SUBMITTED BY:
RISK ASSESSMENT CLIENT:
Al Ain Zoo
SCREW AIR COMPRESSOR MAINTENANCE SERVICE (Axon Facility Management)
TECHNICAL PARTS EST.
Eye contact. Use proper personnel protective In case any kind of exposure happened on
equipment before work. like safety eye. Hold eye open eye and rinse slowly and
3 Chemical Vision lost, workers goggles 2 3 gently with water for 15-20 minutes.
handling eye irritation Keep one eye wash in your first aid 1 3 3
chance of box. Call a poison control centre or doctor for
blindness treatment.
Page 2 of
6
SUBMITTED BY:
RISK ASSESSMENT CLIENT:
Al Ain Zoo
SCREW AIR COMPRESSOR MAINTENANCE SERVICE (Axon Facility Management)
TECHNICAL PARTS EST.
Hand injury, cuts, PPE with provided and all adheres on Effective internal communication, warnings
7 Neglected workers the usage Continuous supervision by 3 3 9 to be issued for those who don’t comply the 1 3 3
impact, feet
use of PPE supervisors, safety officers PPE requirements
protection
Main contractor supervisor should be
follow the site supervision
Human Mental overload and All those behaviours shall be Only trained and experienced employees
8 workers 2 2 4 are allowed in the site. 1 2 2
Behaviour under load, stress, monitored and control by project
Human error management
Job rotation
Reputation damage
Violation of That behaviours shall be met with
to ATS, Prosecution
Legal and effective punishment
9 and fines, Loss of workers Incident Reporting, Recording and 3 4 12 1 4 4
Other
certification, Loss of Management Internal auditing
requirement
self-insurance
Page 3 of
6
SUBMITTED BY:
RISK ASSESSMENT CLIENT:
Al Ain Zoo
SCREW AIR COMPRESSOR MAINTENANCE SERVICE (Axon Facility Management)
TECHNICAL PARTS EST.
Page 4 of
6
SUBMITTED BY:
RISK ASSESSMENT CLIENT:
Al Ain Zoo
SCREW AIR COMPRESSOR MAINTENANCE SERVICE (Axon Facility Management)
TECHNICAL PARTS EST.
NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, Intolerable Risks (High) = 15 – 25
Page 5 of
6
SUBMITTED BY:
RISK ASSESSMENT CLIENT:
Al Ain Zoo
SCREW AIR COMPRESSOR MAINTENANCE SERVICE (Axon Facility Management)
TECHNICAL PARTS EST.
SUBMITTED BY:
RISK ASSESSMENT CLIENT:
Al Ain Zoo
SCREW AIR COMPRESSOR MAINTENANCE SERVICE (Axon Facility Management)
TECHNICAL PARTS EST.
Consequence
Consequence (Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
Equip. Product. Practically impossible or Once in 10 R=CxP 1 2 3 4 5
A (1)
1 First Aid Immediate Minor <AED 1k <1 hr years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift
E (5) Common or Daily 1 1 2 3 4 5