MEP Design Basis Report-R0 (1)
MEP Design Basis Report-R0 (1)
Main Consultant:
MEP Consultant:
REVISION SHEET
Prepare
Document No. Rev. Date Description d Approved
02.04.201 For Review and
CEC/P184/DBR R0 NSR DG
5 Approval.
INDEX
1.0 INTRODUCTION
1.0 INTRODUCTION
1.1 PURPOSE
This report outlines the design considerations for the 'Mechanical and Electrical
Services' for the 2B+G+1+R Medical Centre @ Al Hebiah First, Dubai based on
the architectural drawings made available to us with M/s Al Saraya Engineering
Consultants.
Basement level 2
It consists of car park, storage area, lift lobby, as well as the services area i.e.
water tanks, pump room, electric room and telephone cabinet.
Basement level 1
It consists of car park, generator room, UPS Room, GSM Room, Service/ Control
Room, Main telephone room, vacuum compressor room, Medical Gas Storage
room, Male Prayer Room, Female Prayer Room, Female Lockers, Male Lockers,
ETS Room, Medical Waste room, storage area and lift lobby.
Ground Floor
Ground floor consist of Pharmacy, Laboratory, Micro Lab, Vital Signs, Patient
Reports, Medical Reports, Storage Rooms, Coffee Shop, Phlebotomy, General
Surgery, Orthopedic Clinic, Gynecology Clinic, Dermatology Clinic, Plastic Clinic,
Nursing Station, Laser Rooms, LPG Room, Cardiology/I.M. Clinic, ENT Clinic, LV
Room, Garbage Room, Treatment Room, Pediatric Clinic, Family Practice, Winc/
General Practitioner, Registration/ Check out area and, male & female waiting
areas and lobby area.
First Floor
First floor consists of Dental Consultant, Dental Hygienist, Opthal Consultant,
Visual Acutizer, OPG Room, Nurse Station, Fluoroscopy, PACS, Radiologist office,
Mammography, Ultrasound, storage rooms, Housekeeping, Operation Rooms,
consumables storage, procedure room/ Endoscopy Suite, Clean corridor,
Decontamination, Wrap & Pack, Sterile Store, Electrical Room, OR Control room,
office, Nurse Station, Recovery area, male & female lockers, OR Lounge,
Kitchen, Pre – OP room, Patient Rooms, Reception Lobby & Corridor.
Roof Floor
Roof floor consists of Storage room.
Table format below indicates the following parameters as per 2007 ASHRAE
Handbook-HVAC Applications. Relevant pages of standard are attach for
reference in Annexure -M1.
1. Design temperature & Relative Humidity.
As per 2007 ASHRAE Handbook –HVAC applications
2. Minimum total air changes per hr.
As per 2007 ASHRAE Handbook –HVAC applications
3. Minimum fresh air changes per hour.
As per 2007 ASHRAE Handbook –HVAC applications
4. Air flow in relation to adjacent area.
Pressure relationship, air movement will be from clean area to less
clean area.
5. Filtration levels at different areas.
Two types of filtration efficiencies have been considered depending on
the requirements which are identified in the following table.
These are as follows:
a) Three stages of filtration consisting of Pre-Filter, Bag-Filter & HEPA
Filters up to 0.3 micron particle size (OT’s). The AHU serving operation
theatre, shall have built –in HEPA filters in AHU.
b) One stage of filtration consisting of pre filters and up to 10 micron
particle size (For all other areas)
Tel.: 04 - 38 60 601 CEC/P153/DBR-R0 Post Box: 125786,
Fax: 04 - 38 60 602 Page 5 of 34 Dubai –
U.A.E.
Design Basis Report for 2B + G + 1 + R Medical Centre
at Al Hebiah First, Dubai.
1. Chilled .
2. Variable secondary chilled water pumping system.
3. AHU’s with air plate to plate heat exchangers with 3 stage filtration system,
built in electrical heaters, shall be used for operation theatres.
4. FAHU’s with double heat recovery wheel shall be used for mechanical
ventilation.
5. FCU’s with single stage filtration shall be used to serve for all the areas
except O.T’s.
6. Heating element and humidifier arrangement shall be proposed as per client
requirements.
7. Car park ventilation & Smoke extract system
Primary pumps shall be used to circulate constant chilled water in chillers and
secondary pumps are used to circulate chilled water to all the air side cooling
equipment.
3.2.3 OPERATION THEATER HVAC DESIGN & AIR HANDLING UNIT SELECTION
Modern hospital hygiene focuses its interest in air-conditioning on a limited
protection zone, in which air-borne germs must be excluded rigorously from
operation wounds and in which patients may pose concrete dangers (as sources
of the spread of infections to the surroundings). For this OT area, it is required
that the entire aseptic environment of surgery in operating rooms, including the
tables for materials and instruments, a free zone for clean room hand-overs of
sterilized materials and of the OT team in sterilized garb be shielded securely
from the surroundings by a sufficiently large low-turbulence displacement air
flow (laminar flow).
Ultra clean canopies feature full-surface HEPA filters installed horizontally at the
ends, which are located directly ahead of the fabric diffusers (single-layer or
differential flow). The horizontal HEPA filter area and the fabric provide a uniform
diffusion of the air.
The resistance of the HEPA filters in the filter area canopies is considerably less
than that of end-mounted channel filters, and averages 60 Pa at an outflow
Air handling units for operation theatre shall have the following features:
1. 3 stage filtration system (Pre filter, Bag filter, HEPA filter)
2. Air plate to plate heat exchanger for heat recovery purpose.
3. Cooling coil designed to meet the latent load.
4. Standby by motor in case of emergency breakdown.
5. 2 Speed motors for AHU, High speed during operation mode and
low speed during non-operating hours.
6. Built in electric heater (modulating type).
The use of central fresh air and exhaust system will minimize the energy
use while controlling odor and building pressure.
The use of double heat recovery fresh air and exhaust heat recovery units
reduce the cooling capacity and annual energy demand by 60-70 %.
The SCADA system controls, the comfort level in each zone and gives instant
reaction to system, AHU’s & FCU’s receive inputs to achieve optimum energy
usage without disturbing individual comfort level selection.
The car park ventilation system shall be provided with duct less jet fans and
axial fans system.
All passages, lobbies shall be provided with smoke management system (i.e.
pressurization and smoke extract) to extract Smoke in case of fire via smoke
duct riser connected to smoke fans at roof. Motorized Smoke and Fire dampers
shall be provided in smoke extract ducts at each level.
Fire dampers shall be positioned in all air ductwork crossing fire walls/slabs.
They shall be triggered from a fusible link.
The operation of each and every motorized smoke and fire damper shall be
controlled and monitored by a dedicated smoke control system.
From the external water mains, an incoming water line shall be connected to
underground RCC water tank for Domestic use plus adequate storage for fire
reserve.
Water from Underground tank shall be transferred to overhead water tank via
transfer pump set and the tank shall be located in the roof.
It’s recommended to have Roof water tank with one day storage for domestic
use.
Cold water supply to all the facility shall be through a booster pump set to
maintain 1.5 bar at each level and fixture.
Main water meter shall be provided on the main incoming water line.
All piping for cold water distribution shall be Polypropylene (PPR). All piping
exposed to sun shall be provided with proper insulation and cladding to avoid
damage.
Solar hot water system with drain back shall be proposed to provide hot water to
the hospital in order to save energy.
Unvented drain back systems have less maintenance than pressurized glycol
systems and NO SCHEDULED MAINTENANCE.
The absorbers in the collector will last three times longer than in any other
system, because the HTF fluid is unpressurized and is never stagnant in the
collector
Hot water recirculating pump shall be proposed to provide instant hot water at
all the fixtures
Hot water shall be provided only to common toilets and all laboratories
All hot water supply and return piping shall be with Polypropylene (PPR) piping
with proper insulation, suitable for 16 bar pressure rating.
3-4 Nos. taps with hose connectors shall be provided in the parking area.
Bib taps shall be provided in external area to every 30 m.
Provision for the supply pipes with isolation valve is provided as per architectural
requirement, detailed design to be handled by the specialist.
This shall be double stack gravity drainage system (soil and waste) with
separate vent pipe designed in accordance with the recommendations of the
Chartered Institution of Building Services Engineers and to the requirements of
the Dubai Municipality Drainage Department.
All Water Closets and Urinals shall be connected to Soil piping with suitable “S”
or “P” trap based on the selection of the fixture.
All other fixtures i.e. Wash Basins, Bath Tub, Showers, sinks shall be provided
with the waste water piping through the floor trap.
Wash Basin - 32 mm
Kitchen Sink - 40 mm
Shower - 40 mm
Floor Trap - 80 mm
Proper cleanouts shall be provided to all waste water piping at each change of
direction.
All soil and waste water risers shall be dia 110 mm and vent piping shall be of
80mm.
All vent pipes shall be taken to the roof and shall be terminated at minimum 1.5
m above the habitable space with proper vent cowl.
All undergoing piping shall be at least 900 mm below the compacted paved
surface. Concrete encasing shall be ensured in areas, where heavy traffic is
envisaged.
All work shall be installed and tested in accordance with BS 5572 code of practice
for sanitary works.
A separate Rain water system shall be designed to discharge rain water freely at
ground floor level and to be discharged outside the plot with natural slope.
Suitable treatment is required for the waste generated from the following
sections:
CSSD Central Sterilized service department Area
Laboratory Area
Operation Theatre scrub sinks
Mortuary
CEC recommends that the waste water from the above sections will be collected
in a storage tank, neutralized before disposing off to the sewer drain.
The maximum temperature of the waste water will be 70 deg C (From CSSD
Boiler drain) and the average water temperature will be 40 deg C. The design
water temperature will be 45 deg C.
The size of neutralization plant shall be based on the number of fixtures used
and their disposal capacity on daily basis.
The waste water from the washer, Auto Clave, Laboratory sinks, mortuary area
and Operation theatre scrubs will be collected through the dedicate discharge
header prior to collection.
Duty on line strainer will retain suspended particles, plastics etc which may be
unintentional components of the waste water coming from the hospital. These
strainers are to be manually isolated and cleaned regularly.
The waste water free from suspended particles will be collected in a waste water
collection tank.
The circulation pumps will be circulating the waste water for on line PH
monitoring and treatment for PH neutralization.
The circulating header will have solenoid valves on the recycle line and also on
the disposal header as shown in the drawing. A sample will be continuously
tapped for the PH monitoring which will be set between 7.0 & 8.5 PH. Whenever
the PH is below 7.0, the On line monitor will give command for the alkaline
dosing pump to add alkaline solution in the waste water. The dosing will
continue till the PH reaches 8.5 and stops automatically.
When the PH of the waste water reaches within the range of 7 & 8.5, the
discharge solenoid valve opens and the return solenoid valve closes
The fire detection and protection system shall be designed in accordance with
requirement of the regulations issued by NFPA and the requirement of the Local
Civil Defence Authority
The Following services shall be provided:
Apart from the water system, FM200 system, Foam systems as well as dry
powder and CO2 extinguishers shall be used in the project as per the
requirement of Authority and NFPA codes.
The fire pump capacity has been evaluated as 1000 USgpm. Water reserve of 60
minutes of pump operation has been considered for the tank, resulting in
capacity of 60,000 US gallons (227.12 Cu. Mtr).
This system shall be provided solely for use by the fire brigade personnel and
shall consist of main risers with landing valves located at each floor level in the
fire cabinet, to cover all areas.
Car park area shall be provided with upright sprinkler. Pendant type sprinkler
shall be provided wherever false ceiling available.
If void space is more than 900 mm; upright sprinkler shall be provided above
ceiling void.
Dry powder fire extinguishers shall also be provided for the Electrical room,
Pump room.
Jockey Pump.
Electric Pump.
Diesel Pump.
Electric pump shall be actuated automatically in case when the fire spreads in
the large area and when jockey pump is inefficient to supply water with the
required amount of pressure.
Diesel pump is the backup pump for the Electric pump and will be actuated
automatically in case there is a power failure to the Electric pump due to cable
burns, short circuit etc.
As this is a diesel powered pump enough diesels should be stored in diesel tank
to run the pump.
The fire detectors shall be provided below the false ceiling as well as above false
ceiling if the ceiling void height is equal or above 800mm . For detectors
mounted above false ceiling, response indicator shall be installed on false ceiling
with LED light.
Sounder with flasher will be provided for proper evacuation from habitable area
such as corridors, lobby, reception area, parking and external area to the
building etc.
Manual Break Glass shall be provided in every main exit and sub exit from the
compartment areas like OT, lift lobby, corridor at the interval of every 30mtr.The
Break glass with emergency key to mute the alarm shall be located near the
nurse stations.
Smoke detectors shall be provided in Reception, lobby, storages, lift pit, corridor,
UPS room, Patient rooms, nurse stations, laser, consult,OT (subjected to
specialist consultant),LV room, Electrical room, Telephone room etc.
All external areas shall be covered with weather proof loop sounders with
flasher at regular intervals as per Civil Defence requirements.
The fire alarm system shall be interfaced with Civil Defence network / central
monitoring station via. 24x7 system.
The patient and non patient access areas shall be separated in different zones,
such a way that each patient access areas(wards) shall have separate detction
and alarm zone. And the nonpatient access areas with multiple detection and
alarms.
requirement. All escape route, corridors, staircases shall be provided with the
directional fitting.
The main power Cables from LV room located in the ground floor of the medical
centre shall be routed through cable trays, to the Electrical rooms located in
Basement floor, Ground floor, First floor, and Roof floor.
UPS shall be considered for 30 mins. battery back-up for Critical Load such as
power outlets for CCTV system, Data/Voice racks and Fire Detection/Alarm
system,and light fittings of OPT, , Computer work stations etc. UPS shall be
located in the dedicated UPS room located at the basement 1.
Standby DG shall be considered with ATS for secondary power source for
ventilation/extract fans, lift, lifesaving equipment’s and Nurse station, CSSD,
Labs, OT, main reception, UPS etc. The space provision for the stand by DG set
is already shown in the Drawings.
The high voltage system consisting of HV Ring Main Units (RMUs), Transformers
and underground cabling to the RMUs and Transformers, which shall be
Supplied and installed by DEWA.The location of the RMU & transformer room
shall be in the Ground floor. The HV cable shall be distributed from RMU to
transformer room by cable trays/trenches.
Each LV panel shall be connected with Multi step Capacitor Bank Panel in order
to acquire desired power factor improvement as per the Authority standards.
All mechanical equipment and metallic installations inside and outside the
building (water pipelines, A/C ducts, heating pipes…etc.) will be connected to the
MET by equipotential bonding conductors.
Clean earthing system will be provided for Telephone, specialized IT racks, and
patch panels. Dedicated earth pits shall be provided for UPS and DG set. A
separate Clean Earthing system shall be provided for the Telephone and
Electronic devices installed at the medical centre including OT equipment’s etc.
The low Current System and the Telecommunication System will be connected to
the Main Earth Terminals (MET). Clean earthing system will be provided for
telecom / GSM / data equipment.
The system will be a faraday cage system. The lightning system shall consist of
the following components:
7.7 LIGHTING:
Basement 2
1 Storage 150 Switch 1 x 28 W, T5 lamp, IP 54
Motion Sensor, LCP
1x18W CFL Recessed
2 Lift Lobby 150 and Over-ride
Light , IP 20
switch
Motion Sensor, LCP
3 Parking area 150 and Over-ride 2x 28W, T5 lamp, IP 54
switch
Basement 1
5 Micro Lab
First floor
1 Consult
2 OT
3 Nurse station
4 IP As per ID/Specialist requirement
5 Reception
6 Waiting area
Male & Female
7
Toilet
8 Service rooms 200 Switch 2 x 28 W, T5 lamp, IP 54
Roof floor
7.9.1 CORRIDORS:
Ceiling mounted Motion sensors shall be provided for lights in Corridors, Lift
Lobby, etc.
The Lighting of The Parking area and Roof shall be controlled by Timer and
Manual Override switch.
Lighting Control Panel shall be provided near DB for lighting circuits. Manual
override switches for all above lighting control shall be provided at one common
easily accessible location.
Sockets shall comply with BS 1363 and BS 546 as appropriate and shall be
provided as below:
For the purpose of small utility power requirement, twin 13A switched
socket shall be provided.
For corridors and general purpose, minimum 1 no. 13A single switched
socket shall be provided.
For table tops, computer workstations, small equipment, TV etc. Twin
13A switch socket shall be provided.
For ventilation extract fans, hand drier, water cooler, geysers, split A/C
units etc. 20A DP switch with neon type indicator shall be provided.
Fused Spur outlet without switch shall be provided for important areas
like fire alarm, laser, magnetic door holder, all interfacing units for fire
alarms, med.gas etc.
For air curtain DP switch with control panel and door interphase unit
shall be provided so that it is switched on only when required.
For toilet extract fan, fan failure indicator shall be provided outside the
toilet door.
All switches for heater, hand drier, water cooler, UPS socket shall be
suitable engraved.
10A, 230V Single/Multi Gang, Multi way switches shall be provided, slow break
type specially designed for AC circuit to BS 367 and all the Switches shall be
Modular type.
The Switch shall be of the same manufacturer for a particular type of switch
throughout the installation as per specialist/Architect.
Tel.: 04 - 38 60 601 CEC/P153/DBR-R0 Post Box: 125786,
Fax: 04 - 38 60 602 Page 28 of 34 Dubai –
U.A.E.
Design Basis Report for 2B + G + 1 + R Medical Centre
at Al Hebiah First, Dubai.
All switches and accessories in wet and damp areas will be of the splash proof
type to min. IP 54 protection standard.
A stand by backup Generator shall be proposed for the facility with the capacity
of accommodating the life saving equipment. Generally stand by generator to
feed power for life saving equipment i.e. ventilation/extract fans, lift, fire pump,
etc. as per the latest DCD regulations.
The Generator shall supply all life safety equipment and power for operational
purposes to the following: •Fire Telephone and fire alarm systems • Back-up to
emergency lighting systems • Security and access control system • FBMS
systems • Mechanical ventilation • Smoke management system • Staircase & lift
pit pressurization.
It is proposed to feed equipment for medical centre like OT, CSSD and specialist
requirement for medical equipment’s.
DG sets shall be radiator cooled and located in the generator room which need
to be located & finalised along with Architect. DG system shall be provided with
DG exhaust pipes to discharge exhaust gases at acceptable locations to operator
and architect.
DG room shall be provided with wire fusible link connected to the fuel solenoid
valve for automatic stopping of the fuel to DG set in the event of the DG room
temperature shooting up. Emergency stop push button near DG entrance door
shall also be provided to stop the fuel to DG set in case of any emergency.
1. Administration UPS system shall feed to computer station, fire alarm panel,
gas detection panel, access door system, patch panels, PA racks, nurse call
system, BMS work station, security cameras, security work station,
electromagnetic doors, CCTV, DECT (Wi-Fi) system and Data racks.
2. Medical UPS system shall feed to bed head units for all wards in IP, medial
equipment’s etc.
Intercom Facility for each Rooms in all the floors connected with
reception/administration, BMS rooms, IP room, nursing stations, consult rooms,
Lab, Pharmacy etc. and security if required, shall be provided, along with
Telephone Network with the support of EPABX system, which shall be mounted
either in the reception or Telephone room in the Ground floor.
Containment for RG11 outlets for SMATV system shall be provided in the
Reception, waiting area and IP room etc.as per the Furniture layout if disk
antenna on roof allowed by the master developer.
Provision for Set Top box (STB), splitter units etc. shall be installed at roof top
together with the Dish Antenna.
room, pump room areas and other strategic locations as per Client’s/specialist
requirements.
The system shall provide a bright, clear, highly-defined image on the monitor,
with minimum manual readjustments to maintain a suitably high image quality
without eye fatigue at normal room illumination level. Monitor shall be of 19 inch
(diagonal) screen and shall be built in sturdy frame.
Cameras installed at outdoors shall be suitable for outdoor operation at zero lux
level. Outdoor cameras must be contained in IP66 enclosure. Number of
Monitors shall be decided by number of Cameras.
Containment for GSM Dual Antenna System Network shall be proposed for the
Building as per Etisalt Regulations. All the GSM Equipment’s shall be installed in
the Dedicated GSM room at Roof Level’s. Antennas were located in the Corridors,
Lift Lobby, Lift Pit, Car parking Area, etc. subjected to the strength of the signal.
GSM equipment and cables shall be supplied and install by Etisalt.
All special systems listed below shall be designed by specialist & MEP
containment for the same shall be coordinated under MEP design.
SMATV
Intercom system
Access control
CCTV system
Nurse Call Bell system
Surgical Lighting
BED Head System
Medical Gas system
Intruders Alarm
Central clock system
9.1 ELECTRICAL
The following techniques been proposed to save energy & reduce operating cost
in line with Green Building Requirement
9.2 MECHANICAL
7. The use of double heat recovery units in FAHU will reduce the cooling
capacity and annual energy demand by 60-70 %.
8. Constant primary/variable secondary pumping system will reduce the
pumping cost.
9. 100 % fresh air AHU will have plate heat exchangers to reduce the capacity
of cooling coil.
10. AHU’s shall be equipped with VFD to save the fan energy consumption.
11. BMS controlling across dead zone for minimized reheat/cooling energy input.
12. Use of solar power for hot water system.
All work will be in strict compliance with the applicable sections of the codes and
standards, design guides issued by the following agencies.
All work will be in strict compliance with the applicable sections of the codes and
standards, design guides issued by the following agencies.
*…..…**….…*….…**……….*……**…….*…….*