The document outlines a Continuous Assessment Framework for students undertaking the CSEC syllabus, detailing five projects related to construction and design. Each project requires specific work activities, sources of evidence, and documentation, including reports, sketches, and plans. The projects cover topics such as industry examination, site layout, architectural drawing, and furniture design.

Uploaded by

michael bryan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
0 views

SBA construction framework

The document outlines a Continuous Assessment Framework for students undertaking the CSEC syllabus, detailing five projects related to construction and design. Each project requires specific work activities, sources of evidence, and documentation, including reports, sketches, and plans. The projects cover topics such as industry examination, site layout, architectural drawing, and furniture design.

Uploaded by

michael bryan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

SBA PORTFOLIO ASSESSMENT: CONTINUOUS ASSESSMENT FRAMEWORK

PROJECT CSEC WORK ACTIVITY SOURCES OF EVIDENCE


No. SYLLABUS UNIT
1 Fundamenta As a requirements of the new CSEC syllabus students i. Field Trip
l of Industry are required to undertake a detailed examination of a ii. Identification of
local construction industry. As such your task is to visit safety signs and
Scotts Development and formulate a report to include procedures
the following: (Existing and
 Organization of Scotts Development recommended)
 List of the safety rules that govern the day to day iii. Pictures of the
running of the organization manufacturing
 Report of an accident (fictitious) process
 Design anaylsis of one of the manufactured iv. Written business
product. plan
You are also required to write a business plan based on v. Written accident
the operations observed at Scotts development. Your report
business plan should include the following:
 Executive Summary
 Company Description
 Products and Services
 Market Plan
 Organization and Management Team
 Financial plan and projections:

Your work must be presented in the form of a word


document.
2 Site Work You are required to follow the outline of a simple site  Pictures of the
Operation plan given and use the information learnt of the steps layout process
Project to be followed to laying out a building to complete this  Writing up of the
aspect of your SBA. steps and
The process must include the following steps: procedures that
 Establish base/building line were followed to
 Establish corner profiles complete the layout
 Ensure layout is square process. This
 Establish trenches and wall widths should methods of
checking
squareness.
3 Basic  Redesign of the roof  Picture of the
Architectural  Description of the problem destroyed house
Drawing  Two possible solutions  Detailed description
Project  Orthographic drawings of one of the possible of the problem
solutions  Isometric and
 List of material and cost orthographic
 Steps and procedures for making drawings of possible
solution.
 List of material and
costing for making
the replacement
roof
 Steps for making
the roof
4 Construction You are required to design and build a chair. Your  Auto Cad drawings
Project project must be accompanied by the following: of the table
 Pictorial sketch of the table (isometric and
 Steps and procedures for making the table orthographic)
 List of materials  Pictures of the
 Layout and construction construction
 Joints to be used process
 Assembly process
 Finish

5 Furniture Design and make a centre table that can be used by  Auto Cad drawings
Technology staff who use the staffroom. Your project must include of the coffee table
Project the following: (isometric and
 Pictorial sketch of the table orthographic)
 Steps and procedures for making the table  Pictures of the
 List of materials construction
 Layout and construction process.
 Joints to be used  Written
 Assembly process documentation of
 Finish the process to
include a material
list.