Ppm Job Plan
Ppm Job Plan
CCTV System
Intrusion Detection System
Electric Vehicle Charging Station
Earthing & Bonding System
Foam System
Fire Extinguishers
Drainage System
Stormwater System
Ventilation System
anical
Ventilation System
Mechanical
Fuel System
Irrigation System
Lifts
Vertical
Escalator
January
CODE ASSET J1 J2 J3 J4
MV1 Transformer
FS Foam System
FE Fire Extinguishers
RS Irrigation Tank
LF Lifts
ES Escalator
February March April May June
F1 F2 F3 F4 M1 M2 M3 M4 A1 A2 A3 A4 Y1 Y2 Y3 Y4 JU1 JU2
June July August September October November
JU3 JU4 L1 L2 L3 L4 G1 G2 G3 G4 S1 S2 S3 S4 O1 O2 O3 O4 N1 N2 N3
November December Activities / systems Total Groups
N4 D1 D2 D3 D4 W M Q S Y Total Groups
SYSTEM DAILY
PAVA D
ACCESS CONTROL D
BATTERY D
Toilet Alarm D
Electrical
BACKGROUND MUSIC D
PM&GS D
Fire Protection
Plumbing
Submersible Pumps D
Oil Interceptors D
Level Sensors D
Mechanical
Mechanical
Building Services
Landscaping
Vertical Transportation
WEEKLY MONTHLY
Transformer M
INTRUSION DETECTION W
EV CHARGER M
HARMONIC FILTER M
LV SWITCHBORD M
LIGHTING CONTROL M
PM&GS W
IP VIDEO & DURESS ALARM
GATE BARRIER W GATE BARRIER M
Foam system W Foam system M
FIRE EXTINGUISHER M
CLEAN AGENT NOVEC W CLEAN AGENT NOVEC M
COPPER SILVER IONIZATION W COPPER SILVER IONIZATION M
ELECTRIC WATER HEATER M
WATER PUMP W WATER PUMP M
MULTIMEDIA FILETRS W MULTIMEDIA FILETRS M
Submersible Pumps W Submersible Pumps M
Oil Interceptors W Oil Interceptors M
Storm Water Transfer Pumps W Storm Water Transfer Pumps M
Car Park Exhaust Fans W Car Park Exhaust Fans M
Jet Fans W Jet Fans M
General Exhaust Fans M
Overfill Alarm W
Valves W
Leak Detection W
Fuel Tanks M
Close Control Units W Close Control Units M
Irrigation Tank M
Lifts M
Escalator M
Every 2 Month QUARTERLY
PAVA Q
ACCESS CONTROL Q
CCTV Q
INTRUSION DETECTION Q
HARMONIC FILTER Q
LV SWITCHBORD Q
LIGHTING CONTROL Q
BACKGROUND MUSIC Q
PM&GS Q
IP VIDEO & DURESS ALARM Q
Foam system Q
FIRE EXTINGUISHER Q
Escalator 2 - M
SEMI-YEARLY
Transformer S
Toilet Alarm S
INTRUSION DETECTION S
EV CHARGER S
HARMONIC FILTER S
ALTERNATOR S
LIGHTING CONTROL S
BACKGROUND MUSIC S
ACTIVE COMPONENTS S
PASSIVE SYSTEM S
Foam system S
MULTIMEDIA FILETRS
Submersible Pumps SS
Oil Interceptors S
Irrigation Tank S
Lifts S
Escalator S
SEMI-YEARLY BI - YEARLY
ALTERNATOR BI A
YEARLY YEARLY 2 - Y
Transformer Y
UPS Y
Fire Alarm System Y
BATTERY Y
EV CHARGER Y
EARTHING & BONDING Y
LIGHTING PROTECTION Y
HARMONIC FILTER Y
ALTERNATOR Y
PM &GS Y
Foam system Y
FIRE EXTINGUISHER Y
CLEAN AGENT NOVEC 2 Y
COPPER SILVER IONIZATION Y
ELECTRIC WATER HEATER Y
WATER PUMP Y
MULTIMEDIA FILETRS Y
Submersible Pumps Y
Oil Interceptors Y
Storm Water Transfer Pumps Y
Car Park Exhaust Fans Y
Jet Fans Y
General Exhaust Fans Y
Fire Dampers Y
Leak Detection Y
Close Control Units Y
Fresh Air Handling Units Y
Fresh Air Handling Units (Condensing Units) Y
Irrigation Tank Y
Lift Y
YEARLY 4 - Y YEARLY 5 - Y
ALTERNATOR 5 YEAR
FIRE EXTINGUISHER 5Y
CLEAN AGENT NOVEC 5 Y
Fresh Air Handling Units 5Y
YEARLY 10 - Y
Electrical
Code
MV1-M-01
MV1-M-02
Job Plan Description
Transformer
Monthly Maintenance
Description
Functional check of monitoring device.
Correct position / tightening if he is winding clamping devices.Tightening torque between 20 and 40 Nm
Code Total
CP1-M
Ud Task Total
Time (hr)
Page 1 of 1
System Job Plan Description Code Total
Transformer
Electrical MV1-S 0.0
Semi-Yearly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description
Transformer
Electrical
Yearly Maintenance
Code Description Ud
MV1-Y-01 Conduct electrical continuity. Function of the temperature sensors. PT 100 / PTC
MV1-Y-02 Check the moisture on the windings. Drying at 80 deg C.
MV1-Y
Task Total
Time (hr)
Page 1 of 1
System
Electrical
Code
MV2-4Y-01
MV2-4Y-02
MV2-4Y-03
MV2-4Y-04
MV2-4Y-05
Job Plan Description
Ring Main Unit
4-Yearly Maintenance
Description Ud
Visual inspections (to check insulators, finish of powder coating, finish of passivation, etc.)
Mechanical tightness (ensure all screws and bolts are tight)
Functional checks and lubrication (doors, interlocks, mechanisms, moving items, etc.)
Check the climatic conditions surrounding the switchgear (temperature, humidity, AC room, etc.)
RMU condition (short circuits, conducted operations, expected operations to come, etc.)
Code Total Back to Index
MV2-4Y 0.0
Task Total
Time (hr)
Page 1 of 1
System Job Plan Description Code Total
Uninterruptible Power Supply (UPS)
EL UPS-Y
Yearly Maintenance
Task Total
Code Description Ud Time (hr)
UPS-Y-01 Visual inspection of the UPS system and batteries
Check the environment of the UPS (dust, humidity, air conditioning, and so
UPS-Y-02 on)
Verify the “Events history” menu if no strange alarms have been recorded. If
UPS-Y-03 Ok delete the events.
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fire Alarm System
Fire Alarm FA-D
Daily Maintenance
Page 1 of 1
Back to Index
System
Fire Alarm
Code
FA-W-01
FA-W-02
FA-W-03
FA-W-04
FA-W-05
FA-W-05
Job Plan Description
Fire Alarm System
Weekly Maintenance
Description
Check fuses.
Senior worker in AC activities
Assistant in AC activities
Check primary power supply for normality.
Senior worker in AC activities
Assistant in AC activities
Check interfaced systems and equipment
Senior worker in AC activities
Assistant in AC activities
Check for trouble signals
Senior worker in AC activities
Assistant in AC activities
Check for initiating devices LED blinking randomly.
Senior worker in AC activities
Assistant in AC activities
Take investigation and rectification action if there are fault signals or any abnormal conditions and displays present on FACP.
Code Total Back to Index
FA-W 0.0
Ud Task Total
Time (hr)
hr
hr
hr
hr
hr
hr
hr
hr
hr
hr
Page 1 of 1
System Job Plan Description Code Total
Fire Alarm System
Fire Alarm FA-M
Monthly Maintenance
Page 1 of 1
System Job Plan Description Code Total
Fire Alarm System
Fire Alarm FA-Q
Quarterly Maintenance
Page 1 of 2
Back to Index
System Job Plan Description
Fire Alarm System
Fire Alarm
Semi-Annual Maintenance
Code Description Ud
Activate a input via an alarm initiating device and check that the correct outputs activate
(Notification Appliances sound/flash, relays activate, alarm indicator lights). Reset system.
Repeat for each alarm initiating device.
Momentarily open the following circuits one at a time and check for a trouble sign:
FA-S-02 • Notification Appliance Circuits
• Initiating devices
Momentarily open the following circuits one at a time and check for a trouble sign:
• Notification Appliance Circuits
• Initiating devices
If new batteries were installed, wait 48 hours before completing this step. Remove AC power,
activate initiating device and check that:
• The alarm indicator lights
• All active Notification Appliances sound
Measure battery voltage while the Notification Appliances are sounding. Replace any battery
with terminal voltage less than 85% of rating. Reapply AC power and reset the system.
Task Total
Time (hr)
Page 1 of 1
System
Fire Alarm
Code
FA-Y-01
FA-Y-02
FA-Y-03
Job Plan Description
Fire Alarm System
Annual Maintenance
Description
Primary power supply shall be tested under maximum load with all devices in load, operating simultaneously.
Worker plumber
FA-Y 0.0
Ud Task Total
Time (hr)
hr
hr
hr
Page 1 of 1
System Job Plan Description Code
Leak Detection System
Leak Detection LD-M
Monthly Maintenance
Page 1 of 1
Total Back to Index
0.0
Total
(hr)
Page 1 of 1
System Job Plan Description Code Total
Leak Leak Detection System
LD-Q 0.0
Detection QUARTERLY Maintenance
Sensor cables need to be dipped into water. Note: (For periodic test
LD-Q functionality of sensing cables). Notify the appropriate site 0.00
personnel that service may be interrupted to some equipment.
Senior worker in AC activities hr
Page 1 of 1
System Job Plan Description Code Total
Leak Leak Detection System
LD-S 0.0
Detection Semi-Annual Maintenance
Page 1 of 1
System Job Plan Description Code
Building Management System
Building Management BM-W
Weekly Maintenance
Page 1 of 1
Total
0.0
Total
(hr)
Page 1 of 1
System Job Plan Description Code
Building Building Management System
BM-M
Management Monthly Maintenance
Task
Code Description Ud
Time
Page 1 of 1
Total
0.0
Total
(hr)
Page 1 of 1
System Job Plan Description Code
Building Building Management System
BM-S
Management Semi-Annual Maintenance
Task
Code Description Ud Time
Check control instruments for terminal security, signs of electrical
overheating, and correct earthing to safety devices.
BM-S-01
Senior worker in AC activities hr
Assistant in AC activities hr
Check operation and actions (proportional band, reset, integral times. etc.) of
BM-S-02 PLC/DDC Controller.
Senior worker in AC activities hr
Page 1 of 1
Total Back to Index
0.0
Total
(hr)
Page 1 of 1
System Job Plan Description Code
Building Building Management System
BM-Y
Management Annual Maintenance
Page 1 of 1
Total Back to Index
0.0
Total
(hr)
Page 1 of 1
System Job Plan Description Code Total
Public Address and Voice Alarm System (PAVA)
HVAC PAVA-D 0.0
Daily Maintenance
Task Total
Code Description Ud Time (hr)
Check for indication of normal operation as part of the fire alarm system
routine maintenance.
PAVA-D-01 Senior worker in AC activities
hr
Assistant in AC activities hr
Page 1 of 1
System Job Plan Description Code Total
Public Address and Voice Alarm System (PAVA)
HVAC PAVA-W 0.0
Weekly Maintenance
Page 1 of 1
System Job Plan Description Code Total
Public Address and Voice Alarm System (PAVA)
HVAC PAVA-Q 0.0
Quarterly - Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Public Address and Voice Alarm System (PAVA)
HVAC PAVA-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
PAVA-S-01 A visual inspection should be made to confirm that all cable fittings
and equipment are secure, undamaged and adequately protected
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Access Control System
HVAC ACS-D 0.0
Daily Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Access Control System
HVAC ACS-M 0.0
Monthly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Access Control System
HVAC ACS-Q 1.5
Quarterly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Access Control System
HVAC ACS-S 1.5
Semi-Yearly Maintenance
Test the backup battery by disconnecting the main power and make 1
ACS-S-01 sure that the backup power is satisfying 1.500
Manpower hr 1.500
Test the system failover function.
ACS-S-02
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Central Battery System
HVAC CB-D #REF!
Daily Maintenance
CB-D-04 4. The battery DC float charge voltage and DC Float Current. Float
Charge voltage level should be as per system specification
Manpower hr
CB-D-05 5. Measure and record the air temperature within the battery room
Manpower hr
6. The Battery room is clean, free of debris and well lighted
CB-D-06
Manpower hr
8. The result of test with any fault found is recorded in the logbook
CB-D-08 and the action taken noted
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Central Battery System
HVAC CB-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Check the system has adequate ventilation. Louvers in the door, and grilles
in the rear panel must not be obstructed. Standoff brackets must be fitted
to the rear of all control cabinets to prevent accidental covering of rear
CB-M-01 ventilation grills.
Manpower hr
The operating environment should be free from dust, which can accumulate
CB-M-02 inside modules
Manpower hr
All LED indicators provided on display are showing healthy mode and
audible/visual fault alarms are not operating to indicate fault; The LED
indicators should show, Supply Healthy and Maintained Lights LEDs are on
CB-M-03 (providing the maintained output is on). All other LEDs should be OFF and
Sounder OFF.
Manpower hr
Record the battery DC float charge voltage and DC Float Current. Float
CB-M-04 Charge voltage level should be as per system specification
Manpower hr
Measure and record the air temperature within the battery Room
CB-M-05
Manpower hr
Ensure the Battery room is clean, free of debris and well Lighted.
CB-M-06
Manpower hr
The CBS is to be functionally tested for a duration of 2 minutes by initiating
a simulated mains failure, it is necessary to open the control cabinet and
switch off the Mains Input Switch (SW1) (do not actuate any other controls),
to allow the inverter to run. During this discharge test, the following
readings should be noted and recorded: • AC output Voltage
• AC output current
CB-M-07 • DC Voltage
• DC Current
Manpower hr
At the end of the test, close the Mains Input Switch (SW1) and check that the char
CB-M-08
Manpower hr
Allow the charger module(s) to run until batteries are recharged and float voltage i
CB-M-09
Manpower hr
The batteries must be visually inspected for any sign of degradation and the
findings are recorded: • Visual
inspect the battery cell for Cleanliness. • Visual
inspect for any sign of terminal damage or evidence of heating.
CB-M-10 • Visual inspect for container
or cover damage.
Manpower hr
The battery should be visually inspected each month to check that there is
CB-M-11 no evidence of damaged or leaking cells
CB-M-11
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Central Battery System
HVAC CB-Y 0.0
Annually Maintenance
Check the system has adequate ventilation. Louvers in the door, and
CB-Y-01 grilles in the rear panel must not be obstructed. Standoff brackets 0.000
must be fitted to the rear of all control cabinets to prevent
accidental covering of rear ventilation grills.
Manpower hr
CB-Y-04 The battery DC float charge voltage and DC Float Current. Float 0.000
Charge voltage level should be as per system Specification
Manpower hr
CB-Y-05 Measure and record the air temperature within the battery room 0.000
Manpower hr
The Battery room is clean, free of debris and well lighted
CB-Y-06 0.000
Manpower hr
Open each battery breaker and check for charge fail indicator. Close
CB-Y-13 breakers 0.000
Manpower hr
Manpower hr
Manpower hr
Page 2 of 2
Back to Index
System Job Plan Description Code Total
Disabled Toilet Alarm System
HVAC DRC-D 0.0
Daily Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Disabled Toilet Alarm System
HVAC DRC-W 0.0
Weekly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Disabled Toilet Alarm System
HVAC DRC-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
The Standard recommends that every six months the System should be
DRC-S-01 thoroughly inspected to ensure continued reliability.
Senior worker in AC activities hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
CCTV System
HVAC CCTV-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Intrusion Detection System
HVAC ID-W 0.0
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect all sensors, cameras, and control panels for any physical damage or
signs of tampering
ID-W-01 Senior worker in AC activities hr
Assistant in AC activities hr
Verify the integrity of physical doors.
ID-W-02 Senior worker in AC activities hr
Assistant in AC activities hr
Conduct a weekly test of the communication links between various IDS
components to ensure reliable connectivity.
ID-W-03 Senior worker in AC activities hr
Assistant in AC activities hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Intrusion Detection System
HVAC ID-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Calibrate intrusion detection sensors to maintain accuracy. Adjust
ID-Q-01 sensitivity levels if environmental conditions change
Assistant in AC activities hr
Test backup power sources, such as batteries and generators, to ensure
ID-Q-02 they are functioning correctly.
Senior worker in AC activities hr
Monitor the health of power supplies to prevent disruptions
ID-Q-03
Assistant in AC activities hr
Review and update procedures for verifying alarms to reduce false positives
1
ID-Q-04
Assistant in AC activities hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total Back to Index
Intrusion Detection System
HVAC ID-S 0.0
Semi-Yearly Maintenance
Page 1 of 1
System Job Plan Description Code Total
EV Chargers
HVAC EV-M 0.0
Monthly Maintenance
Manpower hr
Check for cuts, damage, and debris. If debris is present, remove it. If you
EV-M-02 find damage, contact your supplier.
Manpower hr
Check for damage and corrosion. If present, contact your supplier.
EV-M-03
Manpower hr
Ensure there is no debris or damage inside or around the cable, cable holder
and connector/plug. If present, remove debris and/or notify the supplier of
any damage. Check the connector/plug pins for any signs of corrosion and
EV-M-04 contact the supplier, if there is any damage to the pins.
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
EV Chargers
HVAC EV-S 0.0
Semi-Yearly Maintenance
EV-S-01 Check the HMI for damage/signs of faded color that is clearly visible.
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
EV Chargers
DWGW EV-Y 0.0
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Check emergency-stop circuit (door switch, emergency stop button)
EV-Y-01
Manpower hr
Auxiliary relay earth fault
EV-Y-02
Manpower hr
Test of heating, ventilation, LEDs
EV-Y-03
Manpower hr
If cooled cables are installed in the charging station: - Check the recooling
EV-Y-04 unit, cables and cable glands for tightness and possible leaks.
Manpower hr
Plug holder, plug and cable insulation
EV-Y-05
Manpower hr
Check measured values
EV-Y-06
Manpower hr
Test charge, loop measurement, residual current circuit breaker and residual
EV-Y-07 current circuit breaker Press test button
Manpower hr
Calibrate control panel
EV-Y-08
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Earthing and Bonding System
DWGW EB-Y 0.0
Annually Maintenance
EB-Y-04 Ensure that all connections are secure and free from corrosion.
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Lightning Protection System
DWGW LP-Y 0.0
Annually Maintenance
Ensure that all connections are secure and free from corrosion.
LP-Y-04
Senior worker in AC activities hr
Assistant in AC activities hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Active Harmonic Filter
DWGW HSF-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Check for any signs of physical damage, corrosion, or loose connections.
HSF-M-01
Senior worker plumber hr
Ensure that the cooling system (if applicable) is functioning correctly and
HSF-M-02 that there are no obstructions to airflow.
Senior worker plumber hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Active Harmonic Filter
DWGW HSF-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Test the active harmonic filter under load conditions to ensure it is operating
HSF-Q-01 within specified parameters.
Plumber WORKER hr
Verify that the filter is effectively mitigating harmonic distortion as
HSF-Q-02 intended.
plumber assistant hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Active Harmonic Filter
DWGW HSF-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Clean the exterior of the filter to remove dust and debris.
HSF-S-01
Plumber assistant hr
Inspect cooling fans or heat sinks and clean or replace them as necessary.
HSF-S-02
Plumber assistant hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Active Harmonic Filter
DWGW HSF-Y 0.0
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Conduct electrical tests to measure parameters such as voltage, current,
HSF-Y-01 and power factor to ensure proper operation.
Senior worker plumber hr
Check for firmware updates provided by the manufacturer and install them
as necessary to ensure optimal performance and compatibility with the
HSF-Y-02 latest standards.
Senior worker plumber hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
LV Switchboards
DWGW LVS-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Vacuum-clean dust on the exterior surface of the switch board
LVS-M-01
Manpower hr
Check the operation of the ventilation fans and clean their filters
LVS-M-02
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
LV Switchboards
DWGW LVS-Q
Quarterly Maintenance
Page 1 of 2
System Job Plan Description Code Total
Alternator
DWGW LVEPD1-S 0.0
Semi-Yearly Maintenance
Page 1 of 1
Total
24.0
Total
(hr)
24.000
Page 1 of 1
System Job Plan Description Code
Alternator
DWGW LVEPD1-Y
Annually Maintenance
Task
Code Description Ud Time
Test the customer connection of auxiliaries
LVEPD1-Y-01
Worker plumber hr
Page 1 of 1
Total
0.0
Total
(hr)
Page 1 of 1
System Job Plan Description Code Total
Alternator LVEPD1-
DWGW 0.0
5Yearly Maintenance 5Y
Task Total
Code Description Ud Time (hr)
Inspect coupling arrangement
LVEPD1-5Y-01
Worker plumber hr
Inspect condition of bearings
LVEPD1-5Y-02
Worker plumber hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Automatic Transfer Switch LVEPD2-
DWGW 0.0
Annually Maintenance Y
Task Total
Code Description Ud Time (hr)
Clean the 7ATB Enclosure - Brush and vacuum away any excessive dust
LVEPD2-Y- accumulation. Remove any moisture with a clean cloth.
01
Manpower hr
Check the transfer switch contacts - Bypass, isolate, and withdraw the
transfer switch. Then remove the transfer switch interphase barriers and
LVEPD2-Y- check the condition of the contacts. Re-place contacts when pitted or worn
02 excessively. Re-install the interphase barriers carefully
Manpower hr
Main transfer switch lubrication - If the switch is subjected to severe dust or
abnormal operating conditions, renew factory lubrication on all movements
LVEPD2-Y- and linkages. Relubricate solenoid operator if TS coil is replaced. Don’t use
03 oil; order lubrication kit 920799.
Manpower hr
LVEPD2-Y- Check all cable connections and retighten them
04 Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Lighting Control System
DWGW LC-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Cleaning sensors - Dust and debris can interfere with sensor operation
LC-M-01
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Lighting Control System
DWGW LC-Q #REF!
Quarterly Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Lighting Control System
DWGW LC-BIY
Semi-Yearly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Lighting Control System
DWGW LC-Y 5.8
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Testing relays - Verify that relays are functioning properly. 1 2.500
LC-Y-01
Worker plumber hr 2.500
Cleaning light fixtures - Remove dust and debris from light fixtures 1 3.250
LC-Y-02
Worker plumber hr 3.250
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Background Music System
DWGW BM-D
Daily Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Background Music System
MSJ BM-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
The components should be visually inspected for signs of moisture ingress
and other deterioration. 1
BM-Q-01 0.000
Manpower hr
Check the functionality during emergency conditions. 1
BM-Q-02 0.000
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Background Music System
MSJ BM-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
A visual inspection should be made to confirm that all cable fittings and
equipment are secure,
BM-S-01 undamaged and adequately protected
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Active Components
MSJ CN1-W #REF!
Weekly Maintenance
Manpower hr
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Active Components
MSJ CN1-M 0.0
Monthly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total Back to Index
Active Components
MSJ CN1-S #REF!
Semi-Yearly Maintenance
Manpower hr
Page 1 of 3
System Job Plan Description Code Total
Passive
MSJ CN2-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Patch panel, IDF and copper parts should be checked for any dust and any
CN2-S-01 physical. Clean with damp cloth for any dust.
Manpower hr
If any physical damage is there, replace with passive components
CN2-S-02
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Parking Management and Guidance System
VTS PMG-D #REF!
Daily Maintenance
Verify that barrier gates and other moving parts operate smoothly
PMG-D-03 without any unusual sounds or resistance.
Manpower hr
System Job Plan Description Code Total
Parking Management and Guidance System
VTS PMG-W #REF!
Weekly Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Parking Management and Guidance System
VTS PMG-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Perform calibration tests on sensors and cameras to ensure accurate
PMG-Q-01 detection and alignment.
Manpower hr
Test the functionality of payment kiosks, ticket dispensers, and other
PMG-Q-02 electronic components.
Manpower hr
Lubricate moving parts of barrier gates and other mechanical components
PMG-Q-03 to prevent wear and ensure smooth operation.
Manpower hr
Review system logs and performance metrics to identify any trends or
PMG-Q-04 abnormalities that may require attention.
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Parking Management and Guidance System
VTS PMG-Y #REF!
Annually Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
IP Video Intercom and Duress Alarm System IP&DA-
VTS 0.0
Weekly Maintenance W
Task Total
Code Description Ud Time (hr)
Check the system log and alarms, frequency
IP&DA-W-01
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
IP Video Intercom and Duress Alarm System
MVES IP&DA-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Clean all the equipment and the panel frequently
IP&DA-Q-01
Worker electrician hr
Page 1 of 1
System Job Plan Description Code Total
Gate Barrier System
MVES GB-W 0.0
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Visually examine barrier for signs of vehicle impact and tampering.
GB-W-01
Worker electrician hr
Check readily accessible (those not requiring removal of access covers)
welds for cracks, bolts for tightness, and retaining devices (cotter keys, snap
GB-W-02 rings, etc) to insure they are securely in place.
Worker electrician hr
Visually inspect for debris in any recessed areas.
GB-W-03
Worker electrician hr
Check all safety warning devices (lights, horns/sirens, traffic arms) to ensure
they are operating properly and are synchronized to barrier movement.
GB-W-04
Worker electrician hr
Check that all controls function properly, and that barrier movement is
smooth. (Emergency fast operation is naturally abrupt and may not appear
smooth; however, barrier should not bind as It moves between limits.)
GB-W-05
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Gate Barrier System
MVES GB-M
Monthly Maintenance
Page 1 of 2
Back to Index
Fire Protection System
Back to Index
Job Plan Description Code Total
FIRE Foam System
FS-W #REF!
PROTECTION Weekly Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
FIRE Foam System
PROTECTIO FS-M 0.0
N Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Check for any visible signs of damage, leaks, or obstructions in the foam
FS-M-01 system components.
Worker electrician hr
Inspect foam concentrate storage areas for proper levels, leaks, or any
FS-M-02 unusual conditions.
Worker electrician hr
Verify that the control panel indicates normal operation.
FS-M-03
Worker electrician hr
Test alarms and indicators to ensure proper functioning.
FS-M-04
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Foam System
MVES FS-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Conduct a foam concentrate analysis to ensure it meets the required
FS-Q-01 specifications.
Worker electrician hr
Replace foam concentrate if necessary.
FS-Q-02
Worker electrician hr
Perform flow tests on discharge devices to confirm they are delivering the
FS-Q-03 correct flow rates.
Worker electrician hr
Check sprinkler heads for any blockages.
FS-Q-04
Worker electrician hr
Conduct pressure tests on the system to ensure that it operates within the
FS-Q-05 specified parameters.
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Foam System
MVES FS-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect foam concentrate storage tanks for corrosion, leaks, and proper
FS-S-01 insulation.
Worker electrician hr
Check tank vents and overflows for obstructions.
FS-S-02
Worker electrician hr
Test foam concentrate pumps to ensure they start and operate correctly.
FS-S-03
Worker electrician hr
FS-S-04 Exercise control valves to ensure proper functioning
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Foam System
MVES FS-Y 0.0
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Conduct a full functional test of the foam system, including activation of
FS-Y-01 alarm devices.
Worker electrician hr
Simulate system activation to ensure proper discharge and coverage.
FS-Y-02
Worker electrician hr
Inspect and clean all foam discharge nozzles and sprinkler heads.
FS-Y-03
Worker electrician hr
Replace any damaged or corroded nozzles.
FS-Y-04
Worker electrician hr
Verify that the foam proportioning system is working correctly. 1
FS-Y-05
Worker electrician hr
Test the calibration of proportioning devices.
FS-Y-06
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fire Extinguishes
MVES FE-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Ensure the fire extinguisher is in its designated location and is easily
FE-M-01 accessible.
Worker electrician hr
Check for any signs of physical damage, corrosion, or leakage.
FE-M-02
Worker electrician hr
FE-M-03 Verify that the pressure gauge or indicator is in the operable range.
Page 1 of 1
System Job Plan Description Code Total
Fire Extinguishes
MVES FE-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Check for proper signage and labelling on the extinguisher.
FE-Q-01
Worker electrician hr
Inspect the hose and nozzle for any blockages or damage.
FE-Q-02
Worker electrician hr
Ensure the safety pin and tamper seal are intact.
FE-Q-03
Worker electrician hr
Weigh the extinguisher to verify that it is within the allowable weight range
FE-Q-04 specified on the label.
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fire Extinguishes
MVES FE-Y 0.0
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Conduct a detailed visual inspection of the entire extinguisher for any
FE-Y-01 defects or damage.
Worker electrician hr
Check that the discharge nozzle is clear and unobstructed.
FE-Y-02
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fire Extinguishes
LVES FE-5Y 0.0
5-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Perform a maintenance service by a qualified technician.
FE-5Y-01
Worker electrician hr
charge and recharge the extinguisher as necessary.
FE-5Y-02
Worker electrician hr
Check and replace any damaged or worn parts.
FE-5Y-03
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
NOVEC Clean Agent System
LVES FP-W 0.0
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Check cylinder pressures
FP-W-01
Worker electrician hr
Hazard and enclosure inspection
FP-W-02
Worker electrician hr
Pipework and controls inspection
FP-W-03
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
NOVEC Clean Agent System
LVES FP-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect hazard area system components
FP-M-01
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
NOVEC Clean Agent System
LVES FP-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Test pressure switches.
FP-S-01
Worker electrician hr
Test electric control heads
FP-S-02
Worker electrician hr
Check cylinder weights and pressures.
FP-S-03
Worker electrician hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
NOVEC Clean Agent System
LVES FP-2Y 0.2
2-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Blow out distribution piping. 1
FP-2Y-01 0.200
Worker electrician hr 0.200
Page 1 of 1
Back to Index
System Job Plan Description Code Total
NOVEC Clean Agent System
LVES FP-5Y 0.2
5 Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Agent Cylinder, Nitrogen pilot cylinder and flexible hose, hydrostatic
pressure test and/or inspection 1
FP-5Y-01 0.180
Worker electrician hr 0.180
Flexible hose hydrostatic pressure test and inspection 1
FP-5Y-02 0.058
Worker electrician hr 0.058
Page 1 of 1
Back to Index
System Job Plan Description Code Total
NOVEC Clean Agent System
LVES FP-10Y 1.5
10 Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Agent cylinder and nitrogen cylinder hydrostatic pressure test 1
FP-10Y 0.180
Worker electrician hr 0.180
Flexible hose hydrostatic pressure test and inspection 1
FP-10Y 1.344
Worker electrician hr 1.344
Page 1 of 1
Back to Index
PLUMBING System
System Job Plan Description Code Total
Copper Silver Ionization System
LVES DW1-D 0.0
Daily Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Copper Silver Ionization System
LVES DW1-W #REF!
Weekly Maintenance
Page 1 of 4
Back to Index
System Job Plan Description Code Total
Copper Silver Ionization
LVES DW1-M #REF!
Monthly Maintenance
Page 1 of 2
System Job Plan Description Code Total
Copper Silver Ionization
LVES DW1-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Perform a comprehensive inspection of the entire system, including
DW1-Q-01 electrodes, plumbing connections, and control components.
Worker electrician hr
Test the system's ionization effectiveness by conducting microbial analysis
DW1-Q-02 of the treated water
Worker electrician hr
Check and calibrate the system's sensors and monitoring equipment
DW1-Q-03
Verify that the system's alarms and safety features are functioning correctly
DW1-Q-04
Page 1 of 1
System Job Plan Description Code Total
Copper Silver Ionization
LVES DW1-S #REF!
Semi-Yearly Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Copper Silver Ionization
FSFA DW1-Y 0.0
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Perform a complete system inspection and evaluation by a qualified
DW1-Y-01 technician or water treatment specialist.
Senior worker plumber hr
Conduct a detailed review of system performance and effectiveness based
DW1-Y-02 on water quality data and microbial analysis results
Senior worker plumber hr
Page 1 of 1
System Job Plan Description Code Total
Domestic Water Pump
LVES DW2-W #REF!
Weekly Maintenance
Page 1 of 3
System Job Plan Description Code Total
Domestic Water Pump
LVES DW2-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
External Cleaning of pumps
DW2-M-01
Worker electrician hr
Inspect and clean the pump impeller, casing, and volute to remove any
DW2-M-02 accumulated debris or sediment. 3
Worker electrician hr
Check motor alignment and coupling alignment to ensure proper alignment
DW2-M-03 and minimize wear on components.
Worker electrician hr
Inspect the electrical wiring and connections for signs of wear, corrosion, or
DW2-M-04 damage.
Worker electrician hr
Test the pump system for leaks and repair any faulty seals or gaskets
DW2-M-05
hr
Check the temperature of capacitors directly via temperature gun after
operation for a long period, check if there is an excessive temperature of
DW2-M-06 individual capacitors.
hr
Page 1 of 1
System Job Plan Description Code Total
Domestic Water Pump
LVES DW2 120.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Conduct a thorough inspection of the pump system, including all
components and accessories 1
DW2-Q-01 40.000
Worker electrician hr 40.000
Measure and record pump performance parameters such as flow rate,
pressure, and power consumption. 1
DW2-Q-02 64.000
Worker electrician hr 64.000
nspect and replace pump bearings if necessary, following manufacturer
guideline 1
DW2-Q-03 16.000
Worker electrician hr 16.000
Check and clean the pump suction and discharge valves to ensure proper
DW2-Q-04 operation
Page 1 of 1
System Job Plan Description Code Total
Domestic Water Pump
LVES DW-Y #REF!
Annually Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Multimedia Filters
LVES DW3-W #REF!
Weekly Maintenance
Page 1 of 3
Back to Index
System Job Plan Description Code Total
Multimedia Filters
LVES DW3-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Conduct a visual inspection of the filter media layers for stratification and
DW3-M-01 compaction.
Worker electrician hr
Measure and record pressure differentials across the filter bed to determine
DW3-M-02 backwash frequency
Worker electrician hr
Perform a comprehensive backwash cycle to remove accumulated debris
DW3-M-03 and restore filter efficiency
Worker electrician hr
Page 1 of 1
System Job Plan Description Code Total
Multimedia Filters
LVES DW3-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
System Job Plan Description Code Total
Multimedia Filters
LVES DW3-S #REF!
Semi-Yearly Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Multimedia Filters
LVES DW3-Y #REF!
Annually Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Electric Water Heater
LVES DW4-M 0.0
Monthly Maintenance
Inspect the area around the water heater for signs of water leaks,
DW4-M-01 corrosion, or rust
Worker electrician hr
Inspect the safety valves
DW4-M-02
Worker electrician hr
Page 1 of 1
System Job Plan Description Code Total
Electric Water Heater
LVES DW4-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Electric Water Heater
LVES DW4-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Electric Water Heater
LVES DW4-Y #REF!
Annually Maintenance
DW4-Y-01 Test the water heater's pressure relief valve to ensure it opens and
closes properly. Replace if it fails to operate correctly.
Manpower hr
Check the condition of the tank insulation. Replace or repair damaged
DW4-Y-02 insulation to improve energy efficiency.
Manpower hr
Inspect the drain valve for leaks or corrosion. Replace if necessary.
DW4-Y-03
Manpower hr
Verify that the thermostat is accurate by comparing the water temperature
DW4-Y-04 setting with an accurate thermometer
Manpower hr
Page 1 of 2
Back to Index
System Job Plan Description Code Total
Submersible Pumps
FSFA DS1-D #REF!
Daily Maintenance
Page 1 of 2
System Job Plan Description Code Total
Submersible Pumps
FSFA DS1-W 0.0
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect pump cables: Check the condition of pump cables for signs of wear,
DS1-W-01 fraying, or damage. Replace cables if necessary.
Manpower hr
Remove any debris, sediment, or foreign objects from the pump intake to
DS1-W-02 prevent clogging and improve efficiency.
Manpower hr
Conduct a brief performance test to ensure the pump is delivering the
DS1-W-03 expected flow rate and pressure
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Submersible Pumps
FSFA DS1-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Manpower hr
Page 1 of 1
System Job Plan Description Code Total
Submersible Pumps
FSFA DS1-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Check the oil-on-oil lubricated units. 1
DS1-Q-01 0.000
Manpower hr
Check grease lubricated bearings for saponification. This condition is usually
caused by the infiltration of water or other fluid past the bearing shaft seals
and can be noticed immediately upon inspection, since it gives the grease a
whitish color. Wash out the bearings with a clean industrial solvent and
replace the grease with the proper type as recommended. 1
DS1-Q-02 0.000
Manpower hr
Inspect pump impeller: Remove the pump casing and inspect the impeller
for signs of wear, erosion, or corrosion. Clean or replace the impeller as
DS1-Q-04 needed.
Page 1 of 1
System Job Plan Description Code Total
Submersible Pumps
FSFA DS1-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Check the mechanical seal and replace if necessary.
DS1-S-01
Manpower hr
Take vibration readings on the bearing housings. Compare the readings with
the last set of readings to check for possible pump component failure (e.g.
bearings
DS1-S-02
Manpower hr
Check shaft or shaft sleeve for scoring. Scoring accelerates packing wear.
DS1-S-03
Manpower hr
Check alignment of pump and motor. Shim up units if necessary. If
misalignment reoccurs frequently, inspect the entire piping system. Unbolt
piping at suction and discharge flanges to see if it springs away, thereby
indicating strain on the casing. Inspect all piping supports for soundness and
DS1-S-04 effective support of load.
Manpower hr
Correct as necessary
DS1-S-05
Manpower hr
Page 1 of 1
System Job Plan Description Code Total
Submersible Pumps
FSFA DS1-Y 0.0
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Remove the casing. Inspect the pump thoroughly for wear, and order r 1
DS1-Y-01 0.000
Manpower hr
Check wear ring clearances. Replace when clearances become three (3)
times their normal clearance or when a significant decrease in discharge 1
DS1-Y-02 pressure for the same flow rate is observed. 0.000
Manpower hr
Remove any deposit or scaling. 1
DS1-Y-03 0.000
Manpower hr
Measure total dynamic suction and discharge head as a test of pump
performance and pipe condition. Record the figures and compare them with
the figures of the last test. This is important, especially where the fluid being
pumped tends to form a deposit on internal surfaces. 1
DS1-Y-04 0.000
Manpower hr
Perform pump alignment: Conduct a comprehensive pump alignment check
DS1-Y-05 using precision alignment tools to ensure optimal performance and
efficiency
Page 1 of 1
System Job Plan Description Code Total
Oil Interceptors
FSFA DS2-D 0.0
Daily Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
System Job Plan Description Code Total
Oil Interceptors
FSFA DS2-W 0.0
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect the inlet and outlet pipes for any blockages, corrosion, or
DS2-W-01 leaks. 0.000
Manpower hr
Check the condition of baffles and weirs inside the interceptor to ensure
they are intact and properly positioned. 3. Remove any accumulated debris
or sediment from the interceptor to prevent clogging and maintain optimal
DS2-W-02 flow 0.000
Manpower hr
Page 1 of 1
System Job Plan Description Code Total
Oil Interceptors
FSFA DS2-M 0.0
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Oil Interceptors
FSFA DS2-Q 0.0
Quarterly Maintenance
Page 1 of 1
System Job Plan Description Code Total
Oil Interceptors
FSFA DS2-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Pump out and properly dispose of the accumulated oil, grease, and
DS2-S-01 solids from the interceptor.
Manpower hr
Conduct a thorough inspection of the interceptor's internal components,
including baffles, weirs, and skimming mechanisms, for signs of wear or
damage. 3. Test the effectiveness of the interceptor by introducing a known
quantity of oil and grease and monitoring its separation efficiency
DS2-S-02
Manpower hr
Page 1 of 1
System Job Plan Description Code Total
Oil Interceptors
FSFA DS2-Y 0.0
Annually Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Storm Water Transfer Pumps
FSFA SW-W 0.0
Weekly Maintenance
Page 1 of 1
System Job Plan Description Code Total
Storm Water Transfer Pumps
FSFA SW-M 0.0
Monthly Maintenance
Page 1 of 1
System Job Plan Description Code Total
Storm Water Transfer Pumps
FSFA SW-Q 0.0
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
System Job Plan Description Code Total
Storm Water Transfer Pumps
FSFA SW-Y #REF!
Annually Maintenance
Drain and flush the pump system to remove sediment and deposits
SW-Q-01 from the piping and components.
Manpower hr
Inspect and test the pump shaft, seals, and packing glands for wear and
SW-Q-02 leakage.
Manpower hr
Perform electrical testing and insulation resistance measurements on the
SW-Q-03 pump motor windings.
Manpower hr
Conduct a comprehensive performance test of the pump system under full
SW-Q-04 load conditions.
Manpower hr
Page 1 of 2
Back to Index
Mechanical System
System Job Plan Description Code Total
Car Park Exhaust Fans
FSFA VS1-D 0.0
Daily Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Car Park Exhaust Fans
FSFA VS1-W 0.0
Weekly Maintenance
Clean fan blades and housing to remove dust, dirt, and debris buildup that can hinder airflow
and reduce fan efficiency 1
VS1-W 0.000
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Car Park Exhaust Fans
FSFA VS1-M 0.0
Monthly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Car Park Exhaust Fans
FSFA VS1-Q 0.0
Quarterly Maintenance
Page 1 of 1
System Job Plan Description Code Total
Car Park Exhaust Fans
FSFA VS1-S 0.0
Semi-Yearly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Car Park Exhaust Fans
FSFA VS1-Y 0.0
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Jet Fans
FSFA VS2-W
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect jet fan blades for cleanliness, wear, or damage. Clean blades to remove dust, dirt, and
VS2-W-01 debris that may accumulate and affect airflow
Manpower hr
Page 1 of 1
System Job Plan Description Code Total
Jet Fans
FSFA VS2-M
Monthly Maintenance
Manpower hr
.Test jet fan operation and listen for abnormal noises or vibrations
VS2-M-02 indicating potential issues
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Jet Fans
FSFA VS2-Q
Quarterly Maintenance
VS2-Q-01 Conduct a visual inspection of the jet fan housing, motor, and support structure for signs of
corrosion, damage, or structural integrity issues. Repair or replace any damaged components.
Manpower hr
Clean the jet fan housing and surrounding areas to remove dirt, dust, and debris that could
VS2-Q-02 obstruct airflow or impede fan performance.
hr
hr
Manpower hr
Test jet fan performance using an anemometer or airflow meter to measure
airflow velocity and volume. Adjust fan speed or settings as needed to meet 1
VS2-S-02 design specifications.
Manpower hr
Inspect and test any control systems or sensors integrated with the jet fans
VS2-S-03 to ensure proper operation and responsiveness.
Page 1 of 1
System Job Plan Description Code Total
Jet Fans
FSFA VS2-Y
Annually Maintenance
Page 1 of 2
Back to Index
System Job Plan Description Code Total
General Exhaust Fans
FSFA VS3-M
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
VS3-M-01 Inspect fan blades for cleanliness and signs of wear or damage.
Clean blades as needed to remove dust and debris buildup.
Manpower hr
Check motor and fan bearings for proper lubrication. Lubricate bearings as
VS3-M-02 recommended by the manufacturer.
Manpower hr
Test fan operation by activating it from the control panel. Listen for unusual
VS3-M-03 noises or vibrations indicating potential issues.
Manpower hr
Inspect electrical connections and wiring for signs of corrosion, overheating,
or damage. Tighten loose connections and repair or replace damaged wiring
VS3-M-04 as needed
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
General Exhaust Fans
FSFA VS3-Q 0.0
Quarterly Maintenance
VS3-Q-01 Clean fan housing and surrounding areas to remove dirt, dust, and
debris that could obstruct airflow or impede fan performance.
Manpower hr
Inspect motor mounts and support brackets for signs of corrosion or
VS3-Q-02 structural damage. Repair or replace any damaged components.
Manpower hr
Check motor alignment and tension to ensure proper operation. Adjust or
VS3-Q-03 realign the motor as needed.
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
General Exhaust Fans
FSFA VS3-S 0.0
Semi-Yearly Maintenance
Task Total
Code Description Ud Time (hr)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
General Exhaust Fans
FSFA VS3-Y
Annually Maintenance
Task Total
Code Description Ud Time (hr)
Manpower hr
Clean and lubricate motor bearings and shafts according to manufacturer
VS3-Y-02 recommendations.
Manpower hr
Conduct performance testing to verify that the fan is operating within
VS3-Y-03 design parameters and meeting ventilation requirements.
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fire Dampers
FSFA VS5-Q
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Check closure springs.
VS5-Q-01
Manpower hr
Inspect for obstruction which could interfere with free operation and
VS5-Q-02 complete closure.
Manpower hr
Check the damper for rust and/or corrosion.
VS5-Q-03
Manpower hr
Clean damper blades and working parts. Do not sure petroleum-based
VS5-Q-04 products as they could cause excessive dust collection.
Manpower hr
Page 1 of 1
System Job Plan Description Code Total
Fire Dampers
FSFA VS5-Y
Annually Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Motorized Dampers (MSDs & MSFDs)
FSFA VS4-Q
Quarterly Maintenance
Task Total
Code Description Ud Time (hr)
Check for any possible accumulation of dust on the side seal.
VS4-Q-01
Manpower hr
Check power supply connections. Note: However, if after several inspections,
it can be determined if it is necessary to adjust intervals of inspections that
VS4-Q-02 will suit the condition.
Manpower hr
Check internal components for signs of corrosion, damage, dirt, dust etc
VS4-Q-03
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Level Sensors
FSFA FL1-D
Daily Maintenance
Page 1 of 1
System Job Plan Description Code Total
Overfill Alarm
FSFA FL2-W
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect for damages & leaks
FL2-W-01
Manpower hr
Page 1 of 1
System Job Plan Description Code Total
Valves
FSFA FL3-W 0.0
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect for damages & leaks
FL3-W-01
Manpower hr
Check water and foam pressure.
FL3-W-02
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Leak Detection
FSFA FL4-W
Weekly Maintenance
Task Total
Code Description Ud Time (hr)
Check for any alarms
FL4-W-01
Manpower hr
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Leak Detection
FSFA FL4-Y 0.0
Annually Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fuel Tanks
FSFA FL5-M
Monthly Maintenance
Task Total
Code Description Ud Time (hr)
Inspect for leaks and damages.
FL5-M-01
Manpower hr
Inspect for any rust or corrosion.
FL5-M-02
Manpower hr
FL5-M-03 Check for mechanical & electrical connections.
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fresh Air Handling Units
FSFA AHU1-Q
Quarterly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fresh Air Handling Units
FSFA AHU1-S
Semi-Yearly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fresh Air Handling Units
FSFA AHU1-Y
Annually Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Fresh Air Handling Units
FSFA AHU1-5Y 0.0
5 YEAR Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
FAHU Condensing Units
FSFA AHU2-S
Semi-Yearly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
FAHU Condensing Units
FSFA AHU2-Y
Annually Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Close Control Units
FSFA AHU3-W
Weekly Maintenance
Check for suction and discharge gas pressure and gas pipes for any
AHU3-W-01
possible gas leak and check the filter drier condition. Monitor sight
glass during operation
Measure the unit power supply voltage, compressor and fan running
AHU3-W-02 amperes
Observe unit weekly for any change in running condition and any unusual
AHU3-W-03 noise
AHU3-W-04 Make sure all access panels and doors are tightly closed using all latches
and handles
Check air side fans bearing lubrication schedule as per label provided
AHU3-W-05
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Close Control Units
FSFA AHU3-M
Monthly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Close Control Units
FSFA AHU3-S
Semi-Yearly Maintenance
AHU3-S-04 Inspect coils for dirt build-up. Clean fins if air flow is restricted.
AHU3-S-05 Inspect electrical wiring for condition. Tighten all connections.
AHU3-S-06 Check air side fans bearing lubrication schedule as per label provided.
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Close Control Units
FSFA AHU3-Y
Annually Maintenance
AHU3-Y-06 Check air side fan bearing lubrication schedule as per label provided
Page 1 of 1
Back to Index
Building Services
System Job Plan Description Code
Rolling Shutter Door
FSFA RSD-Q
Quarterly Maintenance
RSD-Q-01 Put oil in all moving parts except clutch mechanism on fire doors and the wool
pile in the guides on rolling grilles or counter doors. The guides should be
lubricated with a paste wax or silicone spray.
If electrically operated, every three months check the oil level in the gear reducer. If it
is necessary to add oil, use gear oil as recommended by the operator installation
instruction. At this time check tension of roller chain between operator and door
RSD-Q-02 sprocket, if too loose, loosen operator mounting bolts and slide operator to tighten
chain. Retighten mounting bolts.
Page 1 of 1
Total Back to Index
Total
(hr)
Page 1 of 1
System Job Plan Description Code Total
Fresh Air Handling Units
FSFA RSD-S
Semi YEAR Maintenance
All bearings provided with grease fittings should be lubricated every six
months*. If so equipped, find
bearings located in the drive bracket and tension end of the counterbalance.
RSD-S-02
Fire doors should be drop tested every six months unless otherwise required
RSD-S-03 by others.
Page 1 of 1
Back to Index
Landscaping System
System Job Plan Description Code Total
Irrigation Tank
FSFA RS-M
Monthly Maintenance
RS-M-01 Check standard water level and checking operation of water level
control valve.
RS-M-02 Check any clog in the Airvent, and Overflow
RS-M-03 Check always if the manhole cover is completely shut
RS-M-04 Check the inner parts of the tank and outlet
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Irrigation Tank
FSFA RS-S 0.0
Semi YEAR Maintenance
RS-S-01 Clean the inner side of the water tank – When cleaning the innder
side of the water tank, use soft materials like soft cloth or sponge,
do not use rough materials like steel brush or wire
RS-S-02
Retighten any loose bolts and nuts. (Do not use impact wrench)
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Irrigation Tank
FSFA RS-Y
Annually Maintenance
RS-Y-01
1. Check and retighten any looseness of the bolts and nuts for ladder
Page 1 of 1
Back to Index
Transportation System
System Job Plan Description Code Total
Lifts
FSFA LF-M
Monthly Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Lifts
FSFA LF-S
Semi YEAR Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Lifts
FSFA LF-Y
Annually Maintenance
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Escalator
FSFA ES-M
Monthly Maintenance
Check clearances. •
Step-to-step clearance. •
Step-to-skirt clearance. •
ES-M-03 Comb segment-to-step clearance.
• Coverplates
ES-M-05 Check controller cabinet. Clean, visually check for burn marks and
discoloration, tighten any
Check brake stopping loose(brake
distance connections
with brake lever. Visual check:
ES-M-06 escalator should stop within the length of one half to one step.
Clean pits (light cleaning). Clean pits: there should be no oil or trash in pits
ES-M-07 (recommended each service)
ES-M-08 Step chains. Lubricate if necessary
Automatic oiler. Check and fill reservoir; check brushes for correct
ES-M-09 adjustment and function
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Escalator
FSFA ES-2M
2 Monthly Maintenance
ES-2M-01
See the Chain Module in Kone Escalator Maintenance Instruction
ES-2M-02 See the Handrail Module in Kone Escalator Maintenance Instruction
Page 1 of 1
Back to Index
System Job Plan Description Code Total
Escalator
FSFA ES-S
Semi Maintenance
Page 1 of 1
Back to Index