R15.00
34
R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50
32
DETAIL PEMASANGAN
GATE VALVE & FITTING NO
DRAWING TITLE:
REVISION DATE BY
AS BUILT DRAWING
A DETAIL PEMASANGAN GATE VALVE
PROJECT:
B B OWNER:
A OWNER
CHECKED BY APPROVED BY KNOWN BY
CONTRACTOR:
CONTRACTOR
DRAWING BY SUBMITED BY
TOFIK
DATE: DATE: DATE:
05 -
Keterangan :
KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE
Residential Area
24.00
24.00
STOP
STOP
Ø50
8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50
3867 m²
13.50
Phase 2 5.983m²
18.00
2.416m²
28.35
7.00
R1.00
6.00
R8.00
3.102m²
3.92
13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE
3059 m² R 3.867m²
12.00
Ø50
######m² 10.941m²
16.00
Sub total 29.368m²
TOTAL = 178.728
18.00
8.00
3102 m² HYDRANT
TO DRAINAGE
Ø50
12.00
2.00 2.00
13.50
7.00
9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910
50.00
4.50
2.10 5.00
4.50
16.00
STOP
18.00
10.25
STOP
HYDRANT
35.
5983 m²
60.00
55.25
00
14.50 10.25
8.00
7.00
8.00
STOP
STOP 4.00
15.50
4.00
STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
STOP
STOP
1 01
4.00
STOP 02
04 03
4.00
STOP
08 10.25
0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25
0+540
8.00 8.00
13
PIPA DISTRIBUSI
0+520
16.00
HDPE Ø300
0+500
P = 87 Meter 14 2.00 2.00
0+480
7.00 7.00
10.25 13.50
9.00
PIPA DISTRIBUSI
0+460
50.00
HDPE Ø600
2.00
0+440
15
P = 381 Meter
0+420
2.00
16.00
0+400
P P P P
0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE
Ø80 16
TO DRAINAGE
0+360
9.00
X: -8541.451
0+340
Y: 1714.984 0+320
+37.70
34.27
34.30
17 0+300
0+280
59 60 61
HDPE Ø600
58
ENTRANCE
BIKE LANE
57
6.00
20.00
3.50 56
P
18 55
2.50
54
P
0+260
19
P = 381 Meter 20
53
P
3.00
8.00 6.50 52
4.13
20.00
2.59
3
21 3.50 51
0+240
50
ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22
6.00
49
6.00 6.00 48 6.00 6.00 6.00
23
2.50
47 R8.00
24.00
5.50
46
0+220
24
R8.00
P P P P P P P P P P P P P
1.50
7.00 7.00
45
R8.00
25 43
44
42
39
40
R8.00
0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE
33 34
27 51.00
35
8.00 6.50
28 9.00
32
31
30
0+180
27 28
29
P
26
25 24
21
P
22
23
20 19
18
P
0+160
3.74
15
16
14 17
53.57
13
9
12
10 ENTRANCE
9.00 8
0+140
3 11
7
9.00
4 6
5
50.00
0+120
2
0+100
16.00
1
0+080
0+060 P P P
0+040
0+020
ENTRANCE
0+000
34.64
9.00
5.00
8.00 3.10
3.10
12.00
STOP
R15.00
34
R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50
32
A 2.00
A
NO REVISION DATE BY
DRAWING TITLE:
AS BUILT DRAWING
TAMPAK ATAS
NTS DETAIL PEMASANGAN WASH OUT
PROJECT:
OWNER:
2.00
5.00
3.00 5.00
OWNER
2.00
CHECKED BY APPROVED BY KNOWN BY
CONTRACTOR:
POTONGAN A-A
NTS
CONTRACTOR
DETAIL WASH OUT DRAWING BY SUBMITED BY
TOFIK
DATE: DATE: DATE:
06 -
Keterangan :
0,5 ND.
10.75
9.75
STOP
166.66 49.84 13.00 20.00 57.50
STOP TO DRAINAGE
Residential Area
24.00
24.00
STOP
STOP
Ø50
8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50
3867 m²
13.50
Phase 2 5.983m²
18.00
2.416m²
28.35
7.00
R1.00
6.00
R8.00
3.102m²
3.92
13.50
13.50
ROW 24
0,5 ND.
7.00 7.00
3059 m² R 3.867m²
12.00
Ø50
######m² 10.941m²
16.00
Sub total 29.368m²
TOTAL = 178.728
18.00
8.00
3102 m² HYDRANT
TO DRAINAGE
Ø50
12.00
2.00 2.00
13.50
7.00
9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910
50.00
4.50
2.10 5.00
4.50
16.00
STOP
18.00
10.25
STOP
HYDRANT
35.
5983 m²
60.00
55.25
00
14.50 10.25
8.00
7.00
8.00
STOP
STOP 4.00
15.50
4.00
STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
STOP
STOP
1 01
4.00
STOP 02
04 03
4.00
STOP
08 10.25
0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25
0+540
8.00 8.00
13
PIPA DISTRIBUSI
0+520
16.00
HDPE Ø300
0+500
P = 87 Meter 14 2.00 2.00
0+480
7.00 7.00
10.25 13.50
9.00
PIPA DISTRIBUSI
0+460
50.00
HDPE Ø600
2.00
0+440
15
P = 381 Meter
0+420
16.00
0+400
P P P P
ND.
ND.
6.00 6.00 6.00 6.00
0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE
Ø80 16
TO DRAINAGE
ND.1
0+360
9.00
ND.2
X: -8541.451
0+340
Y: 1714.984 0+320
+37.70
34.27
34.30
ND
17 0+300
0+280
D
59 60 61
HDPE Ø600
58
ENTRANCE
BIKE LANE
57
6.00
20.00
3.50 56
P
18 55
2.50
D
54
P
0+260
19
P = 381 Meter 20
53
P
3.00
8.00 6.50 52
4.13
20.00
2.59
3
21 3.50 51
0+240
50
ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22
6.00
49
6.00 6.00 48 6.00 6.00 6.00
23
2.50
47 R8.00
24.00
5.50
46
0+220
24
R8.00
P P P P P P P P P P P P P
1.50
7.00 7.00
45
R8.00
25 43
44
42
39
40
R8.00
0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE
33 34
27 51.00
35
8.00 6.50
28 9.00
32
31
30
0+180
27 28
29
P
D
26
25 24
21
P
22
23
20 19
18
P
0+160
3.74
15
16
14 17
53.57
13
9
12
10 ENTRANCE
9.00 8
0+140
3 11
7
9.00
D
4 6
5
50.00
0+120
2
0+100
16.00
1
0+080
0+060 P P P
0+040
0+020
ENTRANCE
0+000
34.64
9.00
8.00 3.10
3.10
12.00
STOP
R15.00
34
R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50
C
32
C
C
C
E
0,5 ND. Y
E E
NO REVISION DATE BY
POTONGAN G-G POTONGAN H-H Y DRAWING TITLE:
E
AS BUILT DRAWING
POTONGAN B-B DETAIL THRUST BLOCK
ND.
PROJECT:
E
JARINGAN PIPA DISTRIBUSI
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3
B
OWNER:
ND.1
ND
ND.2
ND.
B
B
E
PT. BUMI SERPONG DAMAI
A
E
E
DENAH OWNER
DENAH A
CHECKED BY APPROVED BY KNOWN BY
ND.
DENAH DENAH
CONTRACTOR:
ND.1 ND.2 A B C D E VOL. ND. A B C D E VOL. ND. A B C D E VOL. ND. A B C D E VOL.
mm mm mm mm mm mm mm m3 mm mm mm mm mm mm m3 mm mm mm mm mm mm m3 mm mm mm mm mm mm m3
TOFIK
DATE: DATE: DATE:
DETAIL PEMASANGAN
GATE VALVE & FITTING 07 -
A
Keterangan :
TROTOAR
JALAN
1300
PIPA HDPE PIPA HDPE
1900
BEND 45 BEND 45
Residential Area
BEND 45 BEND 45
24.00
24.00
STOP
STOP
Ø50
8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50
3867 m²
13.50
Phase 2 5.983m²
18.00
2.416m²
28.35
7.00
R1.00
6.00
R8.00
3.102m²
3.92
13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE
3059 m² R 3.867m²
12.00
Ø50
######m² 10.941m²
PIPA HDPE
16.00
Sub total 29.368m²
TOTAL = 178.728
18.00
8.00
3102 m²
THRUST BLOCK THRUST BLOCK TO DRAINAGE
HYDRANT
Ø50
12.00
2.00 2.00
13.50
7.00
9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910
50.00
4.50
2.10 5.00
4.50
16.00
STOP
18.00
10.25
STOP
HYDRANT
35.
5983 m²
60.00
55.25
00
14.50 10.25
8.00
7.00
8.00
STOP
STOP 4.00
15.50
4.00
STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
STOP
STOP
1 01
4.00
STOP 02
04 03
4.00
STOP
08 10.25
0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25
0+540
8.00 8.00
13
PIPA DISTRIBUSI
0+520
16.00
VARIABLE HDPE Ø300
0+500
P = 87 Meter 14 2.00 2.00
0+480
7.00 7.00
10.25 13.50
9.00
PIPA DISTRIBUSI
0+460
50.00
HDPE Ø600
2.00
0+440
15
P = 381 Meter
0+420
16.00
0+400
P P P P
0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE
Ø80 16
TO DRAINAGE
0+360
9.00
X: -8541.451
0+340
Y: 1714.984 0+320
+37.70
34.27
34.30
17 0+300
0+280
59 60 61
HDPE Ø600
58
ENTRANCE
BIKE LANE
57
6.00
20.00
3.50 56
P
18 55
2.50
54
P
0+260
19
P = 381 Meter 20
53
P
3.00
8.00 6.50 52
4.13
20.00
2.59
3
21 3.50 51
0+240
50
ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22
6.00
49
6.00 6.00 48 6.00 6.00 6.00
23
2.50
47 R8.00
24.00
5.50
46
0+220
24
R8.00
P P P P P P P P P P P P P
1.50
7.00 7.00
45
R8.00
25 43
44
42
39
40
R8.00
0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE
33 34
27 51.00
35
8.00 6.50
28 9.00
32
31
30
0+180
27 28
29
P
DETAIL PEMYEBERANGAN PIPA DI JALAN
26
25 24
21
P
22
23
20 19
18
P
0+160
3.74
15
16
14 17
53.57
13
9
12
10 ENTRANCE
9.00 8
0+140
3 11
7
9.00
4 6
5
50.00
0+120
2
0+100
16.00
1
0+080
0+060 P P P
0+040
0+020
ENTRANCE
0+000
34.64
9.00
NTS 3.10
8.00
STOP
12.00
3.10
R15.00
34
R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50
32
< 900
PIPA HDPE
PIPA HDPE
PIPA HDPE
DRAWING TITLE:
PIPA HDPE
100
3°
200
3°
AS BUILT DRAWING
STANDARD PENYEBRANGAN PIPA
PIPA HDPE
VARIABLE
PROJECT:
1000
PIPA HDPE BATU KALI PIPA HDPE PIPA HDPE
1PC : 3PS
OWNER:
MIN. 1.300
PIPA HDPE KLEM 6x100 PIPA HDPE
1000
BEND 45 BEND 45
> 900
THRUST BLOCK
BEND 45
100
200
PIPA HDPE
THRUST BLOCK
OWNER
THRUST BLOCK
CHECKED BY APPROVED BY KNOWN BY
VARIABLE
LEBAR SALURAN
DENAH
PENYEBRANGAN PIPA MELALUI SALURAN KECIL TYPE B NTS
NTS
DATE: DATE: DATE:
CONTRACTOR:
PIPA HDPE
400
MIN. 1.500
PIPA HDPE
PIPA HDPE 3° 3° PIPA HDPE
200
CONTRACTOR
GORONG-GORONG
DRAWING BY SUBMITED BY
08 -
Keterangan :
property line
property line
KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE
Residential Area
24.00
24.00
STOP
STOP
Ø50
8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50
3867 m²
13.50
Phase 2 5.983m²
18.00
2.416m²
28.35
7.00
R1.00
6.00
R8.00
3.102m²
3.92
13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE
3059 m² R 3.867m²
12.00
Ø50
######m² 10.941m²
16.00
Sub total 29.368m²
TOTAL = 178.728
18.00
8.00
3102 m² HYDRANT
TO DRAINAGE
Ø50
12.00
2.00 2.00
13.50
7.00
9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910
50.00
4.50
2.10 5.00
4.50
16.00
STOP
18.00
10.25
STOP
HYDRANT
35.
5983 m²
60.00
55.25
00
14.50 10.25
8.00
7.00
8.00
STOP
STOP 4.00
15.50
4.00
STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
STOP
STOP
1 01
4.00
STOP 02
04 03
4.00
STOP
08 10.25
0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25
0+540
8.00 8.00
13
PIPA DISTRIBUSI
0+520
16.00
HDPE Ø300
0+500
P = 87 Meter 14 2.00 2.00
0+480
7.00 7.00
10.25 13.50
9.00
PIPA DISTRIBUSI
0+460
50.00
HDPE Ø600
2.00
0+440
15
P = 381 Meter
0+420
16.00
0+400
P P P P
0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE
Ø80 16
TO DRAINAGE
0+360
9.00
X: -8541.451
0+340
Y: 1714.984 0+320
+37.70
34.27
34.30
17 0+300
0+280
59 60 61
HDPE Ø600
58
ENTRANCE
BIKE LANE
57
6.00
20.00
3.50 56
P
18 55
2.50
54
P
0+260
19
P = 381 Meter 20
53
P
3.00
8.00 6.50 52
4.13
20.00
2.59
3
21 3.50 51
0+240
50
ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22
6.00
49
6.00 6.00 48 6.00 6.00 6.00
23
2.50
47 R8.00
24.00
5.50
46
0+220
24
R8.00
P P P P P P P P P P P P P
1.50
7.00 7.00
45
R8.00
25 43
44
42
39
40
R8.00
0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE
33 34
27 51.00
35
8.00 6.50
28 9.00
32
31
30
0+180
27 28
29
P
26
25 24
21
P
22
23
20 19
18
P
0+160
3.74
15
16
14 17
53.57
13
9
12
10 ENTRANCE
9.00 8
0+140
3 11
7
9.00
4 6
5
50.00
0+120
2
0+100
16.00
1
0+080
0+060 P P P
0+040
0+020
ENTRANCE
0+000
34.64
9.00
8.00 3.10
3.10
12.00
STOP
R15.00
34
R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50
32
0.20 0.20
0.40
0.60
TRANCE 50 0.40
0.60
0.80
1.00
50 KABEL
1000x1000
0.80
1.00
DUCTING TM
1.20 1.20
1.40 1.40
1.60 1.60
NO REVISION DATE BY
1.80 1.80
2.00
2.20
35 200 350 350 350 400 35 330 35 400 350 350 350 200 35 2.00
2.40
2.60
2.80
3.00
6.50 2.00 14.50 4.00 14.50 2.00 6.50 200
DRAWING TITLE:
100
2.75
50.00 2.75
AS BUILT DRAWING
POTONGAN MELINTANG JALAN &
PROJECT:
DETAIL 1
JARINGAN PIPA DISTRIBUSI
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3
OWNER:
0.20 OWNER
0.40
0.60
TRANCE CHECKED BY APPROVED BY KNOWN BY
0.80
1.00
50 KABEL
1000x1000
DUCTING TM
1.20
1.40
1.60
DATE: DATE: DATE:
1.80
2.00
2.20
35 CONTRACTOR:
2.40
2.60
2.80
3.00
6.50 2.00 CONTRACTOR
100 DRAWING BY SUBMITED BY
TOFIK
DRAWING NO:
08
DATE:
SHEET:
DATE:
SCALE:
-
Keterangan :
KEY MAP
9.00
166.66 49.84 13.00 20.00 57.50
8.00
6.50 7.00
9.75
10.75
STOP STOP TO DRAINAGE
Residential Area
24.00
24.00
STOP
STOP
Ø50
8.00
STOP
10.25 11.50 8.00
STOP #####m²
6.50
53.75 7.50
3867 m²
13.50
Phase 2 5.983m²
18.00
2.416m²
28.35
7.00
R1.00
6.00
R8.00
3.102m²
3.92
13.50
13.50
7.00 7.00
ROW 24
#####m² 3.059m² TO DRAINAGE
3059 m² R 3.867m²
12.00
Ø50
######m² 10.941m²
16.00
Sub total 29.368m²
TOTAL = 178.728
18.00
8.00
3102 m² HYDRANT
TO DRAINAGE
Ø50
12.00
2.00 2.00
13.50
7.00
9.00
7.00
13.50
2416 m² X:-7577.205
Y:2166.910
50.00
4.50
2.10 5.00
4.50
16.00
STOP
18.00
10.25
STOP
HYDRANT
35.
5983 m²
60.00
55.25
00
14.50 10.25
8.00
7.00
8.00
STOP
STOP 4.00
15.50
4.00
STOP
24.00
Jl. BSD Boulevard Utara Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
Jl. BSD Boulevard Utara
STOP
STOP
1 01
4.00
STOP 02
04 03
4.00
STOP
08 10.25
0+560
X: -8489.701
X: -8543.951
11 Y: 1922.411
Y: 1914.984 12 10.25
0+540
8.00 8.00
13
PIPA DISTRIBUSI
0+520
16.00
HDPE Ø300
0+500
P = 87 Meter 14 2.00 2.00
0+480
7.00 7.00
10.25 13.50
9.00
PIPA DISTRIBUSI
0+460
50.00
HDPE Ø600
2.00
0+440
15
P = 381 Meter
0+420
16.00
0+400
P P P P
0+380
ENTRANCE ENTRANCE ENTRANCE ENTRANCE
Ø80 16
TO DRAINAGE
0+360
9.00
X: -8541.451
0+340
Y: 1714.984 0+320
+37.70
34.27
34.30
17 0+300
0+280
59 60 61
HDPE Ø600
58
ENTRANCE
BIKE LANE
57
6.00
20.00
3.50 56
P
18 55
2.50
54
P
0+260
19
P = 381 Meter 20
53
P
3.00
8.00 6.50 52
4.13
20.00
2.59
3
21 3.50 51
0+240
50
ENTRANCE
1.50
ENTRANCE ENTRANCE ENTRANCE ENTRANCE ENTRANCE
13.50
22
6.00
49
6.00 6.00 48 6.00 6.00 6.00
23
2.50
47 R8.00
24.00
5.50
46
0+220
24
R8.00
P P P P P P P P P P P P P
1.50
7.00 7.00
45
R8.00
25 43
44
42
39
40
R8.00
0+200
6.00 6.00 6.00
26 ENTRANCE ENTRANCE ENTRANCE
38
37
36
41 ENTRANCE
33 34
27 51.00
35
8.00 6.50
28 9.00
32
31
30
0+180
27 28
29
P
26
25 24
21
P
22
23
20 19
18
P
0+160
3.74
15
16
14 17
53.57
13
9
12
10 ENTRANCE
9.00 8
0+140
3 11
7
9.00
4 6
5
50.00
0+120
2
0+100
16.00
1
0+080
0+060 P P P
0+040
0+020
ENTRANCE
0+000
34.64
9.00
8.00 3.10
3.10
12.00
STOP
R15.00
34
R10.00
R15.00
33
STOP 11.00
3.00 3.10
13.50
32
NO REVISION DATE BY
DRAWING TITLE:
AS BUILT DRAWING
STANDARD PEMASANGAN PIPA
1775
PROJECT:
2525
JARINGAN PIPA DISTRIBUSI
2625
ROW 50-B UTARA TAHAP 2
BSD BARAT TAHAP II-3
OWNER:
OWNER
CHECKED BY APPROVED BY KNOWN BY
150
650
DATE: DATE: DATE:
CONTRACTOR:
100
100 650 100
CONTRACTOR
DRAWING BY SUBMITED BY
500
DRAWING NO:
DATE:
SHEET:
DATE:
SCALE:
10 -