0% found this document useful (0 votes)
3 views

DD Daily Shift Report Updated- 2023

The Daily Drilling Shift Report provides detailed information on drilling operations, including drill hole specifics, crew details, and tasks performed throughout the shift. It tracks rig engine and compressor hours, consumables usage, and any incidents or weather impacts. The report concludes with signatures from the driller and client to confirm the accuracy of the data recorded.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

DD Daily Shift Report Updated- 2023

The Daily Drilling Shift Report provides detailed information on drilling operations, including drill hole specifics, crew details, and tasks performed throughout the shift. It tracks rig engine and compressor hours, consumables usage, and any incidents or weather impacts. The report concludes with signatures from the driller and client to confirm the accuracy of the data recorded.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Daily Drilling Shift Report (DD)

Date: Drill Hole Information Drill Hole Information Drill Crew Information (Full Name Pay-roll)
Client: Hole Number: Hole Number: Driller
Fleet Number: Start Depth Start Depth Off-sider 1
Location: End Depth End Depth Off-sider 2
Shift: Total Meters Total Meters Off-sider 3
Method: Diamond Coring Casing Depth (Diameter) Casing Depth (Diameter) Off-sider 4

Start - Rig Engine Hours: Start - Compressor Hours:


Task 6:00 7:00 8:00 9:00 10:00 11:00 12:00 1:00 2:00 3:00 4:00 5:00 Total Hrs Comments
Travel to Site
Tool Box Meeting
Pre-start Inspection
Rig Up (setting up rig over drill point)
Rig Down (packing up on completion)
Drilling
Pulling Rods / Run Rods
Reaming Casing
Pulling Casing / Run Casing
Hole Conditioning
Stuck tube
Moving / Traming Time
Stuck in Hole
Working Stuck Casing / Rods
Fishing Stuck Casing / Rods
Cement Hole
Standby / Cement Curing Time
Lunch Break
Survey Time
Water pump set-up / Water lines
Standby (Client)
Standby (Sahara)
Maintenance (Routine) Sahara
Weather (rain / lightning)
Incident / Investigation
Security Alert
Breakdown (mechanical)
Travel to Camp
End - Rig Engine Hours: End - Compressor Hours: Total Hours

Diameter - Casing / Rods / Depth Consumables Usage Hire Survey Equipment Fuel Usage (litres) Drillers Signature
Drilling PQ Depth Liquid-Pol Survey (Down-hole) Hire Rig
Drilling HQ Depth CR-650 PQ Core Orienation Tool Hire Water Pump _______________________________________
Drilling NQ Depth Bit Lub / Super Lub HQ Core Orienation Tool Hire Support Truck Clients Signature
Casing Depth (PQ) Aus-Plug NQ Core Orienation Tool Hire Support Vehicle
Casing Depth (HQ) Aus-Trol North Seeking Gyro Hire Water Truck _______________________________________

You might also like