The document provides operational data for the 23.5 MLD Sewage Treatment Plant (STP) at Sangli, detailing the working hours, service history, and upcoming service inspections for various blowers over several days in October 2024. Each blower's total hours, hours since last service, next service due, and inspection dates are consistently recorded. The data indicates that all blowers have not operated in the last 24 hours leading up to each report date.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
2 views15 pages
01 (5)
The document provides operational data for the 23.5 MLD Sewage Treatment Plant (STP) at Sangli, detailing the working hours, service history, and upcoming service inspections for various blowers over several days in October 2024. Each blower's total hours, hours since last service, next service due, and inspection dates are consistently recorded. The data indicates that all blowers have not operated in the last 24 hours leading up to each report date.