0% found this document useful (0 votes)
24 views2 pages

PERI Formwork Load Calculator Results

The document presents results from a formwork load calculator based on GB 50666-2011, detailing parameters such as concrete density, temperature, and pouring height. Key results include a maximum fresh concrete pressure of 114.0 kN/m² and a minimum pouring time of 0.8 hours. It emphasizes the importance of following assembly instructions for safety and compliance during formwork system use.

Uploaded by

George Boisteanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views2 pages

PERI Formwork Load Calculator Results

The document presents results from a formwork load calculator based on GB 50666-2011, detailing parameters such as concrete density, temperature, and pouring height. Key results include a maximum fresh concrete pressure of 114.0 kN/m² and a minimum pouring time of 0.8 hours. It emphasizes the importance of following assembly instructions for safety and compliance during formwork system use.

Uploaded by

George Boisteanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Formwork Load Calculator | Results

based on GB 50666-2011

Boundary Conditions Legend


(mm) Concrete slump 180 mm Input value
Correction coefficient of Output value
β 1.00
concrete slump influence
γc (kN/m3) Density of concrete 24.0 kN/m³

Concrete temperature on
T (°C) 15 °C
placing
Initial setting time of
t0 (h) 6.7 h
fresh concrete
H (m) Vertical pouring height 5.00 m

Results
Characteristic value of the
F
maximum possible fresh 114.0 kN/m²
(kN/m2)
concrete pressure
hs (m) Hydrostatic pressure head 4.75 m

t (h) Minimum pouring time 0.8 h

Maximum rate of
V (m/h) 6.48 m/h
placement

Please pay attention:


 The illustrations and icons are understood to be system representations only. The additionally required
access and safety equipment for the use of this formwork system in accordance with the regulations are
to be taken from the corresponding assembly instructions.
The assembly instructions provide a basis for the project related risk assessment and the procedures for
the preparation and use of the formwork system by the company.
They do not replace however the latter.

 This application is based on the following document:


 GB 50666-2011 Code for construction of concrete structures.

Notes

20.02.2025 | www.peri.com | © PERI SE Page 1 | 2


Terms of Use
for PERI Applications

You can find the accepted Terms of Use for PERI Applications by clicking on the following link:

https://apps.peri.com/core/views/media/pdfs/en_tc.pdf

20.02.2025 | www.peri.com | © PERI SE Page 2 | 2