24-CHE - PRO, DLSU, MNLPR NO. 6000025984 Supply Exhaust and Pressurization Fan Rehab For BAGH, HSSH, ERSC and EYH DATED 15 AUGUST 2024
24-CHE - PRO, DLSU, MNLPR NO. 6000025984 Supply Exhaust and Pressurization Fan Rehab For BAGH, HSSH, ERSC and EYH DATED 15 AUGUST 2024
18 Repair of damaged ducting for blowers and apply sealant for the duct connection 1.00 120,000.00
Sanding and painting of fan ducting using two (2) coats of epoxy primer and two (2) coats of light gray
19 INCLUDED
(Nippon paint)
Sanding and Painting of brackets and metal platform of elevator pressurization blower using two (2)
20 1.00 226,896.00
coats of epoxy primer and two (2) coats of gray (Nippon paint)
21 Installation of bird screen in every gooseneck ducting 1.00 128,326.00
22 Repair of air duct flashing INCLUDED
23 Reconnect the power supply and ensure proper connection. INCLUDED
24 Checking of proper fan blower rotation INCLUDED
25 Checking for unusual noise, vibration, and bearing temperatures. INCLUDED
26 Replacement of fresh air supply room window louver 1.00 225,826.00
27 Testing and commissioning INCLUDED
SUBTOTAL 1,375,848.00
3 CLEARING WORKS and TURNOVER DOCUMENTS: QTY AMOUNT
1 Cleaning and clearing of work area each day of work completion.
2 Hauling, handling and disposal of all debris, excess, and unwanted materials.
INCLUDED
3 Turnover documents including progress report with photos before, during and after the project;
warranty certificate, maintenance manual
SUB TOTAL -
TOTAL COST 1,499,848.00
TOTAL DISCOUNT 74,992.40
TOTAL COST 1,424,855.60
TOTAL COST INCLUSIVE OF VAT 1,595,838.27