100% found this document useful (1 vote)
45 views

Highway Engineering Chandra - Get instant access to the full ebook content

The document provides information about various eBooks available for download, particularly focusing on highway engineering by A.M. Chandra. It outlines the contents of the book, which covers essential topics in highway engineering such as planning, design, materials, and traffic engineering. The text aims to serve as a standard reference for students and practicing engineers in the field.

Uploaded by

huyuporgho76
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
45 views

Highway Engineering Chandra - Get instant access to the full ebook content

The document provides information about various eBooks available for download, particularly focusing on highway engineering by A.M. Chandra. It outlines the contents of the book, which covers essential topics in highway engineering such as planning, design, materials, and traffic engineering. The text aims to serve as a standard reference for students and practicing engineers in the field.

Uploaded by

huyuporgho76
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 64

Read Anytime Anywhere Easy Ebook Downloads at ebookmeta.

com

Highway Engineering Chandra

https://ebookmeta.com/product/highway-engineering-chandra/

OR CLICK HERE

DOWLOAD EBOOK

Visit and Get More Ebook Downloads Instantly at https://ebookmeta.com


Recommended digital products (PDF, EPUB, MOBI) that
you can download immediately if you are interested.

Traffic and Highway Engineering, 5th Edition Garber


Nicholas J.

https://ebookmeta.com/product/traffic-and-highway-engineering-5th-
edition-garber-nicholas-j/

ebookmeta.com

Highway Engineering: Planning, Design, and Operations 2nd


Edition Findley

https://ebookmeta.com/product/highway-engineering-planning-design-and-
operations-2nd-edition-findley/

ebookmeta.com

A Textbook of IRRIGATION AND DRAINAGE ENGINEERING 2nd


Edition Dr. Prem Chandra Jha

https://ebookmeta.com/product/a-textbook-of-irrigation-and-drainage-
engineering-2nd-edition-dr-prem-chandra-jha/

ebookmeta.com

Success in Academic Writing (Bloomsbury Study Skills),


Trevor Day

https://ebookmeta.com/product/success-in-academic-writing-bloomsbury-
study-skills-trevor-day/

ebookmeta.com
Mira the Royal Detective Meet Mira Disney Books

https://ebookmeta.com/product/mira-the-royal-detective-meet-mira-
disney-books/

ebookmeta.com

An Exploration of Technology and its Social Impact 1st


Edition Savvas Andreas Katsikides

https://ebookmeta.com/product/an-exploration-of-technology-and-its-
social-impact-1st-edition-savvas-andreas-katsikides/

ebookmeta.com

The Impact of the Convention on the Elimination of All


Forms of Discrimination Against Women on the Domestic
Legislation in Egypt 1st Edition Nora Salem
https://ebookmeta.com/product/the-impact-of-the-convention-on-the-
elimination-of-all-forms-of-discrimination-against-women-on-the-
domestic-legislation-in-egypt-1st-edition-nora-salem/
ebookmeta.com

JavaScript The Definitive Guide 7th Edition David Flanagan

https://ebookmeta.com/product/javascript-the-definitive-guide-7th-
edition-david-flanagan-3/

ebookmeta.com

Hayek and the Evolution of Capitalism 1st Edition Naomi


Beck

https://ebookmeta.com/product/hayek-and-the-evolution-of-
capitalism-1st-edition-naomi-beck/

ebookmeta.com
Computer Networking: A Top-down Approach 8th Edition James
F. Kurose

https://ebookmeta.com/product/computer-networking-a-top-down-
approach-8th-edition-james-f-kurose/

ebookmeta.com
NEW AGE

HIGHWAY
ENGINEERING

A M CHANDRA
HIGHWAY
ENGINEERING
HIGHWAY
ENGINEERING

A M CHANDRA
Professor of Civil Engineering
Arba Minch University, Ethiopia
Formerly Professor of Civil Engineering
Geomatics Engineering Section
Indian Institute of Technology Roorkee, India

NEW AGE INTERNATIONAL (P) LIMITED, PUBLISHERS


LONDON • NEW DELHI • NAIROBI

Copyright © 2020 New Age International (P) Ltd., Publishers
Published by New Age International (P) Ltd., Publishers

All rights reserved.


No part of this ebook may be reproduced in any form, by photostat, microfilm, xerography,
or any other means, or incorporated into any information by retrieval system, electronic or
mechanical, without the written permission of the publisher. All inquiries should be emailed
to [email protected]

This ebook has been given to EBSCO for hosting on non-exclusive basis.

ISBN: 978-81-224-5832-9

PUBLISHING GLOBALLY
NEW AGE INTERNATIONAL (P) LIMITED, PUBLISHERS
7/30A, Daryaganj, New Delhi - 110002
Visit us at www.newagepublishers.com
Preface

This text is an attempt to present various aspects of Highways Engineering in a most lucid manner.
It covers the syllabi of highway engineering prescribed by most of the Indian universities for the
undergraduate courses. The students as well as the practicing engineers engaged in the construction of
highways in the country would find the text useful to acquire knowledge required in the field of highway
engineering.
The whole subject matter has been presented in nineteen chapters. Chapter 1 presents the
Introduction of the subject. Chapter 2 deals with the Highway Planning. Planning of a given task or
project is the most important step which has to be done first to execute a work successfully. After
finalizing the terminal points for a highway to be provided, the best alignment considering all technical,
economic, and social aspects is chosen out of different possible alignments. This part has been covered in
Chapter 3. Before constructing a highway, it is essential to design all the elements of highway from
engineering point of view for safe, comfortable, and economical journey. This requires the knowledge
of highway pavements design discussed in Chapter 4. The traffic engineering aspects are given in
Chapter 5. Chapter 6 deals with the highway materials and testing, the knowledge of which is essential
for the construction of a durable road. Various types of roads used in different conditions are low-cost
roads, bituminous roads, cement concrete roads, hill roads, and other types of pavements are covered
in Chapters 7 to 12. The highway drainage, discussed in Chapter 13, is an important factor of all
types of roads to keep them in good condition and durable. The road side amenities are basically to
provide a pleasant, comfortable, and safe journey to the road users and it is covered in Chapter 14.
Some of the other related matters to the highway construction, such as construction equipment and
plants, maintenance works for highways, economics and finances involved and estimates are presented
in Chapters 15 to 18. This text introduces for the first time the Chapter-19 on the Intelligent Transport
System (ITS) which is an essential requirementfor making smart cities in our country.
Each chapter contains selected questions at the end of the chapter and also the solutions of some of
the illustrative problems have been presented wherever required,at the end of the chapter,to introduce
the students and designers to the actual field problems.
Throughout the text various standards and recommendations of the different organizations of
Central Government of the country for the planning and design of different types of roads have been
followed. The author gratefully acknowledges the authors of technical publications in various journals

v
vi Highway Engineering

and other publications for their liberal use in preparing this text in the interest of the subject matter and
feels that the text would serve the purpose of a standard text book. The author also expresses his thanks
to Dr Raju Ramesh Reddy, Professor, Arba Minch University, for providing some input on Intelligent
Transport System.
This text being the first edition, some errors might have been left unnoticed and the author would
sincerely welcome the constructive suggestions in improving the text in its subsequent editions.
Arba Minch, Ethiopia

Arba Minch, Ethiopia A. M. Chandra

Acknowledgement

The author expresses his deep sense of gratitude to Dr Alemayehu Chufamo, Scientific Director,
Institute of Technology, Arba Minch University, Ethiopia, for his inspiration and for providing all
necessary help in completing this text without which it would have not been possible to bring out this
text in the present form. The author is extremely grateful to him.

A. M. Chandra
Contents

Preface v
Acknowledgement vi
1. Highway Engineering 1–6
1.0 Introduction 1
1.1 Modes of Transportation 1
1.2 Branches of Transportation Engineering 2
1.3 Characteristics of Road Transport 3
1.4 Advantages of Roads 3
1.5 Requirements of an Ideal Road 3
1.6 History of Road Construction 4
2. Highway Planning 7–17
2.0 Introduction 7
2.1 Planning Requirements 7
2.2 Classification of Roads 13
2.3 Road Patterns 14
3. Highway Surveys and Alignment 18–31
3.0 Introduction 18
3.1 Alignment Controlling Factors 18
3.2 Steps for Final Alignment 21
3.3 Requirement of Surveying Instruments 28
3.4 Highway Re-alignment 29
4. Highway Geometric Design 32–134
4.0 Introduction 32
4.1 Factors Governing the Geometrical Design Standards 33
4.2 Elements of Highway Geometrics 34
4.3 Road Structure 34
4.4 Pavement Structure Characteristics 36
4.5 Width of Pavement 37
4.6 Traffic Separators or Medians 39
4.7 Kerbs 39
4.8 Road Margins 40
4.9 Formation or Roadway Width 41
vii
viii Highway Engineering

4.10 Right-of-Way 41
4.11 Camber 45
4.12 Design Speed 47
4.13 Stopping Sight Distance (SSD) 49
4.14 Crossing Sight Distance (CSD) 53
4.15 Overtaking Sight Distance (OSD) 53
4.16 Overtaking Zones 57
4.17 Sight Distance at Intersections 57
4.18 Road Gradient 58
4.19 Grade Compensation on Horizontal Curves 60
4.20 Superelevation 60
4.21 Horizontal Curves 67
4.22 Transition Curve 77
4.23 Vertical Curves 84
4.24 Road Intersections (Junctions) 93
5. Traffic Engineering 135–185
5.0 Introduction 135
5.1 Definition of Traffic Engineering 135
5.2 Objects of Traffic Engineering 135
5.3 Traffic Characteristics 136
5.4 Road User Characteristics 136
5.5 Vehicular Characteristics 137
5.6 Traffic Survey 140
5.7 Passenger Car Unit (PCU) 149
5.8 Road Accidents 152
5.9 Measures to Prevent Road Accidents 157
5.10 Parking 158
5.11 Highway Lighting 161
5.12 Road Intersections and their Design 166
5.13 Traffic Operations 166
5.14 Traffic and Transportation Planning 172
Illustrative Examples 173
Questions 182
6. Highway Pavements Design 186–226
6.0 Introduction 186
6.1 Types of Pavement 187
6.2 Highways in India 188
6.3 Road Structure 188
Contents ix

6.4 Flexible Pavements 189


6.5 Rigid Pavements 189
6.6 Semi-Rigid Pavements 189
6.7 Design of Pavements 190
6.8 Design of Bituminous Paving Mixes 191
6.9 Design of Flexible Pavements 194
6.10 Design of Rigid Pavements 200
7. Highway Materials and Testing 227–248
7.0 Introduction 227
7.1 Aggregate Used in Road Construction 227
7.2 Requisites of a Good Road Aggregate 229
7.3 Tests for Road Aggregates 230
7.4 Bituminous Mateials 239
8. Low-Cost Roads 249–278
8.0 Introduction 249
8.1 Classification of Low-Cost Roads 249
8.2 Dust Prevention in Low-Cost Roads 257
8.3 Soil Stabilized Roads 257
8.4 Considerations for Soil Stabilization 265
8.5 Soil Survey 267
8.6 Soil Classification Systems 271
Illustrative Examples 275
Questions 277
9. Bituminous Roads 279–300
9.0 Introduction 279
9.1 Use of Bituminous Materials in Bituminous Roads 281
9.2 Types of Bituminous Pavements 284
9.3 Construction Methods of Bituminous Roads 289
Questions 299
10. Cement Concrete Roads 301–324
10.0 Introduction 301
10.1 Comparison between Cement Concrete Roads and Bituminous Concrete Roads 302
10.2 Methods of Construction of Cement Concrete Road 303
10.3 Construction Procedure 306
10.4 Concreting Under Extreme Weather Conditions Including Rainy Season 309
10.5 Plants and Equipment 310
10.6 Joints in Cement Concrete Roads 312
10.7 Arrangement of Transverse Joints 316
x Highway Engineering

10.8 Joint Fillers and Sealing Compounds 318


10.9 Design of Dowel Bars 319
10.10 Other Forms of Cement Concrete Roads 319
11. Hill Roads 325–348
11.0 Introduction 325
11.1 Considerations for Hill Road Construction 326
11.2 Hill Roads Planning—Basic Principles 327
11.3 Collection of Basic Data Through Surveying for Alignment 328
11.4 Fixing Road Alignment in Hills 328
11.5 Surveying in Remote Areas 331
11.6 Geometrics of Hill Roads 332
11.7 Protective Works for Hill Roads 341
11.8 Drainage in Hill Roads 342
11.9 Maintenance of Hill Roads 344
11.10 Pedestrian Crossing Bridges 346
Illustrative Examples 346
Questions 348
12. Other Types of Pavements 349–358
12.0 Introduction 349
12.1 Other Types of Pavements 349
12.2 General Methods of Construction of other Types of Pavements 350
13. Highway Drainage 359–380
13.0 Introduction 359
13.1 Significance of Highway Drainage 359
13.2 Requirements of Highway Drainage System 360
13.3 Sources of Water Entering the Road Structure 360
13.4 Highway Drainage Systems 361
13.5 Surface Drainage 361
13.6 Sub-Surface Drainage 369
13.7 Road Construction in Waterlogged Area 374
Illustrative Examples 375
Questions 379
14. Roadside Amenities 381–386
14.0 Introduction 381
14.1 Roadside Development 381
14.2 Street Alignment, Proportion, and Balance 382
14.3 Roadside Arboriculture 382
14.4 Erosion Control 384
Contents xi

14.5 Street Lighting 385


14.6 Roadside Equipment 385
14.7 Construction Materials and Practices 385
14.8 Advertisement Control 385
15. Highway Construction Equipment and Plants 387–399
15.0 Introduction 387
15.1 Earthwork 387
15.2 Embankment 391
15.3 Construction of Embankments 393
15.4 Preparation of Subgrade 393
15.5 Soil Compaction 394
15.6 Equipment for Bituminous Roads 395
15.7 Equipment for Cement Concrete Roads 399
15.8 Construction of Some Other Roads 399
16. Highway Maintenance 400–414
16.0 Introduction 400
16.1 Causes of Pavement Failure 400
16.2 Classification of Maintenance Works 400
16.3 Pavement Failures 401
16.4 Maintenance of Different Types of Roads 406
16.5 Pavement Evaluation 412
16.6 Strengthening the Existing Pavements 412
16.7 Principle of Road Improvements 413
17. Highway Economics and Finances 415–428
17.0 Introduction 415
17.1 Highway User Benefits 416
17.2 Principles of Economic Analysis 417
17.3 Application of Economic Analysis to Highways 418
17.4 Methods of Economic Analysis 419
17.5 Highway Vehicle Operation Cost 421
17.6 Highway Costs and Consequences 422
17.7 Computation of Annual Highway Cost 424
17.8 Highway Finance and Administration 426
18. Highway Estimates 429–435
18.0 Introduction 429
18.1 Rough-Cost Estimate 429
18.2 Detailed Estimate 431
xii Highway Engineering

19. Intelligent Transportation Systems 436–445


19.0 Introduction 436
19.1 Functions of ITS 436
19.2 Advantages of Its Applications 437
19.3 ITS Working and Applications 437
19.4 Benefits of ITS 437
19.5 Services Offered by the ITS 438
19.6 Intelligent Transportation Technologies 440
19.7 ITS Applications 441
19.8 ITS in Mysore City 442
19.9 ITS in Korea 443
Appendix–I 446
Appendix–II 447
Appendix–III 448
Appendix–IV 449
Appendix–V 450
Bibliography 451
Index 459
CHAPTER 1
Highway Engineering

1.0 INTRODUCTION
The key factor to development of any modern society is communication. The communication may
be of information, commodity, or human being. The communication of information keeps the society
activities going in a particular region for planning and management. Transportation of commodities
produced is needed at production, distribution and consumption stages. Transportation of human being
is required for the exchange of ideas in decision making and for personal reasons. Also to maintain the
law and order in a certain region, transportation of police force is required. To defend the territory of
a country against the aggression and to guard the borders with foreign territories, the defence forces
require an efficient transport system.
Inadequate transportation facilities retard the process of socio-economic development of the country.
Adequate transportation system indicates directly the level of social and economic development of the
country. Therefore, for the rapid overall growth and development of a country, it is essential to have an
efficient and latest modern transportation system.

1.1 MODES OF TRANSPORTATION


Human being is surrounded by three basic mediums, viz., land, water, and air, and all these mediums are
used for transportation. By utilizing these mediums, the following four modes of transportation have
been developed:
i. Roadways or highways,
ii. Railways,
iii. Waterways,
iv. Airways, and
v. Other modes.

1.1.1 Roadways or Highways


The roadways or the highways not only include the modern highway system but also the city streets,
feeder roads, and rural roads catering for a wide range of road vehicles and pedestrians. The road
transportation is the only mode which gives maximum service to almost all sectors of activities requiring
1
2 Highway Engineering

transport. It provides maximum flexibility in terms of travel with reference to route, direction, time, and
speed of travel, etc., through various modes of road vehicles. Door to door service is only possible
by road transport. It also provides a feeder system for other modes of transportation and not only to
supplement them but also to provide independent facility for road travel by a well-planned network of
roads throughout the country.

1.1.2 Railways
Railways were primarily developed for long distance transportation and urban travel. Later its expansion
was done to feed the rural population too. The transportation along the railway lines by railways
between the stations is economical for both the passengers and goods, particularly for long distances.
The railway tracks serve as arteries for transportation by land and roads, they also serve as feeder system
for transportation to the interior parts and to intermediate localities between the railway stations. The
energy requirement to haul unit load through unit distance by railway is only a fraction of that required
by road, and therefore, it is advantageous to transport bulk goods by the available railway facilities.

1.1.3 Waterways
Waterways include oceans, rivers, canals, and lakes for the movement of ships and boats. Transportation
by water is the slowest among all modes of transportation; but this mode needs minimum energy to haul
unit load through unit distance, and therefore, it is the cheapest among all the modes of transportation of
huge quantity of goods. This mode of transportation is only possible between the ports on the sea routes
or along the rivers and canals where inland transportation facilities are available.

1.1.4 Airways
The transportation by air is one of the fastest and most expensive modes of transportation. It is a best
mode of transportation of perishable goods which need least time in transportation from one place to
another. It also provides comfort to the passengers apart from saving transportation time between the
airports.

1.1.5 Other Modes


The other modes of transportation have been developed on the basis of the types of goods or material
to be transported. The pipe lines are used for the transportation of water and other fluids including even
solid particles. Elevators, Belt conveyors, Cable cars, Aerial ropeways, Trams and Monorails are also
functioning as minor transportation system.
Since each mode of transportation has widely varying characteristics, it is essential to have proper
coordination between different modes of transportation system. A healthy competition between different
modes should be encouraged for their effective use.

1.2 BRANCHES OF TRANSPORTATION ENGINEERING


Transportation engineering deals with the planning, design, construction, and maintenance of the
transportation facility. The airport and other facilities for the operation of aircrafts come under the
Highway Engineering 3

Airport Engineering. The Dock and Harbor Engineering includes the development of terminal facilities
for ships and boats, their harboring, and repairs, etc. The design and laying of railway tracks and yards,
and their maintenance, and safety and control of train movements are covered under the Railway
Engineering. The planning, design, construction and maintenance of roads and roadway facilities to
cater to the needs of road traffic are dealt in Highway or Road Engineering.

1.3 CHARACTERISTICS OF ROAD TRANSPORT


Some important characteristics of road transport can be summarized as below:
i. All types of vehicles such as animal driven carts, cycles, rickshaws, cars, and trucks can use it.
ii. It is the nearest mode of transport for people or public.
iii. It is the only mode of transport which serves the remotest isolated villages.
iv. It offers the flexibility of changes in direction of travel as per need, comfort, and convenience.
v. Overall investment in construction and maintenance of road transport is small compared to
other modes of transportation.
vi. Because the road vehicles can directly reach near to the point of destination, it saves time of
travel especially for short distances.
vii. For some human being, most pleasant and memorable moments of their life are passed on
roads.

1.4 ADVANTAGES OF ROADS


A well-arranged network of road system has the following advantages over the other modes of transport:
i. They are essential for economic prosperity and overall development of the country.
ii. They are essential from the defence and military point of view of the country.
iii. They are helpful in maintaining law and order by easy movement of police force.
iv. They provide easy movement of traffic from one place to another.
v. They help in the growth of trade and other economic activities in and outside the villages and
towns.
vi. They are comparatively cheaper and convenient mode of transport in many cases.
vii. They establish good commercial links between cities.
viii. They serve as a tool for all forms of developments whether industrial, agricultural, or trade.
ix. They also serve as feeder lines for railways, waterways, and airways, and thus, help in the
development of these modes of transport.

1.5 REQUIREMENTS OF AN IDEAL ROAD


The following are some of the requirements in respect of designs for an ideal road:
i. It should be free from submergence for all time safe movement.
4 Highway Engineering

ii. It should have easy gradient.


iii. Intelligently erected traffic signs should be provided for safety of the pedestrians and
passengers.
iv. The road users must be provided with various amenities along the road, such as sufficient
lighting, watering, fuelling stations, shady avenues, grass verges, parking facilities, restaurants,
etc.
v. It should have properly designed curves, good alignment, directness, and visibility.
vi. It should have adequate foundation depth for efficiently distributing the traffic load over
sufficient area of formation.
vii. The width of the road should be sufficient and camber or cross fall of surface should be as per
requirement.
viii. The road surface should have the following characteristics:
a. Economical in construction and low maintenance cost.
b. Even and smooth but not slippery.
c. Hard, durable, and uniform wear.
d. Neither dusty nor muddy.
e. Offering least resistance to traffic, etc.
f. Impervious and impermeable to rain water.

1.6 HISTORY OF ROAD CONSTRUCTION


There is little information available about the different construction material used during different
periods of history in India. The usual road construction materials were stones mostly undressed form for
Shoulder
Sloping 5 cm thick layer of
Side drain wearing small stones
surface
30 cm

8 cm thick
layer of broken
stones
Kerb stone
stores
17 cm thick layer of large
foundation stones

2.70 m

Fig. 1.1. Tresaguet construction

major roads. Most of the other roads used to be simply kucha roads. Most of the required amenities for
roads in towns were usually provided. Methods of compaction and technique of providing drainage in
Highway Engineering 5

the form of camber and side drains were not known until the development of Tresaguet construction of
roads in the late 18th century (Fig. 1.1) by a French engineer Pierre Tresaguet.
It is understood that the ancient roads built by the Romans were remarkable for their straightness
and bold inception. The Appian Way which was built by the Romans in 312 B.C. extended over a length
of about 580 km, and was known to be one of the earliest and best constructed roads of those times. A
typical cross-section of Roman roads is shown in Fig. 1.2.
15–20 cm large size
25–40 cm small size blocks of stones
broken stone in
lime motor

25–40 cm large
size broken stones
Vertical in lime mortar
kerb
stones

20–25 cm
10-20 cm hard stratum of soil

Fig. 1.2. Roman road

Telford’s road construction suggested by Thomos Telford (1757–1834) was based on providing
heavy foundation stones above the soil subgrade to achieve firmness of road base. He also suggested
having a definite cross-slope at top surface of pavement by varying the thickness of foundation stones
shown in the typical cross-section of Telford’s construction (Fig. 1.3).
First layer of
broken stones
Second layer of Top sloping
small broken stones wearning surfaces

19 cm

Broken
stones
22 cm
17 cm

1.8 m 2.7 m

Foundation stones Horizontal formation

Fig. 1.3. Telford construction

John Macadam (1456-1836), a Scotish engineer, suggested a road construction design which was
more scientific. He realized that the stress due to wheel load of traffic gets decreased at the lower level
layers of the road, and hence, it was not necessary to provide large foundation stones. To take care of
the percolated water, he suggested the cross-slope for the subgrade also. A typical cross-section of the
6 Highway Engineering

Macadam’s road construction is shown in Fig. 1.4.


Top layer of broken
Second layer of stones (25 mm,
smaller broken stones maximum size)

25 cm
First layer of larger
broken stones

4.50 m
Cambered
formation

Fig. 1.4. Macadam construction

QUESTIONS
1.1 Write a short note on the necessity of roads in the development of a country.
1.2 What are the modes of transportation? Briefly discuss each.
1.3 Discuss the characteristics of road transport.
1.4 How the roads help in the growth of economic prosperity and overall development of a country.
1.5 Discuss the requirements of an ideal road.
1.6 Briefly discuss the historical development of road construction.
1.7 Briefly discuss any two of the following:
a. Roman road
b. Tresaguet road
c. Telford construction
d. Macadam construction.
1.8 Write a short note on any one of the following (refer to Appendices):
a. Jayakar Committee recommendations.
b. Central Road Fund.
c. Indian Road Congress.
d. Nagpur Conference.
e. National Highway Act.
f. Central Road Research Institute.
CHAPTER 2
Highway Planning

2.0 INTRODUCTION
The object of highway planning is to provide a highway system which could give maximum transportation
at minimum cost. It requires a well-defined program to collect data and analyze the existing conditions.
It may also include the analysis to plan for the future requirements. The collected data through various
surveys aims at related studies for determining the present state of the whole rural road system and plan
for future development region-wise which includes the estimation of the ultimate cost of owning and
maintaining the economically necessary improved system; with an objective that a definite economically
integrated transportation system may be established and the future of the highway transportation may
be protected from the hazards inherent in a short-sighted and shifting public policy. One very important
fact that has been established by these studies in the realization that needs of urban and rural areas
though different, are still integrated.

2.1 PLANNING REQUIREMENTS


The modern highway planning includes the following:
i. To collect and tabulate the information about the existing transportation system in the area.
ii. To determine the general inter-relation of all branches of the transportation system and their
effect on each other.
iii. To access the adequacy of the existing transport facilities as per present needs, and the
improvements and extension of these facilities for the anticipated future needs for a certain
period.
iv. To determine the methods of financing these projects and the periods over which the
construction work can be spread.
v. To estimate the cost of the construction and maintenance.
vi. To find out the agency to which the construction and maintenance may be handed over for
execution.
The planning study is carried out under the following heads:
i. Road inventory study,
ii. Traffic studies,
7
8 Highway Engineering

iii. Economic planning studies, and


iv. Financial planning studies.

2.1.1 Road Inventory Studies


The road inventory is prepared by collecting all data about the existing road. Detailed information about
the existing roads is essential for the preparation of maps, compilation of statistics about the mileage of
the various types of highways, the various types of structures and such other data, evaluation of needs of
a highway by comparing it with the revised standards and a periodic evaluation of the adequacy of the
highways in the system. The inventory records may be in the form of general maps, plans, and profile
sheets and written documents.
The items included in the road inventory are such as:
a. Clear demarcation of different States from the roadway point of view.
b. Man-made and natural features adjacent to roads such as buildings, land-lines, fencing,
monuments, bench marks, water courses, etc.
c. Description of road geometrics such as roadway width, right-of-way width, sight distances,
curves radii, gradients, road camber, etc.
d. Information about the structural details of the pavements, surface types, and pavement design,
cross-sections, and soil characteristics.
e. Road conditions, i.e., surface condition, drainage and driving qualities, etc.
f. Information about the type of drainage structures, their locations, number of spans, lateral
clearance, distance between roadway surface and stream bed, width of structures, vertical
clearance, load-capacity, condition of structures, adequacy of waterway, and approach
alignment.
g. Information about rail-road crossings, their names, number of rail tracks, gradient of the
highway at approaches, angle of crossing, propriety of sight-distance, and curvature near it, if
any.
h. Land-use, agricultural and other potential productivity.
i. Classification of the highway and its service to the community.
j. Traffic volume, speeds, and accident experience on the road.
k. Maintenance cost of the highway.
A series of maps are prepared from the above information for planning purposes. In a central
planning office, all information collected through the agencies, such as State Public Departments,
Municipalities and Corporations, are pooled up for planning on a natural basis. The various information
are collected as per standards prepared by a central body such as Ministry of Transport in India. The
collected information is updated using occasional field checks at an interval of say 10 years.
Highway Planning 9

2.1.2 Traffic Studies


Since the mode of road transport has been changing in India slowly from animals and bullock carts to
motor vehicles it is, therefore, important that the future trends in the development of traffic are assessed
properly. This aspect of road transport is taken into consideration at the planning stage. In the planning
process, considerable information on the fundamental characteristics of traffic flow, the behavior and
desire of the driver, and traffic capabilities of highway facilities is essential. The following provide
fundamental data required for the planning as well as for geometric and structural design:
a. Volume,
b. Classification,
c. Size,
d. Weight,
e. Speed, and
f. Lateral placement of vehicles.
A comprehensive traffic survey which may be split into rural and urban traffic studies as below,
provide for system selection, route location, and design, cost-benefit analysis, justification and priority
determination, etc. It also helps organize and administer the decision taken on the subject as also to
employ suitable personnel for the execution of the work. This also splits into Rural and Urban Traffic
studies as below:

Rural Traffic Studies


Rural traffic studies mainly consist of determination of traffic volume, types of vehicles operating on
the highways, the speed of vehicle, their directional distribution, load carried by them, and the number
and frequency of accidents.
The Motor Vehicle Volume Studies can be carried out on hourly basis at selected key stations either
by manual method or by automatic counting. The collected information is sufficient to determine the
hourly, daily, weekly, and yearly distribution of traffic trends and can be used to determine the necessity of
widening the road, data for roadway planning, maintenance, evaluation of accident rate of total volume,
the relationship to traffic of day and night accidents, and necessity of providing alternate facilities. Flow
maps can also be prepared from the above studies which form the basis for further planning.
The Classification Counts of vehicles as to the type and size is essential to set standards for use in
geometric design. Such information is collected by manual counting at selected stations.
The Origin and Distribution Study (O and D study) is required to be done to determine the directional
distribution of vehicles for assessing the change in traffic volumes as the highways approach cities. In
the case of rural roads, such a study supplies information to determine the proper expansion of the
roadway system in the area, and the priorities for construction. A study carried out at Cordon Stations
outside the city limits helps in the determination of the necessity or otherwise of a bye-pass which
would allow the out-station vehicles to pass on to it and thus relieve congestion on the city roads which
would serve local traffic only. The method of such studies has been discussed in the Chapter-5 on Traffic
Engineering.
10 Highway Engineering

The Loadmeter Studies involve the establishment of temporary weight stations at sufficient number
of points to give representative results for load carried by trucks and other heavy commercial vehicles.
These stations should be away from the permanent weighing stations which are sometimes established
to enforce the law. Data may be collected on the classification of vehicle type, State of registration, Make
and body type, rated capacity and gross weight, type of fuel used, size and ply of tires, dimensions of
the vehicles, weight both when empty and loaded, axle-load, origin and destination, trip length, private
or public, etc. The work of different types of data collection can be done simultaneously by keeping the
Loadmeter stations and O and D study stations same.
A very important part of traffic studies in rural areas is conducted through Accident Studies. Regular
maintenance of accident records is of great importance in chalking out traffic safety programs, in
watching the effectiveness of each program, and in mobilizing public opinion for careful driving, etc.,
also in preparing spot maps showing high accident frequency places, and in carrying out before and
after studies.
Speed Studies in highway planning are essential to determine the speed trends, the distribution and
fluctuation in different areas, etc. Such studies require good weather conditions on straight portions of
roads, and in open areas with no roadside developments. The study should be done periodically and it
should give information about the requirements of the fast moving vehicles and help in determining the
design-speed on which depends most of the elements of geometric design.

Urban Traffic Studies


The traffic study is made for highway planning within the city limits integrating it with rural planning.
As such, a variety of traffic surveys are essential in order to properly plan the city streets and to control
the traffic. In addition to the traffic studies, the O and D studies and speed studies, there is a need for
cordon counts, the pedestrian study, road congestion or speed and delay study, roadway capacity, road
user’s psychology, and parking problem studies, etc.

2.1.3 Economic Planning Studies


Proper planning of highways requires study of the economic status and developments in the region.
Collection of information regarding the dispersal and location of the cities, towns, and villages classified
on population basis, the location of existing industries and natural sources of materials, the trend of
future development, the classification of the area as agricultural, semi-agricultural and non-agricultural,
the location of the marketing centers and goods sold, number of permanent and temporary shops and
stalls, the hours of their opening and closing, number of people going to attend these business centers as
customers , their mode of transportation, etc., becomes important.
The information collected through the economic studies determines the zones of supply and demand
as also the areas of primary and secondary commercial influence and as such helps in proper layout of
the roads, upgrading of the surfaces where heavy traffic is expected on existing roads by either providing
better modes of transportation or by providing alternate routes based upon the needs of the area.
Highway Planning 11

The planning of roads in a particular region largely depends on the population of the region, its
mobility and future trends, which are based on the economic life of the area. The centralized amenities
in respect of services, social activities, and employment opportunities in the cities attract the rural
population to the cities resulting into the strained economic life of the cities. Therefore, there will be a
greater and rapid demand for better transportation facilities in the cities, which may not be possible to
cope with. This situation results in the deterioration of the transportation problem in the city areas.

2.1.4 Financial Planning Studies


To cover the information on the financial aspects of planning, the financial planning studies are
conducted. For a wise fiscal planning, it is essential to determine continuously the financial needs, costs,
and benefits of improvements, allotment of funds for maximum benefit and compilation of statistics for
the income and expenditure on the various highway facilities. This may also include the studies to find
out the agency which should pay for the betterment of the highway system. It may ultimately lead to the
enactment of a law to realize the funds from beneficiaries.
These studies may be sub-divided into the following:
a. Basic Statistics: For the road finance, the basic statistics on various duties and taxes includes:
i. Rates of import duty on motor vehicle and motor spirit,
ii. The gross amount of customs-revenue on the of vehicles and accessories,
iii. Revenue from excise duty on tires,
iv. Central government revenue from motor spirit,
v. Revenues from motor taxes in various States,
vi. Registration fees realized by State governments,
vii. Sales tax on motor vehicles, accessories, and motor spirit, and
viii. Local taxes, etc.
The basic statistics by the Ministry of Transport, Road Wing, Government of India, over a
number of years provides a comparison of trends in the allocation of funds to the several
highway improvements. The future planning of the highways is based on the information
regarding the statement of the total income from various taxes and its allocation for various
projects both by the Central and the State governments.
b. Motor Vehicle Use Studies: Such studies assist in the formulation of a plan especially for city
areas that would help in the determination as to where the highway funds should be used to
give the largest number of motorists the maximum benefit for the taxes they pay and to provide
for the most essential needs on all classes of roads and streets. The information is obtained by
interviewing a selected sample of urban and rural drivers of various types of vehicles.
The information can be tabulated or can be presented in the form of diagrams as shown in
Figs. 2.1 and 2.2.
12 Highway Engineering

Major district roads (13.2 %)

Minor district roads (12.0 %)


State highways (22.3 %)

Village roads (4.5 %)

National highways (48 %)

Fig. 2.1. Motor-vehicle use (classified according to the types of highways in a particular area)

Kilometers travelled by vehicle


40 Trips made by vehicle
Percentage of trips of travel

30

20

10

0
To and Related Medical Educatio- Pleasure
from work business purposes Shopping Others
nal, civic
Vacations trips Others
and
Earning Living Family Business religious Social and Recreation

Purpose of trip

Fig. 2.2. Motor-vehicle trips and travel classified by major purposes of trip

c. Road Life Studies: The road life studies are carried out to determine the life of roadway
elements which determines the amount and cost of replacements required each year in future
for each road. Through such studies, the facts concerning the life of various types of highways,
construction and maintenance cost and salvage values of road elements, etc., are collected.
The history of each section of road is maintained with complete design, construction and
maintenance dates. The information about the salvage value of various elements is added
thereafter.
d. Road Fund Allocation Studies: The roadway fund allocation studies include the determination
of properties for the allocation of funds to various projects. Besides, the demands of traffic, the
economic development in the area and the service to be rendered by a facility to the community,
factors like the political influence and strategic needs also affect the fixation of property. For
deciding the properties, from the engineering point of view, the method of sufficiency rating is
used.
Highway Planning 13

2.2 CLASSIFICATION OF ROADS


For the planning of highways in a country or region, it is necessary to include all kinds of roads in the
area. Therefore, it is essential to know the different kinds of roads and how they are classified.

2.2.1 Types of Road


Basically there can be the following two types of roads:
a. All weather roads which are open for use in all weather conditions throughout the year except
at major river crossings where interruption to traffic is permissible up to a certain extent of time.
b. Fair-weather roads which depend on the weather conditions during different seasons of the
year. On such roads the traffic may be interrupted during monsoon season at causeways where
streams may overflow across the road.
The roads are also named on the basis of carriageway or the type of road pavement as below:
a. Paved roads are those roads which are provided with hard pavement course with at least a
water bound macadam (WBM) layer.
b. Unpaved roads are the roads which are not provided with hard pavement course of at least a
WBM layer. The earth roads and gravel roads come under this category of roads.
Based on the type of pavement surfacing provided, the roads types are categorized as:
a. Surfaced roads are provided with bituminous or cement concrete surfacing.
b. Un-surfaced roads are not provided with bituminous or concrete surfacing.
The surface roads with bituminous surfacing are also called black-topped roads.

2.2.2 Method of Classification of Roads


The roads are generally classified on the following basis:
i. Traffic volume,
ii. Load transported or tonnage, and
iii. Location and function.
The different agencies have classified the roads arbitrarily on the basis of traffic volume or
tonnage, and accordingly the roads have been classified as heavy, medium, and light traffic roads. The
classification based on location and function appears to be more acceptable for a country as they have
been defined more clearly. The Nagpur Road Plan classified the roads in India on location and function
criteria into the following five categories:
i. National Highways (NH),
ii. State Highways (SH),
iii. Major District Roads (MDR),
iv. Other District Roads (ODR), and
v. Village Roads (VR).
14 Highway Engineering

The National Highways assigned an unique number are the main highways of the country running
through the length and breadth of India, connecting major ports, foreign highways, State capitals, and
large industrial and tourist centers including the roads required for strategic movements of defense of
India.
The State Highways are arterial roads of a State, connecting up with the National Highways of
adjacent States, district headquarters, and important cities within the State. The Major District Roads
are important roads within a district serving areas of production and markets, and connecting those
with each other or with the main Highways. The Other District Roads are roads serving rural areas of
production and providing them with outlet to market centers, Taluk headquarters, block development
headquarters or other main roads. The Village Roads are the roads connecting villages or groups of
villages with each other to the nearest road of a higher category.

2.2.3 Modified classification of Road System (by Third Road Development


Plan 1981–2001)
According to the modified classification system, the roads classified by the Nagpur Road Plan, the roads
are classified under three classification heads as:
i. Primary System,
ii. Secondary System, and
iii. Tertiary System.
The primary system includes the National Highways and Expressways which have superior facilities
and design standards, are meant for the routes having very high volume of fast moving traffics. The
expressways are provided with divided carriageways, controlled access, grade separation at cross-roads,
and fencing. The responsibility of maintenance of the expressways lies on the Central Government or
State Government depending on who owns them.
The Secondary system of roads consists of two categories of roads as the State Highways and the
Major District Roads, and the Tertiary system consists of the rural roads which includes Other District
Roads and the Village Roads.

2.3 ROAD PATTERNS


The road pattern generally depends on the type of area for which roads are being provided. The various
road patterns are classified as follows:
i. Rectangular or Block pattern,
ii. Radial or Star and Block pattern,
iii. Radial or Star and Circular pattern,
iv. Radial or Star and Grid pattern,
v. Hexagonal pattern, and
vi. Minimum Travel pattern.
Highway Planning 15

The choice of pattern very much depends on the locality, the layout of different towns, villages,
industrial and production centers, and the choice of the planning engineer. Each pattern has its own
advantages and disadvantages.
The rectangular or block pattern of roads (Fig. 2.3) has been used in Chandigarh for city roads. This
pattern is not considered convenient from traffic operation point of view. Fig. 2.4 shows the radial or star
and block pattern of the road net work.
Built up area

Central business
area

Main road

Fig. 2.3. Rectangular or block pattern

Rectangular
pattern

Central business
area

Radial roads

Fig. 2.4. Radial or star and block pattern

Figs. 2.5 and 2.6 show radial or star and grid pattern and hexagonal pattern, respectively.
16 Highway Engineering

Radial roads

Central business
Ring road area

Fig. 2.5 Radial or star and circular pattern

Business area
d
Gri

Radial roads

Fig. 2.6. Radial or star and grid pattern

Fig. 2.7. Hexagonal pattern


Highway Planning 17

QUESTIONS
2.1 What do you mean by Highway Planning?
2.2 Explain the necessity and objective of highway planning.
2.3 What are the various methods of road classification?
2.4 Briefly outline the main features of various road patterns in common use. Explain with sketch
the radial or star and grid pattern.
2.5 Briefly discuss the requirements for road planning.
2.6 What are Loadmeter studies? Explain it briefly.
2.7 What do you understand by road life studies?
CHAPTER 3
Highway Surveys and Alignment

3.0 INTRODUCTION
Once the planning stage is over, the terminal points between which a highway of a specific standard has
to be located are decided in consultation with the planners and administrators. To give a specific shape
to the proposal, the work is assigned to a highway engineer. The engineer’s first task is to locate the best
and most economical alignment of the highway on the ground by considering various factors such as
engineering, economic, social, and political, responsible for selection of the best alignment. The most
essential requirements of any highway are:
i. The route should be short,
ii. The construction and maintenance should be easy,
iii. It should provide a safe driving, and
iv. It should be economical in construction as well as in maintenance.
It is desirable to have a short (or shortest) alignment between the two terminal stations. A shortest
alignment is a straight alignment but due to various considerations there are always deviations from
the shortest route. Also the alignment should be such that there are minimum problems in construction
and maintenance of the road. The alignment should also be such that it has easy gradients and curves
to make the driving of vehicles easy. The stability of road where there are natural slopes, embankments
and cut-slopes, and foundation of embankments, must also be looked into so that the road is safe
for construction and maintenance from the economic considerations of the total cost of construction
including the maintenance and vehicle operations.

3.1 ALIGNMENT CONTROLLING FACTORS


An alignment can seldom fulfill all the requirements simultaneously, and therefore, a judicious choice
has to be found out considering all the factors and compromising with some of them. In general, the
following are some of the factors which control the road alignment:
i. Obligatory points,
ii. Traffic,
iii. Geometric design,
iv. Economics, and
v. Other considerations.
18
Highway Surveys and Alignment 19

In the hilly areas, the road alignment is affected by the following factors:
i. Stability,
ii. Drainage,
iii. Geometric standards, and
iv. Resisting lengths.

3.1.1 Obligatory Points


The obligatory points govern the road alignment and they are divided into two categories as
a. the points through which the alignment must pass and
b. the points through which the alignment should not pass.
The various examples of the first category may a bridge site, intermediate town, a mountain pass, or
a quarry. To avoid a hill or high bridges, the various alternatives could be to cut tunnel, to go round the
hills, or to deviate until a suitable hill pass becomes available.
The road bridges across a river can be located only at a place where the river has a straight and
permanent path, and where the bridge abutment and piers can be properly located. While selecting an
alignment, the road curves should be avoided near the bridge site and also skew crossing should be
avoided as far as possible.
Between the two terminal stations there could be some important intermediate towns, villages, or
other places which must be connected through the proposed road. This would require the deviation in
straight alignment. Sometimes help of link roads may also be considered to avoid excessive deviation
of the road.
There are some obligatory points of second category through which the road should not pass, and
make it necessary to deviate from the proposed shortest alignment. These obligatory points may be
very costly structures, religious places, unsuitable land, etc. In India, the religious places like temples,
mosques, churches, graveyards,, or tombs are protected by the law from being acquired for any purpose.
If a costly structure is acquired, a very heavy compensation is to be given which shall increase the cost
of construction of the road. The unsuitable land like marshy, peaty, and water logged areas should be
avoided by deviating the alignment; otherwise the construction of road on such lands is also going to
increase the cost.

3.1.2 Traffic
The traffic has its own requirements on a particular type of road. The origin and destination study should
be carried out in the area and the desire line showing the trend of the traffic flow should be drawn. The
new road alignment should take into account the desire line, traffic flow pattern, and future trends.

3.1.3 Geometric Design


The factors such as gradient, radius of curve, and sight distance which are considered in geometric
design of highways, also govern the final alignment of the road. The road should have, as far as possible,
20 Highway Engineering

flat or less than the ruling or design gradient. To achieve this, sometimes it may be necessary to deviate
the alignment in view of the design speed, maximum allowable superelevation, and coefficient of lateral
friction. It may be necessary to make adjustment in horizontal alignment of the road keeping in view
the minimum radius of horizontal curves and transition curves. The final alignment should be such that
the obstruction to intervisibility does not cause restrictions to the sight distance requirements for safe
driving.

3.1.4 Economy
The alignment finalized considering all aspects should also be economical keeping in view the initial
cost, maintenance cost, and vehicle operation cost. The alignment should also be such that there is a
balance in cutting and filling of earthwork to decease the cost of construction.

3.1.5 Other Considerations


There are various other factors which govern the alignment of a road such as:
i. Drainage consideration,
ii. Hydrological factors,
iii. Political considerations,
iv. Monotony in driving to avoid accidents, and
v. Foreign territory.

3.1.6 Special Considerations in Hilly Terrain


The special considerations such as stability, drainage, geometric standards of hill roads, and resisting
length require special attention when a road is aligned in hilly terrain. A common problem in hill is
the land slide, and therefore, such areas where land slide usually takes place, a special care should be
taken. Also there would be too much cutting and filling which would cause steepening of existing slopes
affecting the stability.
In hilly areas, numerous hill-side drains should be provided for adequate drainage facility by
providing cross-drainage structures which are expensive, and therefore, attempt should be made to keep
them a minimum to reduce the cost of construction of the road.
The geometric design of hilly roads is governed by the gradient, curves, and speed. These factors
consequently influence the sight distance, radius of curves, and other related features. The route should
enable the ruling gradient to be attained in most of the length, minimizing steep gradients, hair-pin
bends, and needless rise and fall.
The resisting length of a road is defined as the total work to be done to move the loads along the
route taking the horizontal length, the actual difference in levels between two stations, and the sum of
the effective rise and fall in excess of floating gradient. The resisting length of the alignment should be
kept as low as possible. Thus ineffective rise and excessive fall should be kept to a minimum.
Highway Surveys and Alignment 21

3.2 STEPS FOR FINAL ALIGNMENT


To finalize the alignment of a highway, a topographic map of the area is the first requirement. The
other requirements to help in finalizing the alignment are aerial photographs, soil survey, data about
flood frequency and flood level, etc. To finalize an alignment, the engineering surveys are to be carried
out in four stages. The first three stages consider all possible alternative alignments keeping in view
the various requirements of highway alignment. The fourth stage includes the detailed survey of the
selected alignment including soil survey.
The four stages of engineering surveys are:
i. Reconnaissance,
ii. Preliminary surveys,
iii. Final location and detailed survey, and
iv. Soil survey.

3.2.1 Reconnaissance
The reconnaissance is a kind of survey of the region to examine a relatively large area between the
terminal points for the purpose of determining broad corridors through which the alignment may pass.
These corridors may be sufficiently wide, being defined on either side by the terrain which is inaccessible
due to high cliffs or steep falls, or unsuitable for other reasons. Sometimes features like wide rivers,
lakes, swamps or adverse topography may limit any route to a series of bands having restricted width.
Reconnaissance survey is primarily carried out to gather the first hand information about the general
topography, physical features, and land-use of the area on which generally depends the alignment
gradients, sight distances, cross-sections, and other design elements. In flat areas, topography may not
alone affect the location but it might affect certain design elements such as the drainage. On the other
hand in hilly areas, where the terrain is rugged, the location is mainly governed by the above mentioned
factors.
The second phase of the reconnaissance survey is devoted to the inspection of each band to determine
the most feasible routes based on certain fundamental criteria that have significant effect on its location.
For reconnaissance survey, the following are very helpful:
i. Available topographic maps of Survey of India with 15 m or 30 m contour interval. By careful
study, the main features like rivers, hills, valleys, etc., shown in the topographic map, it is
possible to have an idea of several possible routes and further details of these may be studied
later at the site.
ii. Available large scale aerial photographs of the area help in determining all details with respect
to reconnaissance, preliminary survey, and final location survey, and in certain cases even
the preparation of estimates can also be worked out from the aerial photographs. The extent
of ground surveys would be limited to supply the necessary ground control, filling up any
missing details, and checking up the interpreted results as regards to the type of the soil and
22 Highway Engineering

material available in the area. Use of aerial photographs avoids many of field works reducing
the whole work mainly to office works, and considerably saving in time, money, and man-
power. Another advantage is that the work can be done under ideal conditions and without
any interference from political sources. It depends on the highway agencies whether to use the
aerial photographs for reconnaissance work only or to include rest of the ground survey work
also using large scale aerial photographs putting them in the form of composite maps called as
mosaics, and leaving very little ground survey work at the final location survey stage.
For a better and more accurate study, sometimes stereo pair of aerial photographs are studied under
instrument known as stereoscope. Such studies require trained personnel.
As far as the highway location is concerned, the work on photographs may be divided into four
stages.

Stage-1
Reconnaissance survey of the entire area as a whole between the terminal points using small-scale aerial
stereo photographs and stereoscope. It includes determination of controls of topography and land-use,
and location of feasible route bands on the photographs.

Stage-2
Reconnaissance of all feasible route bands is conducted by stereoscopic examination of large-scale
aerial photographs of each route band. The details of topography and land-use are determined, and the
location and comparison of all feasible routes on the photographs are done to select the best route.

Stage-3
This includes the preliminary survey of the best route and interpretation of available material, soil, and
drainage conditions, etc., by the method of photointerpretation.

Stage-4
In this stage the location of the highway on the ground guided by the preliminary location made in the
third stage is performed. It also includes preparation of the design-data from aerial photographs using
photogrammetric methods.
In selection of routes during reconnaissance, the following are considered:
i. Basic Criteria
a. Minimum design standards: The minimum design standards regarding alignment and
gradients, etc., are fixed prior to the start of the work. Any one of the feasible routes that
economically fits these standards would be suitable.
b. Grading and Earthwork: A line which generally follows the contours of the area would be
cheaper than the one that cuts the natural ground slopes. The type of material encountered
Highway Surveys and Alignment 23

may be another major factor on the cost of earthwork. The solid rock excavation needs
blasting which adds to the more cost than the ordinary earthwork.
c. Foundation condition: At the reconnaissance stage the complete foundation study for the
location of the drainage structures is not feasible, but the preliminary information needed
can be obtained through the general condition of the area. For example, the presence of
marshes and boggy areas are unsuitable for foundation of structures. Also if the sub-grade
soil is poor, the construction cost may go up.
d. Geological conditions: The suitability of the area and any subsequent problem that may
arise can be revealed by the casual study of the geology of the area. Always, the alignment
should pass through the area having sound rocks, and the areas having sedimentary rocks
which are generally the cause of landslides should be avoided or the road should be
located in such a way that the rocks are dipping towards the hillside. Earthquake faults,
especially the live faults should be suitably taken care of for the major structures.
The general study of the geology of the area would also indicate the availability of
construction material required for the road and other structures, and the location of
quarries within reasonable haul-distance which may reduce the overall construction cost.
e. Drainage: Detailed drainage studies at this stage may not be possible and also may not be
as useful but a general idea about the drainage condition of the area is necessary so as to
ascertain the likely drainage problems both surface and sub-surface, and also the type and
number of drainage structures needed for an all-weather road.
f. Right-of-way: A major factor contributing enormously to the cost of highway is the right-
of-way. The cost may go up to 70% of the construction cost in developed areas due
to acquisition of land for the right-of way. Therefore, it is desirable to investigate the
possibility of shifting the alignment from developed to undeveloped areas for reducing
the cost considerably. For the future expansion of the road for expressways and freeways,
etc., the adjoining property have to be acquired which tremendously increase the cost of
construction. While finalizing the alignment this factor should also be looked into.
g. Effect of population: The location of highway must consider the future trends of
development of society adjoining to it including services to the community in respect of
the schools, religious centers, public buildings, business centers, industrial areas, farms, etc.
h. Traffic characteristics: Careful analysis of comparative traffic service rendered by each
alternative route under study must be made at the reconnaissance stage. It is essential
to evaluate how best a particular route would fit in with the traffic requirements of an
area. The volume of traffic on a particular route can be evaluated by making origin and
destination surveys. The geometric design of a road depends on the physical characteristics
of the vehicles. Therefore, it is also essential to assess whether the physical situation of
that route would be able to accommodate the necessary required geometric design. It
requires examination of all types of vehicles, select general class groups and establish
representative size vehicles within each class for design purpose.
24 Highway Engineering

i. Financing: The route selection also depends largely on the availability of funds. If the total
fund required to construct a highway is not available at a time, then the stage construction
has to be implemented and it may take a number of years to complete the work. In such
case, it is preferable to select a route where the improvements would bring it up to the
required standards during the period over which the plan is spread, rather than selecting
an alternative which needs all the construction right at the beginning before the traffic
could use it and thus incurring heavy expenditure. In case the expenditure has to spread
over a period of years, it is essential to study each alternative and evaluate its use at every
stage of construction keeping in view the available funds.
j. Maintenance costs: A scientific approach to the route selection would be to take into
consideration the maintenance cost envisaged every year. The routes having extraordinary
costs such as removing snow during winter and repairing any landslides, etc., should be
avoided because they will have recurring heavy maintenance costs and also inconvenience
to the users. This problem becomes more serious especially in hilly areas where the only
means of transport is by road and its blockade means cutting off the area from the outside
world.
ii. Available Data
Quality of reconnaissance study would vary directly with the extent of knowledge and
information collected for locating the highway in the area. A lot of information about the area
can be gathered from the available topographic maps and aerial photographs of the area which
can be acquired at reasonable costs from the Survey of India, Dehradun (UK).
Geological and soil maps for some part of the country are also available. The geological
conditions and soil types obtained from these maps can be quite helpful in giving information
about drainage conditions.
iii. Field Studies
Reconnaissance for selection of a most desirable route includes also actual field studies without
which the decision on the final alignments may be doubtful. A careful review as verification
of the observations made from the maps and photographs is done by actual field study. For
field studies, help of a helicopter or light airplane may be employed, and in some cases actual
field visits are done. After the alternate routes have been worked out and the areas have been
restricted to small bands, the information has to be collected carefully for each alternative.
The surveying instruments such as hand level, Abney level, compass, etc., are used to collect
information about the natural slopes, the existing gradients, elevation of critical summits, and
stream-crossings for the verification of information collected through maps and photographs
by interpretation.

3.2.2 Preliminary and Final Surveys


The preliminary survey is conducted to obtain sufficient data along the route selected as a result of the
reconnaissance for final location. It requires running an accurate primary traverse, usually called the
Highway Surveys and Alignment 25

P-line or Base line along the selected route and similar traversed also along the secondary or alternate
routes, if any. Generally the open traverse is used which cannot be adjusted as a closed traverse, and
therefore, to ensure some standards of accuracy certain precautions in measurements of distances and
angles are necessary. For the highways in rural areas, an accuracy of 1:3000 in urban areas 1:5000
should be observed. For preliminary surveys, the photogrammetric methods may be used to complete
the work in a shorter time and also in a more effective manner.
Sometimes in exceptionally rugged and hilly areas, a profile along the P-line is run with occasional
important cross-sections. Some agencies prefer more detailed work at the preliminary stage by recording
levels along the P-line at 20 to 30 m intervals. The levels are also recorded at the points where the
levels change suddenly. Generally the profile is drawn at some scale on which the map is to be finally
produced. For drawing profile, the following horizontal and vertical scales are adopted:
Horizontal scale 1:1000 to 1: 2000
Vertical scale 1:100 to 1:200
Profile of all intersecting roads, rail-roads, and stream crossings up to 300 m on either side of
the P-line are also drawn since their levels affect the final location. After fixing the P-line, important
topographical features such as rock-outcrops, faults, bad soil, marshes, lakes, streams, drainage
conditions, landslide possibilities, quarries, gravel pits, any other features which may affect the final
location and design of the highway, are also recorded.
All information collected by preliminary survey is shown in a map called Preliminary Survey
Map, also known as the Basic Map. The basic map shows the bearings of various traverse lines, the
distances, the deflection angles, corner ties, and other salient features along the alignment. It also shows
the topographical features discussed in the above paragraph as well as the other man-made features such
as roads, bridges, building, railway lines, etc.
The center-line or the final base line transferred to the ground should follow as closely as possible
the line drawn on the preliminary map conforming to the major and minor control points. Usually stakes
at 30 m interval are established on the center-line. The entire survey work especially on curves must be
done with utmost care employing the best survey practices. Center-line control can be established by
carefully referencing the points of curvature, point of tangency, setting out bench marks at close intervals
and at places free from disturbances during construction so that their positions can be relocated easily
by measurements of ties computed from the P-line. Direction of property lines, distances of property
corners and location of buildings, fences and other improvements must be made accurately since the
acquisition of the right-of-way and future settlement of disputes arising there from shall depend on the
position of these features vis-a-vis the centre line of the road.
Sometimes, the detailed level work has to be done in the final location survey if it was not carried out
in preliminary survey. The leveling data should be as precise as possible for accurate establishment of
the grade lines, calculation of earthwork quantities, and design of drainage structures, etc. For leveling
works including along the center-line, the bench marks established by the Survey of India throughout
the country, should be used. The temporary bench marks as reference points should be established along
the alignment at an interval of 300 m in plain areas and at closer intervals in hilly terrain. Also the bench
26 Highway Engineering

marks should be established on a line parallel to the proposed center-line at a distance of about 100 m
from it, with a view to avoid any disturbance while different phases of construction are going on.
For calculation of earthwork and other quantities, and establishment of grade line, the detailed
cross-sections of about 25 m on either side of the center-line and at stations every 20 or 30 m apart,
depending on the type of terrain along it, should be taken. Cross-sections should also be taken at all
intermediate points where the sudden changes in elevation occur. The cross-sections also help in the
design of the drainage structures. From the leveling data, profile should be drawn along the center-
line, rail-road crossings, and stream crossings. While taking the cross-sections, important topographical
features such as property lines, fences, buildings, rail and road intersections, water courses, bridges, soil
data, land-use, etc., at least within the right-of-way, should be recorded.

3.2.3 Soil Survey


In the recent years, the soil survey has become a part of highway alignment location. During the
detailed survey operations, the soil samples along the center-line of the route at an interval of about
100 m should also be collected with the help of borings taken to a depth of 3 m for determining the type
of soil, the gradation of particles, and its natural water content, etc., to help in designing the road cross-
section, its base, and the pavement type, etc. The bore-hole data also helps in drawing the soil-profile.
For soil survey hand-operated or mechanically operated auger of 10 to 12 cm diameter is generally
used to obtain disturbed soil-samples. Undisturbed soil-samples may also be taken by other methods if
needed. Other details of soil survey are discussed in Sec. 8.5

3.2.4 Preparation of Plans


The engineering drawings of the project include Highway Plans. Highway Plan consists of preparation
of plans, profiles, and cross-sections, etc., of the highway for recording complete information regarding
the exact location of the alignment and also the details of quantities of material, etc., for construction.
The data after necessary investigations and field location are sent to the design office where it is suitably
processed in regard to the geometric design, drainage structures, and pavement type, etc. The upper
portion of the drawing sheet of the Highway Plan is utilized for drawing the plan-view and the lower
half for showing the profile. The cross-sections are usually shown on a different drawing sheet. The
details of the plans, profile, and cross-sections are discussed below:

Plans
The plans drawn to a horizontal scale of 1:1000 to 2000 should carefully show the following:
a. The horizontal alignment with the right-of-way and all necessary existing topographical
features, such as roads and rail-roads crossings, buildings, streams, fences, drainage-structures, etc.
b. Complete information regarding bearings of all tangents, degree of curvature, the points of
tangency, and points of intersection of all curves, etc., for easy establishment of the center-
line.
c. The positions and elevations of all bench marks.
d. Any other information that may affect the execution of the project.
Highway Surveys and Alignment 27

Profile
The profile is drawn usually on the same horizontal scale as that of the plans, but the vertical scale for
showing the elevations of the original ground surface is exaggerated 5 to 10 times. The profile should
show the following:
a. The elevations of the original ground surface along the roadway center-line.
b. The vertical alignment or the grade line for the proposed road together with the vertical curves
at the points of change in grades so as to form a continuous profile. This shall include the
percentage grades, the lengths of the vertical curves, the terminal points of the curves together
with the elevations of the points where change in grades occur.
c. The H.F.L. line of the region.
The plan and profile both show the details of various drainage channels, existing structures, etc.

Cross-sections
Depending on the terrain conditions, the cross-sections along the center-line are generally prepared at
20 to 30 m intervals on a separate sheet. The cross-sections are also drawn at intermediate points where
found necessary. Certain other details, as follows, are also worked out to obtain complete design:
a. The computation of earthwork and excavation quantities.
b. Detailed design for the various drainage crossings.
c. Preparation of site maps of road and rail-road crossings.
d. Preparation of abstract of quantities and finally the detailing of the construction methods and
specifications to be followed, etc.
To make minute details more conspicuous for construction, the drawings of bridges and culverts,
and the site maps, etc., are drawn to a larger scale.
The Land Acquisition Plans and Schedules are also usually prepared from the survey drawings for
land acquisition details. These plans show all general details such as buildings, wells, nature of gardens,
and other details required for assessing the values. The scale adopted for such plans may be 1:4000 or less.
The Land Plans for Quarries should also be prepared for acquiring the construction materials for
the construction of the highway. The size and scale of such maps may be similar to those for land
acquisition.

3.2.5 Bridge Location


The selection of sites for long-span bridges should be taken up while deciding the final alignment. This
may be a governing factor because a suitable site for the bridge should be at right-angles to the center-
line of the stream at the narrowest point allowing preferably a straight and level approach. The site
should be selected before the final alignment of the road on either side of such a crossing. The bridges of
relatively short span should be located conforming to the general alignment of the highway previously
determined, as far as possible. The design of such short-span bridges can be done later to fit into the
alignment as required under certain set of conditions.
Other documents randomly have
different content
In handsome Cloth Covers. Price 2s. 6d. each net.
Postage 4d. extra.
Strong-Hand Saxon. The Adventures of a
Canadian Scout and a British Boy in the Far West. By
CHRISTOPHER BECK.
"Boys who like a story positively throbbing with excitement should by all
means invest in Christopher Beck's 'Strong-Hand Saxon.' ... Of breathless
interest. "—Western Mail.

Coo-ee! A Story of Peril and Adventure in


the South Seas. By ROBERT LEIGHTON.
"This story of peril and adventure in the South Seas will be welcomed with
acclamation by boys.... One of the best sea stories it has been our good
fortune to peruse."—The Schoolmaster.

The Honour of the Lions. A Scouting Story


of Adventure and Mystery. By STACEY BLAKE.
"It is the type of story which a boy declares to be 'ripping.'" Manchester
Courier.

The Young Cavalier. By PERCY F.


WESTERMAN.
"One of the best stories of the English Civil War we have met, and Mr.
Gordon Browne's fine pictures enrich it unspeakably." Pall Mall Gazette.

The Quest of the Veiled King. By RUPERT


CHESTERTON.
"A really good yarn which will be appreciated by every scout and by many a
boy who belongs to no patrol."—Morning Post.

Pirate Gold. The Story of an Adventurous


Fight for a Hidden Fortune. By J. R. HUTCHINSON.
"The search for hidden treasure is a subject of which readers seem never to
tire. No one knows how to tell a story of this kind better than Mr. Hutchinson,
and here he is equal to himself. He keeps us in suspense as to the issue up to
the last minute: who is to succeed? Our readers will get no little
entertainment in finding out this for themselves." Spectator.

THE SCOUT LIBRARY


STORIES OF ADVENTURE.

In handsome Cloth Covers. Price 2s. 6d. each net.


Postage 4d. extra.

Corky and I. (Marooned.) The Adventures of


Two Chums Adrift. By A. B. COOPER, Author of "Lost in the
Arctic," etc.
"The story goes with a rare swing from start to finish; it is, in fact, a
'corking' good story with excellent illustrations."— Saturday Review.
Rattlesnake Ranch. A Tale of the Great
North-West. By ROBERT LEIGHTON, Author of "Kiddie of the
Camp," etc.
"This is one of the best stories of adventure in the North-West that we have
met with for a long time."—Manchester Courier.

Frank Flower. The Boy War Correspondent.


By A. B. COOPER.
"Boy Scouts should thoroughly enjoy this story, for the principles on which
young Flower always acts are thoroughly sound, and, though no offensive
morals are drawn, the advantage of 'straight' conduct is made obvious. "—
Academy.

Jack Corvit, Patrol Leader; or Always a


Scout. By V. R. NENDRICK.
"This is a rousing book for Boy Scouts, full of stirring incidents and exciting
adventures, with the hero always well to the fore. The idea of the story is to
illustrate the various items of the Scout Law, and the idea is well carried
out."—The People.

Gildersley's Tenderfoot. A Thrilling Tale of


Redskin and Prairie. By ROBERT LEIGHTON, Author of "Kiddie of
the Camp," etc.
"A rattling good story of adventure in the Wild West which boys will
thoroughly enjoy."—Bookman.

Sons of the Sea. An Engrossing Tale of the


Sea Scouts. By CHRISTOPHER BECK, Author of "The Crimson
Aeroplane," etc.
"Mr. Beck tells a story of the Sea Scouts and shows how handy these young
people may become.... Written in a manly, healthy style, and may be
recommended to the attention of every boy."— The Field.

BOOKS BY THE CHIEF SCOUT


SIR ROBERT BADEN-POWELL, K.C.B.

SCOUTING FOR BOYS A HAND BOOK FOR


INSTRUCTION IN GOOD
CITIZENSHIP
9th Edition. The Official Handbook of the Boy Scouts.
Price 2s. net, paper; 3s. net, cloth (postage 4d. extra).

THE WOLF CUB'S HANDBOOK


The Official Handbook for the training of boys from 8-11, leading
up to the time when they can become full Scouts. Paper wrapper,
price 1s. 6d. net; cloth boards, price 2s. 6d., net (postage 4d.
extra).

GIRL GUIDING. THE OFFICIAL


HANDBOOK FOR THE
GIRL GUIDES
4th Edition. Paper wrapper, price is. 6d. net (postage 3d. extra);
cloth boards 2s. 6d. net (postage 4d. extra).

MY ADVENTURES AS A SPY
Extra Crown 8vo, Cloth Gilt, with Coloured Frontispiece, Four
Halftone Illustrations, and other Sketches by the Author. Price 3s.
6d. net (postage 5d. extra).
SCOUTING GAMES
A splendid collection of Outdoor and Indoor Games specially
compiled for Boy Scouts, 4th Edition.
Price is. 6d. net, paper wrapper. 2s. 6d. net in cloth boards
(postage 3d. extra).
"No one who, as a schoolboy, has read a word of Fenimore Cooper
or Ballantyne, nobody who feels the fascination of a good detective
story, or who understands a little of the pleasures of wood craft,
could fail to be attracted by these games, or, for that matter, by the
playing of the games themselves. "—Spectator.

YARNS FOR BOY SCOUTS TOLD ROUND THE


CAMP FIRE.
2nd Edition.
"There is no gift book that could be put into the hands of a
schoolboy more valuable than this fascinating volume, and if you
asked the boy's opinion he would probably add, 'No book that he
liked better.'"—Spectator.

YOUNG KNIGHTS OF THE EMPIRE


THEIR CODE AND FURTHER SCOUT YARNS.
"The Ten Laws of Scouts and Sir Robert's exposition of them make
a most lucid and telling code of behaviour; and very good, too, are
his tales of travel, chapters on sea-scouting, backwoodsmen, &c.,
all illustrated by the author himself."—Times.

BOY SCOUTS BEYOND THE SEAS "MY WORLD


TOUR."
Illustrated by the Author.
"Describes in brightest and most concise fashion his recent tour of
inspection amongst the Boy Scouts.... Every boy will read it with
avidity and pronounce it 'jolly good.'"—Graphic.
The above 3 books, price 1s. each in pictorial Wrapper, or 2s. each
in cloth boards (postage 4d. extra).

THE CUB BOOK. THE BOOK FOR THE BOYS.


Price 3d. net (post free 4d.).

MARKSMANSHIP FOR BOYS THE RED FEATHER AND


HOW TO WIN IT.
Price 3d. net (post free 4d.).

Write for Illustrated List of Books for Boy Scouts to


A. F. SOWTER, Publisher; "The Scout" Offices, 28 Maiden Lane,
London, W.C. 2.

Transcriber's Notes:

This book contains a number of misprints.


The following misprints have been corrected:

[now was. it would] —>


[now was, it would]

[a dappper little man] —>


[a dapper little man]

[d'r'aps she'll] —>


[p'r'aps she'll]

[like mad?"] —>


[like mad!"]
because it is a statement, not a question.

[reported a ridge of hill] —>


[reported a ridge of hills]

[became imminent; the] —>


[became imminent: the]

[there could be do doubt.] —>


[there could be no doubt.]

[to accompany us---Leslie] —>


[to accompany us—Leslie]
*** END OF THE PROJECT GUTENBERG EBOOK 'MIDST ARCTIC
PERILS: A THRILLING STORY OF ADVENTURE IN THE POLAR
REGIONS ***

Updated editions will replace the previous one—the old editions will
be renamed.

Creating the works from print editions not protected by U.S.


copyright law means that no one owns a United States copyright in
these works, so the Foundation (and you!) can copy and distribute it
in the United States without permission and without paying
copyright royalties. Special rules, set forth in the General Terms of
Use part of this license, apply to copying and distributing Project
Gutenberg™ electronic works to protect the PROJECT GUTENBERG™
concept and trademark. Project Gutenberg is a registered trademark,
and may not be used if you charge for an eBook, except by following
the terms of the trademark license, including paying royalties for use
of the Project Gutenberg trademark. If you do not charge anything
for copies of this eBook, complying with the trademark license is
very easy. You may use this eBook for nearly any purpose such as
creation of derivative works, reports, performances and research.
Project Gutenberg eBooks may be modified and printed and given
away—you may do practically ANYTHING in the United States with
eBooks not protected by U.S. copyright law. Redistribution is subject
to the trademark license, especially commercial redistribution.

START: FULL LICENSE


THE FULL PROJECT GUTENBERG LICENSE
PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK

To protect the Project Gutenberg™ mission of promoting the free


distribution of electronic works, by using or distributing this work (or
any other work associated in any way with the phrase “Project
Gutenberg”), you agree to comply with all the terms of the Full
Project Gutenberg™ License available with this file or online at
www.gutenberg.org/license.

Section 1. General Terms of Use and


Redistributing Project Gutenberg™
electronic works
1.A. By reading or using any part of this Project Gutenberg™
electronic work, you indicate that you have read, understand, agree
to and accept all the terms of this license and intellectual property
(trademark/copyright) agreement. If you do not agree to abide by all
the terms of this agreement, you must cease using and return or
destroy all copies of Project Gutenberg™ electronic works in your
possession. If you paid a fee for obtaining a copy of or access to a
Project Gutenberg™ electronic work and you do not agree to be
bound by the terms of this agreement, you may obtain a refund
from the person or entity to whom you paid the fee as set forth in
paragraph 1.E.8.

1.B. “Project Gutenberg” is a registered trademark. It may only be


used on or associated in any way with an electronic work by people
who agree to be bound by the terms of this agreement. There are a
few things that you can do with most Project Gutenberg™ electronic
works even without complying with the full terms of this agreement.
See paragraph 1.C below. There are a lot of things you can do with
Project Gutenberg™ electronic works if you follow the terms of this
agreement and help preserve free future access to Project
Gutenberg™ electronic works. See paragraph 1.E below.
1.C. The Project Gutenberg Literary Archive Foundation (“the
Foundation” or PGLAF), owns a compilation copyright in the
collection of Project Gutenberg™ electronic works. Nearly all the
individual works in the collection are in the public domain in the
United States. If an individual work is unprotected by copyright law
in the United States and you are located in the United States, we do
not claim a right to prevent you from copying, distributing,
performing, displaying or creating derivative works based on the
work as long as all references to Project Gutenberg are removed. Of
course, we hope that you will support the Project Gutenberg™
mission of promoting free access to electronic works by freely
sharing Project Gutenberg™ works in compliance with the terms of
this agreement for keeping the Project Gutenberg™ name associated
with the work. You can easily comply with the terms of this
agreement by keeping this work in the same format with its attached
full Project Gutenberg™ License when you share it without charge
with others.

1.D. The copyright laws of the place where you are located also
govern what you can do with this work. Copyright laws in most
countries are in a constant state of change. If you are outside the
United States, check the laws of your country in addition to the
terms of this agreement before downloading, copying, displaying,
performing, distributing or creating derivative works based on this
work or any other Project Gutenberg™ work. The Foundation makes
no representations concerning the copyright status of any work in
any country other than the United States.

1.E. Unless you have removed all references to Project Gutenberg:

1.E.1. The following sentence, with active links to, or other


immediate access to, the full Project Gutenberg™ License must
appear prominently whenever any copy of a Project Gutenberg™
work (any work on which the phrase “Project Gutenberg” appears,
or with which the phrase “Project Gutenberg” is associated) is
accessed, displayed, performed, viewed, copied or distributed:
This eBook is for the use of anyone anywhere in the United
States and most other parts of the world at no cost and with
almost no restrictions whatsoever. You may copy it, give it away
or re-use it under the terms of the Project Gutenberg License
included with this eBook or online at www.gutenberg.org. If you
are not located in the United States, you will have to check the
laws of the country where you are located before using this
eBook.

1.E.2. If an individual Project Gutenberg™ electronic work is derived


from texts not protected by U.S. copyright law (does not contain a
notice indicating that it is posted with permission of the copyright
holder), the work can be copied and distributed to anyone in the
United States without paying any fees or charges. If you are
redistributing or providing access to a work with the phrase “Project
Gutenberg” associated with or appearing on the work, you must
comply either with the requirements of paragraphs 1.E.1 through
1.E.7 or obtain permission for the use of the work and the Project
Gutenberg™ trademark as set forth in paragraphs 1.E.8 or 1.E.9.

1.E.3. If an individual Project Gutenberg™ electronic work is posted


with the permission of the copyright holder, your use and distribution
must comply with both paragraphs 1.E.1 through 1.E.7 and any
additional terms imposed by the copyright holder. Additional terms
will be linked to the Project Gutenberg™ License for all works posted
with the permission of the copyright holder found at the beginning
of this work.

1.E.4. Do not unlink or detach or remove the full Project


Gutenberg™ License terms from this work, or any files containing a
part of this work or any other work associated with Project
Gutenberg™.

1.E.5. Do not copy, display, perform, distribute or redistribute this


electronic work, or any part of this electronic work, without
prominently displaying the sentence set forth in paragraph 1.E.1
with active links or immediate access to the full terms of the Project
Gutenberg™ License.

1.E.6. You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form,
including any word processing or hypertext form. However, if you
provide access to or distribute copies of a Project Gutenberg™ work
in a format other than “Plain Vanilla ASCII” or other format used in
the official version posted on the official Project Gutenberg™ website
(www.gutenberg.org), you must, at no additional cost, fee or
expense to the user, provide a copy, a means of exporting a copy, or
a means of obtaining a copy upon request, of the work in its original
“Plain Vanilla ASCII” or other form. Any alternate format must
include the full Project Gutenberg™ License as specified in
paragraph 1.E.1.

1.E.7. Do not charge a fee for access to, viewing, displaying,


performing, copying or distributing any Project Gutenberg™ works
unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8. You may charge a reasonable fee for copies of or providing


access to or distributing Project Gutenberg™ electronic works
provided that:

• You pay a royalty fee of 20% of the gross profits you derive
from the use of Project Gutenberg™ works calculated using the
method you already use to calculate your applicable taxes. The
fee is owed to the owner of the Project Gutenberg™ trademark,
but he has agreed to donate royalties under this paragraph to
the Project Gutenberg Literary Archive Foundation. Royalty
payments must be paid within 60 days following each date on
which you prepare (or are legally required to prepare) your
periodic tax returns. Royalty payments should be clearly marked
as such and sent to the Project Gutenberg Literary Archive
Foundation at the address specified in Section 4, “Information
about donations to the Project Gutenberg Literary Archive
Foundation.”

• You provide a full refund of any money paid by a user who


notifies you in writing (or by e-mail) within 30 days of receipt
that s/he does not agree to the terms of the full Project
Gutenberg™ License. You must require such a user to return or
destroy all copies of the works possessed in a physical medium
and discontinue all use of and all access to other copies of
Project Gutenberg™ works.

• You provide, in accordance with paragraph 1.F.3, a full refund of


any money paid for a work or a replacement copy, if a defect in
the electronic work is discovered and reported to you within 90
days of receipt of the work.

• You comply with all other terms of this agreement for free
distribution of Project Gutenberg™ works.

1.E.9. If you wish to charge a fee or distribute a Project Gutenberg™


electronic work or group of works on different terms than are set
forth in this agreement, you must obtain permission in writing from
the Project Gutenberg Literary Archive Foundation, the manager of
the Project Gutenberg™ trademark. Contact the Foundation as set
forth in Section 3 below.

1.F.

1.F.1. Project Gutenberg volunteers and employees expend


considerable effort to identify, do copyright research on, transcribe
and proofread works not protected by U.S. copyright law in creating
the Project Gutenberg™ collection. Despite these efforts, Project
Gutenberg™ electronic works, and the medium on which they may
be stored, may contain “Defects,” such as, but not limited to,
incomplete, inaccurate or corrupt data, transcription errors, a
copyright or other intellectual property infringement, a defective or
damaged disk or other medium, a computer virus, or computer
codes that damage or cannot be read by your equipment.

1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for


the “Right of Replacement or Refund” described in paragraph 1.F.3,
the Project Gutenberg Literary Archive Foundation, the owner of the
Project Gutenberg™ trademark, and any other party distributing a
Project Gutenberg™ electronic work under this agreement, disclaim
all liability to you for damages, costs and expenses, including legal
fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR
NEGLIGENCE, STRICT LIABILITY, BREACH OF WARRANTY OR
BREACH OF CONTRACT EXCEPT THOSE PROVIDED IN PARAGRAPH
1.F.3. YOU AGREE THAT THE FOUNDATION, THE TRADEMARK
OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL
NOT BE LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT,
CONSEQUENTIAL, PUNITIVE OR INCIDENTAL DAMAGES EVEN IF
YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH DAMAGE.

1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you


discover a defect in this electronic work within 90 days of receiving
it, you can receive a refund of the money (if any) you paid for it by
sending a written explanation to the person you received the work
from. If you received the work on a physical medium, you must
return the medium with your written explanation. The person or
entity that provided you with the defective work may elect to provide
a replacement copy in lieu of a refund. If you received the work
electronically, the person or entity providing it to you may choose to
give you a second opportunity to receive the work electronically in
lieu of a refund. If the second copy is also defective, you may
demand a refund in writing without further opportunities to fix the
problem.

1.F.4. Except for the limited right of replacement or refund set forth
in paragraph 1.F.3, this work is provided to you ‘AS-IS’, WITH NO
OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.

1.F.5. Some states do not allow disclaimers of certain implied


warranties or the exclusion or limitation of certain types of damages.
If any disclaimer or limitation set forth in this agreement violates the
law of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted
by the applicable state law. The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.

1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation,


the trademark owner, any agent or employee of the Foundation,
anyone providing copies of Project Gutenberg™ electronic works in
accordance with this agreement, and any volunteers associated with
the production, promotion and distribution of Project Gutenberg™
electronic works, harmless from all liability, costs and expenses,
including legal fees, that arise directly or indirectly from any of the
following which you do or cause to occur: (a) distribution of this or
any Project Gutenberg™ work, (b) alteration, modification, or
additions or deletions to any Project Gutenberg™ work, and (c) any
Defect you cause.

Section 2. Information about the Mission


of Project Gutenberg™
Project Gutenberg™ is synonymous with the free distribution of
electronic works in formats readable by the widest variety of
computers including obsolete, old, middle-aged and new computers.
It exists because of the efforts of hundreds of volunteers and
donations from people in all walks of life.

Volunteers and financial support to provide volunteers with the


assistance they need are critical to reaching Project Gutenberg™’s
goals and ensuring that the Project Gutenberg™ collection will
remain freely available for generations to come. In 2001, the Project
Gutenberg Literary Archive Foundation was created to provide a
secure and permanent future for Project Gutenberg™ and future
generations. To learn more about the Project Gutenberg Literary
Archive Foundation and how your efforts and donations can help,
see Sections 3 and 4 and the Foundation information page at
www.gutenberg.org.

Section 3. Information about the Project


Gutenberg Literary Archive Foundation
The Project Gutenberg Literary Archive Foundation is a non-profit
501(c)(3) educational corporation organized under the laws of the
state of Mississippi and granted tax exempt status by the Internal
Revenue Service. The Foundation’s EIN or federal tax identification
number is 64-6221541. Contributions to the Project Gutenberg
Literary Archive Foundation are tax deductible to the full extent
permitted by U.S. federal laws and your state’s laws.

The Foundation’s business office is located at 809 North 1500 West,


Salt Lake City, UT 84116, (801) 596-1887. Email contact links and up
to date contact information can be found at the Foundation’s website
and official page at www.gutenberg.org/contact

Section 4. Information about Donations to


the Project Gutenberg Literary Archive
Foundation
Project Gutenberg™ depends upon and cannot survive without
widespread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can
be freely distributed in machine-readable form accessible by the
widest array of equipment including outdated equipment. Many
small donations ($1 to $5,000) are particularly important to
maintaining tax exempt status with the IRS.

The Foundation is committed to complying with the laws regulating


charities and charitable donations in all 50 states of the United
States. Compliance requirements are not uniform and it takes a
considerable effort, much paperwork and many fees to meet and
keep up with these requirements. We do not solicit donations in
locations where we have not received written confirmation of
compliance. To SEND DONATIONS or determine the status of
compliance for any particular state visit www.gutenberg.org/donate.

While we cannot and do not solicit contributions from states where


we have not met the solicitation requirements, we know of no
prohibition against accepting unsolicited donations from donors in
such states who approach us with offers to donate.

International donations are gratefully accepted, but we cannot make


any statements concerning tax treatment of donations received from
outside the United States. U.S. laws alone swamp our small staff.

Please check the Project Gutenberg web pages for current donation
methods and addresses. Donations are accepted in a number of
other ways including checks, online payments and credit card
donations. To donate, please visit: www.gutenberg.org/donate.

Section 5. General Information About


Project Gutenberg™ electronic works
Professor Michael S. Hart was the originator of the Project
Gutenberg™ concept of a library of electronic works that could be
freely shared with anyone. For forty years, he produced and
distributed Project Gutenberg™ eBooks with only a loose network of
volunteer support.
Project Gutenberg™ eBooks are often created from several printed
editions, all of which are confirmed as not protected by copyright in
the U.S. unless a copyright notice is included. Thus, we do not
necessarily keep eBooks in compliance with any particular paper
edition.

Most people start at our website which has the main PG search
facility: www.gutenberg.org.

This website includes information about Project Gutenberg™,


including how to make donations to the Project Gutenberg Literary
Archive Foundation, how to help produce our new eBooks, and how
to subscribe to our email newsletter to hear about new eBooks.

You might also like