Wind Load considered at all levels, floors and heights : (b) For Wall Types (Ground & 1st Floor & 2nd- F & B Lvl ) = 1.9kPa as per IS 875 Part 3-2015.
General Notes : 1
All facade systems mentioned in the BoQ shall be based on approved concept architectural drawings (Plans, elevations & sections) provided by the project
architect, Technical specifications and all relevant Indian & International standards.
Contractor shall carry out detailed site survey to understand the profile available for fixing of facade at no additional cost.
Facade vendor shall design the facade system as per the site survey data, concept drawings given by project architect and the parameters laid in the
technical specification matrix and accordingly shall prepare and submit the shop drawings for approval to owner/owner's consultant & architect.
Facade vendor shall do all necessary changes / modifications in design & shop drawings as per the corrections / modifications given by the owner/owner's
consultant & architect and shall take approval for the design and shop drawings before proceeding for work.
The item rate and scope of the work shall include all associated works like insulations, fire stop, guttering arrangement to drain water; flashings, treating
junctions with concrete and other materials including cost of material etc. all complete as per the approved shop drawing details and as directed by the
owner.
The rate include providing & supplying all hardware like stainless steel screws, EPDM gaskets, backer rod, all required sealants (structural & weather), dash
fasteners, Hot dip galvanized welded MS brackets & framework, scaffolding etc complete as per drawings & technical specifications.
All extruded Mild steel vertical sections shall comply to IS 2062 Grade A and shall be coated with High Performance Low VOC Anticorrosive Protective
Coating system of 280 microns comprising zinc phosphate polyamine epoxy primer of 100 microns each and one top coat of High solids Acrylic
Polyurethane high performance glossy finish paint (Colour as per architect intent) of 80 microns after shot blasting as per SA 2.5 Swedish standards.
All concealed Mild steel sections shall comply to IS 2062 Grade A and Hot Dip Galvanised to minimum 100 microns coating.
All the external/internal visible Aluminium surfaces shall have Super durable Powder coating (Jotun/Akzonobel) of minimum 60 micron confirming to
AAMA 2604. (Shade as per Architect).
The work shall also includes providing & erecting independent double legged Cup- Lock Scaffolding System & MS supports / bracing, all tools & tackles,
equipments & machineries required for the work including shifting & lifting of material, all types of arrangements for necessary safety precautions at site.
The designed facade system should be able to withstand all performance requirements as mentioned in the specifications not limited to thermal stresses,
seismic forces, wind velocity, rain, atmospheric variations and to cover any other stress occurring from natural or man made factors whatsoever condition
etc. with adequate factor of safety to meet relevant IS code and international codal provisions.
Prior to start of work contractor shall submit samples of each item such as extruded sections, sample for anodizing / PVDF / Powder coated showing exact
colour, glass, IGU, Spider fittings, EPDM/ neoprene beading, gaskets, wool pile, backer rod, fittings and fixtures, silicon sealant, etc. for approval from the
Owner/Owner's consultant & architect. The material to be procured for the work shall be as per this approved samples.
Page 14 of 48
CKOH/PPR/2025/JAN/11798
Providing all specified finished for aluminium sections, flashings, cover cap etc
All extruded aluminium sections shall be as per specified alloy and shall be free of die marks and other defects.
Bill of Quantities must be read in conjunction with the Technical specifications, Drawings, General Conditions of Contract.
All make of materials, shade, supplier list shall be approved by Employer/ Consultant/ Architect.
Designing the system including galvanised steel sub structure which shall be reviewed and approved by the structural consultant / owner's consultant.
All concealed aluminum surfaces, any extruded aluminium cleats, etc., shall be finished with CHROME FREE pretreatment primer coating.
Smoke seal insulation and fire stop (UL tested 2 hr rated) assembly between the RCC structure and curtain wall at floor level as indicated in the concept
drawings as per the facade consultant material specification.
The Facade system installed and material (Like hardware's, stainless steel fittings, Glass and aluminium alloy along with field water test for water leakage)
tested as per technical matrix shall be guaranteed for 10 years and expected structural stability as 25 years in approved proforma on stamp paper of
appropriate value.
6. Providing Non-Staining & Non-Bleeding weather silicone -Dowsil 991/GE-SCS9000, Structural silicone Dowsil 995/983 from Dow/GE-SSG4000/ GE-SSG
4400 , shade as per architects requirement.
Contractor to co-ordinate with MEP consultant for perimeter sealing of MEP services penetrating through façade work. Vendor to include cost of
performance test per BoQ item, field water test, protection of facade, cleaning and handover of complete facade to owner per technical specifications.
Quoted Rate shall include supply of all approved materials, labour, hardware, all consumables, tools & tackles, equipment's, lead & lift, scaffolding, staging,
platform, cleaning, testing, handover and etc.., complete installation at all Floors and Levels as per the approved drawings and as directed by the
Employer/ Consultant/ Architect.
All above specifications are valid for all the items unless otherwise specified.
System shall be designed as per the design wind pressure and the system must pass the proof test at 1.5 times designed wind pressure without any failure,
permanent deformation.
Rate shall include the strengthening of the aluminum gridwork for the provision of the Signage as advised by the client.
NOTE 1:-Rate shall include strengthening of the Aluminium Grid Work and providing structural connection to mount the client s branding signage as
advised by the client. Rate shall also include coordinating with lighting vendor and making provision for routing lighting cables and installing light fixtures in
the facade work & canopy work.
NOTE1: Mode of Measurement for façade elements shall be only visible elevation areas i.e.. Module centre to centre,End to End for RCC openings. All
flashings @ Jamb level, Cill etc Aluminium sheet/ACP panel, along with All copings, soffits shall not paid extra as they are considered part of the system.
Please Note - Base Rate for ACP (Aluminium composite panel) is INR 1900/Sqm (FOR site) , GST will be extra
NOTE2:
All
the folds need to be "V" Grooved prior to bending the sheet to avoid bending radius.
Page 15 of 48
CKOH/PPR/2025/JAN/11798
The rates quoted against each item in the BOQ shall be deemed to cater for all minor construction details which are not specifically mentioned in the
BOQ, but are fairly and obviously intended and are essential for the full & final completion of the Works (otherwise covered in drawings /
specifications / codes) and it is the responsibility of the Contractor to point out to the Client / PMC about any major constructional details missing details
or gaps/ ambiguities or incorrect information related to the Works, in the Drawings, Specifications and or Bill of Quantities, before providing his offer on
or before the Tender Submission Date .The Successful Contractor is not entitled to make any extra claim on this account.
WT-01 UNITIZED CURTAIN WALL SYSTEM I Straight and Faceted (System+Installation Cost) @ Office Lvls- 3rd to Above Terrace Floor
1 7,390 SQM 8,479 62,659,810
The framing members provide no structural support for the building and the curtain wall is deemed to be a light weight façade which is intended to
separate the external from the internal of the building and provides natural light into the building. -
The extruded aluminium sections of Alloy 6063 -T6 & tolerances confirming ASTM B221/BS/DIN/EN standards and are designed (for L/240 for DGU and
L/180 for Single glazing or 19mm whichever is less for either case) to withstand a wind pressure of 2.8 Kpa at all levels, elevations and heights.The structural
profiles shall have minimum 2.5mm wall thickness. -
The curtain wall system is designed to have internal drainage system within the extruded sections and suiting to design wind presure as indicated in CTM.
-
The Curtain wall system shall be glazed with following Performance Insulated Glass. Performance & Shade as per architect.
-
(a) 32mm Insulated High-Performance glass unit comprising of 8mm HS +16 Air Gap + 8mm FT -
In this system cut to size and fabricated insulated glass units are glazed into the aluminium framing members at factory using structural sealant.
-
This system shall not have any visible aluminium members from outside except for vertical and horizontal grooves (as indicated in façade tender drawings).
-
Gaskets are employed as water barrier between the composite mullion, head and sill junctions as indicated in the drawings, which are fully drained in the
event of leakage past the primary seal. -
The external inter-panel gasketry (primary weather seal) to be factory installed to minimize on-site works. -
Adhesive tape shall be of Open PU cell type ±35 - 40 Shore hardness. All the joints horizontal or vertical inside and outside proper sealed with weather
sealants and backer rod during the installation. -
Providing and Fixing Ethylene Propylene Dinine Monomer (EPDM) Gaskets microwave curd as weather strip and barrier to ensure water and air tightness.
EPDM Gaskets shall be manufactured as per ASTM C 864-05/DIN 7863/BS 4255 standards recommended and adopted worldwide.Weather strip shall be
EPDM Gaskets with Hardness Shore A with a typical value of not less than 70 ± 5, ultimate tensile strength of 7.5 Mpa (Min) and Elongation at Break 200% -
(Min).
Page 16 of 48
CKOH/PPR/2025/JAN/11798
Option-02: Supply and fixing of a continuous tested perimeter barrier protection as an integral component of the exterior wall systems to prevent the
passage of air leakage and flame propagation from one floor to another floor or from one compartment to another sideway. Providing Wet arcylic based
sprayable Fire-rated joint spray, tested Facade Passive Firestop System to provide minimum 2 hours of fire rating as per Indian Standards ( IS 18190 ) to
seal gap between horizontal slab & curtain wall. The system should comply to the IS 18190 requirements of Movement Rating , Leakage Rating ( L Rating-
which should be less than 1.0 SCFM/LF ) , Integrity Rating ( 2 hours) and Insulation T Rating.The requirements of MOVEMENT Capability mentioned in IS
18190 are of Thermal ( min 500 cyvles ) , Wind Sway ( min 500 cycles ) , Seismic( min 100 cycles ) and combined ( min 100 cycles ) should be met by the
product . The requirement s of same sample should be tested first for Movement Rating and then followed for L rating + F Rating + T Rating; as per IS
18190 Test apparatus. The Firestop Documents Submission should have a System Certification with a LOGO of Intertek or UL which is based on ASTM E
2307. ( Intertek/UL labs are the renowned labs who does testing for Passive Firestop Edge of System based on parameters of ASTM E 2307 , IS 18190
Codes) . For projects in India , IS 18190 is the only standard which should be followed and other standards like BS EN1364-4 is not relevant as the
Movement Rating is not tested per BS EN 1364-4. In absense of System Certification of UL/Intertek, EJ shall be submitted as per actual site conditions by
the manufacturer, based in accordance to international firestop council (IFC) and through well qualified professionals..Fire rated joint spray which should
with 3.2 mm wet film thickness with 12.5 mm overlap joint on SAFING material of stone mineral wool 64kg/m3 density which shall be compressed at site -
to achieve additional 33% volume compression of the gap width as per UL /Intertek Certification. Fire Rated Joint Spray has to be enclosed by a top lid of
1.2mm thick mill finished GI floor closure flashing fixed using gas actuated nails and installed over perimeter barrier to avoid any impact load directly on
top of the installed fire stops and also to apply intumescent sealant over GI sheet flashing joint (Dow or approved equivalent).
Page 17 of 48
CKOH/PPR/2025/JAN/11798
The Contractor shall submitt the Tested and Listed reports certified by UL/TBW/IFC/ESL or Intertek from the manufacturer along with all material data
sheet matching the said reports for material approval to be used in Firestop assembly. Post approval of material to be used, contractor to submit the
duly stamped drawings from fire stop manufacturers along with draft warranty confirming the performance ( Installation & Firestop assembly) for a
period of 10 years.On-site smoke seal test for workmanship verification shall be carried out for smoke leakage after vendor’s approved inspection report.
(Location selected by consultant/client representative). -
# Slab mounted Aluminium Extruded Serrated brackets as per tender drawings along with aluminum extruded adpator for hooking plate attached to
mullions. -
# All concealed aluminum surfaces any extruded aluminium cleats shall be finished with CHROME-FREE pretreatment primer coating. -
# Exposed exterior Aluminium sheet flashing shall be 2mm thk.finished with Super Durable Powder coating of minimum 60 microns confirming AAMA 2604
standards (Shade as per Architect) matching with external Aluminium profiles. Exposed interior aluminium flashing at Jamb / ceiling closure flashing shall be
2.0mm thk.sheet with Super Durable Powder coated of minimum 60 microns confirming AAMA 2604 standards matching with internal aluminium profiles
(Shade as per architect intent) (as indicated in tender concept drawing).The Aluminium Sheet alloy shall be 3xxx series (Temper-H14/H16) confirming to BS -
1474 or equivalent.
The floor closure flashing shall be provided continuously with 2.0mm thk Solid Aluminium Sheet Flashing closing Gap between transom and building line
wherever required.2.0mm thick Aluminium Sheet flashing shall be finished with Super Durable Powder Coated -minimum 60 microns confirming AAMA
2604 standards (Shade as per Architect) along with 1.2mm Thk GI primary seal and Stonewool insulation of minimum Density of 128Kg/m3 The
Aluminium Sheet alloy shall be 3105 H14/H16 series confirming to BS 1475. -
# The vendor shall include any supports in soffit or parapet/beam area @Head level to anchor curtain wall glazing system to be included in the price.
-
# Fabrication cutout, holes and notches for lighting, and wiring by coordinating with other agencies as and when required. -
# Providing support to the lightening conductor strip from exterior of unitized curtain wall as per lighting consultant and coordinating with agency as an
when required. (To be installed during fabrication of panels along with HDG steel inserts.) -
# Top parapet coping 4.0mm Thk Aluminium Composite Panel ( FR Grade- A2,s1,do) cladding along with 0.8mm Thk GI primary seal & waterproofing
membrane above the structural glazing .The Aluminium Sheet alloy shall be 3xxx series (Temper-H14/H16) confirming to BS 1474 or equivalent.
-
Page 18 of 48
CKOH/PPR/2025/JAN/11798
# Hardware and accessories like Handles, Friction hinges etc shall be of approved make as per Architect's/Consultant's Specifications. -
Note:For the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up
to two decimal places. All insulations,flashings @ Jamb level, Cill etc Aluminium sheet/Any metal panel, along with All copings, soffits shall not paid extra as
they are considered part of the system. -
3. Providing aluminium extruded Serrated brackets & aluminium hooks plates brackets. -
4. Providing extruded aluminium framing members with SDF finish of minimum 60 microns (shade as per architects specifications). -
5. Providing all hardwares & consumables including Stainless steel 316 grade Mechanical Expansion Anchor,Stainless steel 316 grade chemical anchor
fasteners (As required) SS 316 grade screws, bolts and accessories, friction hinges, lock with corner transmission etc. complete proof system as indicated in -
CTM.
6. Providing Dry/Wet Smoke seal and fire stop (UL /Intertek tested 2hr-Fire Rating ) assembly between the RCC structure and curtain wall at floor level.
-
7. Providing Non-Staining & Non-Bleeding weather silicone -Dowsil 991/GE-SCS9000, Structural silicone Dowsil 995/983 /GE-SSG4000/ GE-SSG 4400 , shade
as per architects requirement. -
8. Fabricating and supplying serrated Aluminium Extruded Brackets to accommodate 3 Dimensional movement for achieving perfect verticality and proper
fixing of structural glazing system with the RCC/ masonry/structural steel framework of building structure, using stainless steel (chemical/mechanical)
anchor fasteners/ bolts, Teflon separator to prevent bimetallic contacts with nuts and washers etc. of stainless steel Grade 316, of the required capacity -
and in required numbers.
9. Provision to support lightening conductor onto the curtain wall system from exterior as per lighting consultant /architect/client intent. -
10.Supplying, drilling /cleaning hole and fixing of Torque Controlled Expansion Anchor HST4-R or equivalent, of sizes ranging from M8 to M20. The Anchor
should possess ETA Certificate for use in Cracked Concrete , approved as per Seismic C2 Category and have Fire Resistance values for up to 120 mins
tested in accordance with EAD 330232-01-0601,. CE conformity and FM Approval. The anchor should be pre-assembled M8-M20 (Stainless Steel )as per EN
ISO 4042: 1999, a nut of Strength Class 8 (EN ISO 20898-2:2012) and stainless steel washer (EN ISO 4042:1999). Design of Anchor should be done as per EC2
Part-4 using engineering Software as per actual load data and site conditions as provided by structural consultant and the report to be submitted to the
project manager and design engineer for approval. Anchor shall be driven with the help of HS-SC setting tool ,fixed at right embedment depth as per design
report and activated using SIW 6AT-A22 Impact Wrench with adaptive torque Module to ensure adequate torque as per the given diameter mentioned in -
the ETA. The same must be documented in the form of software generated report and shall be submitted to the project manager at the time of inspection.
Scanning before drilling to be done with PS Scanning tool to avoid rebar hits.
11.The Contractor shall provide curtain wall , having all the performance characteristics all complete, as per the facade Tender drawings, as per item
description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. -
12. Providing MS support/ MS Insert (Hot Dip Galvanized-minimum 100 microns) as per design if required. -
13. Rate shall include On-Site Water Test: Onsite test for workmanship verification shall be carried out in stages for water penetration hose test as per
AAMA 501.2 ( Randon loactions selected by consultants /client representative). -
14.Providing and laying Specially formulated Fleeceback 100mil (2.5mm) TPO membrane based FR Grade facade waterproofing, air vapour barrier system
including preparation of surface as required for treatment of facade and Walls etc. consisting following operations: -
Page 19 of 48
CKOH/PPR/2025/JAN/11798
Properties : Membrane shall be 100% UV resistance, Ozone resistance according to ASTM D1149 a with Breaking strength of > 1.6 KN, Elongation at break
of internal fabric 25% and Puncture Resistance, 450lbf. -
13.The Contractor shall provide curtain wall , having all the performance characteristics all complete, as per the facade Tender drawings, as per item
description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. -
14. Rate shall include the strengthening of the aluminum gridwork for the provision of the Signage as advised by the client.
-
-
SPANDREL INSULATION PANEL & SHADOW BOX @ PERIMETER FIRE BARRIER JOINT SYSTEM FOR CURTAIN WALLING INTERJUNCTION AREA BEHIND ACP
1.1 PANEL): Extra over WT-01 1,680 SQM 2,719 4,567,920
System + Fabrication + Installation + Material (One side Black Glass Fibre Tissue factory Laminated Tested Stonewool insulation + 1.5mm Thk G.I. Sheet
Tray - Mill Finish) Cost -
Spandrel Area @ Beam Location: Providing & fixing the shadow box in the spandrel panel with one side Factory Laminated Aliminium Foil on to the
Stonewool insulation of minimum 128 kg/m3 density & minimum 50mm thick firmly held in the G.I.supporting tray of 1.5mm thk for spandrel areas @
beam location indicated in the facade tender drawing.. The facing of aluminium foil (pre-laminated on the ROCKWOOL slabs) shall be of high strength
without kraft paper and total thickness of foil facing shall be 86gsm. The fixing of Stonewool Slab on to the G.I. Tray by means of special pins rigidly holding
Stonewool Slab.Concealed spandrel back pan should be of 1.5mm thick G.I. Sheet shall be mill finish. -
The perimeter fire barrier joint and spandrel insulation being a part of firestop system shall be tested based on ASTM E2307 and follows IS18190 guidelines,
where the spandrel insulation, such as Siderise CWSI50, Curtainrock 80 (Roxul rockwool) or approved equivalent. The spandrel panel interfacing with the
perimeter barrier smoke seal should be protected for the duration of 120 mins as per required Fire resistance rating. The insulation to be used is of stone
mineral wool in nature and shall be of minimum of 50mm thickness & min 128 kg/m3 density. The spandrel stone mineral wool insulation perofrmance
parameter shall be tested based on ASTM E2874 & all materials used shoud be supported by test reports to assure fire resistance rating as mentioned -
above.
Approved Makes -
Siderise CW-SI50 -
Thermafibre Firespan 90 (US-UL) -
Rockwool Curtain Rock 80 -
-
1.2 TOP HUNG OPERABLE VENT :Extra over WT-01 180 NOS 22,073 3,973,140
Page 20 of 48
CKOH/PPR/2025/JAN/11798
Top Hung Size For WT-01 : (WxH) = 1200mm (Width) X 2275mm (Ht) -
Approved Make: -
Alualpha/ Securistyle -
Giesse -
Cotswold SEA Private Limited -
-
1.3 PERFORMANCE VISION GLASS FOR WT- 01 @ 3rd to Terrace Floor: [GL-01] 5,330 SQM 3,555 18,948,150
(Glass Supply & Delivery at site Cost Only) -
Supplying & Delivering (to jobsite) vision glass panels of Approved make comprising of hermetically-sealed 32mm Thick Insulated Glass Unit.. The IGUs
shall be assembled in the factory/workshop of the glass processor. Performance and shade as per direction of engineer in charge. Rate shall be inclusive of
Landing cost on site, Wastage , Breakage of the Glass and inclusive of packing cost.For payment only the actual area of glass on face # 1 of the glass panels
(excluding the areas of the grooves and weather silicone sealant) provided & fixed in position, shall be measured in sqm up to two decimal places. -
Performance Vision :
GL-01:8mm Thick Heat Strengthened (HS) Outerlite [Performance Coating On Surface #2] + 16mm Air Spacer Gap + 8mm Thick Clear Fully Tempered
(FT)] Innerlite glass unit. -
Page 21 of 48
CKOH/PPR/2025/JAN/11798
Aluminium outer skin and inner skin should confirm to alloy 3xxx series grade and H22 / H24 temper with minimum mechanical properties as per given
values. The thickness shall be minimum 0.50 mm thickness and PVDF shall be add-on to this thickness. -
Surface of the Composite Panel should be finished with Kynar-500 /Hylar 5000 PVDF based coating (Polyvinylidene Di Fluoride) on the topside with
minimum 35 microns thickness of approved Metallic Colour and a service coating on the reverse side. -
The top coat surface shall comply with the “specification for coated coil for exterior building applications” issued by ECCA (European Coil Coating
Association). The coating shall confirm to AAMA 2605 by double coat double baked process for exterior grade finish. The reverse side of the cladding panel -
surface facing the wall shall have polyester base coating to protect against the possible corrosion problems.
The finished surface shall be protected with a self-adhesive peel off foil with 80 microns thickness (white or black) tested to with stand at least 6 months
exposure to local weather condition without losing the original peel off characteristic or causing stain or other damages on the coated surface of the
aluminium composite panel. If the stain or any damage noticed after peel off by the fabricator, such panel should be replaced with new one of the same -
shade and color, at no extra cost.
The peel off foil should be removed at the time of handing over as may be required by the Site-In-Charge. -
Warranty: The top sheet shall be coated with PVDF coat by continuous coil coating process and shall be of minimum 35 microns thickness of approved
metallic colour passing AAMA 2605 standard for 15 year warranty along with 70% Gloss Retention after 10 Years. -
APPROVED MAKE -
Alucobond -
Aludecor -
VIVA -
-
Page 22 of 48
CKOH/PPR/2025/JAN/11798
1.6 WT-01A 4mm Thk Aluminium Composite Panel Vertical Band Cladding @ Office Lvls-3rd to 13th Floor 500 SQM 2,901 1,450,500
( System + Fabrication + Installation cost) ( Including M.S. Structure) -
Design, engineer, furnish, fabricate, package, deliver (to jobsite) and install complete: -
System comprises of extruded aluminium framing members (Vertical & Horizontal) mechanically fixed on to the designed built steel structure/RCC
columns/slabs/beams using Hot dipped galvanized (HDG) bracket of minimum 100 microns as indicated in the tender drawing. -
Fabricated 4mm Thk aluminium composite panel (FR Grade ACP) with grooving and bending along with corner cleats are fixed mechanically on to the
aluminium framing member using extruded aluminium runner and stainless steel 316 grade screws providing vertical / horizontal groove for expansion as -
indicated in the tender drawing.
The vertical/horizontal joints are closed joint groove system of approved make in compliance with the technical specifications. -
Vertical /Horizontal Stiffeners to be provided in the Aluminium Composite Panels used for giving extra intermediatory support to final ACP Size to prevent
the panel from sagging/deflecting.The extruded section shall be of 6063 T6 alloy Conforming to ASTM B 221M and are designed as per AS: 1288-2006 to -
withstand a wind pressure as per Technical Specifications at all levels, elevations and heights.
The system shall be designed to withstand a wind pressure of 2.8 kPa as indicated in Technical Specifications at all levels, elevations and heights.
-
All concealed aluminum surfaces, any extruded aluminium cleats, etc., shall be finished with CHROME FREE pretreatment primer coating.
-
All extruded Mild steel sections shall comply to IS 2062 Grade A and Hot Dip Galvanized to minimum 100 microns coating..
-
The fastening materials like Anchors, Nuts, Bolts, Rivets, washers, clamps, straps etc required for fixing the framing members to the mild steel structure
shall be of stainless steel 316 grade and corrosion resistant of approved make as per Architects/Consultants Specification. The fastening brackets of
Aluminium alloy 6005 T5 / MS with Hot Dip Galvanized with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and
anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and
drawing. The item includesall material & labour component, all mock ups at site, all samples of the individual components for testing in an approved
laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with -
aluminium composite panel cladding till the handing over of the building for occupation.
The Contractor shall provide aluminium composite panel cladding, having all the performance characteristics all complete, as per the Architectural
drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge.
-
Aluminium Composite panel of Fire rated Class A2, s1,d0 as per test standard EN 13501-1 Grade having minimum total thickness of 4mm. The panel shall be
reinforced behind to meet the required structural design and deflection criteria. The panel shall be designed with the cleats to allow temperature variance
and surface temperature differentials due to ambient temperature differential without causing any effect on flatness of the panels. -
Page 23 of 48
CKOH/PPR/2025/JAN/11798
-
1.7 M01-4mm Thk Aluminium Composite Panel ( Fire Retardant Grade - Class A2,s1,d0 ) Panel : Extra over WT-01A 500 SQM 2,424 1,212,000
(Material Supply & Delivery at site Cost Only) -
Aluminum composite panel shall be of approved makes and made out of 4mm thick aluminum composite panel comprising of Aluminum Skin of Minimum
0.5mm of AA 3105 Alloy with KYNAR 500/Hylar 5000 PVDF based fluorocarbon resin and Lead free Coating by Double coat double bake process with the
facility in India from where the ACP is being supplied and manufacturer must have the QAV ( Accelerated weather testing Machine),Salt spray testing
Facility available with the yearly calibration from the NABL approved authorities of approved finish +3mm thick non-combustible mineral based polymer
core of Class A2,s1,d0 As per En13501-1 (minimum 90% non-combustible inorganic material) + 0.5mm aluminum skin of AA 3105 Alloy with service coat
bond with co extrusion/Lamination process. Overall weight of the panel shall not be less than 8 kg per sqm. Manufacturer must be FPC certified with the
valid FPC certification of Class A2,s1,d0 as per EN 13501-1 of the unit from where the material is being supplied. -
Aluminium outer skin and inner skin should confirm to alloy 3xxx series grade and H22 / H24 temper with minimum mechanical properties as per given
values. The thickness shall be minimum 0.50 mm thickness and PVDF shall be add-on to this thickness. -
Surface of the Composite Panel should be finished with Kynar-500 /Hylar 5000 PVDF based coating (Polyvinylidene Di Fluoride) on the topside with
minimum 35 microns thickness of approved Metallic Colour and a service coating on the reverse side. -
Page 24 of 48
CKOH/PPR/2025/JAN/11798
The finished surface shall be protected with a self-adhesive peel off foil with 80 microns thickness (white or black) tested to with stand at least 6 months
exposure to local weather condition without losing the original peel off characteristic or causing stain or other damages on the coated surface of the
aluminium composite panel. If the stain or any damage noticed after peel off by the fabricator, such panel should be replaced with new one of the same -
shade and color, at no extra cost.
The peel off foil should be removed at the time of handing over as may be required by the Site-In-Charge. -
Warranty: The top sheet shall be coated with PVDF coat by continuous coil coating process and shall be of minimum 35 microns thickness of approved
metallic colour passing AAMA 2605 standard for 15 year warranty along with 70% Gloss Retention after 10 Years. -
APPROVED MAKE -
Alucobond -
Aludecor -
VIVA -
-
SPANDREL INSULATION @ Behind ACP Area : Extra over WT-01A
1.8 400 SQM 2,386 954,400
Spandrel Area @ ACP Area: Providing & fixing the shadow box in the spandrel panel with one side Black Glass Fibre Tissue factory Lamianted Stonewool
insulation of minimum 60 kg/m3 density & minimum 50mm thick firmly held in the G.I.supporting tray of 1.5mm thk for spandrel areas as indicated in the
facade tender drawing.. The fixing of Stonewool Slab on to the G.I. Tray by means of special pins rigidly holding Stonewool Slab.Concealed spandrel back -
pan should be of 1.5mm thick G.I. Sheet shall be mill finish.
-
1.9 STEEL FABRICATION for WT-01A: 10,498.00 Kg 157 1,648,186
Design, Engineer, Furnish, Fabricate, package, deliver (to jobsite) and Install: -
Designing,Engineering,Cutting,Hoisting,Fabricating and Installing mild steel framing members in built up tubular (rectangular hollow tubes etc)for locations
indicated in the tender drawings. The framing members are welded and anchored to the MS structure as indicated in the tender drawings. All concealed
Mild steel sections shall comply to IS 2062 Grade A and Hot Dip Galvanised to minimum 100 microns coating. -
After Welding Hot - Dip Galvanized sheet, touch up of the wedding / cut area is required using Zinc - Rich Paint to restore corrosion protection . Zinc - rich
Paint- Apply a zinc rich paint on a clean, dry surface with a brush or spray. The paint should contain at least 65 % to 69 % metallic Zinc by weight or more
than 92 % metallic Zinc in the dry film. -
WT-02 : EXTRUDED ALUMINIUM RIBBON METAL BAND CLADDING Finished with Super Durable Powder Coating (Material Supply + System + Installation
2 Cost) @ Office Lvls-3rd to 13th Floor 4,705 Rmtrs 2,795 13,150,475
Page 25 of 48
CKOH/PPR/2025/JAN/11798
Providing all hardware's & consumables including Stainless steel mechanical anchor fasteners, screws, bolts and all required accessories (As per design), of
approved make, 316 grade as per concept tender drawing and specification. -
Warranty: 25 years Product Performance Guarantee for Powder to be offered for the Project in accordance with the standards and the acceptance criteria
laid down in the Guarantee document by the powder coating manufacturer. The guarantee shall be for the entire duration of 25 years for the decorative
properties (gloss/colour) and the film integrity mentioned in the document. A draft guarantee shall be requested from the powder coating manufacturer -
and submitted to ensure adherence to specifications.
-
WT-03 Semi-Unitised Structural Glazing System @ Retail Area-Ground,1st & F & B Floor/ Mall Elevator Lobby (System+Installation Cost)
3 4,745 SQM 7,342 34,837,790
Page 26 of 48
CKOH/PPR/2025/JAN/11798
The extruded aluminium sections of Alloy 6063 -T6 & tolerances confirming ASTM B221/BS/DIN/EN standards and are designed (for L/240 for DGU and
L/180 for Single glazing or 19mm whichever is less for either case ) to withstand a wind pressure of 1.9 Kpa at 1st Floor level ( corridor).The structural
profiles shall have minimum 2.5mm wall thickness. -
The curtain wall system is designed to have internal drainage system within the extruded sections and suiting to design wind presure as indicated in CTM.
-
The Curtain wall system shall be glazed with following Non-Performance Insulated Glass. Performance & Shade as per architect.
-
(a) 32mm Insulated Non-Performance glass unit comprising of 8mm HS +16 Air Gap + 8mm FT -
In this system cut to size and fabricated clear Insulated glass units is structurally glazed with Sub frame using structural silicone sealant and fixed with the
help of toggle to the main frame.Aluminium sash members are mechanically installed on to the aluminium framing members at site along with gaskets as -
indicated in the Concept tender drawings.
This system shall not have any visible aluminium members from outside except for vertical and horizontal grooves (as indicated in tender concept drawings).
-
Option-01: Supply and fixing of a continuous tested perimeter barrier protection as an integral component of the exterior wall systems to prevent the
passage of air leakage and flame propagation from one floor to another floor or from one compartment to another sideway, between two separate
occupants or to separate public and non-public spaces vertically & horizontally. The continuous varying gap between the façade and the concrete slab edge
is to be filled with the perimeter barrier compressed as per the manufacturers’ recommendation achieving a minimum 120mins Integrity(F) of 120 min and
Insulation(T) of 120 min, fire resistance period and equivalent to the rating of the floor slab when tested to ASTM E2307 and EN 1364-4 test standard and
also to comply with IS 18190:2023. The thickness of the safing insulation shall be a minimum of 120 mm one-part system with all tested
component(including insulation material). The safing insulation should be stone mineral wool in nature and shall be of a minimum of 64 kg/m3, pre-
compressed at the factory requiring additional compression at site or as per the manufacturer's test data. The product shall have zero VOC content to
maintain environmental hygiene and toxicity. For all unclassified and non-tested joint gaps in accordance with Intertek/UL/ Thomas Bell Wright or
equivalent 3rd party certification, an engineering evaluation must be shared by the manufacturer (with tested products in the referred certificate) and
prepared by qualified personnel based on IFC guidelines. As curtain wall gaps are suscept to component movement during seismic, wind load or
temperature variation, the applied perimeter firestop shall be subjected to precycling movement to minimum of 500 cycles at 30 cycles per minute and
follow the requirements within ASTM E 2307 OR EAD 350141-00-1106. Provide aluminium foil tape (Class O) to be applied at all adjacent butt joints, at the
non-exposed side, on the perimeter joints with CW-FS120 to maintain a seamless connection. The perimeter barrier should be installed using 1mm thick
galvanised zinc-coated steel knife bracket spaced at around 600mm centres or as per the manufacturer's test data & shall be mechanically fixed to the floor -
slab. It is recommended to use 1.2mm thick mill finished GI floor closure flashing installed over perimeter barrier to avoid any impact load directly on top of
the installed fire stops and also to apply intumescent sealant over GI sheet flashing joint (Dow or approved equivalent). Installed perimeter barrier shall be
subjected to audit inspection which shall be certified and approved by the manufacturer.
Page 27 of 48
CKOH/PPR/2025/JAN/11798
Firestop installation shall be done by certified & Licensed Accredited Firestop Specialty Contractor or necessary Firestop Installer training provided for
specific project/application to install in accordance with Manufactures guidelines and UL/Intertek system test certificates . Firestop Speciality Contractor
needs to submit work completition certificate along with Site Specific Engineering Judgement & installation report for periodic inspection & maintenance
purpose . Installed perimeter barrier shall be subjected to audit inspection which shall be certified and approved by the manufacturer. The contractor shall
be responsible to provide approved inspection report from the manufacturer during the course of the project covering all floors & elevations. Inspection
related log book shall be maintained, along with signing from responsible person from jobsite and to be submitted as part of post submittal.The system -
shall be supported by manufacturer's performance warranty.
The Contractor shall submitt the Tested and Listed reports certified by UL/TBW/IFC/ESL or Intertek from the manufacturer along with all material data
sheet matching the said reports for material approval to be used in Firestop assembly. Post approval of material to be used, contractor to submit the
duly stamped drawings from fire stop manufacturers along with draft warranty confirming the performance ( Installation & Firestop assembly) for a
period of 10 years. -
Gaskets are employed as water barrier between the aluminum gridwork and the glazed sashframe, which are fully drained in the event of leakage past the
primary seal. The external grooves are covered with application of backer rod with weather sealant of approved make as indicated in the concept drawing. -
The external inter-panel gasketry (primary weather seal) to be factory installed to minimize on-site works. -
Adhesive tape shall be of Open PU cell type ±35 - 40 Shore hardness. All the joints horizontal or vertical inside and outside proper sealed with weather
sealants and backer rod during the installation. -
Providing and Fixing Ethylene Propylene Dinine Monomer (EPDM) Gaskets microwave curd as weather strip and barrier to ensure water and air tightness.
EPDM Gaskets shall be manufactured as per ASTM C 864-05/DIN 7863/BS 4255 standards recommended and adopted worldwide.Weather strip shall be
EPDM Gaskets with Hardness Shore A with a typical value of not less than 70 ± 5, ultimate tensile strength of 7.5 Mpa (Min) and Elongation at Break 200% -
(Min).
The system shall be designed to withstand a wind pressure of 1.9 Kpa as per IS:875 Part 3 as indicated in CTM at all level, elevation and height.
-
Page 28 of 48
CKOH/PPR/2025/JAN/11798
# Exposed exterior Aluminium sheet flashing shall be 2.0mm thk. finished with Super Durable Powder coating of minimum 60 microns confirming AAMA
2604 standards (Shade as per Architect) matching with external Aluminium profiles. Exposed interior aluminium backpan & flashing shall be 2mm thk.sheet
with Super Durable Powder coated of minimum 60 microns confirming AAMA 2604 standards matching with internal aluminium profiles (Shade as per
architect intent) at visible areas and jamb / soffit locations (as indicated in tender concept drawing).The Aluminium Sheet alloy shall be 3105 H14/H16 -
series confirming to BS 1474 or equivalent.
#All concealed aluminum surfaces any extruded aluminium cleats shall be finished with CHROME-FREE pretreatment primer coating. -
# Fabrication cutout, holes and notches for lighting, and wiring by coordinating with other agencies as and when required. -
# The fastening materials Nuts, Bolts, Rivets, washers, clamps, straps etc required for fixing the framing members to the masonry wall / RCC surface shall be
of stainless steel 316 grade and corrosion resistant of approved make as per Architects/Consultant Specifications. -
# Provide exterior perimeter sealants where curtain wall abutt adjacent materials including, but not limited to concrete shear walls, slab on grade and
penetrations for ancillary equipment and accessories. -
# Above false ceiling only mullions need to be extended till true ceiling with 1.5mm Thk G.I. Backpan ( Mill Finish) along with stonewool insulation pf
100Kg/m3 and aluminium box stiffener to be provided between the mullions to strengthen the GI tray as indicated in the cncept tender drawings. -
# The vendor shall include any supports in soffit or parapet/beam area @Head level to anchor curtain wall glazing system to be included in the price.
-
Note:For the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up
to two decimal places. All insulations,flashings @ Jamb level, Cill etc Aluminium sheet/Any metal panel, along with All copings, soffits shall not paid extra as -
they are considered part of the system.
6. Providing Non-Staining & Non-Bleeding High Performance weather silicone -Dowsil 991/GE-SCS9000, Structural silicone Dowsil 995/983 from Dow/GE-
SSG4000/ GE-SSG 4400 , shade as per architects requirement. -
7. Provision to support lightening conductor onto the curtain wall system from exterior as per lighting consultant /architect/client intent -
8. Rate shall include Stonewool insulation ( minimum density-100 Kg/m³),1.5mm Thk G.I.Tray above soffit area as per façade tender drawings.
-
Page 29 of 48
CKOH/PPR/2025/JAN/11798
10. Rate shall included 2.0mm Thk Exposed Internal Aluminium Sheet Flashing Finished wioth Super Durable Powder Coating ,50mm Thk Stonewool
Insulation with minimum Density - 60 Kg/m3 1.2mm Thk G.I. Primary Seal ( Mill Finish) & Water proofing membrane at the corner mullion junctions of -
WT-03.
11.Providing and laying Specially formulated Fleeceback 100mil (2.5mm) TPO membrane based FR Grade facade waterproofing, air & vapour barrier
system including preparation of surface as required for treatment of facade and Walls etc. consisting following operations: -
Methodology of Fixing Waterproofing : The metal farme surface should be clean by removing all the loose material,kept it dry as per the direction of
engineer in charge.Over the prepaired, providing and laying specially formulated high strength Fleeceback 45mil TPO (1.14mm) with 55mil (1.37mm)
Fleece 100mil (2.5mm) four layer 45mil TPO membrane with heavy duty 55mil Fleece, a EP rubber polymer strong base, high strength polyester-reinforced
fabric centre (scrim) and a tough thermoplastic poly-olefin compound top ply, membrane. TPO with reinforced membranes as per factory extrusion.
Membrane shall be bonded with solvent based bonding adhesive on the metal frame surface, partially mechanically to the surface if required to hold the
membrane with the surface. The overlap of the membrane shall have minimum of 40mm side and end laps which shall be hot air welded with heat welded -
machine as per site condition.
Properties : Membrane shall be 100% UV resistance, Ozone resistance according to ASTM D1149 a with Breaking strength of > 1.6 KN, Elongation at break
of internal fabric 25% and Puncture Resistance, 450lbf. -
13.The Contractor shall provide curtain wall , having all the performance characteristics all complete, as per the facade Tender drawings, as per item
description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. -
14.Expansion Joint will be a part of System Cost Only. Any building expansion joints interfacing with facade system should accommodate required
expansion in the façade systems, façade contractor has to do in detail the joints with necessary waterproofing, flashing, Stonewool Insulations, EPDM
extruded Gasketss, Sealants Etc. -
-
3.1 Non-PERFORMANCE VISION GLASS FOR WT- 03 @ Ground,1st & F & B Lvl : [GL-02] 2,705 SQM 2,952 7,985,160
(Glass Supply & Delivery at site Cost Only) -
Supplying & Delivering (to jobsite) vision glass panels of Approved make comprising of hermetically-sealed 32mm Thick Insulated Glass Unit.. The IGUs
shall be assembled in the factory/workshop of the glass processor. Performance and shade as per direction of engineer in charge. Rate shall be inclusive of
Landing cost on site, Wastage and Breakage of the Glass inclusive of packing cost.For payment only the actual area of glass on face # 1 of the glass panels
(excluding the areas of the grooves and weather silicone sealant) provided & fixed in position, shall be measured in sqm up to two decimal places. -
GL-02:8mm Thick Heat Strengthened (HS) Non- Performance Outerlite + 16mm Air Spacer Gap +8mm Thick Clear Fully Tempered (FT)] Innerlite glass
unit. -
Page 30 of 48
CKOH/PPR/2025/JAN/11798
Approved Make: -
Guardian -
Saint Gobain -
Sisecam Flat Glass -
Emirates Glass -
Asahi -
-
3.3 Non-PERFORMANCE VISION CURVED GLASS FOR WT-03: [GL-02B] @ Entrance Lobbies ( 3 Nos) 340 SQM 8,633 2,935,220
(Glass Supply & Delivery at site Cost Only) -
Supplying & Delivering (to jobsite) vision glass panels of Approved make comprising of hermetically-sealed 32mm Thick Insulated Curved Glass Unit.The
glass should be produced on a horizontal roller-hearth furnace with top and bottom forced convection system for perfect optical quality. The glass shall
be bent on a gear-driven bending system and toughened/heat-strengthened simultaneously with bending. All quality parameters as per IS 2553: Part 2
shall be maintained during the bending process. The glass should be made in an ISO certified factory and should be BIS certified as per Indian regulations
for safety glass.Rate shall be inclusive of Landing cost on site, Wastage and Breakage of the Glass inclusive of packing cost. -
GL-02B:8mm Thick Heat Strengthened (HS) Non- Performance Outerlite + 16mm Air Spacer Gap +8mm Thick Clear Fully Tempered (FT)] Innerlite glass
unit. -
Vertical Fenestration for Retail: Clear Float Glass having SHGC -0.73,U Value- 2.75W/m2K & VLT- 79 % ( Min)
-
Approved Make: -
Guardian -
Saint Gobain -
Sisecam Flat Glass -
Emirates Glass -
Asahi -
-
3.4 Non-PERFORMANCE VISION CURVED GLASS FOR WT-03: [GL-02C] @ Entrance Lobbies ( 3 Nos) 85 SQM 2,982 253,470
(Glass Supply & Delivery at site Cost Only) -
Page 31 of 48
CKOH/PPR/2025/JAN/11798
GL-02C:6mm Thick Non- Performance Curved Monolithic Heat Strengthened (HS) Glass. -
Approved Make: -
Guardian -
Saint Gobain -
Sisecam Flat Glass -
Emirates Glass -
Asahi -
-
D1-Double Leaf Aluminium Framed Manual Swing Doors with Floor Spring integrated with Semi-Unitised Glazing System (Supply+ Installation Cost
3.5 Only) @ Entrance Lobby 20 NOS 90,708 1,814,160
Supply & installation of Dpuble Leaf Framed Door with 6063-T6 /minimum 60 Microns Super Durable Powder Coated Aluminium Sections having door
profiles and Gasket.,and sash lock. Rate shall include landing cost on site. All hardware and accessories shall be as technical specification. Openable door
shall be consist of locking system with floor spring (including top pivot)and necessary hardware of approved make. -
Floor Spring accessories for metal doors (including top pivot & bottom strap). -
Floor spring with standard spindle, cement box & SS cover plate as per EN-1154 standards. -
Offset Type Pull Handle size:32mm dia x 1200mm c/c includes Stainless Steel back to back fixing accessories for Glass Door (Finish:Satin
Stainless Steel 316)
-
Approved Make:Glass -
SAINT GOBAIN GLASS -
GUARDIAN -
Sisecam Flat Glass -
Asahi Glass -
Emirates Glass -
-
D2-Single Leaf Aluminium Framed Manual Swing Doors with Floor Spring integrated with Semi-Unitised Glazing System (Supply+ Installation Cost Only)
3.6 @ Entrance Lobbies 4 NOS 49,347 197,388
Page 32 of 48
CKOH/PPR/2025/JAN/11798
Floor Spring accessories for metal doors (including top pivot & bottom strap). -
Floor spring with standard spindle, cement box & SS cover plate as per EN-1154 standards. -
Offset Type Pull Handle size:32mm dia x 1200mm c/c includes Stainless Steel back to back fixing accessories for Glass Door (Finish:Satin
Stainless Steel 316)
-
Approved Make:Glass -
SAINT GOBAIN GLASS -
GUARDIAN -
Sisecam Flat Glass -
Asahi Glass -
Emirates Glass -
-
D3-Double Leaf Automatic Sliding Aluminium Framed Doors with Aluminium Frames for Fixed Panels Integrated in Entrance Lobby (Wall Mounting
3.7 Type): 4 NOS 1,500,616
375,154
Designing, supplying, fabricating, assembling and installing in position, Wall mounted Double Leaf Automatic sliding Framed Doors with Aluminium Frames
for Fixed Panels from approved company & make as per dimension and specification as indicated in tender drawings and technical specifications.
-
The track profile should be separate from the main profile for enabling reduction in vibration insulation. Operator Length = 4150 mm, clear passage opening
=2000 mm, clear passage height = 2400 mm, includes micro processor controlled drive unit, with self learning mechanism, program selector with knob,
Actuation accessories (2 Nos/door)-combined detector with direction-sensing radar movement sensor and self-monitored double 3D light curtain for
actuating and protecting the closing area ,mechanical components, toothed belt, cover profile, Aluminium profile Body finish : standard silver anodised
operator profile, lock with 13.52 mm thk clear Sentry Laminated Heat Strengthened ( HS) glass for complete elevation - 2 moving panels and 2 Nos. fixed
panels. The system should include 16 bit Microprocessor control unit, a battery to support during power failure for 30minutes or 30cycles, self cleaning
rollers, noiseless maintenance free motor and Bi stable electromechanical lock to restrict the access. A program switch should activate various operating
modes as permanent hold open mode, automatic mode,night mode, shop closing time mode and reduced opening width mode. In addition, it should also
be activated to "OFF" mode by a program selector switch. Authorize access of program switch by key while mount it on a accessible height. The door
system designed for optimum traffic, using a dynamic extension of hold open time. The opening and closing speed can be adjustable to a maximum of -
0.8m/s, adjustable hold open time 0-60 seconds and opening and closing force adjustable to a maximum of 150N.
Page 33 of 48
CKOH/PPR/2025/JAN/11798
Clear Opening:1 Nos. Sliding & 1 Nos. Fixed Panels) : (4100mm Width x 2400mm Ht) -
Door Opening : (2000mm x 2400mm ) -
GL-06: Vision Glass for Double Leaf Automatic Sliding Framed Doors -
Door glass: Vision glass panels comprising of 13.52 mm Laminated glass : 6mm thick clear Heat Strengthened (HS) glass + 1.52mm thick Clear SentryGlas
Interlayer + 6mm thick clear Heat Strengthened (HS) glass.Rate shall be inclusive of Landing cost on site, Wastage and Breakage of the Glass.
-
GEZE -
DORMA -
ASSA ABLOY -
S,.S Portal for Double Leaf Automatic Sliding Framed Doors @ Main Entrance for WT-03 (System+Material+Installation Cost):
3.8 30 SQM 855,270
28,509
Design, engineer, furnish, fabricate, package, deliver (to jobsite) and install complete:2.0mm thick SS Cladding Supported on aluminium Framing and MS
Supports ( Paid Separately). S.S.Sheet Panel shall be Supported on Aluminium Framing with Aluminium Cleat and will be fabricated to make a tray with
corner cleats and riveted.The vertical and horizontal groove joints are to be sealed with weather silicone of approved make in compliance with the technical
matrix. Vertical/Horizontal Stiffeners are provided in the SS sheet to prevent the panel from sagging/deflecting.Quote rate for 2.0mm thick SS sheet (SS -
grade 316) in line with Tender drawing. Rate shall include all taxes and landing cost on site. Shade as per architects and client approval.
-
8.00mm Thk Fibre Cement Board Wall Cladding for WT-03 @ Internal Area
3.10 490 SQM 1,309,770
2,673
Design, engineer, furnish, fabricate, package, deliver (to jobsite), install and supply complete: Supply & installation OF Interior wall cladding using fibre
cement board/plank of approved make 8mm thk & dimension 150mm x 3000mm .Fibre Cement Board should be minimum density 1300kg/m3 & comply to
ASTM C 1185 & BS 476-part 4,5,6 & 7. The sheets will also be screwed (SS 316 Countersunk Screw 300mm c/c) to the M.S. frames.
-
Approved Make: -
Shera -
Everest -
Page 34 of 48
CKOH/PPR/2025/JAN/11798
Spandrel Area @ As a part of Curtain Wall System: Providing & fixing the shadow box in the spandrel panel with one side Factory Laminated Aliminium Foil
on to the Stonewool insulation of minimum 60 kg/m3 density & minimum 50mm thick firmly held in the G.I.supporting tray of 1.5mm thk for spandrel
areas @ beam location indicated in the facade tender drawing.The facing of aluminium foil (pre-laminated on the ROCKWOOL slabs) shall be of high
strength without kraft paper and total thickness of foil facing shall be 86gsm. The fixing of Stonewool Slab on to the G.I. Tray by means of special pins -
rigidly holding Stonewool Slab.Concealed spandrel back pan should be of 1.5mm thick G.I. Sheet shall be mill finish.
-
SPANDREL INSULATION PANEL & SHADOW BOX @ PERIMETER FIRE BARRIER JOINT SYSTEM FOR CURTAIN WALLING INTERJUNCTION AREA (Behind Glass
- 1st Floor/Elevational Horizontal Feature Band Cladding- 2nd Floor ): Extra over WT-03
3.10 810 SQM 2,719 2,202,390
System + Fabrication + Installation + Material (One side Black Glass Fibre Tissue factory Laminated Tested Stonewool insulation + 1.5mm Thk G.I. Sheet
Tray - Mill Finish) Cost -
Spandrel Area @ Beam. behind ACP Panel Location: Providing & fixing the shadow box in the spandrel panel with one side Factory Laminated Aliminium
Foil on to the Stonewool insulation of minimum 128 kg/m3 density & minimum 50mm thick firmly held in the G.I.supporting tray of 1.5mm thk for
spandrel areas @ beam location indicated in the facade tender drawing.. The facing of aluminium foil (pre-laminated on the ROCKWOOL slabs) shall be of
high strength without kraft paper and total thickness of foil facing shall be 86gsm. The fixing of Stonewool Slab on to the G.I. Tray by means of special pins -
rigidly holding Stonewool Slab.Concealed spandrel back pan should be of 1.5mm thick G.I. Sheet shall be mill finish.
The perimeter fire barrier joint and spandrel insulation being a part of firestop system shall be tested based on ASTM E2307 and follows IS 18190:2023
guidelines, where the spandrel insulation, such as Siderise CWSI50, Curtainrock 80 (Roxul rockwool) or approved equivalent. The spandrel panel interfacing
with the perimeter barrier smoke seal should be protected for the duration of 120 mins as per required Fire resistance rating. The insulation to be used is of
stone mineral wool in nature and shall be of minimum of 50mm thickness & min 128 kg/m3 density. The spandrel stone mineral wool insulation
perofrmance parameter shall be tested based on ASTM E2874 & all materials used shoud be supported by test reports to assure fire resistance rating as -
mentioned above.
Approved Makes -
Siderise CW-SI50 -
Thermafibre Firespan 90 -
Rockwool Curtain Rock 80 -
-
Z- Type Performance Horizontal Fixed Louvers along with G.I Brid Mesh Finished with Super Durable Powder Coating : Extra over WT-03 ( Entarnce
3.11 Lobby ) 85 SQM 20,846 1,771,910
Design, engineer, furnish, fabricate, package, deliver (to jobsite) and install complete: -
Page 35 of 48
CKOH/PPR/2025/JAN/11798
All visible exposed aluminium extrusions shall be AA 6063- T6 alloy with outer track and the shutter section shall be SDF powder coated to a minimum film
thickness of 60-90 microns comply as per AAMA 2604 color confiming to architects approval. -
Page 36 of 48
CKOH/PPR/2025/JAN/11798
Quote Rate shall include G.I. bird mesh with 25X25mm opening shall have Powder coating of 60 microns as per AAMA 2603 Standards. -
APPROVED MAKE -
Aluform -
-
M-03: 2.0mm Thk Extruded Aluminium Fluted Panels Cladding Finished with Super Durable Powder Coating ( Metallic Shade) @ Retail- Groud. 1st & 2nd
4 Floor ( Supply + Systenm Cost + installation) ( Pattern as per Architect):Extra over WT-03 490 SQM 4,007,710
8,179
Designing, supplying and fixing of Solid Extruded Aluminium fluted panels (Metallic Shade) , Design No. DN 834, Fluted Panel Depth- 13.5mm ,Width-
140mm Fluted Panel Sizes 20 & 7 MM with gap of 10mm. with material thickness 2mm. Height 3600mm. -
Fixing Methodology-Aluminium Extruded Fluted Panels shall fixed on aluminium tubes minimum 25x40, with self screws. Frame should be in the opposite
direction of fluted panels & frame to frame distance should be 900 mm maximum. Fluted panels will be fixed as an interlocking method and will be
installed with a hidden screw system. -
Page 37 of 48
CKOH/PPR/2025/JAN/11798
Warranty: 25 years Product Performance Guarantee for Powder to be offered for the Project in accordance with the standards and the acceptance criteria
laid down in the Guarantee document by the powder coating manufacturer. The guarantee shall be for the entire duration of 25 years for the decorative
properties (gloss/colour) and the film integrity mentioned in the document. A draft guarantee shall be requested from the powder coating manufacturer -
and submitted to ensure adherence to specifications.
Mode of Measurement: The cladding system item shall be measured in Square meters (corrected to two decimal for the finished work) of the visible
surface area of cladded profile of solid Aluminium surface after installation all as per approved shop drawings & fixed in position including grooves i.e. -
module centre to centre.
Approved Make: -
Intelligent Aluminium -
-
M-04:2.0mm Thk Extruded Aluminium Perforated Fluted Panels Cladding Finished with Super Durable Powder Coating ( Metallic Shade) @ Retail-
Ground &1st Floor ( Dead Wall Area) ( Supply + System Cost + installation): Extra over WT-03
4.1 140 SQM 1,275,960
9,114
( Material + System + Fabrication + Installation cost) -
Designing, supplying and fixing of Solid Extruded Aluminium fluted panels (Metallic Shade) , Design No. DN 834, Fluted Panel Depth- 13.5mm ,Width-
140mm Fluted Panel Sizes 20 & 7 MM with gap of 10mm. with material thickness 2mm. Height 3600mm. -
Fixing Methodology-Aluminium Extruded Fluted Panels shall fixed on aluminium tubes minimum 25x40, with self screws. Frame should be in the opposite
direction of fluted panels & frame to frame distance should be 900 mm maximum. Fluted panels will be fixed as an interlocking method and will be -
installed with a hidden screw system.
Page 38 of 48
CKOH/PPR/2025/JAN/11798
Warranty: 25 years Product Performance Guarantee for Powder to be offered for the Project in accordance with the standards and the acceptance criteria
laid down in the Guarantee document by the powder coating manufacturer. The guarantee shall be for the entire duration of 25 years for the decorative
properties (gloss/colour) and the film integrity mentioned in the document. A draft guarantee shall be requested from the powder coating manufacturer -
and submitted to ensure adherence to specifications.
Mode of Measurement: The cladding system item shall be measured in Square meters (corrected to two decimal for the finished work) of the visible
surface area of cladded profile of solid Aluminium surface after installation all as per approved shop drawings & fixed in position including grooves i.e. -
module centre to centre.
Approved Make: -
Intelligent Aluminium -
-
5 WT-05 : 20mm THK ( MINIMUM ) MULTICELL POLYCARBONATE SYSTEM @ Atrium Skylight - Food Court Lvl 1,000 SQM 6,842 6,842,000
Material + System + Installation cost : ( Excluding M.S. Structure) -
Page 39 of 48
CKOH/PPR/2025/JAN/11798
Test Reports/Certifications:
• Impact Test: Panels must satisfy Dart drop impact test as per IS 14443-97 shall show no sign of breakage on Polycarbonate sheets which have been
exposed to UV for a min.of 500 Hours as per ASTM G 155 or Equivalent test by any NABL Approved Labs.
• Weathering Test: Panels shall not have Yellowness Index as per ASTM E-313 or equivalent, delta change shall not be more than 15 units Delta E when
tested on a sample exposed to UV for 500 Hours as per ASTM G 155/ASTM D2244-89,E308-85 shall change no more than 10 units Delta E after ten years in
comparison with the original. -
• Flammability Test (B-s1, d0): Panels shall be tested against fire as per EN 13501-1:2007 in an international accredited laboratory and classified B-s1, d0.
Approved Make: -
Danpalon -
DPI Daylighting -
Palram -
-
Page 40 of 48
CKOH/PPR/2025/JAN/11798
5.3 STEEL FABRICATION for WT-05: @ Glass Skylight 20,000.00 Kg 154 3,080,000
Design, Engineer, Furnish, Fabricate, package, deliver (to jobsite) and Install: -
Designing,Engineering,Cutting,Hoisting,Fabricating and Installing mild steel framing members for Glass Skylight at locations indicated in the tender
drawings. All extruded Mild steel vertical sections shall comply to IS 2062 Grade A and shall be coated with High Performance Low VOC Anticorrosive
Protective Coating system of 280 microns comprising zinc phosphate polyamine epoxy primer of 100 microns each and one top coat of High solids Acrylic
Polyurethane high performance glossy finish paint (Colour as per architect intent) of 80 microns after shot blasting as per SA 2.5 Swedish standards. -
Surface Preparation:Preparing the structural steel surfaces to ensure complete removal of mill scale by blast cleaning confirming to SA 2.5 Swedish
Standard. Surface should be free of all visible oil, grease, dust, dirt, mill scale, rust, oxides, corrosion products and other foreign matters. The medium of -
blasting can be steel shot/grit blasting.
Primer Coat:Epoxy Primer (Two Coats):Two component high solid, zinc phosphate polyamine epoxy primer complies with Volume Solid of 74 ± 2 % and
minimum weight per ltr of 1.5 Kg/ltr. Touch dry of 1 hr @ 30 deg C, which contributes to LEEDv4 Building Standards and having volatile organic compound
(VOC) less than 250 gm/Ltr. VOC emission should be lower than or equal to 0.5mg/m3(CDPH Method.1.1). With Environment Product Declaration (EPD)
from 3rd party. Performance requirement - At 200 microns the primer product along with topcoat, as a system should meet C4 High environment and
meet as per ISO 12944 -6, Neutral salt spray test as per ISO9227 for 720 hrs. The DFT of 200 microns shall be achieved (100 microns per coat of application). -
Top Protective Finish Coat:Polyurethane Finish Coat ( One Coat ):Two component, acrylic aliphatic polyurethane finish coat of specified finish having
minimum volume solids 73 ± 2%,which contributes to LEEDv4 Building Standards and having volatile organic compound (VOC) less than 250 gm/Lt. VOC
emission should be lower than or equal to 0.5mg/m3(CDPH Method.1.1). With Environment Product Declaration (EPD) from 3rd Party. The DFT 80 of -
microns shall be achieved in single coat.
-
WT-06 ELEVATIONAL FEATURE HORIZONTAL BAND CLADDING @ Retail Area -1st & F & B Lvl/ F& B - Terrace Parapet
6 2,050 SQM 4,347 8,911,350
Designing, supplying, fabricating, installing fully engineered system comprising of Extruded Aluminium framing members installed on to the Mild Steel
Structure (Hot Dip Galvanized-100 microns) as indicated in the drawings. Extruded aluminium section framing (Vertical and horizontal) mechanically fixed
on to the designed mild steel structure using Hot Dip Galvanized-100 microns brackets. Fabricated Aluminium Composite Panel ( FR Grade ACP) with
grooving and bending along with corner cleats are fixed mechanically on to the aluminium framing and stainless steel 316 grade screws providing
vertical/horizontal grooves for expansion. Vertical/Horizontal Stiffeners to be provided in the Aluminium sheet to prevent the panel from
sagging/deflecting. The system shall be designed to withstand a wind pressure of 1.9 kPa as indicated in CTM at all levels, elevations and heights. The
system must design and pass the proof test at 1.5 times design wind pressure i.e. 2.85 KPa without any failure. The extruded section shall be of 6063 T6
alloy Conforming to ASTM B 221M and are designed as per AS: 1288-2006 to withstand a wind pressure at all levels, elevations and heights. All concealed
aluminium surfaces, any extruded aluminium cleats, etc., shall be finished with CHROME FREE pre-treatment coating. All extruded Mild steel sections shall -
comply to IS 2062 Grade A and Hot Dip Galvanised to minimum 100 microns coating. The fastening materials like Anchors, Nuts, Bolts, Rivets, washers,
clamps, straps etc required for fixing the framing members to the mild steel structure shall be of stainless steel 316 grade and corrosion resistant of
approved make as per Architects/Consultants Specification. Providing Non-Staining & Non-Bleeding weather silicone in the groove joints -Shade as per
architects requirement.
Page 41 of 48
CKOH/PPR/2025/JAN/11798
5. All exposed aluminium surfaces shall be SDF coating finish minimum 60 microns as per AAMA 2604 standards to match the Aluminium shade.
-
6. Providing all hardware's & consumables including Stainless steel 316 grade mechanical anchor fasteners, chemical anchor fasteners (As required) SS 316
grade screws,Rawl plug, bolts and accessories as mentioned in the concept tender drawing and specification.
-
7. Providing Non-Staining & Non-Bleeding weather silicone -Dowsil 991 as per architects requirement. -
8.Supplying, drilling /cleaning hole and fixing of Torque Controlled Expansion Anchor HST4-R or equivalent, of sizes ranging from M8 to M20. The Anchor
should possess ETA Certificate for use in Cracked Concrete , approved as per Seismic C2 Category and have Fire Resistance values for up to 120 mins
tested in accordance with EAD 330232-01-0601,. CE conformity and FM Approval. The anchor should be pre-assembled M8-M20 (Stainless Steel )as per EN
ISO 4042: 1999, a nut of Strength Class 8 (EN ISO 20898-2:2012) and a galvanized washer (EN ISO 4042:1999). It should also possess FM Approval for use in
Pipe Hangers. Design of Anchor should be done as per EC2 Part-4 using engineering Software as per actual load data and site conditions as provided by
structural consultant and the report to be submitted to the project manager and design engineer for approval. Anchor shall be driven with the help of HS-
SC setting tool ,fixed at right embedment depth as per design report and activated using SIW 6AT-A22 Impact Wrench with adaptive torque Module to
ensure adequate torque as per the given diameter mentioned in the ETA. The same must be documented in the form of software generated report and -
shall be submitted to the project manager at the time of inspection. Scanning before drilling to be done with PS Scanning tool to avoid rebar hits.
09. Rate shall be inclusive of TPO Water proofing Membrame behind ACP Cladding for effective protection againt water ingress in the Curtain System.
-
Providing and laying Specially formulated Fleeceback 100mil (2.5mm) TPO waterproofing membrane based Existing facade waterproofing including
preparation of surface as required for treatment of facede and Walls etc. consisting following operations: -
Waterproofing : Over the prepaired, providing and laying specially formulated high strength Fleeceback 45mil TPO (1.14mm) with 55mil (1.37mm) Fleece
100mil (2.5mm) four layer 45mil TPO membrane with heavy duty 55mil Fleece, a EP rubber polymer strong base, high strength polyester-reinforced fabric
centre (scrim) and a tough thermoplastic poly-olefin compound top ply, membrane. TPO with reinforced membranes as per factory extrusion. Membrane
shall be bonded with solvent based bonding adhesive on the metal frame surface, partially mechanically to the surface if required to hold the membrane
with the surface. The overlap of the membrane shall have minimum of 40mm side and end laps which shall be hot air welded with heat welded machine as -
per site condition.
Properties : Membrane shall be 100% UV resistance, Ozone resistance according to ASTM D1149 a with Breaking strength of > 1.6 KN, Elongation at break
of internal fabric 25% and Puncture Resistance, 450lbf. -
-
6.1 M01-4mm Thk Aluminium Composite Panel ( Fire Retardant Grade - Class A2,s1,d0 ) Panel : Extra over WT-06 2,050 SQM 2,424 4,969,200
(Material Supply & Delivery at site Cost Only) -
Page 42 of 48
CKOH/PPR/2025/JAN/11798
Aluminium outer skin and inner skin should confirm to alloy 3xxx series grade and H22 / H24 temper with minimum mechanical properties as per given
values. The thickness shall be minimum 0.50 mm thickness and PVDF shall be add-on to this thickness. -
Surface of the Composite Panel should be finished with Kynar-500 /Hylar 5000 PVDF based coating (Polyvinylidene Di Fluoride) on the topside with
minimum 35 microns thickness of approved Metallic Colour and a service coating on the reverse side. -
The top coat surface shall comply with the “specification for coated coil for exterior building applications” issued by ECCA (European Coil Coating
Association). The coating shall confirm to AAMA 2605 by double coat double baked process for exterior grade finish. The reverse side of the cladding panel
surface facing the wall shall have polyester base coating to protect against the possible corrosion problems. -
The finished surface shall be protected with a self-adhesive peel off foil with 80 microns thickness (white or black) tested to with stand at least 6 months
exposure to local weather condition without losing the original peel off characteristic or causing stain or other damages on the coated surface of the
aluminium composite panel. If the stain or any damage noticed after peel off by the fabricator, such panel should be replaced with new one of the same -
shade and color, at no extra cost.
The peel off foil should be removed at the time of handing over as may be required by the Site-In-Charge. -
Warranty: The top sheet shall be coated with PVDF coat by continuous coil coating process and shall be of minimum 35 microns thickness of approved
metallic colour passing AAMA 2605 standard for 15 year warranty along with 70% Gloss Retention after 10 Years. -
APPROVED MAKE -
Alucobond -
Aludecor -
VIVA -
-
WT-07: Glass Railing with S.S 304 Grade Vertical Post & S.S. 304 Grade Handrail Pipe @ F & B Lvl - 2nd Floor ( 1.2m High)
7 245 RMTRS 15,420 3,777,900
Glass Railing is designed to withstand the Wind Pressure of Maximum 1.9 Kpa as per IS 875 (PART III) and 300 kg/m live load @ F & B Lvl The Railing Glass
shall have Sentry Laminated Glass and shall be held on SS Vertical Balustrade (316 grade, satin finished) and are spaced @ max 1500 mm c/c distance with
S.S. 304 Grade Brackets/Fittings,SS routel etc. as per tender drawings . Balustrade is fixed on the RCC Slab with SS Base Plates & anchored to RCC structure
with anchor Bolts - 4 Nos./ plate in SS 316 Grade. Glass is mounted with fixed bracket fittings fixed on SS vertical baluster with necessary Nylon Gasket,
washers etc. complete. The glass is fixed on the railing bracket with thru hole fixatation ( 2 nos. Brackets / Vertical).All screws, washers, fasteners used shall
be only stainless steel of 316 grade. Teflon/ Nylon Bushes & Separators to prevent bi-metallic contacts. Provide SS 316 grade circular handrail pipe rest -
atop the Glass railing as a part of the system as indicated in the tender drawing.
Rate shall include fixing Railings to the RCC surface with necessary clamps,fastenning straps, nuts,bolts,washers and other fastening material of stainless
steel 316 grade and corrosion resistant. Quote rate shall include 63.5 mm dia x 2mm Thk Handrail Pipe @ 1250 mm Ht. ( from FFL ).
-
Page 43 of 48
CKOH/PPR/2025/JAN/11798
-
Approved Make: Railing -
KINLONG -
Q-RAILING -
Dorma -
-
-
7.1 NON-PERFORMANCE VISION GLASS for WT-07:GL-04 130.00 SQM 8,417 1,094,210
(Glass Supply & Delivery at site Cost Only) -
GL-04:Vision glass panels comprising of 17.52 mm Laminated glass : 8mm thick clear Fully Tempered (Heat Soak Test) glass + 1.52mm thick Clear
SentryGlas Interlayer +8mm thick clear Fully Tempered (Heat Soak Test) glass.Rate shall be inclusive of Landing cost on site, Wastage and Breakage of
the Glass inclusive of packing cost. -
-
7.2 NON-PERFORMANCE VISION CURVED GLASS for WT-07:GL-04A 95.00 SQM 19,238 1,827,610
(Glass Supply & Delivery at site Cost Only) -
GL-04A:Vision glass panels comprising of 17.52 mm Laminated glass : 8mm thick clear Fully Tempered (Heat Soak Test) glass + 1.52mm thick Clear
SentryGlas Interlayer +8mm thick clear Fully Tempered (Heat Soak Test) glass.The glass should be produced on a horizontal roller-hearth furnace with top
and bottom forced convection system for perfect optical quality. The glass shall be bent on a gear-driven bending system and toughened/heat-
strengthened simultaneously with bending. All quality parameters as per IS 2553: Part 2 shall be maintained during the bending process. The glass should
be made in an ISO certified factory and should be BIS certified as per Indian regulations for safety glass.Rate shall be inclusive of Landing cost on site, -
Wastage and Breakage of the Glass.
-
WT-08: 0.7mm Thk Exterior Linear Aluminium Soffit Cladding with Locking System @ Retail- 2nd Floor/ Staircase Area -Soffit
8 475 SQM 5,622 2,670,450
Page 44 of 48
CKOH/PPR/2025/JAN/11798
#.Any fastening materials screws,nuts,bolts,rivets,washers,clamps and other accessories, etc. shall be in stainless steel SS 316 grade and corrosion resistant
of approved make as per Architects/Consultant Specifications. . -
Supplying, drilling /cleaning hole and fixing of Torque Controlled Expansion Anchor & medium to heavy duty injection adhesive for Anchor fixing (as
required) with sizes ranging from M8 to M24. The Anchor shall be third party tested, possess ETA approval and shall be pre-assembled and should be of
Material Grade- Stainless Steel A4,a nut of Stainless Steel A4 and a Stainless Steel A4 washer. The Expansion & Adhesive/Chemical Anchor shall be
approved for use in Cracked Concrete and Seismic C2 category. ETA to have Fire Resistance values, CE conformity and FM Approval. Anchor shall be fixed at
right embedment depth and as per embedment mark in case of Expansion Anchor . The chemical anchor (Threaded Rod) should have certification/
approvals/ test reports from/ for ETA/ TR023, fire rated, water tightness. Design of Anchor shall be done as per ETAG 001 Annex C and TR045 using -
Software as per actual load data and site conditions and the report to be submitted to the project engineer in charge for approval.
Technical Specifications :
• Exterior Linear Aluminium Panel: 300mm Wide x 30mm deep x 0.7mm Thk .
• Aluminium Alloy,Temper-AA 3005/AA 3105-H26 (for Higher Strength) confirming EN 573-3 or equivalent.
• Panel Length: up to 6000mm.
• Panel Carrier-AA 5050 (Al.Mg). (Distance Max. 0.80 mtrs c/c). -
• Pre –treatment: Chrome-free conversion layer.
• • Surface Treatment-2- Layer PVDF Coating confirming AAMA 2605.
Page 45 of 48
CKOH/PPR/2025/JAN/11798
Warranty: 25 years Product Performance Guarantee for Powder to be offered for the Project in accordance with the standards and the acceptance criteria
laid down in the Guarantee document by the powder coating manufacturer. The guarantee shall be for the entire duration of 25 years for the decorative
properties (gloss/colour) and the film integrity mentioned in the document. A draft guarantee shall be requested from the powder coating manufacturer -
and submitted to ensure adherence to specifications.
APPROVED MAKE -
M/s. Hunter Douglas India Pvt. Ltd -
-
WT-09: UPVC / Aluminum Horizontal Box Louvers along with G.I.Bird Mesh ( Shade as per Architect) @ Rear Side- Office Core Wall.
9 1,000 SQM 7,726 7,726,000
The fastening materials like Anchors, Nuts, Bolts, Rivets, washers, clamps, straps etc required for fixing the framing members to the masonry wall/ RCC
surface shall be of stainless steel 316 grade and corrosion resistant. -
Mode of Measurement for façade elements shall be only visible elevation areas i.e.. Module centre to centre,End to End for RCC / Structure openings .
-
-
9.1 M-01: UPVC Horizontal Box Louvers along with G.I.Bird Mesh @ Rear Side- Office Core Wall. 675 SQM 3,738 2,523,150
Page 46 of 48
CKOH/PPR/2025/JAN/11798
Quote Rate shall include G.I. bird mesh with 25X25mm opening shall have Powder coating of 60 microns as per AAMA 2603 Standards.
-
-
M-02: Aluminium Horizontal Box Louvers shall be finished with Super Durable Powder Coating along with G.I.Bird Mesh @ Rear Side- Office Core Wall.
9.2 75 SQM 429,750
5,730
( Material Cost Only) -
Design, engineer, furnish, fabricate, package, deliver (to jobsite) and install complete:
The system comprises of Continuous Fixed Horizontal Louvers ( 50mm x 100mm x2 mm Thk) in office areas of the Building as indicated in the tender
drawing. Aluminium Louvers consisting of box of size to be equally spaced as indicated in the tender drawings. The Aluminium Sections of Alloy 6063 T5 /
T6 & tolerances confirming to DIN / EN standard from approved..All the visible surfaces shall be finished with Super Durable Powder coating of minimum
60-90 Microns confirming AAMA 2605 standards- shade as per Client's and Architect's requirement. -
Page 47 of 48
CKOH/PPR/2025/JAN/11798
Warranty: 25 years Product Performance Guarantee for Powder to be offered for the Project in accordance with the standards and the acceptance criteria
laid down in the Guarantee document by the powder coating manufacturer. The guarantee shall be for the entire duration of 25 years for the decorative
properties (gloss/colour) and the film integrity mentioned in the document. A draft guarantee shall be requested from the powder coating manufacturer
and submitted to ensure adherence to specifications. -
Quote Rate shall include G.I. bird mesh with 25X25mm opening shall have Powder coating of 60 microns as per AAMA 2603 Standards. -
-
10 WT-10 4mm Thk Aluminium Composite Panel CLADDING @ Retail Area ( 2nd Floor)- COLUMNS WRAP 200 SQM 2,938 587,600
Page 48 of 48
CKOH/PPR/2025/JAN/11798
Note: Mode of measurement for Aluminium Composite Panel Sheet cladding system item shall be measured in Square meters of the visible surface area of
cladded profile of the Aluminium surface after installation all as per approved shop drawings. All flashings @ Jamb level, Cill etc of Aluminium metal panel
along with all soffits shall not paid extra as they are considered part of the system. -
5. All exposed aluminium surfaces shall be SDF coating finish minimum 60 microns as per AAMA 2604 standards to match the Aluminium shade.
-
6. Providing all hardware's & consumables including Stainless steel 316 grade mechanical anchor fasteners, chemical anchor fasteners (As required) SS 316
grade screws,Rawl plug, bolts and accessories as mentioned in the concept tender drawing and specification.
-
7. Providing Non-Staining & Non-Bleeding weather silicone -Dowsil 991 as per architects requirement. -
8. Rate shall include Stonewool insulation ( minimum density-100 Kg/m³),1.5mm Thk G.I.Tray behind Aluminium Sheet Panel as per façade tender
drawings. -
9.Supplying, drilling /cleaning hole and fixing of Torque Controlled Expansion Anchor HST4-R or equivalent, of sizes ranging from M8 to M20. The Anchor
should possess ETA Certificate for use in Cracked Concrete , approved as per Seismic C2 Category and have Fire Resistance values for up to 120 mins
tested in accordance with EAD 330232-01-0601,. CE conformity and FM Approval. The anchor should be pre-assembled M8-M20 (Stainless Steel )as per EN
ISO 4042: 1999, a nut of Strength Class 8 (EN ISO 20898-2:2012) and stainless steel washer (EN ISO 4042:1999). Design of Anchor should be done as per EC2
Part-4 using engineering Software as per actual load data and site conditions as provided by structural consultant and the report to be submitted to the
project manager and design engineer for approval. Anchor shall be driven with the help of HS-SC setting tool ,fixed at right embedment depth as per design
report and activated using SIW 6AT-A22 Impact Wrench with adaptive torque Module to ensure adequate torque as per the given diameter mentioned in
the ETA. The same must be documented in the form of software generated report and shall be submitted to the project manager at the time of inspection. -
Scanning before drilling to be done with PS Scanning tool to avoid rebar hits.
Page 49 of 48
CKOH/PPR/2025/JAN/11798
-
10.1 M01-4mm Thk Aluminium Composite Panel ( Fire Retardant Grade - Class A2,s1,d0 ) Panel : Extra over WT-10 200 SQM 2,424 484,800
(Material Supply & Delivery at site Cost Only) -
Aluminum composite panel shall be of approved makes and made out of 4mm thick aluminum composite panel comprising of Aluminum Skin of Minimum
0.5mm of AA 3105 Alloy with KYNAR 500/Hylar 5000 PVDF based fluorocarbon resin and Lead free Coating by Double coat double bake process with the
facility in India from where the ACP is being supplied and manufacturer must have the QAV ( Accelerated weather testing Machine),Salt spray testing
Facility available with the yearly calibration from the NABL approved authorities of approved finish +3mm thick non-combustible mineral based polymer
core of Class A2,s1,d0 As per En13501-1 (minimum 90% non-combustible inorganic material) + 0.5mm aluminum skin of AA 3105 Alloy with service coat
bond with co extrusion/Lamination process. Overall weight of the panel shall not be less than 8 kg per sqm. Manufacturer must be FPC certified with the
valid FPC certification of Class A2,s1,d0 as per EN 13501-1 of the unit from where the material is being supplied. -
Aluminium outer skin and inner skin should confirm to alloy 3xxx series grade and H22 / H24 temper with minimum mechanical properties as per given
values. The thickness shall be minimum 0.50 mm thickness and PVDF shall be add-on to this thickness. -
Surface of the Composite Panel should be finished with Kynar-500 /Hylar 5000 PVDF based coating (Polyvinylidene Di Fluoride) on the topside with
minimum 35 microns thickness of approved Metallic Colour and a service coating on the reverse side. -
The top coat surface shall comply with the “specification for coated coil for exterior building applications” issued by ECCA (European Coil Coating
Association). The coating shall confirm to AAMA 2605 by double coat double baked process for exterior grade finish. The reverse side of the cladding panel
surface facing the wall shall have polyester base coating to protect against the possible corrosion problems. -
The finished surface shall be protected with a self-adhesive peel off foil with 80 microns thickness (white or black) tested to with stand at least 6 months
exposure to local weather condition without losing the original peel off characteristic or causing stain or other damages on the coated surface of the
aluminium composite panel. If the stain or any damage noticed after peel off by the fabricator, such panel should be replaced with new one of the same -
shade and color, at no extra cost.
The peel off foil should be removed at the time of handing over as may be required by the Site-In-Charge. -
Warranty: The top sheet shall be coated with PVDF coat by continuous coil coating process and shall be of minimum 35 microns thickness of approved
metallic colour passing AAMA 2605 standard for 15 year warranty along with 70% Gloss Retention after 10 Years. -
APPROVED MAKE -
Alucobond -
Aludecor -
VIVA -
-
10.2 STEEL FABRICATION for WT-10: 5,000.00 Kg 157 785,000
Design, Engineer, Furnish, Fabricate, package, deliver (to jobsite) and Install: -
Page 50 of 48
CKOH/PPR/2025/JAN/11798
After Welding Hot - Dip Galvanized sheet, touch up of the wedding / cut area is required using Zinc - Rich Paint to restore corrosion protection . Zinc - rich
Paint- Apply a zinc rich paint on a clean, dry surface with a brush or spray. The paint should contain at least 65 % to 69 % metallic Zinc by weight or more
than 92 % metallic Zinc in the dry film. -
-
WT-11 4mm Thk ACP CLADDED PERGOLA @ RETAIL-2nd Floor / F & B near Lift Enclosure
11 175 SQM 2,730 477,750
Designing, supplying, fabricating, installing fully engineered system comprising of Extruded Aluminium framing members installed on to the Mild Steel
Structure (Hot Dip Galvanized-100 microns) as indicated in the drawings. Extruded aluminium section framing (Vertical and horizontal) mechanically fixed
on to the designed mild steel structure using Hot Dip Galvanized-100 microns brackets. Fabricated 4mm Thk Aluminium Composite Panel ( FR Grade ACP)
with grooving and bending along with corner cleats are fixed mechanically on to the aluminium framing and stainless steel 316 grade screws providing
vertical/horizontal grooves for expansion. Vertical/Horizontal Stiffeners to be provided in the Aluminium sheet to prevent the panel from
sagging/deflecting. The system shall be designed to withstand a wind pressure of 1.9 kPa as indicated in CTM at all levels, elevations and heights. The
system must design and pass the proof test at 1.5 times design wind pressure i.e. 2.85 KPa without any failure. The extruded section shall be of 6063 T6
alloy Conforming to ASTM B 221M and are designed as per AS: 1288-2006 to withstand a wind pressure at all levels, elevations and heights. All concealed
aluminium surfaces, any extruded aluminium cleats, etc., shall be finished with CHROME FREE pre-treatment coating. All extruded Mild steel sections shall
comply to IS 2062 Grade A and Hot Dip Galvanised to minimum 100 microns coating. The fastening materials like Anchors, Nuts, Bolts, Rivets, washers, -
clamps, straps etc required for fixing the framing members to the mild steel structure shall be of stainless steel 316 grade and corrosion resistant of
approved make as per Architects/Consultants Specification. Providing Non-Staining & Non-Bleeding weather silicone in the groove joints -Shade as per
architects requirement.
Note: Mode of measurement for Aluminium Composite Panel Sheet cladding system item shall be measured in Square meters of the visible surface area of
cladded profile of the Aluminium surface after installation all as per approved shop drawings. All flashings @ Jamb level, Cill etc of Aluminium metal panel
along with all soffits shall not paid extra as they are considered part of the system. -
5. All exposed aluminium surfaces shall be SDF coating finish minimum 60 microns as per AAMA 2604 standards to match the Aluminium shade.
-
6. Providing all hardware's & consumables including Stainless steel 316 grade mechanical anchor fasteners, chemical anchor fasteners (As required) SS 316
grade screws,Rawl plug, bolts and accessories as mentioned in the concept tender drawing and specification.
-
7. Providing Non-Staining & Non-Bleeding weather silicone -Dowsil 991 as per architects requirement. -
Page 51 of 48
CKOH/PPR/2025/JAN/11798
9.Supplying, drilling /cleaning hole and fixing of Torque Controlled Expansion Anchor HST4-R or equivalent, of sizes ranging from M8 to M20. The Anchor
should possess ETA Certificate for use in Cracked Concrete , approved as per Seismic C2 Category and have Fire Resistance values for up to 120 mins
tested in accordance with EAD 330232-01-0601,. CE conformity and FM Approval. The anchor should be pre-assembled M8-M20 (Stainless Steel )as per EN
ISO 4042: 1999, a nut of Strength Class 8 (EN ISO 20898-2:2012) and stainless steel washer (EN ISO 4042:1999). Design of Anchor should be done as per EC2
Part-4 using engineering Software as per actual load data and site conditions as provided by structural consultant and the report to be submitted to the
project manager and design engineer for approval. Anchor shall be driven with the help of HS-SC setting tool ,fixed at right embedment depth as per design
report and activated using SIW 6AT-A22 Impact Wrench with adaptive torque Module to ensure adequate torque as per the given diameter mentioned in
the ETA. The same must be documented in the form of software generated report and shall be submitted to the project manager at the time of inspection. -
Scanning before drilling to be done with PS Scanning tool to avoid rebar hits.
10. Rate shall be inclusive of TPO Water proofing Membrame behind Aluminium Sheet Flashing for effective protection againt water ingress in the Canopy
area . -
14.Providing and laying Specially formulated Fleeceback 100mil (2.5mm) TPO waterproofing membrane based Existing facade waterproofing including
preparation of surface as required for treatment of Pergola Canopy consisting following operations: -
Waterproofing : Over the prepaired, providing and laying specially formulated high strength Fleeceback 45mil TPO (1.14mm) with 55mil (1.37mm) Fleece
100mil (2.5mm) four layer 45mil TPO membrane with heavy duty 55mil Fleece, a EP rubber polymer strong base, high strength polyester-reinforced fabric
centre (scrim) and a tough thermoplastic poly-olefin compound top ply, membrane. TPO with reinforced membranes as per factory extrusion. Membrane
shall be bonded with solvent based bonding adhesive on the metal frame surface, partially mechanically to the surface if required to hold the membrane
with the surface. The overlap of the membrane shall have minimum of 40mm side and end laps which shall be hot air welded with heat welded machine as -
per site condition.
Properties : Membrane shall be 100% UV resistance, Ozone resistance according to ASTM D1149 a with Breaking strength of > 1.6 KN, Elongation at break
of internal fabric 25% and Puncture Resistance, 450lbf. -
-
M01-4mm Thk Aluminium Composite Panel ( Fire Retardant Grade - Class A2,s1,d0 ) : Extra over WT-11
11.1 175 SQM 2,424 424,200
(Material Supply & Delivery at site Cost Only) -
Aluminum composite panel shall be of approved makes and made out of 4mm thick aluminum composite panel comprising of Aluminum Skin of Minimum
0.5mm of AA 3105 Alloy with KYNAR 500/Hylar 5000 PVDF based fluorocarbon resin and Lead free Coating by Double coat double bake process with the
facility in India from where the ACP is being supplied and manufacturer must have the QAV ( Accelerated weather testing Machine),Salt spray testing
Facility available with the yearly calibration from the NABL approved authorities of approved finish +3mm thick non-combustible mineral based polymer
core of Class A2,s1,d0 As per En13501-1 (minimum 90% non-combustible inorganic material) + 0.5mm aluminum skin of AA 3105 Alloy with service coat
bond with co extrusion/Lamination process. Overall weight of the panel shall not be less than 8 kg per sqm. Manufacturer must be FPC certified with the
valid FPC certification of Class A2,s1,d0 as per EN 13501-1 of the unit from where the material is being supplied. -
Aluminium outer skin and inner skin should confirm to alloy 3xxx series grade and H22 / H24 temper with minimum mechanical properties as per given
values. The thickness shall be minimum 0.50 mm thickness and PVDF shall be add-on to this thickness. -
Page 52 of 48
CKOH/PPR/2025/JAN/11798
The top coat surface shall comply with the “specification for coated coil for exterior building applications” issued by ECCA (European Coil Coating
Association). The coating shall confirm to AAMA 2605 by double coat double baked process for exterior grade finish. The reverse side of the cladding panel -
surface facing the wall shall have polyester base coating to protect against the possible corrosion problems.
The finished surface shall be protected with a self-adhesive peel off foil with 80 microns thickness (white or black) tested to with stand at least 6 months
exposure to local weather condition without losing the original peel off characteristic or causing stain or other damages on the coated surface of the
aluminium composite panel. If the stain or any damage noticed after peel off by the fabricator, such panel should be replaced with new one of the same
shade and color, at no extra cost. -
The peel off foil should be removed at the time of handing over as may be required by the Site-In-Charge.
-
Warranty: The top sheet shall be coated with PVDF coat by continuous coil coating process and shall be of minimum 35 microns thickness of approved
metallic colour passing AAMA 2605 standard for 15 year warranty along with 70% Gloss Retention after 10 Years. -
APPROVED MAKE -
Alucobond -
Aludecor -
VIVA -
-
1.10 STEEL FABRICATION for WT-11: 5,250.00 Kg 157 824,250
Design, Engineer, Furnish, Fabricate, package, deliver (to jobsite) and Install: -
Designing,Engineering,Cutting,Hoisting,Fabricating and Installing mild steel framing members in built up tubular (rectangular hollow tubes etc)for locations
indicated in the tender drawings. The framing members are welded and anchored to the MS structure as indicated in the tender drawings. All concealed
Mild steel sections shall comply to IS 2062 Grade A and Hot Dip Galvanised to minimum 100 microns coating. -
After Welding Hot - Dip Galvanized sheet, touch up of the wedding / cut area is required using Zinc - Rich Paint to restore corrosion protection . Zinc - rich
Paint- Apply a zinc rich paint on a clean, dry surface with a brush or spray. The paint should contain at least 65 % to 69 % metallic Zinc by weight or more
than 92 % metallic Zinc in the dry film. -
-
WT-12 4mm Thk Aluminium Composite Panel Cladding @ SERVICE YARD
12 150 SQM 4,006 600,900
Page 53 of 48
CKOH/PPR/2025/JAN/11798
Note: Mode of measurement for Aluminium Composite Panel Sheet cladding system item shall be measured in Square meters of the visible surface area of
cladded profile of the Aluminium surface after installation all as per approved shop drawings. All flashings @ Jamb level, Cill etc of Aluminium metal panel
along with all soffits shall not paid extra as they are considered part of the system. -
5. All exposed aluminium surfaces shall be SDF coating finish minimum 60 microns as per AAMA 2604 standards to match the Aluminium shade.
-
6. Providing all hardware's & consumables including Stainless steel 316 grade mechanical anchor fasteners, chemical anchor fasteners (As required) SS 316
grade screws,Rawl plug, bolts and accessories as mentioned in the concept tender drawing and specification. -
7. Providing Non-Staining & Non-Bleeding weather silicone -Dowsil 991 as per architects requirement. -
8. Rate shall include Stonewool insulation ( minimum density-100 Kg/m³),1.5mm Thk G.I.Tray behind Aluminium Sheet Panel as per façade tender
drawings. -
9.Supplying, drilling /cleaning hole and fixing of Torque Controlled Mechanical Expansion Anchor / medium to heavy duty injection chemical for Anchor
fixing with sizes ranging from M8 to M24 (if required) shall be third party tested, possess ETA approval and shall be pre-assembled and should be of
Material Grade- Stainless Steel A4,a nut of Stainless Steel A4 and a Stainless Steel A4 washer.ETA to have Fire Resistance values & CE conformity Marking.
Anchor shall be fixed at right embedment depth and as per embedment mark in case of Expansion Anchor . The chemical anchor (Threaded Rod) should
have certification/ approvals/ test reports from/ for ETA/ TR023, fire rated, water tightness. Design of Mechanical Expansion Anchor shall be done as per
ETAG 001 Annex C and TR045 using Software as per actual load data and site conditions and the report to be submitted to the project engineer in charge -
for approval.
-
M01-4mm Thk Aluminium Composite Panel ( Fire Retardant Grade - Class A2,s1,d0 ) Panel : Extra over WT-12
12.1 150 SQM 2,424 363,600
(Material Supply & Delivery at site Cost Only) -
Page 54 of 48
CKOH/PPR/2025/JAN/11798
Aluminium outer skin and inner skin should confirm to alloy 3xxx series grade and H22 / H24 temper with minimum mechanical properties as per given
values. The thickness shall be minimum 0.50 mm thickness and PVDF shall be add-on to this thickness. -
Surface of the Composite Panel should be finished with Kynar-500 /Hylar 5000 PVDF based coating (Polyvinylidene Di Fluoride) on the topside with
minimum 35 microns thickness of approved Metallic Colour and a service coating on the reverse side. -
The top coat surface shall comply with the “specification for coated coil for exterior building applications” issued by ECCA (European Coil Coating
Association). The coating shall confirm to AAMA 2605 by double coat double baked process for exterior grade finish. The reverse side of the cladding panel -
surface facing the wall shall have polyester base coating to protect against the possible corrosion problems.
The finished surface shall be protected with a self-adhesive peel off foil with 80 microns thickness (white or black) tested to with stand at least 6 months
exposure to local weather condition without losing the original peel off characteristic or causing stain or other damages on the coated surface of the
aluminium composite panel. If the stain or any damage noticed after peel off by the fabricator, such panel should be replaced with new one of the same -
shade and color, at no extra cost.
The peel off foil should be removed at the time of handing over as may be required by the Site-In-Charge. -
Warranty: The top sheet shall be coated with PVDF coat by continuous coil coating process and shall be of minimum 35 microns thickness of approved
metallic colour passing AAMA 2605 standard for 15 year warranty along with 70% Gloss Retention after 10 Years. -
APPROVED MAKE -
Alucobond -
Aludecor -
VIVA -
-
WT-13: Aluminium Perforated Screen Panel Cladding (Percentage of Perforation-Max 50 %) Finished with Super Durable Powder Coating (Matallic Shade)
13 @ DG Flue Shaft (System + Installation Cost). 280 SQM 2,780 778,400
WT-15: Aluminium Perforated Screen Panel Cladding (Percentage of Perforation-Max 50 %) Finished with Super Durable Powder Coating ( Metallic
13.1 Shade) @ Metal screen -2nd Floor (System + Installation Cost).( Including M.S. Structure) 440 SQM 2,780 1,223,200
Page 55 of 48
CKOH/PPR/2025/JAN/11798
Note: Mode of measurement for Aluminium Composite Panel Sheet cladding system item shall be measured in Square meters of the visible surface area of
cladded profile of the Aluminium surface after installation all as per approved shop drawings. All flashings @ Jamb level, Cill etc of Aluminium metal panel
along with all soffits shall not paid extra as they are considered part of the system. -
5. All exposed aluminium surfaces shall be SDF coating finish minimum 60 microns as per AAMA 2604 standards to match the Aluminium shade.
-
6. Providing all hardware's & consumables including Stainless steel 316 grade mechanical anchor fasteners, chemical anchor fasteners (As required) SS 316
grade screws,Rawl plug, bolts and accessories as mentioned in the concept tender drawing and specification.
-
7. Providing Non-Staining & Non-Bleeding weather silicone -Dowsil 991 as per architects requirement. -
8. Rate shall include Stonewool insulation ( minimum density-100 Kg/m³),1.2mm Thk G.I.Tray behind Aluminium Sheet Panel as per façade tender
drawings. -
9.Supplying, drilling /cleaning hole and fixing of Torque Controlled Mechanical Expansion Anchor / medium to heavy duty injection chemical for Anchor
fixing with sizes ranging from M8 to M24 (if required) shall be third party tested, possess ETA approval and shall be pre-assembled and should be of
Material Grade- Stainless Steel A4,a nut of Stainless Steel A4 and a Stainless Steel A4 washer.ETA to have Fire Resistance values & CE conformity Marking.
Anchor shall be fixed at right embedment depth and as per embedment mark in case of Expansion Anchor . The chemical anchor (Threaded Rod) should
have certification/ approvals/ test reports from/ for ETA/ TR023, fire rated, water tightness. Design of Mechanical Expansion Anchor shall be done as per
ETAG 001 Annex C and TR045 using Software as per actual load data and site conditions and the report to be submitted to the project engineer in charge -
for approval.
Page 56 of 48
CKOH/PPR/2025/JAN/11798
M-02:2Minimum 2.0mm Thk (Vendor to provide required thickness as per Structural Design Calculations) Perforated Aluminium Sheet Cladding Finished
with Super Durable Powder Coating ( Metallic Shade) for WT-15 @ Metal screen -2nd Floor (System + Installation Cost). (Perforation Percentage-
13.3 Maximum -50 %) ( Pattern of Perforation as per Architect) 440 SQM 4,546 2,000,240
Aluminium Specifications:
• Thickness: Minimum 2.0mm Thk ( Vendor to take full resposibility to avoid Deformation & Die Marks in the profile. Façade Vendor to provide
required thickness as per Structural design Calculations.Approval to be provided after Mock - Up & Structural Calculations approval.)
• Pre –treatment: Chrome-free conversion layer. -
• Surface Treatment-Super Durable Powder Coating ( Metallic Shade) confirming AAMA 2604 standards.
• Alloy, Temper: 3005/3105-H44 confirming EN 573-3 or equivalent.
a) Surface Preparation: All extruded aluminium profiles shall be Pre- treated with Chrome-Free Conversion Layer(7 Tank process) to improve resistance to
Corrosion. Chemical treatment of Aluminium surfaces should be done with chromium-free solutions and ensuring proper surface cleaning of aluminium
before coating along with alkaline and acid cleaning and rinsing with de-ionized water. -
Page 57 of 48
CKOH/PPR/2025/JAN/11798
Warranty: 25 years Product Performance Guarantee for Powder to be offered for the Project in accordance with the standards and the acceptance criteria
laid down in the Guarantee document by the powder coating manufacturer. The guarantee shall be for the entire duration of 25 years for the decorative
properties (gloss/colour) and the film integrity mentioned in the document. A draft guarantee shall be requested from the powder coating manufacturer
and submitted to ensure adherence to specifications. -
Mode of Measurement: The cladding system item shall be measured in Square meters (corrected to two decimal for the finished work) of the visible
surface area of cladded profile of solid Aluminium surface after installation all as per approved shop drawings & fixed in position including grooves i.e.
module centre to centre. -
-
13.4 STEEL FABRICATION for WT-15: 8,800.00 Kg 157 1,381,600
Design, Engineer, Furnish, Fabricate, package, deliver (to jobsite) and Install: -
Designing,Engineering,Cutting,Hoisting,Fabricating and Installing mild steel framing members in built up tubular (rectangular hollow tubes etc)for locations
indicated in the tender drawings. The framing members are welded and anchored to the MS structure as indicated in the tender drawings. All concealed
Mild steel sections shall comply to IS 2062 Grade A and Hot Dip Galvanised to minimum 100 microns coating. -
-
WT-14 M.S. Railing @ Refuge Balconies ( 5th,8th &11th Level)
14 2,425 Kg 171 414,675
Page 58 of 48
CKOH/PPR/2025/JAN/11798
Designing,Engineering,Cutting,Hoisting,Fabricating and Installing mild steel framing members for Railing at locations indicated in the tender drawings. All
extruded Mild steel vertical sections shall comply to IS 2062 Grade A and shall be coated with High Performance Low VOC Anticorrosive Protective Coating
system of 280 microns comprising zinc phosphate polyamine epoxy primer of 100 microns each and one top coat of High solids Acrylic Polyurethane high
performance glossy finish paint (Colour as per architect intent) of 80 microns after shot blasting as per SA 2.5 Swedish standards. -
Surface Preparation:Preparing the structural steel surfaces to ensure complete removal of mill scale by blast cleaning confirming to SA 2.5 Swedish
Standard. Surface should be free of all visible oil, grease, dust, dirt, mill scale, rust, oxides, corrosion products and other foreign matters. The medium of
blasting can be steel shot/grit blasting. -
Primer Coat:Epoxy Primer (Two Coats):Two component high solid, zinc phosphate polyamine epoxy primer complies with Volume Solid of 74 ± 2 % and
minimum weight per ltr of 1.5 Kg/ltr. Touch dry of 1 hr @ 30 deg C, which contributes to LEEDv4 Building Standards and having volatile organic compound
(VOC) less than 250 gm/Ltr. VOC emission should be lower than or equal to 0.5mg/m3(CDPH Method.1.1). With Environment Product Declaration (EPD)
from 3rd party. Performance requirement - At 200 microns the primer product along with topcoat, as a system should meet C4 High environment and
meet as per ISO 12944 -6, Neutral salt spray test as per ISO9227 for 720 hrs. The DFT of 200 microns shall be achieved (100 microns per coat of application). -
Top Protective Finish Coat:Polyurethane Finish Coat ( One Coat ):Two component, acrylic aliphatic polyurethane finish coat of specified finish having
minimum volume solids 73 ± 2%,which contributes to LEEDv4 Building Standards and having volatile organic compound (VOC) less than 250 gm/Lt. VOC
emission should be lower than or equal to 0.5mg/m3(CDPH Method.1.1). With Environment Product Declaration (EPD) from 3rd Party. The DFT 80 of
microns shall be achieved in single coat. -
Page 59 of 48
CKOH/PPR/2025/JAN/11798
18 BMU PROVISIONS FOR RESTRAINT SOCKET & PINS (Supply-Restraint Socket & Pins not included in this Item) 1 LUMPSUM 328,375 328,375
Rate shall include make provision to inporporate Restrain Pins/Socket which shall be provided by the BMU vendor in the mullions/transon with adequate
strengthening in the unitized curtain wall system.The unitized curtain wall shall incorporate the tie back buttons which shall be tested at the PMU lab and
incorporated in the shop drawings provided by the facade vendor.The first band of restraints should be no higher than 40m above ground level, with
subsequent bands no more than 20m apart as per BS EN 1808: 2015 Standards to prevent any undue sway of the cradle when in use.