DG SET Commissioning
DG SET Commissioning
Location :
Report No : Commissioning Date : Service Required on Date : Hours :
Commercial Site Id
DG Sr. No OEM Avg.Running
hour per day
Engine Model Engine Sr. No. Phase
Alternator Alternator Frame Alternator Sr.
Make No.
Controller Controller Sr. No. Controller
Make & Model Software
Version
Panel Make Panel Type Panel Sr. No.
Turbocharger Turbocharger Model Turbocharger
Make Sr. No
Fuel Pump Fuel Pump Code Fuel Pump Sr.
DG Details Make No.
Starter Motor Starter Motor Sr. No. Solenoid Sr. No
Make
Charging Charging Alternator Battery Make
Alternator Sr. No
Make
Radiator Make Radiator Sr. No Battery Sr.
No. (Battery
1)
External External Governor Sr. Battery Sr. No.
Most Critical Parameter’s (Criteria must be met by 100% for successful installation)
Action Taken
Observation
Finally Accept / Recommendation
Sr No. Check points Parameter Criteria / Remarks Upload File
Yes / No
Nos. of Earthing 4
Earthing
<1
Resistance in Ohm
As per
Earthing pits &
recommendati
earthing strip
on & size
2 Earthing
Earthing Strips GI
Proper Earthing
Connections to
Proper
engine /
Connections
alternator / Panel /
Controller / ECU
Quality Standard
Overall condition of
Generator/engine
( Photographs )All Hazards Signs
7
Are in Place on canopy / engine /
alternator
/ Panel
14 Bellow alignment
Functioning of Parameters in
controller- L.O.Pr, Coolant temp,
21
RPM, Fuel Level
Client Representative
Consultant Representative
PMC Representative
Contractor Representative
OEM Representative