STAGE_3_FORMS_AND_CHECKLIST
STAGE_3_FORMS_AND_CHECKLIST
(To be submitted after installation of solar PV plant and before site visit)
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
16. User name and Password of remote monitoring system, Yes
preferably along with Open API of data logger
18. Undertaking for DCR content (On the letter head Yes
of Installer)
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
CHECKLIST FOR STAGE-3 – Non-CFA
(non-subsidy) projects (To be submitted after installation of solar PV plant and before site visit)
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
(Subsidy Claim Letter on Company letter Head)
Ref No Date: .
To,
Sub: Claim Letter for release of subsidy for Solar Power Plant of kWp capacity installed
at .....………………………………………………………………………………………………………
Ref:
Dear Sir,
This is in reference to XXXX allocation and sanction letter, We, (Name of Company) has successfully
commissioned the ……..… kWp capacity rooftop solar plant installed at ……………………………..
Post successful installation, commissioning and inspection of the rooftop Solar Power Plant.
Therefore, kindly release the subsidy of INR..................................(INRRs.In words) at the earliest.
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
PERFORMANCE RATIO TEST(PR)
User Details, Location& Plant Image
Vender Name
Consumer Name
Address
Plant Capacity
Irradiance
CA Number
Date of PR Measurement:-
Date Time Irradiation Active Power PR(%)
(W/m2) (KW)
10:00
11:00
12:00
13:00
14:00
15:00
Average
Remark :- The PR Test of the solar PV Plant is above 75% ,therefore the system is ok and acceptable
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
Project Completion Report for Grid-Connected Rooftop
Financial year:
Proposal Title :
Installed by agency :
Mobile: Email:
Longitude:
CA No.
1. Solar PV Module:
Power of each PV Module /
Nos.(Wp)* / Make
Cumulative Capacity of
Modules(kWp):
Solar cell technology: Tilt Angle of
Modules:
Module efficiency (in %) : Azimuth
Indigenous or imported (Cell) RFID passed
inside or outside:
Indigenous or imported (Module) * Supported by Appropriate documentation
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
2. Inverters:
Type of inverter :
Power of each PCU/Nos.
of inverters (KVA)* /Make
Capacity / Power of Type of Charge
PCU / inverters (KVA) : Controller /MPPT
Inverter efficiency (in %)
Grid connectivity level phase Single Phase/ Grid connectivity 220 V/ 415 V
Three Phase level Voltage
3. Mounting Structures
Type Surface Finish
Material Wind Speed
Tolerance
4. Cables:
DC Cable Make Size
AC Cable Make
(Inverter to ACDB) Size
AC Cable Make
(ACDB to Electric Panel) Size
Conductor Insulation/sheath PVC / XLPE
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
7. Online Monitoring Mechanism:
Web Portal :
USER ID : Password:
8. Weather monitoring:
Solar Irradiance
(Pyranomerter - Class IInd Temperature Ambient & Module
or better)
Wind speed sensor
Annex:
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
Commissioning Test Report: Solar Project . kW
Site Engineer
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
Joint Commissioning Report (JCR)
COMMISSIONING REPORT (PROVISIONAL) FOR GRID CONNECTED SOLAR
PHOTOVOLTAIC POWER PLANT (with Net-metering facility)
It is to certify that a Grid Connected Solar PV Power Plant has been installed with following details:
1. Name of the beneficiary: ________________________
2. Address of installation with pin code: ______________________
3. Electricity consumer number: ___________________________
4. Solar PV module capacity (DC):______________________ kWp
5. Inverter capacity (AC) (Nominal output power): __________________ kW
6. Date of installation/commissioning: __________________
7. Date of Joint inspection: _________________
8. Metering arrangement: _______________________(Net meter/Gross meter/Net billing)
The above system is as per BIS/MNRE specifications and has been checked for its performance on and
it is working satisfactorily.
DISCOM EMPANELLED AGENCY CONSUMER
Name ________________
Designation ___________
Date _________________
Sign _________________
Seal _________________
It is to certify that the above system has been purchased with following details:
1. Total project cost ________________
2. Subsidy amount ________________
3. Amount paid by beneficiary ________________
EMPANELLED AGENCY CONSUMER
Name ___________________
Designation ______________
Date ____________________
Sign ____________________
Seal ____________________
Note: This report will be applicable for all the projects installed/commissioned after 31-07-2021
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
Solar Plant Installation Certificate
All Pages to be Printed on Letter Head of Installer and signed by installer
with stamp & consumer with stamp (if applicable)
Address
The system has been installed with equivalent standards which correspond to the required technical &
interconnectivity specifications as per Annexure III (important clauses related to the technical &
interconnection requirements) of Guidelines under DERC (Net Metering for Renewable Energy)
Regulations, 2014 as under:
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
Safety and Central Electricity Reference to regulations
Supply Authority (Measures of
Safety & Electricity
Supply) Regulations, 2010
IEEE 519
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
IEEE 519 Renewable Energy System
should not inject DC power
DC Injection CEA (Technical Standards more than 0.5% of full rated
for connectivity of the DG output at the interconnection
Resources) Regulations, point or 1% of rated inverter
2013 output current into distribution
system under any
operating conditions.
The system has been installed and tested for grid stability, grid protection and specified environmental
influences and is found to have equivalent standards which correspond to the required technical &
interconnectivity specifications as per Annexure III (important clauses related to the technical &
interconnection requirements) of Guidelines under DERC (Net Metering for Renewable Energy)
Regulations, 2014 as under:
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]
Detail list of components to be used in
Renewable Energy System
CA No: ______________, Sanction Load_____________KW, Contact No. of Consumer: ________________
Address:______________________________________________________________________________
Company name of installer:_____________________ Contact No. of installer: ________________________
Details of Solar Capacity:- Existing :________ KW, Proposed :___________ KW, Total: ______________ KW
1 Solar Inverter
2 Solar PV modules
3 Structure
4 Solar cable
5 AC cables
6 Switches/
Circuit Breakers/
Connectors
7 Earthing
8 Connector &
Conduits
9 Junction Boxes/
Enclosures for
Charge
Controllers/
Luminaries
10 LA
11 Data logger
For any query call us on 19123 (Ext.8) or Give a missed call at : 90525 52509 | E-Mail us on [email protected] | [email protected]