COLUMN
FOOTING 0.25 m
QTY L W H V
ALONG X ALONG Y H REINFORCEMENT DEPTH
QTY L W H V
0.30 m
MARK TYPE TOTAL
(pcs) (m) (m) (m) TOTAL mm mm mm SHORT LONG mm (pcs) (m) (m) (m)
(in cu.m.)
(in cu.m.)
F-1
F-1 13 1.5 1.5 1.3 38.03 cu.m.
1000 1000 300 8-12mmø 8-12mmø 1200 CENTER
C-1 13 0.25 0.30 7.0 6.83 cu.m.
SIZE: 250mm x 300mm
VERT. BARS: 6-12mmø
TIES: 2-10mmø PER SET
(1+0.25+0.25) (1+0.25+0.25) (1.2+0.1) TIES SPACING: 4@50, 6@100, REST @ 175 MM O.C
TOTAL EXCAVATION =
WALL FOOTING
PROPORTION VOLUME TOTAL QTY
L W H V TOTAL VOLUME (FOOTING) +
(m) (m) (m) TOTAL
(in cu.m.) TOTAL VOLUME (WALL FOOTING) CEMENT 9 bags 62 bags
6100
3.42 m³
7000
SAND 0.50 m³ 6.83
W-F1 31.00 0.60 0.70
(0.4+0.1+0.1) (0.6+0.1)
13.02 cu.m.
38.03 +13.02 = 51.05 cu.m GRAVEL 1 m³ 6.83 m³
C-1 C-1 C-1
224
673
WF-1 WF-1
FOOTING
FOOTING COLUMN (TIES)
ALONG X ALONG Y H REINFORCEMENT DEPTH
TYPE
CLASS MIXTURE
CEMENT SAND GRAVEL
QTY L W H V MARK
mm mm mm SHORT LONG mm LENGTH SPACING
NO. OF
COLUMNS
TOTAL NO.
OF TIES
(pcs) (m) (m) (m) TOTAL (m) (m)
40 kg/bag 50 kg/bag cu.m. cu.m. (in cu.m.) (pcs) (pcs)
F-1 1000 1000 300 8-12mmø 8-12mmø 1200 CENTER 4 @ 50
AA (4000 - 3500 PSI) 1 : 1½ : 3 12 9.5 0.50 1.0 C-1 7.3 6 @ 100 13 494
F-1 13 1 1 0.3 3.9 cu.m. 28 @ 175
A (3000 - 2500 PSI) 1 : 2 : 4 9 7 0.50 1.0 CONCRETE EFFECTIVE NO. OF NO. OF TOTAL REBAR TOTAL NO. OF
COVER LENGTH REBARS FOOTINGS LENGTH 6M REBAR
(m) (m) (pcs) (pcs) (m) (pcs)
B (3000 - 1500 PSI) 1 : 2½ : 3 7.5 6 0.50 1.0
A B C D = A - (B X C) E F G=DXEXF H = G / 6 m.
PROPORTION VOLUME TOTAL QTY
C (1000 - 500 PSI) 1 : 3 : 6 6 5 0.50 1.0
F-1 1 0.075 2 0.85 16 13 176.80 29.47
CEMENT 12 bags 47 bags
CHB
1
900
NGL ELEV. +0.00
3125
1300
2
600
3500
300
8 500
2875
100
100
3 F-1
2500
4 @ 50
4 @ 50
GRID LINE 1
6 @ 100
4250 2200
GRID LINE A
28 @ 175
28 @ 175
GRID LINE 2
600
6 @ 100
400
6 @ 100
SCALE 1:20M
GRID LINE 3
F-1 F-1 F-1 F-1
4250
GRID LINE D
COLUMN DETAILS
SCALE 1:20M
F-1 F-1
GRID LINE 4
ESTIMATING MASONRY WORKS
DIMENSIONS DIMENSIONS
0.80
3.10 m
2.575 2.575 2.575
GROUND FLOOR GROUND FLOOR 0.80
WALLS 36.88 3.10 114.33 sqm. WALLS 36.88 3.10 114.33 sqm.
OPENINGS OPENINGS
2.050 1.60 2.050 2.050
D-1 0.90 2.10 1.89 D-1 0.70 2.10 1.47
D-2 0.70 2.10 1.47 D-2 0.70 2.10 1.47
0.60 1.60
W-1 0.60 1.20 0.72 2234 PCS. + 2462 PCS. = 2696 PIECES 3.00 m
2.050 2.050
W-2 0.60 1.20 0.72
0.60
W-3 0.80 1.20 0.96
0.60
W-4 1.20 1.20 1.44
5.500
W-5 1.20 1.20 1.44
W-6 1.20 1.20 1.44
W-7 0.60 1.20 0.72
W-8 0.80 1.20 0.96 2ND FLOOR
TOTAL AREA 14.07
NET AREA 82.68
TOTAL NET AREA 176.68 12.50 2234 pcs.
ESTIMATING ROOFING MATERIALS
11300
LAYOUT OF ROOFING SHEETS 3700
ROOF 1
1. Gutter length ÷ Effective width
2.10 m 2.10 m
3.8 m 3.8 m
16 layers
4825
ROOF 2 3.70 ÷ 0.71 = 5.21 ROOF 2
6 layers
2.4 m 2.4 m
10850
10600
2. Determine the no. of roofing sheets
HEIGHT/
LENGTH 1.30 4.15 3.55 1.30 1.28
WIDTH
1.20