0% found this document useful (0 votes)
8 views1 page

3

This document is a quotation from PT. Axia Prima Sejahtera for the installation of 2-inch HDPE pipes at Gate Pos B, with a total cost of Rp 106,572,480. The scope of work includes preparation, procurement, and installation, with specific payment terms outlined. Additional costs include safety, PPN, and indirect costs, while electricity and water are to be provided by the user.

Uploaded by

ICEDA Hum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

3

This document is a quotation from PT. Axia Prima Sejahtera for the installation of 2-inch HDPE pipes at Gate Pos B, with a total cost of Rp 106,572,480. The scope of work includes preparation, procurement, and installation, with specific payment terms outlined. Additional costs include safety, PPN, and indirect costs, while electricity and water are to be provided by the user.

Uploaded by

ICEDA Hum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QUOTATION

MAINCONTRATOR : PT. AXIA PRIMA SEJAHTERA CONTACT PERSON : JAYA HMD


PROJECT NAME : PEKERJAAN PEMASANGAN PIPA HDPE 2" GATE POS B CONTACT NO : +62 812 1060 5230
ATTANTION TO : Pak Sugimin SCOPE OF WORK : (JALUR KABEL PIPA 2IN)
SUBMIT DATE : 29, AGUSTUS. 2024

Currency : Rp.
MATERIAL LABOUR
NO. DESCRIPTION AMOUNT REMARK
AMOUNT AMOUNT

I PEKERJAAN PERSIAPAN 0 2,750,000 2,750,000

II Pengadaan + pemasangan Pipa HDPE Dan Aksesoris PIPA 2 INCH 27,100,000 65,304,000 92,404,000

TOTAL- I 27,100,000 68,054,000 95,154,000

SAFETY COST 951,540

PPN 11% 10,466,940

INDIRECT COST - Konsultasi yang diperlukan

DISCOUNT -

TOTAL- II 106,572,480

TERMS AND CONDITIONS


- DP 30%, REMAINNING 70% MONTHLY PROGRESS PAYMENT
- PPN EXCLUDED
- PPH INCLUDED
- ELECTRICITY AND WATER BY USER
- DELIVERY INCLUDED

- HEAVY EQIPMENT INCLUDED